robert pak vtx meeting june 3, 2005. robert pak 1 vtx meeting june 3, 2005 general progress started...

Download Robert Pak VTX Meeting June 3, 2005. Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades

If you can't read please download the document

Upload: geoffrey-matthews

Post on 18-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

Robert Pak 2 VTX Meeting June 3, 2005 VTX Spec Sheet Linked off PHENIX Silicon and Engineering pages “Parameter book” in TAC Review

TRANSCRIPT

Robert Pak VTX Meeting June 3, 2005 Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades in the central region Ed OBrien, the engineers (and detector reps.) Alternate weeks between mechanical and electrical issues Paul Giannotti (BNL) to work on VTX electrical issues Steve Boose (BNL) to handle HV/LV power supplies for VTX Custom system built in-house preferred CAEN HV/LV system specs for pixel detectors provided by Stony Brook folks Robert Pak 2 VTX Meeting June 3, 2005 VTX Spec Sheet Linked off PHENIX Silicon and Engineering pages Parameter book in TAC Review Robert Pak 3 VTX Meeting June 3, 2005 VTX Spec Sheet (cont) Lots of holes in this section Robert Pak 4 VTX Meeting June 3, D CAD Model at LANL Following slides summarize what is currently fairly firmly established for LANL to use as input for 3D CAD model. At least gets us up to and out of the outer support structure. Robert Pak 5 VTX Meeting June 3, 2005 Pixel Detectors Cable plant: 20 cm x 1.5 cm Al pixel bus (10 cm pigtail off the end of each half ladder) is wire-bonded to Al-Cu transition board. 3 cm x 3 cm x 8 mm encapsulated Al-Cu transition board is wire-bonded to Cu fan-out flex cable. Cu fan-out flex cable terminates with fine pitch multi-pin connector(s): Provides point of disconnect for assembly to SPIRO pilot module board. Considering multiple 3 cm x 8 mm x 8 mm connectors in a finger-like arrangement. SPIRO boards are mounted on endplates of the outer support structure. Beyond 10 cm x 10 cm SPIRO board, HV/LV on coax cables and signals on optical fibers. Cooling: 3 mm dia supply on one end of each ladder and 3 mm dia return off opposite end. Robert Pak 6 VTX Meeting June 3, 2005 Strip Detectors Cable plant (default option): Flex ribbon cable wire-bonded off the end of each ladder provides LVDS link between bus to RCC chips and multi-pin bulkhead connector on the outer support structure: Not wider than width of strip ladder and length to be determined by optimizing route in 3D CAD model. Provides point of disconnect for assembly of strip ladders onto barrel. Cooling: 3 mm dia supply on one end of each ladder and 3 mm dia return off opposite end. Robert Pak 7 VTX Meeting June 3, 2005 Mechanical Support Structure Modular design will allow mounting of VTX independent of NCC. Suspended from support rods cantilevered off CM One end on floating supports to compensate for motion during energization of magnet. Robert Pak 8 VTX Meeting June 3, 2005 Other Integration Issues Additional space necessary for VTX electronics may be provided by truncating corners of HBD to boundary of acceptance limits. Incumbent on VTX Group to prove this space is necessary HBD Group currently designing final support structure Temperature of pole tips from heat generated by energized magnet an issue? Are thermal shields for VTX necessary (as in PHOBOS)? A non-issue according to Hubert; little heat generated Robert Pak 9 VTX Meeting June 3, 2005 Status of Mech Engg Letter of intent from BNL to contract for engineering on VTX mechanics/integration at LANL in place Not the same as the contract for HYTEC Past experience: contract takes ~ 4 mos. to set up HYTEC w/ Dave Lee provided contract draft to BNL Specifies scope of work based on original cost matrix Defines deliverables as finished parts (not just drawings) Meeting in NM w/ HYTEC scheduled for June 16 Robert Pak 10 VTX Meeting June 3, 2005 HYTEC Cost Matrix R&D 200(?) DOE Proposal Robert Pak 11 VTX Meeting June 3, 2005 Status of Mech Engg (cont) Walt Sondheim to present recent update from 3D CAD model Don Lynch to present results on spatial envelopes for proposed detector upgrades in central region