Run 16 RHIC Machine/Experiments Meeting February 23, 2016 Agenda : Run 16 Schedule (Christie) Status of the aperture studies for IR2, and possible d-Au impacts (Chuyu Liu) Other READYTALK LOGIN INFO Audio Login Toll-Free (US & Canada): 866.740.1260 Toll: 303.248.0285 Access Code: 8304505 ReadyTalk link https://core.readytalk.com/interface/guest.jsp?host=readytalk&an=8667401260&ac=8304505

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

Run 16 RHIC Machine/Experiments MeetingFebruary 23, 2016

Agenda:

• Run 16 Schedule (Christie)• Status of the aperture studies for IR2, and possible d-Au impacts

(Chuyu Liu)• Other

READYTALK LOGIN INFOAudio LoginToll-Free (US & Canada): 866.740.1260 Toll: 303.248.0285 Access Code: 8304505

ReadyTalk link https://core.readytalk.com/interface/guest.jsp?host=readytalk&an=8667401260&ac=8304505

Page 2: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

Run 16 plan based on 20 weeks cryo operationand Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015

Today, 23 Feb…• 19 Jan, Begin cool-down to 4.5K

• 25 Jan, Beam in Yellow

• 22 26 Jan, Beam in Blue

• 29 Jan, Feb 3, First Collisions

• 5 7 Feb, Begin 10 week √s=200 GeV/n AuAu physics run• 15 18 April, End 10 week √s=200 GeV/n AuAu physics run

• 16 19 April, Begin 1.4 week √s=20 GeV/n dAu physics run• 26 29 April, End 1.4 week √s=20 GeV/n dAu physics run

• 29 April, Begin 1.4 week √s=39 GeV/n dAu physics run• 9 May, End 1.4 week √s=39 GeV/n dAu physics run

• 12 May, Begin 0.9 week √s=62 GeV/n dAu physics run• 18 May, End 0.9 week √s=62 GeV/n dAu physics run

• 21 May, Begin 0.9 week √s=200 GeV/n dAu physics run• 27 May, End 0.9 week √s=200 GeV/n dAu physics run

• 29 May, Begin 5 day E=40 GeV/n Au CEC physics run• 3 June, End 5 day E=40 GeV/n Au CEC physics run

• 3 June, begin cryo warm-up• 7 June, cryo warm-up complete, 20.0 cryo weeks of operation

See http://www.rhichome.bnl.gov/AP/RHIC2016/ for the Run Coordinator’s detailed plan

• dAu setup time as per Chuyu 1/6/16 email • Actual physics time for each

energy is TBD

dAu schedule as proposed by PHENIX, scaled to 4.7 total physics weeks

Schedule in Orange text not updated yet

Page 3: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

From Fischer et. al., RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015

PHENIX goals: 10 weeks, 1.8 nb-1 with 12 billion MB events recorded within |z|< 10 cm vertex, request dynamic β* squeeze.STAR goals: 13 weeks 10 nb-1 sampled for MTD and 2 billion MB events recorded within |z| < 6 cm for HFT

Page 4: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,
Page 5: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

SCHEDULE FOR WEEK FROM MONDAY FEB. 22ND – SUNDAY FEB. 28TH

MONDAY:- PHYSICS RUNNING

TUESDAY:- PHYSICS RUNNING ALL DAY- LINAC MAINTENANCE 8 AM TO 11 AM

WEDNESDAY:- PHYSICS RUNNING UNTIL 7:45 AM- APEX 8 AM TO 11 PM- 11 PM PHYSICS RUNNING- LINAC SETUP FOR 200 MEV 8 AM TO 11 AM- LINAC 200 MEV EXPERIMENTAL EXPOSURES 11 AM TO 1 PM- LINAC 200 MEV PRODUCTION RUNNING 1 PM ON

THURSDAY:- PHYSICS RUNNING UNTIL 10 AM- BEAM DEV. 10 AM TO 6 PM (56 MHZ & BETA SQUEEZE FOR IP8)- PHYSICS RUNNING 6 PM ON

FRIDAY THROUGH WEEKEND:- PHYSICS RUNNING

Page 6: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

http://www.bnl.gov/cad/esfd

Scheduling Physicist: Christie

AGS-Booster-Tandem/Linac/EBIS Startup

RHIC Cryo scrub & Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

AGS polarized proton studies

RHIC STAR & PHENIX

• RHIC Research with √s = 200 GeV/n AuAu

• RHIC Research with √s = 20,39,62,200 GeV/n dAu

CeC POP Experiment E=40 GeV/n Au

Contingency

NSRL (NASA Radiobiology)

NSRL (NASA-Langley)

BLIP (Isotopes)

BLIP (Other)

Shutdown (RHIC)

C-A Operations-FY16

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2015

14 Jan 16

setup with beams

Sep

concurrent with RHIC

ramp up luminosity

setup as required

16 weeks

10 weeks4.7 physics wks

.4 weeks

12 Oct20 Nov

15C 4 April

4 Jan

16A

5.5 weeks

13 May

30 June

19 Jan

planned

20 weeks

7 Jun

16B

27 May

TBD

31 Jul

15 Apr 22 Jan 5 days

1 Apr

21 Mar

19 Oct 20 Oct

3 Jun

Page 7: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

Archive

Page 8: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

-60 -40 -20 0 20 40 60 80 100 120 140 160 180 200

MW

Days since beginning of Run

RHIC Operations FY14-16CAD Power 14

CAD Power 15

CAD Power 16

as of 20 Jan

Page 9: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

-60 -40 -20 0 20 40 60 80 100 120 140 160 180 200

MW

Days since beginning of Run

RHIC Cryo Operations FY14-16RHIC Cryo 14

RHIC Cryo 15

RHIC Cryo 16

as of 20 Jan

Page 10: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,
Page 11: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

Balanced Billing for the lab +$683K (ahead) Sep through Dec 2015

Page 12: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

d-Au : 5 weeks, 4 energies• “Five to seven weeks of running to perform a small

system beam energy scan (PAC) »

Our optimized choice for 5 weeks: • 20 GeV 1.5 week 9M (BUP: 7M)• 39 GeV 1.5 week 110M (110M)• 62 GeV 1. week 160M (230M)• 200 GeV 1. week 1.6 B (2.4B)Allowing a complete energy scan in the same detectionconditions, and keeping BUP and PAC goals of measuring the excitation function of 2-particle correlations and V2, and possibly - the first BES measurement of V3 in small systems at RHIC.19/01/2016 PHENIX RC RHIC machine-experiment 12

From 1/19/2016 D. Jouan presentation

Page 13: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

From Fischer et. al., RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015

----- 11.0----- 5.0----- 1.5

Chuyu’s latest projections

Page 14: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

Who’s Who for 2016

RHIC 100 x 100 GeV AuAu:Run Coordinator: Xiaofeng Gu, [email protected] , 631-344-4724

RHIC dAu Energy Scan: Run Coordinator: Chuyu Liu, [email protected] , 631-344-4431

RHIC CeC POP Experiment:Run Coordinator: TBD

Scheduling Physicist: Bill Christie, [email protected], 631-344-7137 (x4643 after 29 Jan)

Assistant Scheduling Physicists through 29 Jan:Yousef Makdisi, [email protected], 631-344-4932Phil Pile, [email protected], 631-344-4643

AGS Liaison: Haixin Huang, [email protected] , 631-344-5446

Page 15: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

0

5

10

15

20

25

30

35

40

45

50

1-O

ct-1

01-

Dec

-10

1-Fe

b-11

1-Ap

r-11

1-Ju

n-11

1-Au

g-11

1-O

ct-1

11-

Dec

-11

1-Fe

b-12

1-Ap

r-12

1-Ju

n-12

1-Au

g-12

1-O

ct-1

21-

Dec

-12

1-Fe

b-13

1-Ap

r-13

1-Ju

n-13

1-Au

g-13

1-O

ct-1

31-

Dec

-13

1-Fe

b-14

1-Ap

r-14

1-Ju

n-14

1-Au

g-14

1-O

ct-1

41-

Dec

-14

1-Fe

b-15

1-Ap

r-15

1-Ju

n-15

1-Au

g-15

1-O

ct-1

51-

Dec

-15

Dai

ly A

vera

ge P

ower

(MW

)

Date

BNL Energy Use FY 2011-16RHIC Cryo RHIC other AGS-Exp

Booster AGS-Mach Tandem

CAD Bldg less SMD NSRL Site Base

BNL Peak-Avas of 20 Jan 2016

Page 16: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

1-O

ct-0

11-

Apr-0

21-

Oct

-02

1-Ap

r-03

1-O

ct-0

31-

Apr-0

41-

Oct

-04

1-Ap

r-05

1-O

ct-0

51-

Apr-0

61-

Oct

-06

1-Ap

r-07

1-O

ct-0

71-

Apr-0

81-

Oct

-08

1-Ap

r-09

1-O

ct-0

91-

Apr-1

01-

Oct

-10

1-Ap

r-11

1-O

ct-1

11-

Apr-1

21-

Oct

-12

1-Ap

r-13

1-O

ct-1

31-

Apr-1

41-

Oct

-14

1-Ap

r-15

1-O

ct-1

5

Dai

ly A

vera

ge P

ower

(MW

)

Date

C-AD Energy Use FY 2002-16as of 20 Jan 2016

Page 17: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

0.0

2.0

4.0

6.0

8.0

10.0

12.0

1-O

ct-0

11-

Apr-0

21-

Oct

-02

1-Ap

r-03

1-O

ct-0

31-

Apr-0

41-

Oct

-04

1-Ap

r-05

1-O

ct-0

51-

Apr-0

61-

Oct

-06

1-Ap

r-07

1-O

ct-0

71-

Apr-0

81-

Oct

-08

1-Ap

r-09

1-O

ct-0

91-

Apr-1

01-

Oct

-10

1-Ap

r-11

1-O

ct-1

11-

Apr-1

21-

Oct

-12

1-Ap

r-13

1-O

ct-1

31-

Apr-1

41-

Oct

-14

1-Ap

r-15

1-O

ct-1

5

Dai

ly A

vera

ge P

ower

(MW

)

Date

C-AD Cryo Energy Use FY 2002-16as of 20 Jan 2016

Page 18: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

Who’s Who for 2016

RHIC 100 x 100 GeV AuAu:Run Coordinator: Xiaofeng Gu, [email protected] , 631-344-5446 (office)

RHIC dAu Energy Scan: Run Coordinator: Chuyu Liu, [email protected] , 631-344-4431 (office)

Scheduling Physicist: Bill Christie, [email protected], 631-344-7137Assistants through 29 Jan:Yousef Makdisi, [email protected], 631-344-4932(office)Phil Pile, [email protected], 631-344-4643 (office), 631-834-2005 (cell)

AGS Liaison: Haixin Huang, [email protected] , 631-344-5446 (office)

Page 19: Run 16 RHIC Machine/Experiments Meeting · Run 16 plan based on 20 weeks cryo operation. and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015. Today,

19

PHENIX Proposal for Run-16