Status and Outlook of theRPC Commissioning
Marcello Maggi/INFN-Bari
Marcello Maggi7/12/2006
2
RPC
GAS Distribution
System
HV Easy Crate
System
GAS Close Loop
T,ThrsChamberDCS
ConfDB
FinalCabling
PatchPanels
LBB
TBC
DCC
X-DAQ
Sorter
Trigger
TriggerDCS
X-DAQ
Event dump
LV Easy Crate
System
RBC
TechnicalTrigger
CondDB
THE RPC TRIGGER SYSTEM
Marcello Maggi7/12/2006
3
RPC
GAS SimpleSystem
HV SY1527System
GAS Close Loop??
T,ThrsPrelim.Chamber
DCS
ConfDB
On-flightCabling
PatchPanels
LBB
TBC
DCC
X-DAQ
Sorter
Prelim.Trigger
DCS
X-DAQ
Event dump
LVSY1527 System
HzMeter
noise
SECTOR COMMISSIONING
Marcello Maggi7/12/2006
4
Status of RPC Commissioning
W+2 Completed (except horiz. Sectors) W+1 Completed (except horiz. Sectors) W0 Sector 4 and 5 to completion
Sector Test are done before final cabling
RPC BARREL
Marcello Maggi7/12/2006
5
Status of RPC Commissioning RE+3 pre-commissioned RE+2 pre-commissioned RE+1 pre-commissioned RE-1/2 pre-commissionedMissing Front-End functional and read-out test and
cooling test. Few gas leakages to be fix and understood
Commissioning needs a clear resource allocation and commitments
RPC ENDCAP
Marcello Maggi7/12/2006
6
RPC
GAS Distribution
System
HV Easy Crate
System
T,ThrsChamberDCS
ConfDB
FinalCabling
PatchPanels
LBB
TBC
DCC
X-DAQ
Trigger
TriggerDCS
X-DAQ
Event dump
LV Easy Crate
System
RBC
TechnicalTrigger
CondDB
TOWER TEST
Marcello Maggi7/12/2006
7
Tower Test
On going Tower Test on Near Side Half Wheel +1
Step 1) Cabling: connectivity, CCU chain
Step 2) LV up: grounding and functionalities
Step 3) HV up: stability
Step 4) Data Acquisition: performance, full chain
Use of the MTCC set-up in Green and Balcony Barracks
new
Marcello Maggi7/12/2006
8
MTCC
Marcello Maggi7/12/2006
9
B=3.8T B=3.8T
Th=220mVTh=220mVB=3.8T Th=205mVB=3.8T Th=205mV
B=0T B=0T Th=220mVTh=220mV
MTCC preliminary results
10 Ottobre10 Ottobre
Entries 30712Entries 30712
Mean 0.3705Mean 0.3705
RMS 5.125RMS 5.125
OF 0OF 0
19 Ottobre19 Ottobre
Entries 30712Entries 30712
Mean 16.37Mean 16.37
RMS 88.58RMS 88.58
OF 769OF 769
29 Ottobre29 Ottobre
Entries 30712Entries 30712
Mean 0.514Mean 0.514
RMS 11.1RMS 11.1
OF 119OF 119
NOISE
Noise stable during entire period
Marcello Maggi7/12/2006
10
MTCC preliminary results
EFFICIENCY
HV = 8.5 kV
HV = 9.0 kV
HV = 9.2 kV
HV = 9.4 kV
HV = 9.6 kV
DT Segment extrapolation to RPC
Marcello Maggi7/12/2006
11
MTCC preliminary results
Start using stand-alone RPC reconstruction
Studied RPC
3
RESIDUALS
Marcello Maggi7/12/2006
12
Use of RPC MTCC results
Dedicated Cosmics MC production
Comparison Data Vs MC
Improve the model of the simulation
RPC Trigger and Reconstruction performance with realistic simulation
Marcello Maggi7/12/2006
13
RPC Technical Trigger
LBBox
RBC
LBBox
LBBox
RBC
LBBox
LBBox
RBC
LBBox
LBBox
RBC
LBBox
LBBox
RBC
LBBox
LBBox
RBC
LBBox
1 RBC/ 2 sectorsUXC area
Barrel Wheel
USC area
TTU
TTU
TTU
TTU
TTU
VME Crate
10 Optical Ribbons
Receiv
ing
p
an
el
1 Optical Ribbon/Half wheel
Fiber
Commissioned
In preparation
Marcello Maggi7/12/2006
14
DQM
3 Modules developed
Digi used tested on FF
Efficiency Barrel done
Sync Specific Trigger Studies
Marcello Maggi7/12/2006
15
DCS HV/LV
Data stored on and retrieved from OnlineDBImportant for off-line RPC performance analyses
HV components sensitive to temperature to be understood
Marcello Maggi7/12/2006
16
GAS SYSTEM
Prototype Closed Loop under test at ISR
Many results to report, and to understand
New-Binos stability feature “cured” On going Commissioning of Distributors Gas Gain Monitor to be set-up
Marcello Maggi7/12/2006
17
Conclusion
Clear set of performance benchmark Sector Test on Barrel going smoothly Tower Test ala MTCC in preparation now Time to devote more effort on SW
Few items to follow up closely