Ridge Spring-Monetta K-12 Schematic Design Submittal - September 2017 LS3P Commission No. 2201-168720

Upload: vuhanh

Post on 05-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Ridge Spring-Monetta K-12 Schematic Design Submittal - September 2017LS3P Commission No. 2201-168720

Page 2: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf
Page 3: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Design Statement 2 Site Plan 3Phasing Plans 4-5 Floor Plan - Full Build-Out 6Floor Plans 7-8Massing & Perspectives 9Materials and Systems 10-13Schedule 14Project Budget Summary 15

ContentsRidge Spring Monetta K-12

EXISTING GYMNASIUM BUILDING

“The mission of Aiken County Public School System is to create in students a passion for learning and achievement that will serve them as they compete and contribute in a global society.”

- Aiken County Public School District’s Purpose Statement

1

EXISTING PHASE 1 MIDDLE SCHOOL BUILDING

Page 4: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Our project scope was to develop a campus Master Plan based on Phasing to ultimately replace or renovate most or all of the existing academic and athletic facilities on the campus. Phasing plans were developed for renovations/additions to the campus, presented to the District Committee, and are being presented to the School Board by District Staff. Phase 1 consists of the existing Middle School classroom wing and a kitchen/dining room that is shared with the High School. Phases 2, 3, and 4 are the next steps, which seek to develop and provide the following:

Phase 2: New administration, High School general classrooms, elective classrooms, labs, media center, main gymnasium, althletic fields, and Partner space.

Phase 3: New Elementary school classrooms, media center, dining, and multipurpose space.

Phase 4: New auditorium and renovations to the existing gymnasium to serve as an auxiliary gym.

The Schematic Design Submittal has resulted in a project that remains consistent with the project goals and the needs of the Ridge Spring and Monetta communities.

MAIN ENTRY CONCEPT

Design Statement

2

Page 5: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Site Plan

EXISTING RIDGE SPRING-MONETTA MIDDLE / HIGH SCHOOL CAMPUS

The site is the existing Ridge Spring-Monetta Middle/High School campus located at 10 JP Neese Dr. in Monetta, South Carolina. The new work will be phased in order to keep the existing portions of the school in operation as portions of the existing buildings are selectively demolished while new portions are constructed. The new wings will visually complement the existing Phase 1 Middle School wing, but will ultimately result in a new face for the school, and a cohesive design that is welcoming while providing security and a sense of pride for the Ridge Spring and Monetta communities. Vehicular circulation will be largely re-configured with new car and bus drop-off loops incorporated into the design. New and expanded parking areas will maintain parking accomodations while providing safer pedestrian connections between the existing buildings to remain and the new wings.

N

3

Page 6: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

PHASE 1 (EXISTING) SITE PLAN

PHASE 2 SITE PLAN

Phasing Plans

Existing Track

Existing Baseball

Existing Football

Existing Softball

Existing Gym

Existing High School

Phase 1 Middle School

StudentPartking

Aux.GymPartner

Football & Track

Baseball

Softball

Trojan Rd.

Trojan Rd.

Colu

mbi

a Hw

y.

Colu

mbi

a Hw

y.

Practice

StudentParking

StaffPartking

Visitor Parking

Bus Drop-Off

Bus Parking

CarDrop-Off

Main Gym

MiddleSchool

Admin

HighSchool

Ag ScienceField

Dining

Page 7: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Phasing Plans

PHASE 3 SITE PLAN

PHASE 4 SITE PLAN 5

Colu

mbi

a Hw

y. Aux. GymPartner

Football & Track

Baseball

Softball

Trojan Rd.

Practice

StudentParking

HS/MS Staff

Partking Visitor Parking

Bus Drop-Off

Bus Parking

HS/MS CarDrop-Off

Main Gym

MIddleSchool

Admin

HighSchool

Ag ScienceField

DiningElementary

School ES Staff

Parking

ES CarDrop-Off

Future

Future

Multi-Purpose

Colu

mbi

a Hw

y. Renovated Aux.GymPartner

Football & Track

Baseball

Softball

Trojan Rd.

Practice

StudentParking

HS/MS Staff

Partking Visitor Parking

Bus Drop-Off

Bus Parking

HS/MS CarDrop-Off

Main Gym

MiddleSchool

Admin

HighSchool

Ag ScienceField

DiningElementary

School ES Staff

Parking

ES CarDrop-Off

Future

Future

Multi-Purpose

Audito-rium

Page 8: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

6

Floor Plan - Full Build-Out

NOVERALL PHASED FLOOR PLAN

39,839

MIDDLE / HIGH SCHOOL -1ST FLOOR

44,779

MIDDLE / HIGH SCHOOL -GYM/BAND

45,734

ELEMENTARY - 1ST FLOOR

9,980

MULTIPURPOSE ROOM

16,030

AUDITORIUM

6,707

ELEMENTARY - 1ST FL.SHELL

37,512

EXISTING MIDDLE SCHOOL -RENO.

15,660

EXISTING GYMNASIUM -RENOVATION

4,305

MIDDLE / HIGH SCHOOL -GYM ADD.

FUTURE EXPANSION

FUTURE EXPANSION

Page 9: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Floor Plans

3941 SF

READING ROOM635 SF

WORKROOM

214 SF

MULTIMEDIADISTRIBUTION

442 SF

MECH125 SF

ELEC

83 SF

JAN

75 SF

DATA 248 SF

GIRLS

252 SF

BOYS

63 SF

T

1318 SF

HS PHYSICAL SCIENCE /PHYSICS

1318 SF

HS BIOLOGY / CHEMISTRY224 SF

PREP

951 SF

BUSINESS COMPUTER

108 SF

STOR

183 SF

HS ASST PRINCIPAL

488 SF

STAIR

488 SF

STAIR

58 SF

ELEV

488 SF

STAIR885 SF

COMPUTER

63 SF

T

63 SF

STORAGE

370 SF

CONF / PROFESSIONALLIBRARY

824 SF

HS ENGLISH

824 SF

HS ENGLISH

830 SF

HS ENGLISH

813 SF

HS ENGLISH

793 SF

BUSINESS

203 SF

STORAGE

479 SF

RESOURCE

91 SF

STORAGE

ELEMENTARY

ES/MS/HS SHARED

HIGH SCHOOL

MIDDLE SCHOOL

MS/HS SHARED

NON-ASSIGNABLE

PARTNER

THIRD GRADE

821 SFTHIRD GRADE

821 SF

THIRD GRADE

825 SF

THIRD GRADE

825 SF

FOURTH GRADE

825 SF

FOURTH GRADE

825 SF

READ 180

714 SF

FIFTH GRADE

825 SF

ES ASST. PRINCIPAL

188 SF

FOURTH GRADE

825 SF

COMPUTER

1158 SF

FIFTH GRADE

825 SF

MATH INT

450 SF

FIFTH GRADE

825 SF

ELEC

130 SF

JAN

62 SF

DATA

62 SFRESOURCE

444 SF

STAIR

515 SF

TUTOR

180 SF

COMPUTER

1164 SF

RESOURCE

505 SF

MECHANICAL

419 SFELEV

59 SF

TUTOR

205 SF

JANITOR / STORAGE

154 SF

GIRLS

210 SF

BOYS

210 SF

STORAGE

140 SF

T

62 SF

T

62 SF

TEACHER WORKROOM

524 SF

TUTOR

173 SF

DATE:

PROJECT:

REVISIONS:

MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

1

A

2 3 4 5 6

B

C

D

E

COPYRIGHT 2017 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

TEL. 803.765.2418 FAX 803.765.2419

701-A LADY STREET

WWW.LS3P.COM

COLUMBIA, SOUTH CAROLINA 29201

9/6/

2017

8:1

2:35

AM

A36

0://R

idge

Spr

ing

- Mon

etta

K-1

2/A

rch_

RSM

K-1

2 Ph

ase

2.rv

t

2201-168720

9/1/17

SECONDFLOOR PLAN

A-017

RIDGE SPRING -MONETTA K-12

SCHEMATIC DESIGN

SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN1

No. Description Date

2ND FLOOR: CLASSROOMS

802 SF

HS MATH

802 SF

HS MATH

802 SF

HS SOCIAL STUDIES

802 SF

HS SOCIAL STUDIES

MS SOCIAL STUDIES

822 SF

MS MATH

815 SF

CDOC / CDOC KITCHEN

867 SF

MS SELF-CONTAINED

401 SF

MS SOCIAL STUDIES

829 SF

PRODUCTION STUDIO

329 SF

SCIENCE

1145 SF

V-TEL

362 SF

VISUAL / DIGITAL ARTS

1201 SF

KILN

152 SF

TOILET

88 SF

ELECTRICAL

82 SF

PREP

338 SF

SCIENCE

1145 SF RESOURCE

362 SF

MS MATH

816 SF

ART STORAGE

201 SF

ART STORAGE

201 SF

COURTYARD

COMPUTER

1064 SF

HS/MS ACCOMODATION

719 SF

COMPUTER

719 SF

CAFETERIA

4301 SF

MECHANICAL

1167 SF

ELECTRICAL

204 SF

FREEZER / COOLER

401 SFDRY STORAGE

313 SF

PAPER STORAGE

99 SF

OFFICE

97 SF

MECHANICAL

432 SF

445 SF

RESOURCE

638 SF

ISS

2458 SF

CAFETERIA DINING

61 SF

JAN

1155 SF

MUSIC / CHORUS

145 SF

MS GUIDANCE

148 SF

CAREER

159 SF

HS GUIDANCE

202 SF

FLEX OFFICE

453 SF

RECORDS VAULT

507 SF

MS/HS HEALTH RM.

194 SF

NURSE

607 SF

WKRM/ MAIL

63 SF

DATA

114 SF

ELEC

442 SF

MECH125 SF

ELEC

83 SF

JAN

75 SF

DATA

59 SF

T

248 SF

GIRLS

252 SF

BOYS

MS TEACHER WORKROOM

347 SF

T

53 SF

T

53 SF

EXISTING CHILLER YARD

STUDENT BUS ENTRANCE

ELEMENTARY SCHOOL MAIN ENTRANCE

MIDDLE SCHOOL / HIGH SCHOOL MAIN ENTRANCE

CAR RIDER DROP OFF /

STAFF ENTRANCE

COURTYARD

ELEMENTARY

ES/MS/HS SHARED

HIGH SCHOOL

MIDDLE SCHOOL

MS/HS SHARED

NON-ASSIGNABLE

PARTNER

BOYS

248 SF

GIRLS

246 SF

FEMALE

52 SF

MALE

52 SF

DATA / TELECOM

198 SF

STORAGE

124 SF

JAN

25 SF

AV STORAGE

42 SF

SERVING

790 SF

KITCHEN

1122 SF

151 SF

PRACTICE

238 SF

VESTIBULE

488 SF

STAIR

58 SF

ELEV

488 SF

STAIR

262 SF

BOYS

262 SF

GIRLS

120 SF

OFFICE

802 SF

HS MATH

57 SF

T

52 SF

T

488 SF

STAIR

90 SF

MUSIC STORAGE

DIGITAL AUDIOPRODUCTION

364 SF

MS ASST PR

189 SF

204 SF

CONF. RM.

137 SF

ES GUIDANCE

146 SF

MECH

98 SF

ELEC

57 SF

DATA

64 SF

STOR

55 SF

T

55 SF

T

55 SF

T

63 SF

T

43 SF

STOR

43 SF

STOR

281 SF

CONFERENCE

302 SF

MS/HS PRINCIPAL

FLEX

121 SF

813 SF

MS/HS FOREIGNLANGUAGE

830 SF

MS ENGLISH

824 SF

MS ENGLISH

824 SF

MS ENGLISH

148 SF

FLEX OFFICE

259 SF

MS/HS BOOK

190 SF

CONFERENCE61 SF

STOR

60 SF

JAN

638 SF

HS/MS/ES BOOK STORAGE

50 SF

STOR

164 SF

SRO

159 SF

PSYCH/STUD. SERV.

HS/MS OUTDOOR

DINING

ES OUTDOOR DINING

203 SF

STOR

418 SF

ESOL

17 SF

CLOS.

721 SF

HS RECEPTION / WAITING

?

?

STUDENT BUS ENTRANCE

CAR RIDER DROP OFF /

STAFF ENTRANCE

OUTDOOR READING

MEDIA CENTER

4229 SF

LEVEL READ

317 SF

CONF.

213 SF

GREEN ROOM /PRODUCTION

308 SF

ES HEALTH RM.

507 SF

AV / MULTIMEDIA

519 SF

?

?

FIRST GRADE

817 SF

FIRST GRADE

817 SF

FIRST GRADE

825 SF

PRE-K

1077 SF

PRE-K

1076 SF

?

?HYBRID

1077 SF

PRE-K SPECIAL NEEDS

1076 SF

KINDERGARTEN

1076 SF

KINDERGARTEN

1076 SF

?

?

FLEX CLASSROOM

817 SF

FIRST GRADE

817 SF

FIRST GRADE

817 SF

?

?

COMPUTER

806 SF

SECOND GRADE

804 SF

SECOND GRADE

805 SF

SECOND GRADE

805 SF

ART

1111 SF

MECH

288 SF

STOR

331 SF

ES DINING

4598 SF

ES SERVING

719 SF

ES KITCHEN / BOH (TBD)

1311 SF

VESTIBULE

200 SF

KILN

132 SF

STORAGE

255 SF

MECHANICAL

419 SF

STORAGE

140 SF

ES STAGE

1307 SF

SECOND GRADE

808 SF

T

55 SF

ES RECEPTION / WAITING

721 SF

FLEX OFFICE

203 SF

CONF. RM.

282 SFES PRINCIPAL

302 SF

T

64 SF

T

56 SF

OT / PT

518 SF

T

70 SF

T

70 SF

JAN

123 SF

DATA

127 SF

ELEC

265 SF

OFFICE / WORK

410 SF

T

61 SF

T

61 SFLIT. COACH

193 SF

JANITOR / STORAGE

154 SF

ELEV

59 SF

TUTOR

505 SF

ELEC

130 SF

RESOURCE

444 SF

DATA

62 SF

JAN

62 SF

STAIR

515 SF

TEACHER WORKROOM

524 SFT

62 SF

T

62 SF

STORAGE

140 SF

GIRLS

203 SF

BOYS

203 SF

PALS / RESOURCE

599 SF

KINDERGARTEN

1084 SF

MECHANICAL

314 SF

STORAGE

205 SF

JANITOR / STORAGE

192 SF

TUTOR

192 SF

STORAGE

209 SF

DISHWASH

409 SF

CLOSET

17 SF

FUTURE EXPANSION

FUTURE EXPANSION

DATE:

PROJECT:

REVISIONS:

MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

1

A

2 3 4 5 6

B

C

D

E

COPYRIGHT 2017 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

TEL. 803.765.2418 FAX 803.765.2419

701-A LADY STREET

WWW.LS3P.COM

COLUMBIA, SOUTH CAROLINA 29201

9/6/

2017

8:1

1:26

AM

A36

0://R

idge

Spr

ing

- Mon

etta

K-1

2/A

rch_

RSM

K-1

2 Ph

ase

2.rv

t

2201-168720

9/1/17

FIRST FLOORPLAN -HS/MS/ES

A-015

RIDGE SPRING -MONETTA K-12

SCHEMATIC DESIGN

SCALE: 1/16" = 1'-0"

FIRST FLOOR PLAN1

No. Description Date

1ST FLOOR: CLASSROOMS, DINING, & MEDIA CENTER 7

3941 SF

READING ROOM635 SF

WORKROOM

214 SF

MULTIMEDIADISTRIBUTION

442 SF

MECH125 SF

ELEC

83 SF

JAN

75 SF

DATA 248 SF

GIRLS

252 SF

BOYS

63 SF

T

1318 SF

HS PHYSICAL SCIENCE /PHYSICS

1318 SF

HS BIOLOGY / CHEMISTRY224 SF

PREP

951 SF

BUSINESS COMPUTER

108 SF

STOR

183 SF

HS ASST PRINCIPAL

488 SF

STAIR

488 SF

STAIR

58 SF

ELEV

488 SF

STAIR885 SF

COMPUTER

63 SF

T

63 SF

STORAGE

370 SF

CONF / PROFESSIONALLIBRARY

824 SF

HS ENGLISH

824 SF

HS ENGLISH

830 SF

HS ENGLISH

813 SF

HS ENGLISH

793 SF

BUSINESS

203 SF

STORAGE

479 SF

RESOURCE

91 SF

STORAGE

ELEMENTARY

ES/MS/HS SHARED

HIGH SCHOOL

MIDDLE SCHOOL

MS/HS SHARED

NON-ASSIGNABLE

PARTNER

THIRD GRADE

821 SFTHIRD GRADE

821 SF

THIRD GRADE

825 SF

THIRD GRADE

825 SF

FOURTH GRADE

825 SF

FOURTH GRADE

825 SF

READ 180

714 SF

FIFTH GRADE

825 SF

ES ASST. PRINCIPAL

188 SF

FOURTH GRADE

825 SF

COMPUTER

1158 SF

FIFTH GRADE

825 SF

MATH INT

450 SF

FIFTH GRADE

825 SF

ELEC

130 SF

JAN

62 SF

DATA

62 SFRESOURCE

444 SF

STAIR

515 SF

TUTOR

180 SF

COMPUTER

1164 SF

RESOURCE

505 SF

MECHANICAL

419 SFELEV

59 SF

TUTOR

205 SF

JANITOR / STORAGE

154 SF

GIRLS

210 SF

BOYS

210 SF

STORAGE

140 SF

T

62 SF

T

62 SF

TEACHER WORKROOM

524 SF

TUTOR

173 SF

DATE:

PROJECT:

REVISIONS:

MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

1

A

2 3 4 5 6

B

C

D

E

COPYRIGHT 2017 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

TEL. 803.765.2418 FAX 803.765.2419

701-A LADY STREET

WWW.LS3P.COM

COLUMBIA, SOUTH CAROLINA 29201

9/6/

2017

8:1

2:35

AM

A360

://Ri

dge

Sprin

g - M

onet

ta K

-12/

Arch

_RSM

K-1

2 Ph

ase

2.rv

t

2201-168720

9/1/17

SECONDFLOOR PLAN

A-017

RIDGE SPRING -MONETTA K-12

SCHEMATIC DESIGN

SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN1

No. Description Date

3941 SF

READING ROOM635 SF

WORKROOM

214 SF

MULTIMEDIADISTRIBUTION

442 SF

MECH125 SF

ELEC

83 SF

JAN

75 SF

DATA 248 SF

GIRLS

252 SF

BOYS

63 SF

T

1318 SF

HS PHYSICAL SCIENCE /PHYSICS

1318 SF

HS BIOLOGY / CHEMISTRY224 SF

PREP

951 SF

BUSINESS COMPUTER

108 SF

STOR

183 SF

HS ASST PRINCIPAL

488 SF

STAIR

488 SF

STAIR

58 SF

ELEV

488 SF

STAIR885 SF

COMPUTER

63 SF

T

63 SF

STORAGE

370 SF

CONF / PROFESSIONALLIBRARY

824 SF

HS ENGLISH

824 SF

HS ENGLISH

830 SF

HS ENGLISH

813 SF

HS ENGLISH

793 SF

BUSINESS

203 SF

STORAGE

479 SF

RESOURCE

91 SF

STORAGE

ELEMENTARY

ES/MS/HS SHARED

HIGH SCHOOL

MIDDLE SCHOOL

MS/HS SHARED

NON-ASSIGNABLE

PARTNER

THIRD GRADE

821 SFTHIRD GRADE

821 SF

THIRD GRADE

825 SF

THIRD GRADE

825 SF

FOURTH GRADE

825 SF

FOURTH GRADE

825 SF

READ 180

714 SF

FIFTH GRADE

825 SF

ES ASST. PRINCIPAL

188 SF

FOURTH GRADE

825 SF

COMPUTER

1158 SF

FIFTH GRADE

825 SF

MATH INT

450 SF

FIFTH GRADE

825 SF

ELEC

130 SF

JAN

62 SF

DATA

62 SFRESOURCE

444 SF

STAIR

515 SF

TUTOR

180 SF

COMPUTER

1164 SF

RESOURCE

505 SF

MECHANICAL

419 SFELEV

59 SF

TUTOR

205 SF

JANITOR / STORAGE

154 SF

GIRLS

210 SF

BOYS

210 SF

STORAGE

140 SF

T

62 SF

T

62 SF

TEACHER WORKROOM

524 SF

TUTOR

173 SF

DATE:

PROJECT:

REVISIONS:

MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

1

A

2 3 4 5 6

B

C

D

E

COPYRIGHT 2017 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

TEL. 803.765.2418 FAX 803.765.2419

701-A LADY STREET

WWW.LS3P.COM

COLUMBIA, SOUTH CAROLINA 29201

9/6/

2017

8:1

2:35

AM

A360

://Ri

dge

Sprin

g - M

onet

ta K

-12/

Arch

_RSM

K-1

2 Ph

ase

2.rv

t

2201-168720

9/1/17

SECONDFLOOR PLAN

A-017

RIDGE SPRING -MONETTA K-12

SCHEMATIC DESIGN

SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN1

No. Description Date

Page 10: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

8

1ST FLOOR: HS/MS DINING, MAIN GYM, & AUDITORIUM

Floor Plans

EST.

NUM

BER

OF S

EATS

: 18

7

VISUAL / DIGITAL ARTS

1201 SF

SCIENCE

1145 SF RESOURCE

362 SF

MS MATH

816 SF

ART STORAGE

201 SF

ART STORAGE

201 SF

COMPUTER

1064 SF

HS/MS ACCOMODATION

719 SF

COMPUTER

719 SF

CAFETERIA

4301 SF

MECHANICAL

1167 SF

ELECTRICAL

204 SF

FREEZER / COOLER

401 SFDRY STORAGE

313 SF

PAPER STORAGE

99 SF

OFFICE

97 SF

2458 SF

CAFETERIA DINING

128 SF

AG OFFICE

1503 SF

AG SCIENCE SHOP

1155 SF

MUSIC / CHORUS

120 SF

OFFICE

1946 SF

LOBBY

182 SF

TICKETS

EST.

NUM

BER

OF S

EATS

: 18

7

199 SF

AG STORAGE

EXISTING CHILLER YARD

STUDENT BUS ENTRANCE

COURTYARDGYMNASIUM ENTRANCE

AUDITORIUM ENTRANCE

ELEMENTARY

ES/MS/HS SHARED

HIGH SCHOOL

MIDDLE SCHOOL

MS/HS SHARED

NON-ASSIGNABLE

PARTNER

BOYS

248 SF

GIRLS

246 SF

FEMALE

52 SF

MALE

52 SF

DATA / TELECOM

198 SF

STORAGE

124 SF

JAN

25 SF

AV STORAGE

42 SF

384 SF

GIRLS

390 SF

BOYS

SERVING

790 SF

KITCHEN

1122 SF

800 SF

HEALTH

285 SF

ENSEMBLE

334 SF

EQUIPMENT STORAGE

294 SF

UNIFORM

2186 SF

BAND

604 SF

INSTRUMENT STORAGE

744 SF

AG SCIENCE CLASSROOM

404 SF

MECH

404 SF

EQUIPMENT STORAGE562 SF

LOCKER ROOM

13524 SF

MAIN GYM

77 SF

FAMILY

182 SF

CONCESSIONS

262 SF

BOYS

262 SF

GIRLS

57 SF

T

52 SF

T

797 SF

HOSA CLASSROOM1487 SF

HOSA LAB

185 SF

HOSA STORAGE

182 SF

HOSA OFFICE

80 SF

MUSIC STORAGE

HS/MS OUTDOOR

DINING

ES OUTDOOR DINING

519 SF

COACHES

175 SF

AD OFFICE

801 SF

FLEX CLASSROOM

286 SF

BOYS

287 SF

GIRLS

432 SF

BUS TRANSPORTATION

123 SF

OFFICE

199 SF

AG STORAGE

1,122 SEATS

234 SF

SHOWER / T

1074 SF

WEIGHT ROOM

67 SF

JAN

67 SF

JAN

77 SF

FAMILY

77 SF

T

352 SF

VEST175 SF

STORAGE

418 SF

ESOL

137 SF

PE

562 SF

LOCKER ROOM

234 SF

SHOWER / T

JV/V TEAM(30)

MS PE(105)

HS PE(105)

JV/V TEAM(30)

MS PE(105)

HS PE(105)

177 SF

MECH

123 SF

OFFICE

176 SF

ELEC

EST.

NUM

BER

OF S

EATS

: 18

7

EST.

NUM

BER

OF S

EATS

: 18

7ES

T. N

UMBE

R OF

SEA

TS:

187

EST.

NUM

BER

OF S

EATS

: 18

7

?

?

ES DINING

4598 SF

ES SERVING

719 SF

ES KITCHEN / BOH (TBD)

1311 SF

187 SF

THEATER DRESS. 2

187 SF

THEATER DRESS. 1

2325 SF

STAGE

6133 SF

AUDITORIUM

2070 SF

LOBBY

374 SF

RESTROOMS

259 SF

CONCESSIONS

1875 SF

PROP/ SCENERY

384 SF

CORRIDOR

500 SEATS

376 SF

RESTROOMS

DATE:

PROJECT:

REVISIONS:

MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

1

A

2 3 4 5 6

B

C

D

E

COPYRIGHT 2017 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

TEL. 803.765.2418 FAX 803.765.2419

701-A LADY STREET

WWW.LS3P.COM

COLUMBIA, SOUTH CAROLINA 29201

9/6/

2017

8:1

2:14

AM

A36

0://R

idge

Spr

ing

- Mon

etta

K-1

2/A

rch_

RSM

K-1

2 Ph

ase

2.rv

t

2201-168720

9/1/17

FIRST FLOORPLAN - COREAREAS

A-016

RIDGE SPRING -MONETTA K-12

SCHEMATIC DESIGN

SCALE: 1/16" = 1'-0"

FIRST FLOOR PLAN1

No. Description Date

3941 SF

READING ROOM635 SF

WORKROOM

214 SF

MULTIMEDIADISTRIBUTION

442 SF

MECH125 SF

ELEC

83 SF

JAN

75 SF

DATA 248 SF

GIRLS

252 SF

BOYS

63 SF

T

1318 SF

HS PHYSICAL SCIENCE /PHYSICS

1318 SF

HS BIOLOGY / CHEMISTRY224 SF

PREP

951 SF

BUSINESS COMPUTER

108 SF

STOR

183 SF

HS ASST PRINCIPAL

488 SF

STAIR

488 SF

STAIR

58 SF

ELEV

488 SF

STAIR885 SF

COMPUTER

63 SF

T

63 SF

STORAGE

370 SF

CONF / PROFESSIONALLIBRARY

824 SF

HS ENGLISH

824 SF

HS ENGLISH

830 SF

HS ENGLISH

813 SF

HS ENGLISH

793 SF

BUSINESS

203 SF

STORAGE

479 SF

RESOURCE

91 SF

STORAGE

ELEMENTARY

ES/MS/HS SHARED

HIGH SCHOOL

MIDDLE SCHOOL

MS/HS SHARED

NON-ASSIGNABLE

PARTNER

THIRD GRADE

821 SFTHIRD GRADE

821 SF

THIRD GRADE

825 SF

THIRD GRADE

825 SF

FOURTH GRADE

825 SF

FOURTH GRADE

825 SF

READ 180

714 SF

FIFTH GRADE

825 SF

ES ASST. PRINCIPAL

188 SF

FOURTH GRADE

825 SF

COMPUTER

1158 SF

FIFTH GRADE

825 SF

MATH INT

450 SF

FIFTH GRADE

825 SF

ELEC

130 SF

JAN

62 SF

DATA

62 SFRESOURCE

444 SF

STAIR

515 SF

TUTOR

180 SF

COMPUTER

1164 SF

RESOURCE

505 SF

MECHANICAL

419 SFELEV

59 SF

TUTOR

205 SF

JANITOR / STORAGE

154 SF

GIRLS

210 SF

BOYS

210 SF

STORAGE

140 SF

T

62 SF

T

62 SF

TEACHER WORKROOM

524 SF

TUTOR

173 SF

DATE:

PROJECT:

REVISIONS:

MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS

1

A

2 3 4 5 6

B

C

D

E

COPYRIGHT 2017 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.

TEL. 803.765.2418 FAX 803.765.2419

701-A LADY STREET

WWW.LS3P.COM

COLUMBIA, SOUTH CAROLINA 29201

9/6/

2017

8:1

2:35

AM

A360

://Ri

dge

Sprin

g - M

onet

ta K

-12/

Arch

_RSM

K-1

2 Ph

ase

2.rv

t

2201-168720

9/1/17

SECONDFLOOR PLAN

A-017

RIDGE SPRING -MONETTA K-12

SCHEMATIC DESIGN

SCALE: 1/16" = 1'-0"

SECOND FLOOR PLAN1

No. Description Date

Page 11: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

CONCEPTUAL ELEVATION ALONG TROJAN RD.

BIRD’S EYE VIEW FROM SOUTHWEST (FULL BUILD-OUT)

BIRD’S EYE VIEW FROM SOUTHEAST (FULL BUILD-OUT)

EXISTING MIDDLE SCHOOL WING

Massing & Perspectives

EXISTING GYM TO BE RENOVATED

9

Page 12: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

A. Structural System The structural design will be in accordance with the 2012 IBC and ASCE 7-05 for wind, seismic and gravity loadings. The structural system will consist primarily of load bearing CMU (concrete masonry unit) walls of eight and twelve inch thickness as required by height. The exterior masonry walls will be vertically reinforced and grouted CMU with additional horizontal joint reinforcing with an integral veneer tie system. The interior CMU walls will also be vertically reinforced and grouted and contain horizontal joint reinforcing. Elevated floors will consist of a welded wire mesh reinforced slab on composite metal deck. The slab and deck will be supported on composite steel beams which bear on the main load bearing lines to include exterior walls, corridor walls, and interior partition walls at isolated locations. The roofs will be framed with steel joists spaced approximately five feet on center. Similar to the floor, the steel joists will bear at main bearing lines including exterior walls, and corridor walls. Areas of pitched roofs will be framed with galvanized structural steel framed on top of steel joists. Roof deck will consist of 1 1/2” galvanized steel. Continuous strip footings will be provided beneath all exterior walls and interior masonry walls. Larger spread footings will be used at isolated and integral cmu wall piers. All foundations will be constructed of reinforced concrete. The first floor construction will be a 4-inch welded wire mesh reinforced concrete slab on grade placed on a 15-mil vapor barrier. The code-applied wind and seismic lateral loads will be resisted by a system composed of the elevated concrete floor slab diaphragms, metal roof deck diaphragm and reinforced masonry shear walls.

B. Roofing The insulation system within the new roof system assemblies will consist of polyisocyanurate roof insulation and perlite roof insulation with a minimum R-value of 30. The roofing membrane on the low sloped roof areas will consist of three (3) plies of fiberglass felts adhered in hot asphalt and an Energy Star granule surfaced modified bitumen cap sheet adhered in cold adhesive or torch applied. A three (3) year Contractor’s Warranty and a twenty (20) year Manufacturer’s Warranty will be provided for the low sloped roofing system. All sheet metal components for both roofing systems will consist of pre-finished, minimum 24 gage Galvalume. Other specific flashing details will require other appropriate metal types. The roofing systems will comply with the 2012 IBC and ACPS requirements. C. Exterior and Interior Walls The exterior facade of the new wings will consist of brick and metal panels with aluminum windows. The majority of the interior wall surfaces will be painted concrete block. D. Doors and Windows Exterior doors will be painted hollow metal (steel) while interior doors will typically be stained solid core wood. All door frames will be hollow metal (steel). Classroom windows will typically be aluminum, triple-glazed, with integral blinds. Aluminum storefront windows will be used at selected locations.

E. Wall Finishes All interior walls will be primed and will have a minimum of two finish coats of paint applied. Waterbourne epoxy paint will be used on all CMU walls.

F. Floor Finishes Vinyl composition tile will be used at the classrooms, labs, and corridors. The group toilets will feature an epoxy flooring. The flooring in the main gym will be a combination of a Grade 1 wood flooring at the basketball court and resiliant sports flooring at circulation areas. Quarry tile will be used at the locker rooms. Floors will be painted with waterborn epoxy floor paint in janitor, electrical, data, mechanical, and fire riser rooms.

Materials and Systems

10

Page 13: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

G. Ceilings Acoustical ceiling tile (2’x2’) will typically be provided throughout corridor and classroom spaces. Hard ceilings will be used in toilet and shower areas. No ceilings will typically be installed in janitor, electrical, data, mechanical, or fire riser rooms. H. Accessories and Specialties Marker and tack boards will be provided in all classroom and teaching areas. Signage will be provided to identify each space. Rough-ins will be provided for District-installed Smart Boards. I. Casework and Millwork Durable grade plastic laminate cabinets will be typically provided throughout. Display cabinets will be provided, as will reception desks and media center circulation desks.

J. Mechanical System The chilled water system for the second and future phases of construction will include one of three possible chiller plant options. The first option is the build-out of the existing chiller plant and the addition of a new chiller plant to support the classroom and administrative additions. The second option is to provide one new chiller plant and move the two 90 ton chillers to the new chiller plant which would then support the entire campus. The third option is to add on to the existing chiller plant which would also support the entire campus. The second and third options would provide a chiller plant with 65% to 75% redundancy should one chiller fail or be down for servicing. In the first option, the existing chiller plant would have 50% to possibly 65% redundancy depending upon which building or building areas were added to the existing central chiller plant. The classrooms and administrative areas will be served with indoor or rooftop, variable air volume (VAV) air handlers and terminal units with electric heat. The Kitchen will be served with a rooftop, constant volume air handler. The gym will be served with a combination of indoor or rooftop VAV air handlers and single zone VAV air handlers. Outside air will be provided by a 100% outside air unit dedicated to providing dehumidified air to the Gym. The Auditorium will be served with a combination of indoor or rooftop VAV air handlers and single zone VAV air handlers. Outside air will be provided by a 100% outside air unit dedicated to providing dehumidified air to the Auditorium. All air handlers will be dual wall with chilled water coils and SCR electric heaters. The hoods in the new Kitchen, if new hoods are required, will be served by rooftop makeup air units with gas heat and exhaust fans. All fans will be variable speed controlled by heat sensors and variable speed fan drives provided with the hoods. The existing Gym may be served with chilled water air handlers similar to the new Gym or it may be served with packaged AC units with hot gas reheat for humidity control. The decision on the system to serve the existing Gym is partially based upon the chiller system selected by the District. Ducts will be rectangular or spiral galvanized sheetmetal with fiberglass insulation with FRP jackets. Exposed duct in the Gym will be dual wall duct. Piping will be schedule 40 black steel or Type L copper with polyiso insulation outdoors and in mechanical rooms and fiberglass insulation with ASJ jacket in other locations. Above ground, outdoor piping will have an aluminum jacket. Underground chilled water piping shall have polyurethane insulation with a PVC or FRP jacket.The control system will be a web based control system by Automated Logic Controls. All components of the HVAC system will be controlled along with the common lighting zones (primarily corridors and exterior lighting).

Materials and Systems

11

Page 14: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

K. Plumbing System Large demand usage areas (i.e., kitchen, showers, etc.) will be provided with natural gas-fired instantaneous water heaters. Water heaters for lesser-usage areas shall be electric storage tank type water heaters. A hot water recirculation system shall be provided with a water heater when the hot water system piping exceeds 100 feet from water heater to last fixture. Sanitary sewer shall be collected inside the building and extend 5’-0” outside the building for connection to site the site sanitary sewer system. Water closets shall be floor mounted with flush valves. Urinals shall be wall-hung with flush valves. Flush valves installed in group restrooms shall be the self-powered, sensor type. Except for lavatories in adult restrooms, lavatories shall be wall-hung, enameled cast iron fixtures with sensor type hot and cold water faucets. Group restroom lavatories shall sensor type cold water faucets only. Faucets shall be the self-powered type. Lavatories in single adult restrooms shall have a manual faucet with goose neck and 4” wrist blades. Art Room sinks shall be 302 stainless steel, 18 gauge type with hot and cold water. Art Room sinks will be provided with above floor sediment traps. Classroom sinks shall be 302 stainless steel, 18 gauge type with hot and cold water. Water coolers shall be the stainless steel, wall hung, and vandal resistant type. There shall be one water cooler with bottle filling station on each floor. Wall hydrants will be surface mounted, loose key, anti-freeze with a backflow preventer. Hydrants shall be located at approximately 100-ft. intervals around perimeter of the building. Roof hydrants will be provided at rooftop equipment for wash down and maintenance purposes. A hose bibb with loose key and vacuum breaker will be located in all toilets with floor drains and in mechanical rooms. Water piping located above ground shall be type “L” copper and water piping located below grade shall be type “K” copper. All waste and storm drain piping located below grade shall be schedule 40 PVC piping. All waste, vent, and storm drain piping located above ground shall be No-hub type cast iron piping with heavy duty stainless steel coupling. All gas piping located above ground shall be either corrugated stainless steel piping by Tracpipe or schedule 40 black steel. All gas piping located below grade shall be corrugated stainless steel piping by Tracpipe. If sufficient water pressure is not available on the site, a duplex booster pump shall boost the water pressure of the entire campus. The water service to the building shall be protected with a backflow preventer.

L. Fire Protection System All of the additions will be protected throughout with an automatic fire sprinkler system.The existing Fire Riser system in the existing classroom building made provisions for the majority of the planned future additions by extending five lines from the existing riser room and capping them at two different locations – two lines on one side of building and three lines on the opposite side of the building. A total of six sprinkler zones will be required to provide protection for all of the proposed additions. There are presently four capped outlets in the main manifold located in the Fire Riser room. An additional two new zones will be connected to this existing manifold for a total of six new zones. Each zone assembly will require a control valve and riser check valve assembly. The existing auxiliary gym and proposed addition shall be protected throughout with an automatic fire sprinkler system. This will require a new fire line with Post Indicator Valve, backflow preventer, riser valve assembly and Fire Department Connection. Based on previous water flow tests for this project, it appears that a fire pump may be required for either some or all of the additions. If a fire pump is required, an electric driven fire pump will be proposed. The mechanical rooms, electrical rooms, storage areas, janitor rooms and water heater rooms shall be designed for Ordinary Hazard Group I occupancy. Auditorium Stage and workshop areas shall be designed for Ordinary Hazard Group II occupancy. The remainder of the building shall be designed for Light Hazard Occupancy.

Materials and Systems

12

Page 15: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Concealed sprinklers will be provided in all areas with finished ceilings. Upright sprinklers will be installed in mechanical rooms, electrical rooms, storage rooms, and similar rooms and any other space without ceilings. Upright sprinklers in Gymnasium shall be provided with sprinkler guards.

M. Electrical System Electrical service for the new addition will be obtained from a pad-mount transformer fed by SCE&G. Service voltage will be 277/480V 3 phase 4 wire. Surge protective devices (SPD) will be provided for the new electrical service and downstream distribution equipment. The existing service will be reworked to consolidate main service disconnects in a single location. Emergency power will be derived from an outdoor diesel generator set in a sound attenuated weatherproof enclosure. Nominal size required for the campus is estimated to be 200 kW at 480Y/277 3 phase 4 wire. The new unit will replace the existing 60kW generator. The emergency power system will provide emergency power for the emergency lighting, fire pump and communications systems as well as standby power for food service refrigeration equipment and elevator(s). Interior lighting will generally consist of specification grade LED lay-in lighting fixtures. Lighting levels in classrooms will be controlled via simple 0-10V dimming, inherent in contemporary LED driver design, and shall provide separate control for teaching wall. Exterior lighting will consist of building mounted LED architectural cut-off security fixtures. Occupancy sensors for lighting control and energy savings will be used as much as possible. Commons areas such as corridors and exterior lighting will be controlled by the building automation system. An addressable fire alarm system will be provided. The system will be a voice-evacuation type utilizing strobes, speakers, and pre-recorded voice messages to notify occupants. The fire alarm system will report automatically to a Central Receiving Station. Basis of design will be systems manufactured by Silent Knight. A premises wiring system, including fiber optic backbone with CAT 6 copper drops will be provided. This will include a complete conduit and/or cable tray system for support of IT technology wiring and equipment racks for installation of jack panels and Owner installed electronics. Cable tray system shall be for the sole use of IT, security, CCTV, and other systems installed outside the construction contract. HVAC controls shall not be installed in the cable tray system. Cable tray shall be aluminum ladder type tray. Nominal outlet locations in instructional spaces shall be for nine (9) drops per classroom, one for teacher station, two for wireless access point and six for student stations. Conduit pathway shall be provided within instructional spaces to support multi-media applications between the instructor’s station and display equipment. Empty conduit will be provided for an intrusion detection system (IDS), building access control and CCTV systems. System electronics and installation will be included in the construction contract via Owner’s security vendor. Device locations to be provided by Owner’s security systems vendor for incorporation into the contract documents. A two-way school intercom system shall be provided for calls to instructional areas and for general paging through the building. The existing Rauland Borg TC-21 installed under phase 1 will be extended into the new construction. Call-back buttons shall be provided in classrooms and selected locations. Administration phone handsets shall be provided announcements at the main reception desk, principal’s office, and the guidance reception desk. Sound reinforcement systems and rough-ins for future A/V presentation systems will be provided in the gymnasium. Athletic field lighting manufactured by Musco Sports Lighting will be provided for replacement athletic fields.

Materials and Systems

13

Page 16: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Schedule

14

Page 17: Ridge Spring-Monetta K-12 - aiken.schoolboard.net · in any form without written permission ... monetta k-12/arch_rsm k-12 ph 9/6/2017 8:12:35 am ase 2.rvt 2201-168720 9 ... 137 sf

Preliminary Project Budget Summary Estimate

15

PRELIMINARY PROJECT BUDGET SUMMARY ESTIMATE

Ridge Spring-Monetta K-12 - Phases 2 & 3Aiken County School District 12-Sep-17

LS3P Commission No.: 2201-168720

Phase 2 (2016-2019)

Phase 3 (2019-2021) Phase 4 TBD

Description GSF $/GSF Totals GSF $/GSF Totals GSF $/GSF TotalsEstimated Construction Costs HG Reynolds

Demotition Site and Building Demolition $495,840

Building/Site New MS/HS Addition - Levels 1 & 2 63,300 $205 $12,976,500 73,611 $205 $15,090,255

New MS/HS Gym/Music/CATE 44,779 $205 $9,179,695

Existing gym lobby renovate / new partner space 4,305 $185 $796,425

ES Shell Space Upfit - Levels 1 & 2 13,414 $85 $1,140,190

Sub-total $23,448,460 $16,230,445

Site New Football/Track Stadium $1,300,000 New Baseball/Softball Complex $550,000 New free-standing storage building 2,100 $150 $315,000 New greenhouse 3,000 $50 $150,000

$1,015,000

Projected Sub-Total Construction $24,959,300 $17,530,445

Alternates ES Shell Space - Levels 1 & 2 13,414 135 $1,810,890

MS/HS Auditorium 16,030 $220 $3,526,600

Existing Gym Renovations 15,660 $8 $125,280

Elementary Multi-Purpose Room 9,980 $205 $2,045,900 9,980 $205 $2,045,900

Sub-total $1,810,890 $2,045,900 $5,697,780

TOTAL CONSTRUCTION $26,770,190 $19,576,345 $5,697,780Schematic Design / Estimate Contingency 4.81% $1,286,308 $940,643 $273,778 Projected Total Construction / Phase $28,056,498 $20,516,988 $5,971,558

Professional/Technical/Inspection Fees (Fees, surveys, inspections)

TOTAL $2,552,342 $1,385,207 $661,936

AdvertisingBid advertisements (included in CM@R) (included in CM@R) (included in CM@R)

MiscellaneousFixtures, Furnishings & Equipment; Technology 10% of Projected Const. $2,805,650 $2,051,699 $597,156

TOTAL $2,805,650 $2,051,699 $597,156

Sub-Total $33,414,489 $23,953,894 $7,230,650

Overall Project Contingency 5.00% $1,670,724.45 $1,197,694.72 $361,532.49

ESTIMATED TOTAL $35,085,214 $25,151,589 $7,592,182Running TOTAL $35,085,214 $60,236,803 $67,828,985

AlternatesAdd'l. Construction Admin (LS3P weekly) OPTIONAL 17 mos. $7,000 $112,000 14 mo $7,000 $98,000 14 mo $7,000 $98,000

Add'l. Construction Admin (Consultants as req'd) OPTIONAL, hourly 17 mos. TBD TBD TBD

$35,197,214 $25,249,589 $7,690,182Running TOTAL $35,197,214 $60,446,803 $68,136,985

Under/Over Budget $5,797,214 $6,049,589 $7,690,182OVERALL PROJECT BUDGET $29,400,000 $19,200,000