  • INQU 5025

  • Implementation Specifications

    Scope of Work

    RUM Inc. is a pharmaceutical company that

    wants to implement a potable water system to

    provide potable water to three buildings. The

    potable water system will use well water from

    an existing well and city water as a back up

    source.

  • Implementation Specifications

    Scope of Work

    Engineering services are required to provide

    the following:

    Configuration logic flow chart (SAMA Drawings)

    Pipe and Instrumentation Diagram

    Input and Output List

    Input and Output cards requirements

  • Implementation Specifications

    Scope of work

    Equipment available

    Potable water tank (steam jacket is available at the

    tank)

    Potable water pumps (2)

    Piping

    Concentrated chlorine tank.

  • Implementation Specifications

    User A

    User B

    User C

    Potable Water Tank

    Concentrated Chlorine

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    Base Pipe & Instruments Drawing

  • Implementation Specifications

    Instrumentation available Discrete valves ( 24 Vdc coil)

    Analog valves ( 4 to 20 mA)

    Flow transmitters (4 to 20 mA) including a flow

    element.

    Turbidity meters ( 4 to 20 mA)

    Level transmitter (4 to 20 mA)

  • Implementation Specifications

    Instrumentation available Temperature transmitters (4 to 20 mA) including

    temperature element

    Pressure transmitter ( 4 to 20 mA)

    Flow switch high ( dry contact)

    Differential pressure switches (dry contact)

    Chlorine injection pump, variable speed ( 4 to 20 mA)

  • Implementation Specifications

    Instrumentation available Magnetic starters for pump with the following

    specifications:

    Coil voltage 120Vac

    Auxiliary contact ( dry contact)

    Auto status feedback ( dry contact)

  • Control Specifications

    The tank level will be kept primarily by using well

    water from an existing well. The tank level

    should be kept between 65% and 85% when the

    well water is in use.

  • SAMA Drawing

    H/A

    Set = 85%

    L/A

    Set = 65%

    WELL STOPLT-01

    WELL START

    Stop

    Start

    Interlock

    Status FB

    Auto FB

    Output

    Fail

    Motor

    WELL START

    WELL STOP

    WE-1

    S/S

    WE-1

    STA

    WE-1

    AU

  • Pipe & Instrument Diagram

    User A

    User B

    User C

    Potable Water Tank

    Concentrated Chlorine

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

  • Control Specifications

    There is a pre established limit of 30,000 gallons of

    maximum extraction of well water per day. The system

    should be capable of monitoring the total water extracted

    per day and should be capable of avoiding to exceed the

    maximum extraction limit.

  • SAMA Drawing

    Totalizer

    Set = 30,000 GPM

    FT-01 LIMIT ACHIEVED

    Clock

    Set time= 23:59

    Reset

    Flow InStop

    Start

    Interlock

    Status FB

    Auto FB

    Output

    Fail

    Motor

    WELL START

    WELL STOP

    WE-1

    S/S

    WE-1

    STA

    WE-1

    AU

    LIMIT ACHIEVED

  • Pipe & Instrument Diagram

    User A

    User B

    User C

    Potable Water Tank

    Concentrated Chlorine

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

  • Control Specifications

    The potable water system will use city water as

    the alternate feed water source when well water

    extraction limits is achieved. Tank level should

    be kept between 30% and 50% when the city

    water is in use.

  • SAMA Drawing

    H/A

    Set = 50%

    L/A

    Set = 30%

    CITY CLOSELT-01

    CITY OPEN

    Close

    Open

    Interlock

    Open Conf.

    Close Conf.

    In 3

    In 4

    In 5

    Output

    Fail Out 2

    Valve

    CITY OPEN

    CITY CLOSE

    LCV-

    01

  • Pipe & Instrument Diagram

  • Control Specifications

    If well is on and no flow is detected within 2

    minutes on the make up water line a visible

    alarm should be activated.

  • SAMA Drawing

    WE-1

    STA

    FT-01

    Timer

    ON Delay

    Set = 2 min.AND

    WELL ALARM

    L/A

    Set = 5 GPM

    OR

    In 2

    WELL ALARM

    SL-01

  • Pipe & Instrument Diagram

    Concentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    FCV-

    01

    DO

    SL-01

    DO

    Strobe

    LCV

    -01

    XStrobeSL-01

    DO

  • Control Specifications

    Water entering the tank should be monitored for

    turbidity.

    On the event of a high turbidity the system should

    divert the make up water to drain and keep the

    turbidity monitoring. If situation is solved then the

    make up could be established.

    If high turbidity parameter remains high for more than

    10 minutes a visible alarm should be generated.

  • SAMA Drawing

    H/A

    Set = 20%

    L/A

    Set = 5%

    TO DRAINAT-01

    TO TANK

    Close

    Open

    Interlock

    Open Conf.

    Close Conf.

    In 3

    In 4

    In 5

    Output

    Fail Out 2

    Valve

    TO TANK

    TO DRAIN

    FCV-

    01 Close

    Open

    Interlock

    Open Conf.

    Close Conf.

    In 3

    In 4

    In 5

    Output

    Fail Out 2

    Valve

    TO DRAIN

    TO TANK

    FCV-

    02

  • SAMA Drawing

    H/A

    Set = 20%

    TURBIDITY ALM.AT-01Timer

    ON Delay

    Set = 10 min.

    OR

    WELL ALARM

    SL-01

    TURBIDITY ALM.

  • Pipe & Instrument Diagram

    XStrobeSL-01

    DO

  • Control Specifications

    Potable water distribution will be implemented by a pump pair sequence having pump 1 as the lead pump and pump 2 as the stand by pump.

    The lead pump will be always on and the stand by pump will operate based on high demand of the three users of in the event of a failure of the lead pump.

    This high demand will be determined based on distribution header pressure. If the header pressure goes under 25 psig the lag pumps should be started.

    If the header pressure returns to a normal pressure of 50 pumps the lag pumps should be turned off.

  • SAMA Drawings

    H/A

    Set = 50 PSIG

    L/A

    Set = 25 PSIG

    DEMAND OKPT-01

    HIGH DEMAND

    Stop

    Start

    Interlock

    Status FB

    Auto FB

    In 3

    Output

    Fail

    Motor

    PU-1

    S/S

    1

    PU-1 FAIL

    PU-1

    STA

    PU-1

    AU

    Stop

    Start

    Interlock

    Status FB

    Auto FB

    In 3

    Output

    Fail

    Motor

    PU-2

    S/S

    PU-2

    STA

    PU-2

    AU

    DEMAND OK

    OR

    PU-1 FAIL

    HIGH DEMAND

  • Pipe & Instrument Diagram

    Concentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    LCV-

    01

    DO

    SL-01

    DO

    Strobe

    AT-01

    AI

    FCV-

    01

    DO

    Drain

    FCV-

    02

    DO

    PU-2

    S/S

    DO

    PU-2

    AU

    DI

    PU-2

    STA

    DI

    PU-1

    S/S

    DO

    PU-1

    AU

    DI

    PU-1

    STA

    DI

    PT-01

    AI

    XStrobeSL-01

    DO

  • Control Specifications

    Off line pump should be isolated by keeping an

    individual pump discharge valve closed when

    pump is off.

  • SAMA Drawings

    Stop

    Start

    Interlock

    Status FB

    Auto FB

    In 3

    Output

    Fail

    Motor

    PU-1

    S/S

    1

    PU-1 FAIL

    PU-1

    STA

    PU-1

    AU

    FCV-

    03

    Stop

    Start

    Interlock

    Status FB

    Auto FB

    In 3

    Output

    Fail

    Motor

    PU-2

    S/S

    PU-2

    STA

    PU-2

    AU

    DEMAND OK

    OR

    PU-1 FAIL

    HIGH DEMAND

    FCV-

    04

  • Pipe & Instrument DiagramConcentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    LCV-

    01

    DO

    SL-01

    DO

    Strobe

    AT-01

    AI

    FCV-

    01

    DO

    Drain

    FCV-

    02

    DO

    PU-2

    S/S

    DO

    PU-2

    AU

    DI

    PU-2

    STA

    DI

    PU-1

    S/S

    DO

    PU-1

    AU

    DI

    PU-1

    STA

    DI

    PT-01

    AI

    FCV-

    03

    DO

    FCV-

    04

    DO

    XStrobeSL-01

    DO

  • Control Specifications

    As the well water is not chlorinated, a chlorine injection control loop should be provided monitoring the total free chlorine a recirculation line available from the distribution pump discharge to the tank level and keeping this parameter at a set point of 2 PPM.

    Concentrated chlorine should be injected on this recirculation line using a variable speed injection pump.

    The chlorine parameter should be monitored and alarmed for high and low alarms. If the chlorine parameter is over a high high or a low low predetermined set points the system should shut down the potable water distribution pumps and an a visible alarm should be generated.

  • SAMA DrawingsAT-02

    PID

    SC-01

    AT-02 HH/A

    Set = 2.5 PPM

    LL/A

    Set = 0.5 PPM

    HIGH CHLORINE

    LOW CHLORINE

    OR

    HIGH CHLORINE

    LOW CHLORINE

    PUMP

    SHUTDOWN

    CHLORINE

    ALARM

    OR

    WELL ALARM

    SL-01TURBIDITY ALM.

    CHLORINE

    ALARMSL-02

  • SAMA Drawings

    Stop

    Start

    Interlock

    Status FB

    Auto FB

    Output

    Fail

    Motor

    PU-1

    S/S

    1

    PU-1 FAIL

    PU-1

    STA

    PU-1

    AU

    FCV-

    03

    PUMP

    SHUTDOWN

    Stop

    Start

    Interlock

    Status FB

    Auto FB

    Output

    Fail

    Motor

    PU-2

    S/S

    PU-2

    STA

    PU-2

    AU

    DEMAND OK

    OR

    PU-1 FAIL

    HIGH DEMAND

    FCV-

    04

    PUMP

    SHUTDOWN

  • Pipe & Instrument DiagramConcentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    LCV-

    01

    DO

    SL-01

    DO

    Strobe

    AT-01

    AI

    FCV-

    01

    DO

    Drain FCV-

    02

    DO

    PU-2

    S/S

    DO

    PU-2

    AU

    DI

    PU-2

    STA

    DI

    PU-1

    S/S

    DO

    PU-1

    AU

    DI

    PU-1

    STA

    DI

    PT-01

    AI

    FCV-

    03

    DO

    FCV-

    04

    DO

    AT-02AI

    SC-01

    AO

    SL

    -02

    XStrobeSL-01

    DO

  • Control Specifications

    Concentrated chlorine is kept on a small

    tank and low level condition of this tank

    should be monitored and alarmed. A

    visible alarm should be generated if the

    concentrated chlorine is at low level

    condition.

  • SAMA Drawings

    OR

    WELL ALARM

    SL-01TURBIDITY ALM.

    CHLORINE

    ALARM

    LSL-

    01SL-03

  • Concentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    LCV-

    01

    DO

    SL-01

    DO

    Strobe

    AT-01

    AI

    FCV-

    01

    DO

    Drain

    FCV-

    02

    DO

    PU-2

    S/S

    DO

    PU-2

    AU

    DI

    PU-2

    STA

    DI

    PU-1

    S/S

    DO

    PU-1

    AU

    DI

    PU-1

    STA

    DI

    PT-01

    AI

    FCV-

    03

    DO

    FCV-

    04

    DO

    AT-02AI

    SC-01

    AO

    FSH-

    01DI

    LSL-

    01DI

    Pipe & Instrument Diagram

    SL

    -02

    SL

    -03

    XStrobeSL-01

    DO

  • Pipe & Instrument DiagramConcentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    LCV-

    01

    DO

    SL-01

    DO

    Strobe

    AT-01

    AI

    FCV-

    01

    DO

    Drain

    FCV-

    02

    DO

    PU-2

    S/S

    DO

    PU-2

    AU

    DI

    PU-2

    STA

    DI

    PU-1

    S/S

    DO

    PU-1

    AU

    DI

    PU-1

    STA

    DI

    PT-01

    AI

    FCV-

    03

    DO

    FCV-

    04

    DO

    AT-02AI

    SC-01

    AO

    FSH-

    01DI

    LSL-

    01DI

    FT-02

    AI

    FT-03

    AI

    FT-04

    AI

    SL

    -03

    SL

    -02

    XStrobeSL-01

    DO

  • Control Specifications

    Header temperature should be monitored

    for high and low temperature conditions.

    Both conditions should generate a visible

    alarm.

  • SAMA Drawings

    OR

    HIGH HDR TEMP.

    LOW HDR TEMP

    HDR TEMP ALM.

    OR

    WELL ALARM

    SL-01

    TURBIDITY ALM.

    CHLORINE

    ALARM

    LSL-

    01

    HDR TEMP ALM.

    TT-01 H/A

    Set = 80 oF

    L/A

    Set = 60 oF.

    HIGH HDR TEMP.

    LOW HDR TEMP.

  • Pipe & Instrument DiagramConcentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    LCV-

    01

    DO

    SL-01

    DO

    Strobe

    AT-01

    AI

    FCV-

    01

    DO

    Drain

    FCV-

    02

    DO

    PU-2

    S/S

    DO

    PU-2

    AU

    DI

    PU-2

    STA

    DI

    PU-1

    S/S

    DO

    PU-1

    AU

    DI

    PU-1

    STA

    DI

    PT-01

    AI

    FCV-

    03

    DO

    FCV-

    04

    DO

    AT-02AI

    SC-01

    AO

    FSH-

    01DI

    LSL-

    01DI

    FT-02

    AI

    FT-03

    AI

    FT-04

    AITT-01

    AI

    SL

    -03

    SL

    -02

    XStrobeSL-01

    DO

  • Control Specifications

    Tank temperature should be kept at a set

    point of 25 oC. Steam is available to be

    used on the tank jacket for temperature

    control purposes

  • SAMA Drawings

    TT-02

    PID

    TCV-

    01

  • Pipe & Instrument Diagram

    Concentrated Chlorine

    User A

    User B

    User C

    Potable Water Tank

    Chlorine injection pump

    Pump 1

    Pump 2

    Well

    Pump

    City

    Water

    LT-01AI

    WE-1

    S/S

    DO

    WE-1

    AU

    DI

    WE-1

    STA

    DI

    FT-01AI

    LCV-

    01

    DO

    SL-01

    DO

    Strobe

    AT-01

    AI

    FCV-

    01

    DO

    Drain

    FCV-

    02

    DO

    PU-2

    S/S

    DO

    PU-2

    AU

    DI

    PU-2

    STA

    DI

    PU-1

    S/S

    DO

    PU-1

    AU

    DI

    PU-1

    STA

    DI

    PT-01

    AI

    FCV-

    03

    DO

    FCV-

    04

    DO

    AT-02AI

    SC-01

    AO

    FSH-

    01DI

    LSL-

    01DI

    FT-02

    AI

    FT-03

    AI

    FT-04

    AITT-01

    AI

    Steam

    TCV-

    01

    AO

    SL

    -03

    SL

    -02

    XStrobeSL-01

    DO