run 11 rhic machine/experiments meeting

39
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV Run Readiness √s = 19 GeV very preliminary results from STAR

Upload: zan

Post on 06-Jan-2016

20 views

Category:

Documents


0 download

DESCRIPTION

14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV Run Readiness √s = 19 GeV very preliminary results from STAR. Run 11 RHIC Machine/Experiments Meeting. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Run 11 RHIC Machine/Experiments Meeting

RUN 11 RHIC MACHINE/EXPERIMENTS MEETING

14 Jun 2011

Agenda:

• √s = 200 GeV AuAu progress• ZDC Calibration for AnDY – the plan• Request from AnDY• √s = 27 GeV Run Readiness• √s = 19 GeV very preliminary results from STAR

Page 2: Run 11 RHIC Machine/Experiments Meeting

Run 11 Plan based on PAC recommendation/ALD Guidance and available funds 6/14/10 update

• 3 Jan, Begin cool-down to 4.5K • 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins• 24 Jan, 1 week Ramp-up with 8 hr/night beam to experiments• 11 Feb (machine and ~experiments), begin ~10 week physics run (√s = 500 GeV pp)• 7 Mar, cryo troubles, extended maintenance, 0900 hrs till 2000 hrs 14 Mar – lost 7.5 days• 17 Mar, power distribution problem, extended maintenance, 1930 hrs till 0315 hrs 20 Mar –

lost 2.3 days• 18 Apr, end 9.4 week physics run at √s = 500 GeV• 18 Apr jet target polarization measurement at injection (<5%) • 19 Apr, short maintenance followed by setup for √s = 18 GeV AuAu• 23 Apr, begin ~1 week physics run (√s = 19.6 AuAu)• 2 May 08:00, end 1.3 week physics run at √s = 19.6 GeV• 2 May, begin setup for √s = 200 AuAu• 5 May, begin 2 day Ramp-up with 8 hr/night beam to experiments• 6 May 11:37, begin ~8 week physics run at (√s = 200 GeV/n AuAu)

• 14 Jun- TODAY• 20 June 08:00, end 6.4 wk AuAu physics run at √s = 200 GeV/n, begin 8 hr APEX• 20 -21 June, setup for √s = 27 GeV/n• 22 June, begin 1 week √s = 27 GeV/n physics run• 29 June, end 1 week √s = 27 GeV/n physics run, begin warm-up• 30 June, cryo warm-up ~ complete, end 25.4 weeks cryo operation

Page 3: Run 11 RHIC Machine/Experiments Meeting

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5-M

ay

12

-Ma

y

19

-Ma

y

26

-Ma

y

2-J

un

9-J

un

16

-Ju

n

Inte

gra

ted

Lu

min

os

ity

[m

b^

-1]

Run11 RHIC AuAu Integrated Luminosity for Physics(√s = 200 GeV/n)

STAR PHENIX Lmax Lmin PHENIX Run10

thru store 16061Tuesday 14 Jun

STAR Goal

PHENIX Goal

Page 4: Run 11 RHIC Machine/Experiments Meeting

0

200

400

600

800

1000

1200

1400

0

200

400

600

800

1000

1200

1400

15750 15800 15850 15900 15950 16000 16050 16100

Del

iver

ed lu

mi/

wee

k (m

b-1 )

lum

i/w

eek

for >

3 hr

stor

es a

nd 6

0% ti

me

at st

ore

(mb-1

)

Store Number

Run 11 100 x 100 GeV/n Au-Au (Phenix)60% time at store Integrated lumi Delivered Integrated Lumi/week (Physics)thru fill 16053

Goal

~ 105 hrs/week at store

Page 5: Run 11 RHIC Machine/Experiments Meeting

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

0

10

20

30

40

50

60

15750 15800 15850 15900 15950 16000 16050 16100

aver

age

bunc

h in

tens

ity a

t beg

inni

ng o

f sto

re(x

109 )

Max

imum

Lum

inos

ity

(x 1

026 cm

-2 s-1

)

Store Number

Run 11 100 x 100 GeV/n Au-Au (Phenix)Maximum Luminosity (>3 hr store) Blue/Yellow Average Bunch Intensitythru fill 16053

Page 6: Run 11 RHIC Machine/Experiments Meeting

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac/EBIS Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX

RHIC Research with s = 500 GeV pp

RHIC Research with s = 200 GeV /n AuAu

RHIC Research with s = 27 GeV /n AuAu

RHIC Research with s = 19.6 GeV /n AuAu

RHIC AnDY Drell-Yan Test (2:00 IR)

Extended Maintenance

NSRL (NASA Radiobiology)

BLIP (Isotopes)

BLIP (other)

Shutdown (RHIC)

C-A Operations-FY11

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2011

13 Jun 11

setup with beams

Sep

concurrent with RHIC

ramp up luminosity

5 Oct

25.4 weeks

3Jan

24 Nov

setup as required

10 weeks physics

6.4 weeks

.4 weeks

as run/planned

11A 11B10C

31 Jun

15 Mar 20 May

9.4 weeks

1.3

30 Jun

1

Page 7: Run 11 RHIC Machine/Experiments Meeting

Through 31 May 2011

Page 8: Run 11 RHIC Machine/Experiments Meeting

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

-30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

MW

Days since beginning of Run

RHIC Operations FY09-11CAD Power 09

CAD Power 10

CAD Power 11

thru 31 May

Page 9: Run 11 RHIC Machine/Experiments Meeting

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

-30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

MW

Days since beginning of Run

RHIC Cryo Operations FY09-11RHIC Cryo 09

RHIC Cryo 10

RHIC Cryo 11

thru 31 May

Page 10: Run 11 RHIC Machine/Experiments Meeting

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

-5 5 15 25 35 45 55 65 75 85 95 105 115 125 135 145 155

MW

Days since beginning of Run

RHIC Cryo Operations FY09-11RHIC Cryo 09

RHIC Cryo 10

RHIC Cryo 11

thru 31 May

Page 11: Run 11 RHIC Machine/Experiments Meeting

Old information

Page 12: Run 11 RHIC Machine/Experiments Meeting

AnDY Revised 6/3/2011Singles Corrected (draft – another correction likely)

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr

De

live

red

Lu

min

os

ity

(pb

-1)

Date

Run 11 250 x 250 GeV pp, Luminosity2.9 mb STAR, 2.7 mb PHENIX, 0.95 mb AnDY

STAR

PHENIX

ANDY(x10)

max

min

thru fill final 15472, 18 Apr

Page 13: Run 11 RHIC Machine/Experiments Meeting

√S = 200 GeV/n AuAu luminosity goals (24 May efficiencies)

STAR

2000 mb-1 sampled / 60% = 3300 mb-1 delivered

PHENIX

700 mb-1 sampled / 14% = 5000 mb-1 delivered

Estimate from PHENIX Beam Use Proposal – 15.8%• Live Time = 97%• Uptime = 65%• +/- 10 cm vertex = 25%

Page 14: Run 11 RHIC Machine/Experiments Meeting

9.7 hour store comparing AnDY Lumi to STAR and PHENIX

Not singles corrected

Page 15: Run 11 RHIC Machine/Experiments Meeting

LumiPHENIX = 5.88E9/2.7mb = 2.18 pb-1

STAR = 5.36E9/2.9 mb = 1.84 pb-1

AnDY = 0.52E9/0.95 mb = 0.55 pb-1

b*’sPHENIX ~0.7 mSTAR ~0.8 mAnDY ~ 3 m

9.7 hour store comparing AnDY Lumi to STAR and PHENIX

AnDY Lumi ~consistent with larger b* (x4 less Lumi)

Not singles corrected

PHENIX Lumi (singles corrected) for entire store = 3.09 pb-1

Page 16: Run 11 RHIC Machine/Experiments Meeting

Store 15408 – AnDY projection• 2:00 b* = 3 meters

– AnDY fraction of store 15408 = 0.55/3.09 = 18%

• With 2:00 b* = 1.5 meters– AnDY fraction of store 15408 would have been 2x18%=36%

– using Fischer et.al. 11 May 2010 Table 7 lumi projections for Run12 Physics Weeks Max Lumi Min Lumi AnDY Est (1.5 m b*)

8 276 pb-1 98 pb-1 35-99 pb-1

10 388 pb-1 134 pb-1 48-140 pb-1

12 500 pb-1 170 pb-1 61-180 pb-1

100 pb-1 is not an unreasonable expectation for a 10-12 week run

Page 17: Run 11 RHIC Machine/Experiments Meeting

0

20

40

60

80

100

120

0

200

400

600

800

1000

1200

15750 15800 15850 15900 15950 16000 16050

max

imum

lum

i (x

1026

cm-2

s-1)

lum

i/w

eek

for >

3 hr

stor

es a

nd 6

0% ti

me

at st

ore

(mb-1

)

Store Number

Run 11 100 x 100 GeV/n Au-Au (Phenix)60% time at store Integrated lumi Maximum Luminositythru fill 16016

Page 18: Run 11 RHIC Machine/Experiments Meeting

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

0

10

20

30

40

50

60

15750 15800 15850 15900 15950 16000 16050

aver

age

bunc

h in

tens

ity a

t beg

inni

ng o

f sto

re(x

109 )

Max

imum

Lum

inos

ity

(x 1

026 cm

-2 s-1

)

Store Number

Run 11 100 x 100 GeV/n Au-Au (Phenix)Maximum Luminosity (>3 hr store) Blue/Yellow Average Bunch Intensitythru fill 16016

Page 19: Run 11 RHIC Machine/Experiments Meeting

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

0

200

400

600

800

1000

1200

15750 15800 15850 15900 15950 16000 16050

aver

age

bunc

h in

tens

ity a

t beg

inni

ng o

f sto

re(x

109 )

lum

i/w

eek

for >

3 hr

stor

es a

nd 6

0% ti

me

at st

ore

(mb-1

)

Store Number

Run 11 100 x 100 GeV/n Au-Au (Phenix)60% time at store Integrated lumi Blue/Yellow Average Bunch Intensitythru fill 16016

Page 20: Run 11 RHIC Machine/Experiments Meeting

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

0

10

20

30

40

50

60

15750 15800 15850 15900 15950 16000 16050

aver

age

bunc

h in

tens

ity a

t beg

inni

ng o

f sto

re(x

109 )

Max

imum

Lum

inos

ity

(x 1

026 cm

-2 s-1

)

Store Number

Run 11 100 x 100 GeV/n Au-Au (Phenix)Maximum Luminosity (>3 hr store) Blue/Yellow Average Bunch Intensitythru fill 16016

Page 21: Run 11 RHIC Machine/Experiments Meeting

Fill 15974, not singles corrected

Fill 15974, with singles correction

26%

6%

Page 22: Run 11 RHIC Machine/Experiments Meeting

Fill 15974

Goal 17-20

Goal 122

Peak Lumi goal 45 x 1026 cm-2s-1

Average Lumi goal 25 x 1026 cm-2s-1

Long emitt

x,y emitt

Blue/yellow ions

Page 23: Run 11 RHIC Machine/Experiments Meeting

Store 15408 – AnDY projection• 2:00 b* = 3 meters

– AnDY fraction of store 15408 = 0.55/3.09 = 18%

• With 2:00 b* = 1.5 meters– AnDY fraction of store 15408 woulh have been 2x18%=36%

– using Fischer et.al. 11 May 2010 Table 7 lumi projections for Run12 Physics Weeks Max Lumi Min Lumi AnDY Est (1.5 m b*)

8 276 pb-1 98 pb-1 35-99 pb-1

10 388 pb-1 134 pb-1 48-140 pb-1

12 500 pb-1 170 pb-1 61-180 pb-1

100 pb-1 is not an unreasonable expectation for a 10-12 week run

Page 24: Run 11 RHIC Machine/Experiments Meeting

i.e. there’s still an issue with singles corrections.

0.5000

0.7500

1.0000

1.2500

1.5000

1.7500

2.0000

0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0

Rati

o PH

ENIX

/STA

R ZD

C (s

ingl

es co

rrec

ted)

peak lumi (x 1026 cm-2s-1)

PHENIX/STAR Lumi Ratios, 250 GeV pp Run 11PHENIX/STAR Ratio NOT Singles Corrected

Page 25: Run 11 RHIC Machine/Experiments Meeting

$(20)

$-

$20

$40

$60

$80

$100

$120 O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

Oct

-11

$/M

Wh

rBNL Energy Cost Billed Cost/MWhr

Without Balanced Billing

Balanced Billing Projection

RHIC ON

AGS SEB/FEB

NSRL

through Apr 2011

Page 26: Run 11 RHIC Machine/Experiments Meeting

Through fill 15928 delivered 1474 mb-1

201 ub^-1 of 700 ub^-1 accumulated in 12cm vertex Efficiency = 201/1474 = 14%

Page 27: Run 11 RHIC Machine/Experiments Meeting

0.50

0.75

1.00

1.25

1.50

1.75

2.00

15160 15210 15260 15310 15360 15410 15460

Rati

o PH

ENIX

/STA

R ZD

C (s

ingl

es co

rrec

ted)

fill number

Phenix/STAR Lumi Ratio, 250 GeV pp Run 11

Final Lumi should change as it appears there’s an issue with the singles correction

Page 28: Run 11 RHIC Machine/Experiments Meeting

0

1

1

2

2

3

3

4

0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00

PHEN

IX p

b-1/

stor

e (s

ingl

es c

orre

cted

)

blue beam intensity at physics start (1E11/bunch)

Phenix Lumi vs beam intensity, 250 GeV pp Run 11

Page 29: Run 11 RHIC Machine/Experiments Meeting

Run 11 Plan based on PAC recommendation/ALD Guidance and available funds 4/26/10 update (1/2)

• 3 Jan, Begin cool-down to 4.5K • 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins• ~11 Jan, 2 ⅟2 weeks beam setup for √s = 500 GeV pp in RHIC begins.• 15 Jan, power supply work/DX training complete• 17 Jan, first successful ramp• 19 Jan, 1st maint day• 24 Jan, 1 week Ramp-up with 8 hr/night beam to experiments• 11 Feb (machine and ~experiments), begin ~10 week physics run (√s = 500 GeV pp)• 16 Feb, AGS Jump Quads in routine operation for RHIC injection• 24 Feb, 9 MHz cavity in routine operation • 7 Mar, cryo troubles, extended maintenance, 0900 hrs till 2000 hrs 14 Mar – lost 7.5 days• 17 Mar, power distribution problem, extended maintenance, 1930 hrs till 0315 hrs 20 Mar – lost 2.3 days• 28 March – 1 April, PAC 2011• 15 April Continuing Resolution Ends, guidance to follow• 18 Apr, end 9.4 week pp physics run at √s = 500 GeV • 18 Apr jet target polarization measurement at injection (<5%) • 19 Apr, short maintenance followed by setup for √s = 18 GeV AuAu• 23 Apr, begin ~1 week physics run (√s = 19.6 AuAu)

• 2 May, end 1.3 week physics run at √s = 19.6 GeV

Page 30: Run 11 RHIC Machine/Experiments Meeting

30.00

35.00

40.00

45.00

50.00

55.00

60.00

65.00

0 50 100 150 200 250 300

Pola

riza

tion

(%

)

energy (GeV)

Up down ramp, Blue Beampolarization with current analyzing powers

Up

Down

+11.0 %

-28.5 %

+6.8%

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 50 100 150 200 250 300

Asy

mm

etry

(x10

2 )

energy (GeV)

Up down ramp, Blue BeamAsymmetry

Up

Down

-15.0%

-11.3%

-5.0%

7 April Up-Down Ramp measurementBlue Beam

Current CNI average analyzing powers are:Energy AN

24 0.0144100 0.0122250 0.0147

Page 31: Run 11 RHIC Machine/Experiments Meeting

30.00

35.00

40.00

45.00

50.00

55.00

60.00

65.00

0 50 100 150 200 250 300

Pola

riza

tion

(%

)

energy (GeV)

Up down ramp, Yellow Beampolarization (#1 only) with current analyzing powers

Up

Down

+24.4 % -23.1 %

-0.4 %

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0 50 100 150 200 250 300

Asy

mm

etry

(X10

2 )

energy (GeV)

Up down ramp, Yellow Beamasymmetry (CNI #1 only)

Up

Down

-13.3%

-15.9%

-1.9%

7 April Up-Down Ramp measurementYellow Beam (only Yellow 1 was used as Yellow 2 was acting up)

Current CNI average analyzing powers are:Energy AN

24 0.0144100 0.0122250 0.0147

Page 32: Run 11 RHIC Machine/Experiments Meeting
Page 33: Run 11 RHIC Machine/Experiments Meeting
Page 34: Run 11 RHIC Machine/Experiments Meeting

A good store with 9 MHzSat 2/26

Page 35: Run 11 RHIC Machine/Experiments Meeting

Run 11, First overnight store, Mon Jan 24 00:12Fill number 14919,, s=500 GeV21 days since start of cool-down

20K

20 x 1011

• 28 x 27 bunches• b*=0.65 meters

For peak store lumi = 170 x 1030 cm-2s-1 (projected MAXIMUM)ZDC Rate ~ 400K (assuming 2.4 mb n-pair xsection)

Page 36: Run 11 RHIC Machine/Experiments Meeting

Run 9, First overnight store at s=500 GeV22 days after start of cool-down

• 56 x 56 bunches• b*=0.7 meters

40K

40 x 1011

Page 37: Run 11 RHIC Machine/Experiments Meeting

AGS pp log, 23 Feb 09, 00:26

Page 38: Run 11 RHIC Machine/Experiments Meeting

PHENIX Goal (50% pol)

STAR Goal (50% pol)

Goals to be updated/corrected

Page 39: Run 11 RHIC Machine/Experiments Meeting

Run-11 Au-Au luminosity projections 100 GeV/nucleon

Wolfram Fischer 39

Assume 6 weeks to ramp-up for min, and 8 weeks for max (stoch. cooling re-commissioning).Expect Lavg up to 25x1026cm-2s-1 (+25%).

[from Run-10 to max: b* = 0.75 0.65 m, Nb = 1.1 1.1x109, more cooling]

PHENIX Goal (0.7 recorded)

?? (complicated)

STAR Goal (TBD)

Goals to be updated/corrected