Sales Order Specific Planned Independent Requirement (PIR) ConsumptionRequirement (PIR) Consumption
• SAP ECC 6.0/ERP 6.0
SAP Solution BriefSAP Solution Brief
Index
Synopsis11
Sales Order Specific PIR ConsumptionRequirements
22
IT Sapiens’ Solution Features33
S l i M i
Solution Demo44
Solution Merits55
Our Value Proposition66
1Questions ?77
p
February 19th 2014 ©2014 IT Sapiens, Inc. Proprietary and Confidential
Synopsis11
Standard SAP Planned Independent Requirements (PIR) functionalityin all ERP versions: PIRs are created in ECC directly or are created in ECC through the APO Core y g
Interface PIR Plan can be “Active” or “Inactive” “Active” PIR Plans are relevant for MRP/MPS for planning Sales Orders acquisition and Delivery Post Goods Issues, nets/offsets/reduces an
“Active” PIR Plan, using the Planning Strategy, Consumption Logic and Consumption Periods defined at MRP Group Level or at the Material Master level
Several PIR Plans can be “Active” simultaneously In a VMI scenario, Customer specific PIR Plans are also created resulting in several
PIR plans being simultaneously “Active” When several PIR Plans are “Active” simultaneously, during the Sales Orders
acquisition and Delivery Post Goods Issues, the system offsets the first found PIR plan with the lowest Requirement Plan number
2
Standard SAP ECC Functionality does NOT provide an ability to control Sales Order specific (or Customer specific) PIR Plan netting/offsetting/reduction. THIS IS A GAP.
February 19th 2014 ©2014 IT Sapiens, Inc. Proprietary and Confidential
Sales Order Specific PIR Consumption Requirements22
Industry Requirements for PIR Plan Consumption: In cases where several PIR Plans are simultaneously “Active”
During Sales Order Acquisition and Delivery Post Goods Issue: Need ability to control netting/offsetting/reduction of specific PIR plans
Need ability to assign a specific PIR plan to a Sales Order Item factoring the compatibility of Requirement Types in Sales Order and Planning Strategy
In Txn MD73 “Display Ind. Requirements with Assigned Customer Requirements”: Based on the assignment of “Sales Order Specific PIR Plan”, need ability
to display “Assigned Sales Order quantities” against the PIR Plan assigned to the Sales Order
Based on the assignment of “Sales Order Specific PIR Plan”, need ability, upon Delivery Post Goods Issue to display “Withdrawal quantities” against the PIR Plan assigned to the Sales Order
Need ability to dis-allow changes to the Sales Order specific PIR Plan
3
assignment, if completed Deliveries (i.e. with Post Goods Issue processed) exist
February 19th 2014 ©2014 IT Sapiens, Inc. Proprietary and Confidential
IT Sapiens’ Solution Features33
Solution Excerpts: Provides the following features:
Ability to assign a specific PIR Plan to a Sales Order Item Using Txns VA01, VA02 Using Custom Txn which provides “Mass processing” capability too
During Sales Order Acquisition, system checks if any specific PIR assignment exists: If found, then that specific PIR Plan is offset/assigned with quantities If not found, then SAP standard functionality kicks in
D i D li P t G d I t h k if ifi PIR During Delivery Post Goods Issue, system checks if any specific PIR assignment exists: If found, then that specific PIR Plan is offset/assigned with withdrawal
titiquantities If not found, then SAP standard functionality kicks in
Dis-allows changes to Sales Order specific PIR assignment if completed Deliveries exist
4
Deliveries exist. SAP Standard Screen Exits and User Exits used. NO OTHER MODIFICATIONS.
February 19th 2014 ©2014 IT Sapiens, Inc. Proprietary and Confidential
Demo – Planned Independent Requirements Plans44
Process: Planned Independent Reqt Plans exist for following Materials
Material PH-PIR-1501 Plan # PIR-102013 Plan # PIR-102013 Plan # PIR-012014
Material PH-PIR-1502 Plan # PIR-102013 Plan # PIR-012014
5 (Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Sales Order Creation & PIR Plan # assignment44
Process: Transaction VA01 is used for Sales Order Creation during which PIR Plan # can be assigned
6
(Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Sales Order Creation & PIR Plan # assignment44
Process: Transaction VA01 is used for Sales Order Creation during which PIR Plan # can be assigned
7
(Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Sales Order Saved with PIR Plan # assignment44
Process: Sales Order Display shows that PIR Plan # assignment to items has been retained
8
(Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Display Independent Reqts. With Customer Assignments
44
Process: Txn MD73 for “Display Independent Reqts with Customer Assignments” shows that although
multiple PIR Plans are concurrently active, the systems assigns the Customer Reqts. to the EXACT PIR Plan # assigned to the Sales Order ItemEXACT PIR Plan # assigned to the Sales Order Item.
9
(Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Display Independent Reqts. With Customer Assignments
44
Process: Txn MD73 for “Display Independent Reqts with Customer Assignments” shows that although
multiple PIR Plans are concurrently active, the systems assigns the Customer Reqts. to the EXACT PIR Plan # assigned to the Sales Order ItemEXACT PIR Plan # assigned to the Sales Order Item.
10
(Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Stock/Requirements List shows PIR assignments44
Process: Stock/Requirements List shows the PIR Plan # assigned to Sales Order Item and the PIR Plan
# whose quantity is being offset/reduced. This will be the PIR Plan # that will also be offset with the Delivery Post Goods Issue toothe Delivery Post Goods Issue too.
11 (Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Stock/Requirements List shows PIR assignments44
Process: Stock/Requirements List shows, for Delivery, the PIR Plan # assigned to Sales Order Item and
the PIR Plan # that will also be offset with the Delivery Post Goods Issue too.
12 (Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Demo – Display Independent Reqts. With Customer Assignments – BEFORE & AFTER Delivery PGI
44
Process: Below screen shots of “Display Independent Reqts with Customer Assignments” BEFORE and
AFTER Delivery PGI shows that the EXACT PIR Plan # assigned to Sales Order Item gets reduced with Delivery Post Goods Issue (PGI)reduced with Delivery Post Goods Issue (PGI).
“BEFORE Delivery PGI”
“AFTER Delivery PGI”
13 (Contd…)February 19th 2014 ©2014 IT Sapiens, Inc.
Proprietary and Confidential
Solution Merits55
“Sales Order Specific PIR Consumption” Merits: When multiple PIR Plans are concurrently Active, this solution allows for exact
targeting of PIR Plan that would need to be consumed with Customer Requirements Ability to assign PIR Plan # to Sales Order Items in Txn VA01 and VA02 PIR Plan # assignment to Sales Order Item can be changed as follows:
Can be changed directly in Sales Order using Txn VA02 Can be changed using custom Txn “ZSOASSIGNPIR” Can be changed ONLY IF Delivery Post Goods Issue is NOT Processed
Ability to Mass Process assignment / update of PIR Plans to existing Sales Orders without assignment
Standard SAP Reports reflect exact PIR Consumptions and balance “open” PIR quantitiesF ti lit b ilt i S D li d U E it d NO MODIFICATIONS TO Functionality built using Sap Delivered User Exits and NO MODIFICATIONS TO ANY SAP STANDARD OBJECTS OR DATABASE TABLES
14 February 19th 2014 ©2014 IT Sapiens, Inc. Proprietary and Confidential
Our Value Proposition66
Reduced TCO, Highest First Pass Yield and Highest Quality from: Strong expertise in providing end-to-end Supply Chain Solutions Strong Expertise implementing SAP, enriching Business processes and
alleviating GAPs in SAP, for Life Sciences, Consumer Products, Chemical and High-Tech Industry segments
Very experienced consulting resource base with 12+ years experience and y p g y pdeep cross-functional expertise
Rich Knowledge base of custom solutions to address GAPs in most SAP applicationspp
Ability to demonstrate end-state on Day 1 using in-house SAP Systems rich with: Pre-configured SolutionsPre configured Solutions demo-able SAP Functionality Demo-able IT Sapiens custom solutions Framework to develop strawman solutions
15
Framework to develop strawman solutions Our “Say-To Do” Ratio is 1:1
February 19th 2014 ©2014 IT Sapiens, Inc. Proprietary and Confidential
Questions ?77
For more information…kindly contact
Vijay PisipatyDirector-ERP Solutions & ConsultingIT Sapiens, Inc.e-mail: [email protected]