rev date description by ok’d ap’d

5
REV DATE DESCRIPTION BY OK’D AP’D PROJECT ARCHITECT SYSTEM SAFETY CHIEF ENGINEER DIRECTOR OF ENGINEERING SCALE:_________________ DATE:_____________ DRAWN :______WW_______ CHECKED BY:___________ SCALE FACTOR:_________ SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY CAPITAL PROJECT CONTROL AND QA/QC 1234 MARKET STREET, 12 TH FLOOR, PHILADELPHIA PA 19107 R7 CHESTNUT HILL EAST RAIL TRANSPORTATION RRD STATION AMENITY PROGRAM COVER SHEET WORK ORDER NO. DRAWING C1 OF 2 SHEET NO. 1 OF 31 DRAWING NO. 60245 REV DRAWING LIST 60245 C1 COVER SHEET 60246 C2 GENERAL NOTES & SCHEDULE 60247 A1 CHESTNUT HILL EAST SITE PLAN 60248 A2 CHE PAINTING AND IMPROVEMENT DETAILS 60249 A3 GRAVERS SITE PLAN 60250 A4 GRAVERS PAINTING AND IMPROVEMENT DETAILS 60251 A5 WYNDMOOR SITE PLAN 60252 A6 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60253 A7 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60254 A8 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS 60255 A9 MT. AIRY SITE PLAN 60256 A10 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60257 A11 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60258 A12 MT AIRY PAINTING AND IMPROVEMENT DETAILS 60259 A13 SEDGWICK SITE PLAN 60260 A14 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60261 A15 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60262 A16 SEDGWICK PAINTING AND IMPROVEMENT DETAILS 60263 A17 STENTON SITE PLAN 60264 A18 STENTON PAINTING AND IMPROVEMENT DETAILS 60265 A19 STENTON PAINTING AND IMPROVEMENT DETAILS 60266 A20 WASHINGTON LANE SITE PLAN 60267 A21 WASHINGTON LANE PAINTING AND IMPROVEMENT DETAILS 60268 A22 WASHINGTON LANE PAINTING AND IMPROVEMENT DETAILS 60269 D1 RAILING DETAILS 60270 D2 SIGN DETAILS 60271 D3 FURNISHINGS DETAILS 60272 SH1 SHELTER NOTES 60273 SH2 SHELTER DETAILS 60274 SH3 SHELTER DETAILS 60275 SH4 SHELTER DETAILS PROJECT LOCATIONS RRD STATION AMENITY PROGRAM R7 – CHESTNUT HILL EAST STATIONS

Upload: deion

Post on 31-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

RRD STATION AMENITY PROGRAM R7 – CHESTNUT HILL EAST STATIONS. DRAWING LIST 60245C1 COVER SHEET 60246C2 GENERAL NOTES & SCHEDULE 60247A1 CHESTNUT HILL EAST SITE PLAN 60248A2 CHE PAINTING AND IMPROVEMENT DETAILS 60249A3 GRAVERS SITE PLAN - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: REV  DATE                         DESCRIPTION                      BY    OK’D AP’D

REV DATE DESCRIPTION BY OK’D AP’D

PROJECT ARCHITECT

SYSTEM SAFETY

CHIEF ENGINEER

DIRECTOR OF ENGINEERING

SCALE:_________________

DATE:_____________

DRAWN :______WW_______

CHECKED BY:___________

SCALE FACTOR:_________

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

CAPITAL PROJECT CONTROL AND QA/QC

1234 MARKET STREET, 12TH FLOOR,

PHILADELPHIA PA 19107

R7 CHESTNUT HILL EAST

RAIL TRANSPORTATION

RRD STATION AMENITY PROGRAM

COVER SHEET

WORK ORDER NO.

DRAWING C1 OF 2

SHEET NO. 1 OF 31

DRAWING NO.

60245REV

DRAWING LIST60245 C1 COVER SHEET

60246 C2 GENERAL NOTES & SCHEDULE

60247 A1 CHESTNUT HILL EAST SITE PLAN

60248 A2 CHE PAINTING AND IMPROVEMENT DETAILS

60249 A3 GRAVERS SITE PLAN

60250 A4 GRAVERS PAINTING AND IMPROVEMENT DETAILS

60251 A5 WYNDMOOR SITE PLAN

60252 A6 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS

60253 A7 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS

60254 A8 WYNDMOOR PAINTING AND IMPROVEMENT DETAILS

60255 A9 MT. AIRY SITE PLAN

60256 A10 MT AIRY PAINTING AND IMPROVEMENT DETAILS

60257 A11 MT AIRY PAINTING AND IMPROVEMENT DETAILS

60258 A12 MT AIRY PAINTING AND IMPROVEMENT DETAILS

60259 A13 SEDGWICK SITE PLAN

60260 A14 SEDGWICK PAINTING AND IMPROVEMENT DETAILS

60261 A15 SEDGWICK PAINTING AND IMPROVEMENT DETAILS

60262 A16 SEDGWICK PAINTING AND IMPROVEMENT DETAILS

60263 A17 STENTON SITE PLAN

60264 A18 STENTON PAINTING AND IMPROVEMENT DETAILS

60265 A19 STENTON PAINTING AND IMPROVEMENT DETAILS

60266 A20 WASHINGTON LANE SITE PLAN

60267 A21 WASHINGTON LANE PAINTING AND IMPROVEMENT DETAILS

60268 A22 WASHINGTON LANE PAINTING AND IMPROVEMENT DETAILS

60269 D1 RAILING DETAILS

60270 D2 SIGN DETAILS

60271 D3 FURNISHINGS DETAILS

60272 SH1 SHELTER NOTES

60273 SH2 SHELTER DETAILS

60274 SH3 SHELTER DETAILS

60275 SH4 SHELTER DETAILS

PROJECT LOCATIONS

RRD STATION AMENITY PROGRAMR7 – CHESTNUT HILL EAST STATIONS

Page 2: REV  DATE                         DESCRIPTION                      BY    OK’D AP’D

REV DATE DESCRIPTION BY OK’D AP’D

PROJECT ARCHITECT

SYSTEM SAFETY

CHIEF ENGINEER

DIRECTOR OF ENGINEERING

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

CAPITAL PROJECT CONTROL AND QA/QC

1234 MARKET STREET, 12TH FLOOR,

PHILADELPHIA PA 19107

R7 CHESTNUT HILL EAST

RAIL TRANSPORTATION

RRD STATION AMENITY PROGRAM

SEDGWICK

ARCHITECTURAL

SITE PLAN

WORK ORDER NO.

DRAWING A13 OF A22

SHEET NO. 15 OF 31

DRAWING NO.

60259REV

SCALE:_________________

DATE:_____2/13/09________

DRAWN :______WW_______

CHECKED BY:___________

SCALE FACTOR:_________

PAINT ENTIRE ABANDONED STAIR HEADHOUSE (ES)

REMOVE SECTION OF HEDGE AND INSTALL CONCRETE WALK

INSTALL 3 STAIR HANDRAILS

INSTALL 2 SHELTERS

REPLACE CONCRETE WALK SECTION AND PATCH STAIRS

REPLACE SIDEWALK

INSTALL END OF PLATFORM FENCE & SIGN

PAINT HANDRAILS AND SUPPORTS (EM)

PAINT OUTER BRIDGE GIRDERS INCLUDING OUTER FACE AND TOP, SIDE AND BOTTOM EDGES PER SPEC SECTION

REMOVE EXISTING SHELTER

PAINT STAIR HANDRAILS (EM)

PAINT HANDRAILS AND SUPPORTS (EM)

REPAIR CORNERS OF BRIDGE ABUTMENTS

SEDGWICK STATIONNOT TO SCALE

SEDGWICK SCOPEINBOUND SIDE1. REPLACE SHELTER WITH NEW SHELTER2. INSTALL FIVE PLATFORM MOUNTED SIGNS 3. REPLACE SIDEWALK 4. INSTALL 2 BICYCLE RACKS5. PAINT STAIR HANDRAIL6. REPLACE SIDEWALK ALONG DEVON STREET (APPROX 500 SQFT

OUTBOUND SIDE AND BRIDGE 1. PAINT STAIR HANDRAIL2. INSTALL FIVE PLATFORM MOUNTED SIGNS3. REMOVE STUMPS4. REPAIR CURB (APPROX 100 LF.)5. PAINT BRIDGE OVER E. MT PLEASANT AVENUE6. REPAIR SIDEWALK ALONG E. MT PLEASANT AVE. (APPROX 500 SQFT)

REPLACE HANDRAIL

INSTALL END OF PLATFORM SIGN ON FENCE

REPAIR AND PAINT DECORATIVE IRON FENCE TO ADJACENT BRIDGE (APPROX 450’)

REPLACE RAILING WITH STANDARD GUARDRAIL

PATCH LANDINGS AND TREADS (TYP FOR ALL OF BOTH STAIRS

GRIND STUMPS TO BELOW GRADE, COVER WITH TOPSOIL AND SEED

SPECIAL NOTE FOR REPAIR OF BRIDGE ABUTMENTS:

A LICENSED ENGINEER MUST DESIGN AND SEAL ALL BRIDGE ABUTMENT REPAIRS. ALL REPAIRS MUST BE EXECUTED UNDER THE ENGINEER’S SUPERVISION.

REPLACE APPROXIMATELY 200SQFT OF SIDEWALK BETWEEN HERE AND THE BRIDGE

PAINT DECORATIVE METAL SECTION (EM)

INSTALL PLATFORM MOUNTED ID SIGNS (2 THIS SIDE)

INSTALL PLATFORM MOUNTED ID SIGNS (3 THIS SIDE)

REMOVE EXISTING HANDRAIL

EXTEND PLATFORM 24” AND INSTALL NEWSPAPER CORRAL

Page 3: REV  DATE                         DESCRIPTION                      BY    OK’D AP’D

PAINT PREPARATION AND SYSTEMSEGM - EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:

1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14

2 COATS HIGH SOLIDS POLYURETHANE B65-300

EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:

1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600

2 COATS HIGH SOLIDS POLYURETHANE B65-300

ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY:

1 COAT PREPRITE 200 PRIMER B28W200

2 COATS A100 EXTERIOR LATEX SEMI-GLOSS

REV DATE DESCRIPTION BY OK’D AP’D

PROJECT ARCHITECT

SYSTEM SAFETY

CHIEF ENGINEER

DIRECTOR OF ENGINEERING

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

CAPITAL PROJECT CONTROL AND QA/QC

1234 MARKET STREET, 12TH FLOOR,

PHILADELPHIA PA 19107

R7 CHESTNUT HILL EAST

RAIL TRANSPORTATION

RRD STATION AMENITY PROGRAM

SEDGWICK

ARCHITECTURAL

PAINTING AND IMPROVEMENT DETAILS

WORK ORDER NO.

DRAWING A14 OF A22

SHEET NO. 16 OF 31

DRAWING NO.

60260REV

SCALE:_________________

DATE:_____2/13/09________

DRAWN :______WW_______

CHECKED BY:___________

SCALE FACTOR:_________

REPLACE SHELTER WITH NEW SHELTER

REMOVE AND REPLACE WITH STANDARD GUARDRAIL

GRIND STUMPS TO GROUND LEVEL

INSTALL THREE PLATFORM MOUNTED SIGNS & FRAMES EACH SIDE

PAINT METAL RAILING AND POSTS (EM)

REPLACE SIDEWALK ENTIRE LENGTH

PAINT RAILING (EM)

PAINT METAL STAIR RAILING (EM)

PAINT BRIDGE ABUTMENTS (ES)

PAINT ENTIRE ABANDONED STAIR HEAD HOUSE STRUCTURE

PATCH VOIDS AND PAINT (ES)

PATCH CONCRETE

PAINT METAL RAILING AND POSTS

STAIRS AT OUTBOUND SIDE OUTBOUND END OUTBOUND SIDE OUTBOUND END

OUTBOUND SIDE OUTBOUND ENDOUTBOUND ENDOUTBOUND SIDE INBOUND END

PAINT OUTER GIRDERS OF BRIDGE

OUTBOUND END

AT STREET ON INBOUND SIDE OUTBOUND ENDINBOUND SIDE INBOUND END OUTBOUND SIDE INBOUND END

REMOVE VEGETATION

PAINT DECORATIVE FENCE (EM)

REMOVE POST & FILL HOLES IN CONCRETE

Page 4: REV  DATE                         DESCRIPTION                      BY    OK’D AP’D

PAINT PREPARATION AND SYSTEMSEGM - EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:

1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14

2 COATS HIGH SOLIDS POLYURETHANE B65-300

EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:

1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600

2 COATS HIGH SOLIDS POLYURETHANE B65-300

ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY:

1 COAT PREPRITE 200 PRIMER B28W200

2 COATS A100 EXTERIOR LATEX SEMI-GLOSS

REV DATE DESCRIPTION BY OK’D AP’D

PROJECT ARCHITECT

SYSTEM SAFETY

CHIEF ENGINEER

DIRECTOR OF ENGINEERING

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

CAPITAL PROJECT CONTROL AND QA/QC

1234 MARKET STREET, 12TH FLOOR,

PHILADELPHIA PA 19107

R7 CHESTNUT HILL EAST

RAIL TRANSPORTATION

RRD STATION AMENITY PROGRAM

SEDGWICK

ARCHITECTURAL

PAINTING AND IMPROVEMENT DETAILS

WORK ORDER NO.

DRAWING A15 OF A22

SHEET NO. 17 OF 31

DRAWING NO.

60261REV

SCALE:_________________

DATE:_____2/13/09________

DRAWN :______WW_______

CHECKED BY:___________

SCALE FACTOR:_________

PAINT OUTER BRIDGE GIRDERS

REMOVE SIGN

REPLACE W/ SEPTA GUARDRAIL & INTEGRAL END OF PLATFORM SIGN

REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN

PAINT OUTER BRIDGE GIRDERS

PAINT OUTER BRIDGE GIRDERS

SAWCUT SLAB AND REPLACE LANDING ON STAIR AT IB END OF OB SIDE.

REPLACE RAILING WITH STANDARD GUARDRAIL

REPLACE MISSING CONCRETE AT STAIR AT OB SIDE/OB END

PAINT RAILING (EM)

PAINT ENTIRE ABANDONED STAIR HEAD HOUSE STRUCTURE

STAIRS AT OUTBOUND SIDE INBOUND END

INSTALL GUARDRAIL WITH END OF PLATFORM SIGN FRAME

ATTACH EXISTING RAILING TO NEW GUARDRAIL

OUTBOUND SIDE INBOUND END

OUTBOUND SIDE OUTBOUND END

E INBOUND END

STAIRS AT OUTBOUND SIDE INBOUND END

STAIRS AT OUTBOUND SIDE OUTBOUND END

BRIDGE ABUTMENT ACROSS STREET INBOOUND ENDBRIDGE ABUTMENT ACROSS STREET INBOOUND END

REMOVE BUSHES AND INSTALL 5’-0” WIDE CONCRETE PATH CONNECTION PARKING WITH WALKWAY

REMOVE VEGETATION

REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN

REMOVE TO SOUND SUBSTRATE AND REPAIR DETERIORATED CONCRETE CORNER OBTAIN ENGINEERS APPROVAL – SEE NOTE ON SITE PLAN

Page 5: REV  DATE                         DESCRIPTION                      BY    OK’D AP’D

PAINT PREPARATION AND SYSTEMSEGM - EXTERIOR GALVANIZED METAL - REMOVE LOOSE PAINT WITHOUT DAMAGING THE GALVANIZED SURFACE. SPOT PRIME EXPOSED GALVANIZED SURFACES. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:

1 COAT COROTHANE I - MIO ALUMINUM PRIMER B65S14

2 COATS HIGH SOLIDS POLYURETHANE B65-300

EM - EXTERIOR METAL - REMOVE ALL SURFACE RUST WITH SANDING. IMMEDIATELY SPOT PRIME WITH METAL PRIMER. REMOVE ALL OXIDIZED (CHALKING) PAINT AND SURFACE DIRT. APPLY:

1 COAT MACROPOXY 646 FAST CURE EPOXY B58-600

2 COATS HIGH SOLIDS POLYURETHANE B65-300

ES – EXTERIOR STONE/ MASONRY – REMOVE ANY LOOSE PAINT. ALERT THE SEPTA PROJECT ENGINEER AT ANY SIGNS OF MOISTURE IN THE STONE WORK. APPLY:

1 COAT PREPRITE 200 PRIMER B28W200

2 COATS A100 EXTERIOR LATEX SEMI-GLOSS

REV DATE DESCRIPTION BY OK’D AP’D

PROJECT ARCHITECT

SYSTEM SAFETY

CHIEF ENGINEER

DIRECTOR OF ENGINEERING

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

CAPITAL PROJECT CONTROL AND QA/QC

1234 MARKET STREET, 12TH FLOOR,

PHILADELPHIA PA 19107

R7 CHESTNUT HILL EAST

RAIL TRANSPORTATION

RRD STATION AMENITY PROGRAM

SEDGWICK

ARCHITECTURAL

PAINTING AND IMPROVEMENT DETAILS

WORK ORDER NO.

DRAWING A16 OF A22

SHEET NO. 18 OF 31

DRAWING NO.

60262REV

SCALE:_________________

DATE:_____2/13/09________

DRAWN :______WW_______

CHECKED BY:___________

SCALE FACTOR:_________

REMOVE RUST FROM NOSINGS AND PATCH

EXTEND PLATFORM 24” AND INSTALL NEWSPAPER CORRAL

REPLACE HANDRAILS WITH TREAD MOUNTED CODE COMPLIANT RAILING W/ 5’-0” CLEAR BETWEEN RAILS

REMOVE SHELTER, EXTEND PLATFORM SLAB 24” AT REAR AND INSTALL NEW SHELTER

REMOVE VEGETATION AT JOINTS AND APPLY SEALANT

PAINT HANDRAIL AND CONCRETE PIERS AT BOTTOM (EM& ES)

REPLACE EXISTING HANDRAILINSTALL TWO

ADDITIONAL HANDRAILS

INSTALL DANGER DO NOT PASS SIGN (TYP AT TWO LOCATIONS) (SF1/D2)

INBOUND SIDE INBOUND END

REPLACE HANDREAILS WITH CODE COMPLIANT RAILING

EXTEND PLATFORM SLAB 24” AT REAR AND INSTALL NEW SHELTER

FENCE AT OUTBOUND SIDE INBOUND ENDINBOUND SIDE INBOUND ENDINBOUND SIDE OUTBOUND END

STAIRS AT INBOUND SIDE OUTBOUND END STAIRS AT INBOUND SIDE OUTBOUND END

STAIRS AT INBOUND SIDE INBOUND ENDSTAIRS AT INBOUND SIDE INBOUND END

STRAIGHTEN BENT WIRE BALUSTERS. PAINT FENCE ALL THE WAY TO ADJACENT BRIDGE (APPROX 450’)

RELOCATE BENCH