Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping location, wild stamping, uneven folding, scraping – Couldn’t meet sales for silver boats, glut of gold boats – Sales and production scheduling not matching – Inefficient material handling

Upload: silvester-black

Post on 22-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping

Round 1 Debrief - PM• What worked? What didn’t work?– Bottleneck at folding– Bottleneck at shipping and inspection– Inspection: sale height, stamping location, wild

stamping, uneven folding, scraping– Couldn’t meet sales for silver boats, glut of gold boats– Sales and production scheduling not matching– Inefficient material handling

Page 2: Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping

Changes for Round 2• Consider the following:– Factory Layout

• Move folding tables together? And stamping?

– Point of Use Storage (POUS)• Get rid of kitting, move workers to folding, use POUS at fold1

– Poke-Yoke, Quality at the Source• Have folders inspect work?• Send rework only individual boats, not full batch• Inspection/rework before the oven

– Line Balancing• Inventory build-up detrimental to quality• Get rid of kitting, move workers to folding• Move workers around

Page 3: Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping

Round 2 Debrief - PM• What worked? – Better factory layout– Boat quality down– Bad stamping – Need Poke-Yoke– Sail template worked well in inspection and folding

• What didn’t work or should be improved?– Inspection – move to source, self inspection– Not enough silver boats: orders not same as schedule

Page 4: Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping

Changes for Round 3• Consider the following:– Factory Layout• Flex work

– Pull System, Kanban• Pull between station

– Continuous Flow and Supermarkets• Supermarkets around the oven (monument)

– 2 gold, 2 silver Kanban

• Continuous flow

– Poke-Yoke, Quality at the Source• Inspection at source

Page 5: Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping

Round 3 Debrief - PM• What worked? What didn’t work?– Quick communication of demand– Let us respond to demand mix– Less stressful at each process– Might need Kanban adjustment – increase?– Flex workers – more balance– Less WIP

• Areas for improvement?– Larger Kanban– Time study in folding, line-balancing, flex working, work cell– Layout improvement– Another stamp tool? Another oven?