rri handout

Upload: mukul-kumar-agarwal

Post on 03-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Rri Handout

    1/13

    DETAILS OF JHS STATION

    Name of work

    JHS-Replacement of signaling gears with

    centralized operation of points & signals(A-route)

    Plan Head PH 33 (S&T Plan Head)

    Allocation DRF

    First included

    in the PB2002-03

    PB Item No.

    (2012-13)412

    Estimate

    Sanctioned Detailed Estimate

    Cost Rs.6.78 Cr.

    Revised sanctioned Estimate

    Cost Rs.16.70 Cr.

    Tenders/Contract

    Details

    LOA issued on 18.11.2004.

    CA No. NCR/S&T/JHS/2

    Name of Contractor M/s. Bharat Rail Automations (P) Ltd. B-107, Mandpeshwar Ind. Estate, Mumbai.

  • 8/12/2019 Rri Handout

    2/13

    2

    o Jhansi Station is situated on Itarsi-Delhi Double Line Section atKm.1127.72from CSTM.

    o Jhansi is a 'B' class stationinterlocked to Standard-I.o BLOCK STATIONS, IBH, IBS ON EITHER SIDE OR

    THEIR DISTANCES:-

    Jhansi is a Junction station with lines in four directions as given

    below:-

    Sl. No. Station Side Distance

    1 Bijauli Bina side. 08.48 Kms

    2 Karari Agra side 11.37 Kms

    3 Orchha Manikpur side 11.25 Kms

    4 Mustra Kanpur side 08.23 Kms

    o There is an Intermediate Block Stop Signalbetween JHS A &BJI and JHSKRQ on either side UP & DN Main Line.

    Sl.

    No.Cabins Before RRI After RRI

  • 8/12/2019 Rri Handout

    3/13

    3

    CABINS IN JHS YARD

    After commissioning of RRI (401 Routes) the position of cabins is as

    under

    1 "A" Cabin (Block Cabin). 80 levers 80 levers

    2 'B' Cabin (Non Block Cabin) 100 levers 100 levers

    3 'C' Cabin (Non Block Cabin) 40 levers Nil

    4 DCabin (Non Block Cabin) 80 levers Nil

    5 ECabin (Non Block Cabin) 100 levers Nil

    6 'F' Cabin (Block Cabin) 64 levers 16 levers

    7 GC-1 (Non Block Cabin) 32 levers 21 levers

    8 GC-2 (Non Block Cabin) 48 levers 13 levers

    9 GC-3 (Non Block Cabin). 60 levers 43 levers

    10 Panel Cabin. - Nil

  • 8/12/2019 Rri Handout

    4/13

    4

    SCOPE OF WORK-JHS RRI

    Scope of Signaling Works

    Complete indoor work as per approved plans.Locking and Wiring alteration in F, GC-1, 2 & 3 Cabins.

    Installation and commissioning of gears as given below:-

    FunctionsAs per existing

    original SIP

    As per finally

    approved SIP issued

    a) Signals

    Main Signals 46 54

    Shunt signals 43 72

    Calling ON signals 10 38

    Routing Signals 38 70

    b) Points 93 111

    c) Track Circuits 65 144

    Removal of old Signaling gears. (Outdoor and Indoor)

  • 8/12/2019 Rri Handout

    5/13

    5

  • 8/12/2019 Rri Handout

    6/13

    6

    DETAILS OF SIGNALING GEARS IN JHS RRI

    OUTDOOR GEARS

    Sl. No. Signaling Gear Nos.

    1. Main signal 52

    2 Aspect 43

    3 Aspect 06

    4 Aspect 03

    2. SH signal 72

    Dependent 40Independent 32

    3. Calling ON signal 38

    4. Points 111

    5. Track Circuits 144

    DC Track Circuits 141

    Analog Axle counter 03

    6. IBS (JHS-KRQ) 01

    7. LC Gate

    LC 367 on Main Line Bina end 01

    LC 367 on MKP Line Bina end 01

    8. BPAC

    JHS-CNB 01

    JHS-KRQ 01

  • 8/12/2019 Rri Handout

    7/13

    7

    INDOOR GEARS

    TOTAL NO. OF ROUTES - 401

    Sl. No. Signaling Gear Nos.

    1. Block Instruments 03

    JHS-CNB Diado TLBIJHS-KRQ MUX DLBI

    JHS-ORC Neals TBI

    2. Total Routes 401

    Main signal route 216

    SH signal route 185

    3. Relay Racks 75

    4. CT rack 11

    5. RRI point group 65

    6. Route group 63

    7. SH group 37

    8. Point Chain group 10

    9. Signal Groups 52

    2 Aspect 43

    3 Aspect 06

    4 Aspect 03

    10. Crank Handle group 29

    11. Clock Timer 70

    12. K-50 Relay Neutral 5F/5B 1275

    K-50 Relay Neutral 6F/2B 118K-50 Relay Neutral 4F/4B 80

    13. Interlocked Relay 4F/4B 455

    Interlocked Relay 5F/3B 41

    14. K-50 Relay ACI 5F/3B 50

    15. QSPA1 154

    16. QNNA1 10

    17. QNA1 10

    18. Data logger

    Digital input 2048

    Analog input 96

  • 8/12/2019 Rri Handout

    8/13

    8

  • 8/12/2019 Rri Handout

    9/13

    9

    SCOPE OF TELECOMMUNICATION WORKS

    Sl.

    No.

    Type of

    CommunicationsLocation

    1.a Block phones

    1.Double line Axle counter Block Panel in A Cabinwith Bijauli station.

    2.Neals ball token A type Block instrument in RRIpanel with Orchha.

    3.Diado token less S/L Block instrument in RRI Panelwith Mustra.

    4.SGE 03 position Double line lock & Blockinstrument in RRI Panel with Karari station.

    b Control Telephone

    1.Control telephone of JHS-BIN control is providedat RRI cabin, Goods cabins, Loco, DySS office &Area Control office.

    2.Control telephone of JHS-AGC Control line isprovided at RRI cabin, S.M.Office, DySS office &

    Area Control office.

    3.Control telephone of JHS-CNB controlis providedeach at Lobby, DySS office & Area Control office.

    c TPC phone

    A separate telephone of JHS-BIN & JHS-AGC-TPCline is provided at RRI cabin, DY SS office and AEE

    (TD) Office.

    d Test phone In SMs Office

    2. Auto/DOT Telephones

    Railway administrativePhone no. 54658

    Five digit telephones: A cabin, B cabin, C,FCabin, RRI Panel Cabin,GC-3,SM,DY.SM, CYM,

    Area control ALF(E.T.),TNC, Detail clerk.

    BSNL phone.BSNL telephone No.0510/2440923 is provided in RRICabin.

  • 8/12/2019 Rri Handout

    10/13

    10

    3. Magneto Telephone/ Group Telephone with the Cabin/Gate

    Gate No. 365 Between A Cabin and gateman

    Gate No. 366 Between B Cabin and gateman

    Gate No. 367,368 & 369,

    370 and 371(ORC side)Between RRI and gateman

    Gate No. 117, 118 & 119

    (CNB side)Between RRI and gateman

    Gate No. 368 (KRQ) &369 (KRQ)

    Between RRI and gateman

    A & B Cabins Between RRI and Cabin

    F Cabin Between RRI and Cabin

    4. Telephone with IBS

    Signal post Talk Back

    telephone UP IBS signalat KMS 1258.880

    Between UP IBS signal post and SMs office.

    Signal post Talk backtelephone DN IBS signal

    at KMs 1267/6-8.

    Between DN IBS signal post and SMs office.

    5.Telephone with Axle

    Counter reset boxes

    01 AXT, 02AXT Axle Counter Line

    verification Loc Box, Crank Handle Location

    Boxes & RRI Cabin

    6.Telephone for yard

    communication

    --

    7.VHF Communication

    25 W VHF base station

    Between SM/ASM on duty RRI Cabin and Loco

    Pilot & Guards of running train and inemergency with adjacent stations

    8

    Mobile Train Radio

    Communication

    (MTRC)

    9930835067

  • 8/12/2019 Rri Handout

    11/13

    11

    Works done during Pre NI & NI

    Signaling Works

    Locking and wiring alterations in F-Cabin, Goods Cabin-1, 2

    & 3as per new locking table.

    Inter slotting between RRI cabin and B Cabin, F-Cabin, Goods

    Cabin-1, 2 & 3.

    Fixing of point machines on new turnouts to be laid in Pre NI

    and NI. (19 Nos)

    Removal of mechanical rodding from the points and fixing ofpoint machine and ground connections and testing from RRI.

    (54 Nos.)

    Wiring and testing of Track Circuits (144 Nos)from RRI.

    Wiring and testing of all Signals from RRI.

    a)Main Signals52 Nosb)Shunt Signals72 Nosc)Calling ON signals38 NosShifting of block working of Jhansi-Karari, Jhansi-Mustra

    and Jhansi-Orchha to RRI Cabin.

    Shifting of IBS working and BPAC between JHS-KRQ to RRI

    from F-Cabin.

    Shifting of all Controls, Gate phones and other communicationequipments to RRI.

    Testing and commissioning of all signaling gears from RRI.

    Removal of old signaling gears i.e. Signals, Point Rodding,

    Cabin equipments etc.

  • 8/12/2019 Rri Handout

    12/13

    12

    Engineering Works

    Insertion of turnout 13 Nos.and Derailing Switches 06 Nos.as

    per the day to day program of Pre NI.

    Insertion of associated Glued joints with turn outs.

    Packing of newly laid points.

    Removal of Scissor Crossing with X-overs(28D & 29D)

    Removal of Diamond Crossing with X-over(71D)

    Associated works for S&T for sleeper spacing, packing, trackcircuiting etc.

    Details of activity as per the day to day program of Pre NI and

    NI.

    TRD Works

    OHE Wiring and charging of new x-overs (06 Nos)

    Removal of OHE wiring for Scissor and Diamond X-Over being

    dismantled.

    Traction bonding work for the track circuits coming on new

    turnouts to be laid in Pre NI and NI.

    Change in traction bonding of track circuited area as per new

    plan.

    Details of activity as per the day to day program of Pre NI and

    NI.

  • 8/12/2019 Rri Handout

    13/13

    13