Ryan HamelFrontier El Dorado Refining Company

KSU PPI InternSummer 2006

Erosion Control

Page 2: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Outline of Presentation

1. Company Background

2. Researched Process

3. Scope of the Project

4. Recommendations

5. Potential Benefits and Cost Savings

6. Internship Pros and Cons

7. Questions

Page 3: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Company Background

• FEDRC owned by Frontier Oil Corporation

• Fortune 500 Company (#496)

• 7th best performing stock of all companies listed on the New York stock exchange (2005)

• FEDRC employs 400 Frontier personnel and 100 contractors

Page 4: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Company Background

• FEDRC situated on 1,000 acre site, which has been in operation since 1917

• Frontier Oil Corp. purchased El Dorado site in 1999

• Direct access to pipelines from Canada and Cushing, Oklahoma

• FEDRC produces gasoline, diesel fuels, aviation fuels, asphalt, and other petroleum based products

Page 5: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Researched Process

• Reducing Primary Sludge

• Erosion Control in the Tank Farm

• Flow of stormwater through tank farm– Frequency of flow– Connection between channels– Stormwater channel characteristics

Page 6: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control
Page 7: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control
Page 8: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Scope of the Project

• Soil Lost: 2500 cubic yards– ERE Maps, Tape Measure– Estimated Dimensions and Volume

• Primary Sludge: 25,000,000 lbs– 1 cubic yard soil weighs 2000 lbs– 1 lb soil creates 5 lbs primary sludge

Page 9: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Scope of the Project

• Yearly Sludge Production: 1,250,000 lbs– 25,000,000 lbs total– 50% of erosion occurred in past 10 years

• 10% of WWTP Sludge in 2005– 2005 WWTP Sludge: 13,540,022 lbs

Page 10: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Recommendations

• Armor Stormwater Channels– Groundcover– Global Fill– Rock

• Protecting Inlets and Outlets

• Procedural Changes

Page 11: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Cost Estimate

• Total Cost: $170,000 - $300,000

– High-Priority Areas ($170,000 - $200,000)– Entire Area ($250,000 - $300,000)

• Soil makes up 95% of this cost

• Cost varies according to material use

Page 12: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Benefits of Erosion Control

• Decreased Primary Sludge Generation

• Improved WWTP Efficiency

• Increased Capacity to Recycle Other Sludge

• Decreased Storage Needs

• Improved Stability of Pipe Rack Foundations

• SWP3 Compliance

Page 13: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Cost Savings

Area of Cost Savings Expected Annual Savings

Storage Container Rental Fees $36,135.00Off-site Disposal of Sludge $140,000.00Stormwater Flume Cleaning $1,500.00Pipe Rack Foundations

WWTP Efficiency

Total Savings: $177,635.00

Page 14: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Project Results

• Payback Period: 1.2 to 1.7 years

• Implement Erosion Control in Steps

• Combine erosion control in the tank farm with other practices

Page 15: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Internship Pros and Cons

• Gained experience in a field of interest

• Worked in environmental department

• Helped narrow my future career desires

• Very complex project working primarily on my own

Page 16: Ryan Hamel Frontier El Dorado Refining Company KSU PPI Intern Summer 2006 Erosion Control

Questions?