rpc tc/rc/dpg/commissioning meeting at 18.aug.2014

15
RPC TC/RC/DPG/ COMMISSIONING MEETING AT 18.AUG.2014 DONG-HYUN KIM BEHALF ON THE RPC CURRENT INVESTIGATE TEAM

Upload: deo

Post on 07-Jan-2016

24 views

Category:

Documents


1 download

DESCRIPTION

RPC TC/RC/DPG/Commissioning meeting at 18.aug.2014. Dong- hyun kim Behalf on the RPC current investigate team. Plan. RPC Current study at P5 – Part : RPC EN4 all channels. Step 1. 1. Research the EN4 part 36 channel( From 20.May To 21.May ). Step 1. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

RPC TC/RC/DPG/COMMIS-SIONING MEETING AT 18.AUG.2014

DONG-HYUN KIMBEHALF ON THE RPC CURRENT INVESTIGATE TEAM

Page 2: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

2

PLAN

• RPC Current study at P5 – Part : RPC EN4 all channels

STEP Status

1. Research the EN4 part 36 channel( From 20.May To 21.May ) Done

2. Select channel that had a potential problem Done

3. Select research period( common period from May to Aug. ) Done

4. Investigate channels that had potential problem Processing

5. Investigate all-channels Processing

Page 3: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

3

STEP 1• 1. Research the EN4 part 36 channel( From 20.May To 21.May )

1000 3000 6000 7000 9000 96000

0.20.40.60.8

1

RPC_EN4_R2_R3_C01_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C02_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C03_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C04_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C05_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

RPC_EN4_R2_R3_C06_HV

HV

μΑ

Line – Data , Dot-line - Trend

Page 4: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

4

STEP 1• 1. Research the EN4 part 36 channel( From 20.May To 21.May )

1000 3000 6000 7000 9000 96000.0

0.1

0.2

RPC_EN4_R2_R3_C07_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C08_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.050.1

0.150.2

0.25

RPC_EN4_R2_R3_C09_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.050.1

0.150.2

0.25

RPC_EN4_R2_R3_C10_HV

HVμΑ

1000 3000 6000 7000 9000 96000

0.1

0.2

0.3

RPC_EN4_R2_R3_C11_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

RPC_EN4_R2_R3_C12_HV

HV

μΑ

Line – Data , Dot-line - Trend

Page 5: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

5

STEP 1• 1. Research the EN4 part 36 channel( From 20.May To 21.May )

RPC_EN4_R2_R3_C07_HV

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

RPC_EN4_R2_R3_C13_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.05

0.1

0.15

0.2

RPC_EN4_R2_R3_C14_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

RPC_EN4_R2_R3_C15_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.050.1

0.150.2

0.25

RPC_EN4_R2_R3_C16_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.5

1

1.5

RPC_EN4_R2_R3_C17_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.51

1.52

2.5

RPC_EN4_R2_R3_C18_HV

HV

μΑ

Line – Data , Dot-line - Trend

Page 6: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

6

STEP 1• 1. Research the EN4 part 36 channel( From 20.May To 21.May )

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

RPC_EN4_R2_R3_C19_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

RPC_EN4_R2_R3_C20_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.5

1

1.5

RPC_EN4_R2_R3_C21_HV

HV

μΑ

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C22_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.5

1

1.5

RPC_EN4_R2_R3_C23_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.20.40.60.8

1

RPC_EN4_R2_R3_C24_HV

HV

μΑ

Line – Data , Dot-line - Trend

Page 7: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

7

STEP 1• 1. Research the EN4 part 36 channel( From 20.May To 21.May )

1000 3000 6000 7000 9000 97000

0.5

1

1.5

RPC_EN4_R2_R3_C25_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.5

1

1.5

RPC_EN4_R2_R3_C26_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.5

1

1.5

RPC_EN4_R2_R3_C27_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.20.40.60.8

1

RPC_EN4_R2_R3_C28_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.20.40.60.8

1

RPC_EN4_R2_R3_C29_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.05

0.1

0.15

RPC_EN4_R2_R3_C30_HV

HV

μΑ

Line – Data , Dot-line - Trend

Page 8: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

8

STEP 1• 1. Research the EN4 part 36 channel( From 20.May To 21.May )

1000 3000 6000 7000 9000 97000

0.5

1

1.5

RPC_EN4_R2_R3_C31_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.2

0.4

0.6

0.8

1

RPC_EN4_R2_R3_C32_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.2

0.4

0.6

0.8

1

RPC_EN4_R2_R3_C33_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.2

0.4

0.6

0.8

1

RPC_EN4_R2_R3_C34_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.10.20.30.40.50.6

RPC_EN4_R2_R3_C35_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C36_HV

HV

μΑ

Page 9: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

9

STEP 2• 2. Select channel that had a potential problem

1000 3000 6000 7000 9000 96000

0.2

0.4

0.6

0.8

RPC_EN4_R2_R3_C04_HV

HV

μΑ

Unstable

1000 3000 6000 7000 9000 96000

0.050.1

0.150.2

0.25

RPC_EN4_R2_R3_C09_HV

HV

μΑ

Current all most Zero

Page 10: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

10

STEP 2• 2. Select channel that had a potential problem

Unstable current at 9400V1000 3000 6000 7000 9000 96000

0.050.1

0.150.2

0.25

RPC_EN4_R2_R3_C10_HV

HV

μΑ

Current all most Zero 1000 3000 6000 7000 9000 96000

0.51

1.52

2.5

RPC_EN4_R2_R3_C18_HV

HV

μΑ

Page 11: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

11

STEP 2• 2. Select channel that had a potential problem

Current almost Zero

Current goes down to Zero

1000 3000 6000 7000 9000 97000

0.5

1

1.5

RPC_EN4_R2_R3_C25_HV

HV

μΑ

1000 3000 6000 7000 9000 97000

0.20.40.60.8

1

RPC_EN4_R2_R3_C29_HV

HV

μΑ

Page 12: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

12

STEP 3• 3. Select research period( common period from May to Aug. )

At 9400 V

27.May 10h ~ 11h 10.July 16h ~ 15.July 21h

01.July 14h ~ 03.July 06h 17.July 11h ~18.July 18h

03.July 14h ~ 04.July 21h 01.Aug 12h ~ 03.Aug 17h

At 7000 V

27.May 10h ~ 11h 30.July 20h ~ 31.July 12h

04.July 21h ~ 08.July 12h 31.July 22h ~01.Aug 12h

09.July 22h ~ 10.July 16h 03.Aug 18h ~ 06.Aug 12h

Page 13: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

13

STEP 4• 4. Investigate channels that had potential problem( Processing )

< EN4 R2_R3_C10 Low – current > < EN4 R2_R3_C06 current down to ≈ 0 >- Several channels had this pattern

7.03 14~ 7.04 21-9400 8.01 12~8.03 17-9400

Page 14: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014

14

CONCLUSION

• Ongoing to investigate for the EN4 potential problem channels.

• Continuously, we will investigate the EP4 36 channels

Page 15: RPC TC/RC/DPG/Commissioning meeting  at 18.aug.2014