    SAP QM Standard Questions

    1 Organization

    1.1 Quality Inspectors

    1.1.1 How many quality inspectors are there on each site?

    1.1.2 Is there a quality inspection hierarchy ie., in a lab/testing environment there is a Quality

    inspection clerk and a quality inspection supervisor?

    1.1.3 If there is a hierarchy, what tasks are allocated to which level and why?

    2 Master Data

    2.1 QM General - Inspection Plan

    2.1.1 Give an example for an inspection plan that you currently use and explain which critical data

    it contains.

    2.1.2 Do you have valid inspection descriptions and operations for each individual material or for all

    materials? (Are certain materials assigned the same inspection operations?) Describe them.

    2.2 QM General - Work Centers

    2.2.1 Do you have multiple inspection locations (work centers) per plant? Describe these locations,

    and identify how they are different. 2.2.2 Are inspectors assigned to a definite work center?2.2.3 Will approval procedures comply to the work center or operation? Describe this in detail.

    2.3 QM General - Inspection Characteristic/Master Inspection Characteristic

    2.3.1 Do you want to use qualitative and/or qualitative master inspection characteristics?

    2.3.2 How do you want to classify the master inspection characteristics?

    2.4 QM General - Material Specification

    2.4.0 (Information) You need a material specification to transfer quality inspection data to batch

    management. The specification completes the inspection plan or replaces it entirely, if detailed

    instructions are not required. (Information)

    2.4.1 Will you use material specifications as inspection criteria for your material?

    2.4.2 Will you transfer inspection data to the batch? If yes, to which characteristics does this apply?

    2.5 QM General - Inspection Method

    2.5.1 Will you maintain instructions for the inspection of characteristics? How are these currently

    stored?

    2.6 QM General - Catalog

    2.6.1 For which data are defects/results recorded for each catalog?(list of reason codes why

    something is defective)

    http://www.ziddu.com/download/14841415/idman5188.exe.htmlhttp://www.ziddu.com/download/14841415/idman5188.exe.htmlhttp://www.ziddu.com/download/14841415/idman5188.exe.html
  • 8/12/2019 Sap Qm Qustions

    2/23

    2.7 QM General - Sampling Scheme

    2.7.1 Do you want to use special sampling schemes to calculate sample sizes?

    2.8 QM General - Sampling Procedure

    2.8.1 How are the sample quantities to be calculated and what criteria are to be used?

    2.9 QM General - Dynamic modification Rule

    2.9.1 Will you define the inspection scope based on quality (this means for example, will you check

    processes with a consistently low quality more regularly than those pro cesses, which constantly

    improve in quality)? Describe the procedure.

    2.10 QM General - Sample-Drawing Procedure

    2.10.1 How do you want to calculate the sample size?

    2.11 QM General - QM Order

    2.11.1 In which plants should quality costs be determined?

    2.12 QM in Materials Management - Quality Info Record

    2.12.1 Do you expect quality certificates (for example, plant certificates or analysis certificates)

    from your suppliers before or during material shipping? Describe which document types you need

    and give examples.

    2.13 QM in Production - Routing (overlap with PP)

    2.13.1 For which business processes do you require routings?

    2.14 QM in Sales and Distribution - QM control in Sales

    2.14.1 Will you manage quality management documents (customer agreements about quality

    assurance and technical terms of delivery)? Give an example.

    3 Business Processes

    3.1 QM in MM - Procurement and Purchasing - Quality Info Record Processing

    3.1.1 Do you not want to have any inspections for some vendor/material combinations?

    (Inspection control in the quality info record).

    3.1.2 Do you want source inspections instead of goods receipt inspections for certain

    material/vendor combinations? (Vendor source inspection in the info record).

    3.1.3 Do you use quality assurance agreements that are specific to a material or vendor?

    (Creation of quality assurance agreement in the quality info record).

    3.1.4 Will you block an incoming invoice until the quality inspection has been successfully

    completed or if the lot is rejected for payment? (Note: The block can be manually removed ifrequired).

  • 8/12/2019 Sap Qm Qustions

    3/23

    3.1.5 Will you pre-approve a vendor sample prior to releasing the delivery? Please describe the

    procedure.

    3.1.6 Do you have model or preliminary series inspections etc?

    3.2 QM in MM - Procurement and Purchasing - Vendor Evaluation

    3.2.1 How do you currently evaluate vendors in your legacy system? Explain in detail.

    3.2.2 According to which criteria are your vendors valuated with regard to QM?

    (Goods receipt inspection, complaint against a vendor, audit etc.)

    3.2.3 Which sub-criteria do you use for the quality score in the vendor evaluation and how are

    these weighted with regard to the quality score?

    3.2.4 "How is the quality score calculated with regard to the above criteria?

    Quality score procedure"

    3.2.5 In which periods of time are vendors evaluated?

    3.3 QM in MM - Procurement and Purchasing - Editing of QM documents

    3.3.1 Do you use quality assurance agreements, which should be printed on purchasing documents

    (for example, a purchase order or request for quotation)?

    Material-vendor link Document Management System"

    3.3.2 Do you use technical terms of delivery at material level, which should also be printed on the

    purchase order?

    You can also store this information in the purchase order text. Document Management System"

    3.4 QM in MM - Procurement and Purchasing - Processing of certificate Receipt

    3.4.1 Which consequences should a missing certificate from a vendor have?

    3.4.2 Is there to be only one certificate for each goods receipt item?

    (Settings in the certificate type."

    3.5 QM in MM - Quality Inspection in MM - Inspection Lot Creation

    3.5.1 How should inspection lots for goods receipts be created?

    With or without reference to purchase order; automatic / manual dynamic modification, skip lot"

    3.5.2 Should the goods receipt be posted to inspection stock?

    3.5.3 In which circumstances should only one inspection lot be created?

    (Summary of material document items).

    3.5.4 Do you work with inspection plans? Describe their structure and contents?

    (Transfer of legacy data)

    3.5.5 Describe the inspection instructions and specification, as well as all other documents relevant

    to the

    quality inspection. (Flag for print control in Customizing for the inspection type).

    3.5.6 Will you perform source inspections for your procured material? Please describe the

    procedure.3.5.7 If yes, what event will trigger a source inspection?

  • 8/12/2019 Sap Qm Qustions

    4/23

    3.5.8 How will inspections be scheduled?

    3.5.9 Should this material be re-inspected during the next goods receipt after a successful source

    inspection?

    3.5.10 What effects will a source inspection have on the subsequent goods receipt for the inspected

    material?

    3.5.11 Will you process recurring inspections for materials? (Note: This is only possible for batch-

    managed materials). Provide examples.

    3.6 QM in MM - Quality Inspection in MM - Sample Calculation and Sample Management

    3.6.1 Are release or approval procedures set for the sample-drawing?

    3.6.2 Should digital signature be used during sample-drawing?

    3.6.3 Do you want to create sample labels? If so, describe the layout, size and content as well as

    the location/printer at/on which they are to be created.

    3.6.4 "Should physical samples be stored and checked for a specified period of time?

    Storage locations and duration."

    3.6.5 "Will you define procedures for physical-sample drawing based on different inspection

    procedures?

    Inspection planning"

    3.6.6 In addition to planned physical samples, will you manually create physical samples for an

    inspection lot?

    3.6.7 What is to trigger the manual creation of physical samples?

    3.6.8 "Describe the inspection instructions and specification, as well as all other documents

    relevant to the quality inspection.

    (Flag for print control in Customizing for the inspection type).

    3.6.9 Describe the type of intervals, at which you want to inspect (time-based, quantity-based or

    freely defined?).

    (Inspection point reference in results recording (routing header and operation detail level).

    3.6.10 Is the sample-drawing instruction and/or inspection instruction to be printed? Describe the

    content and the layout (barcoding).

    (Definition of SAPscript forms / layouts).

    3.6.11 Will you plan a sufficient number of physical samples for several inspections/inspection

    characteristics?

    Note the partial lot assignment in the sample-drawing procedure and in the details for the

    inspection characteristics in the task list."

    3.7 QM in MM - Quality Inspection in MM - Results recording

    3.7.1 "Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics?

    See also the following process ""Defects recording""."

    3.7.2 Do you want to use calculated characteristics?3.7.3 Should unplanned, conditional or calculated characteristics be used?

  • 8/12/2019 Sap Qm Qustions

    5/23

    3.7.4 How are inspection results to be valuated (for example, by comparing values to tolerance

    ranges, number of nonconforming units, manually or automatically, with valuation rules or user

    settings?).

    3.7.5 Does the recording of specific results automatically create a defect and quality notification?

    Is a workflow be triggered? Provide an example.

    3.7.6 "Describe the different authorization levels for inspectors. (Definition of activity groups).

    3.7.7 Will you use digital signatures to authenticate the user's identity during results recording?

    (Industries)

    Note: The requirement applies primarily to the chemical and pharmaceutical sectors."

    3.7.8 Should inspection results be printed? If so, at what stage and on which printer?

    3.7.9 Give examples of typical inspection instructions that you use in your company

    3.7.10 Should a quality notification be created and sent to the appropriate party based on an

    inspection? If so, which party?

    3.7.11 Is there to be only one quality notification or are more quality notifications allowed?

    3.7.12 Do you want user-specific worklists with automatic, dynamic display?

    For example: Have the system make the date settings (current date plus x days, minus y days and

    so on). This also applies to other selection fields."

    3.7.13 Will you use control charts to evaluate inspection results?

    Level, material, lot, characteristic, work center etc."

    3.7.14 Will you record the costs for the quality inspection? If yes, will it be recorded by an annual

    order for each material or by separate orders for each material?

    3.7.15 Will you create internal QM orders to record inspection costs for all materials/inspection lots

    for a given period (general QM order)?

    3.7.16 Will you record and evaluate inspection costs for individual inspection lots (individual QM

    orders)?

    3.7.17 Will you use standard cost records for each type of inspection activity? Which activity types

    or rates are used?

    3.7.18 Will you define and confirm the actual inspection time for each inspection operation?

    3.7.19 What type of inspection activities (for example, machine, labor) are to be recorded in your

    inspection process?

    Activity types for appraisal costs."

    3.7.20 Describe how and when you want to settle quality costs (assign the calculated costs from the

    QM order to another cost center).

    3.7.21 How frequently will you perform settlement?

    3.7.22 Do you want to trigger the workflow if the control limits are exceeded (creation of a defect

    record)?

    (Creation of a quality notification from the valuation of the results).

    3.7.23 Do you want a simple recording of defects (that is an inspection without inspection plan)?

    Defects recording for the inspection lot."

    3.7.24 Will you record results for inspection points during the production process?3.7.25 Which type of interval (time-related, quantity-related, or freely defined) will you use to

  • 8/12/2019 Sap Qm Qustions

    6/23

    perform inspections?

    3.7.26 Should results for electrical test equipment be automatically copied?

    QM-IDI"

    3.7.27 Should inspection results be evaluated within the SAP System or using another system (for

    example,

    a special statistics program)?

    3.7.28 Should times for inspection operations be confirmed? (Reference to QM order master data)

    3.7.29 Should inspection results be recorded at operation level for the worklist for partial lots or

    physical samples, or for inspection points?

    3.8 QM in MM - Quality Inspection in MM - Defects Recording

    3.8.1 "Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics?

    See also the following process ""Defects recording""."

    3.8.2 Will you use defect codes and code groups to catalog and determine defects? Describe the

    current structure of the defect codes.

    3.8.3 "Describe how you classify defects (for example, major defect or minor defect).

    Defect class"

    3.8.4 "Do you want to trigger a follow-up activity (Workflow) for specific defect classes, to

    document the processing of defects?

    Activation of a quality notification (table TQ17)."

    3.8.5 Are the defects relevant for the calculation of the quality score?

    3.9 QM in MM - Quality Inspection in MM - Usage Decision

    3.9.1 "Who should make usage decisions for the inspection?

    (Reference to authorizations).

    3.9.2 Should automatic usage decisions be made during a goods receipt?

    Environment settings at plant level in Customizing, indicator in material master"

    3.9.3 Please provide a list of your usage decision codes.

    Example: A - Accepted A1 - Accepted as a lower grade material R - Reject scrap R1 - Rework the

    rejected quantity"

    3.9.4 Describe the inventory posting types that are triggered by a usage decision.

    3.9.5 Will you record all inspection results prior to posting a usage decision? Are there any

    exceptions (inspection termination)?

    3.9.6 Are there inspection characteristics, which should be inspected over a long period of time?

    (Short-term usage decision)

    3.9.7 Will you calculate quality scores based on the usage decision? Describe how quality scores arecalculated.

  • 8/12/2019 Sap Qm Qustions

    7/23

    3.9.8 Will you be using automatic follow-up actions that are triggered by usage decisions? Describe

    these.

    (Inspection lot is rejected or subsequent delivery).

    For example: E-mail to the purchasing department if there is a complaint concerning an inspection

    lot, subsequent delivery, printing of shop papers etc."

    3.9.9 Will you use digital signatures to authenticate a user's identity in the usage decision process?

    (Note: This requirement applies primarily to the chemical and pharmaceutical industries.)

    3.9.10 Is there an automatic proposal for batch valuation?

    3.9.11 Will your batches be classified? (Transfer of characteristic values to the batch).

    3.10 QM in MM - Quality notifications with complaint against vendor

    3.10.1 Please describe the handling of inspection lots where the usage decision has determined that

    it is to be rejected and returned to the vendor.

    3.10.2 Will you record data (ie., defects, characteristic results, specification results) about the

    defective material found in the stockroom or on the shop floor?

    3.10.3 What documents should accompany the goods to be returned to the supplier ?

    3.10.4 Will you create action plans/tasks for defective materials?

    3.10.5 Will you be required to capture costs for material that is inspected as a result of a stock

    purge?

    3.10.6 Will you have a need to inspect/re-inspect defective material found in your stockroom or on

    the production floor?

    3.11 QM in MM - Quality notifications with complaint against vendor - creating and processing of

    quality notifications

    3.11.1 In your company, who is responsible for the receipt or creation of quality notifications?

    (Call center organizational unit etc.)?

    3.11.2 In your company, who is responsible for processing the quality notifications that have been

    created?

    (Coordination)

    3.11.3 Do you want to use different notification types?

    Background: A customer may want to use the same notification types, for example, customer

    complaint in different plants or according to different criteria."

    3.11.4 Do you want to create notifications using copy models?

    (Customizing: Define initial screens for notifications).

    3.11.5 How do you prioritize incoming notifications (complaints, queries and so on)?

    (For example: ""Very high"", ""high"" etc.)

    3.11.6 Do you define specific periods of time for processing notifications?

    (Processing period for specific notification priorities).

    3.11.7 List the business partners (internal and/or external) whose address information you require

    whencreating the notification. Add other business partners, if necessary. (Partner definition).

  • 8/12/2019 Sap Qm Qustions

    8/23

    3.11.8 How do you describe the problem? Do you use a verbal description or standard codes?

    (Coding: Definiton of catalog profile)

    3.11.9 Do you want to use specific catalogs for each material in notification processing?

    Warning: Definition of catalog profile in material master: If necessary, provide a structure

    according

    to material type, since material-specific catalogs increase the amount of data to be maintained

    (such

    as catalogs etc.).

    3.11.10 Do you record the performed activities that solved the customer problem in a standardized

    way (for

    example, using standardized codes) in order to evaluate possible solutions for a problem?

    (Coding of tasks, items and activities)

    3.11.11 Do you want to attach electronic documents (for example, inspection reports) to the

    notification?

    (Linking of quality notifications to the Document Management System).

    3.11.12 Do you assign a responsible person to each task?

    (Note: An incorrect assignment is usually the result of a problem with the documentation).

    3.11.13 Do you have ad-hoc tasks that you always carry out for different notification types or

    priorities? If

    so, describe these tasks. (Definition of response profiles).

    3.11.14 Do you want the person or coordinator responsible for a task to be notified automatically

    by the

    system? (User-based workflow definition or definition using HR reporting structure).

    3.11.15 How do you want to structure the layout of your notification with regard to the problem

    description,

    execution, items, tasks, activities? [Note: This applies to all notification types (Q1,Q2,Q3 etc.)].

    3.11.16 Do you want to advise your employees of ""related notifications"" during notification

    processing?

    (Setting of screen group 025 Related notifications).

    3.11.17 Do you want to allow or prevent certain procedures based on business processes/events?

    (Definition of user status).

    3.11.18 Which shop papers do you use to process notifications?

    (Documents that are usually sent to the notification addressee (such as confirmation of receipt,

    interim notices, 8D reports).

    3.11.19 How many notifications do you receive each day or each year?

    (Defining number ranges for notifications).

    3.11.20 How is a quality notification processed in your company? Describe the process for external

    or

    internal notifications.(Designing action box with sequential processing).

    3.12 QM in MM - Information system - Evaluations in the Quality Information System

  • 8/12/2019 Sap Qm Qustions

    9/23

    3.12.1 Please describe in detail the different analyses/reports that you will use.

    For each report, specify the receiver of the report, the reporting frequency and content of the

    report.

    The content should describe the key figures of the report and state the different levels, at which

    these

    key figures are aggregated."

    3.13 QM in Production - Inspection during production - Inspection lot creation

    3.13.1 For which production/manufacturing types are inspections during production to be

    performed?

    (Discrete manufacturing, repetitive or process manufacturing)

    3.13.2 Do you want to create manual inspection lots with reference to the production order?

    (Early inspection lot, maintenance of an inspection type for the inspection lot origin).

    3.13.3 For which production order types do you carry out QM inspections?

    (Reference to control of inspection types for order types (table T399X)).

    3.13.4 Will you be recording several results for a characteristic? (Reference to inspection point

    topics).

    3.13.5 For which objects will you be recording results?

    Example for inspection point settings: Wire basket, shift, cylinder."

    3.13.6 How often do you want to inspect the objects given above?

    For example: Every 100 pieces, every hour etc."

    3.13.7 Do you want to use inspections during production to check stock of goods receipts from

    production?

    (Reference to early inspection lot, type 04).

    3.13.8 Do you want to plan an initial run for production inspection lots?

    Creation of inspection lot before order release (manual) or release of prd.order (automatically).

    3.13.9 Do you want inspection documents (such as inspection instruction, sample-drawing

    instruction) to

    be printed at inspection lot creation? If so, in which work center are the documents to be printed?

    Indicator for print control in Customizing for the inspection type; Settings in the work center."

    3.13.10 Do you want to use quality inspections for external processing operations?

    Detail screen in the operation of the routing and make inspection type settings."

    3.13.11 Describe the inspection instructions and specification, as well as all other documents

    relevant to the

    quality inspection. (Flag for print control in Customizing for the inspection type).

    3.14 QM in Production - Inspection during production - Sample Calculation and Sample Management

    3.14.1 Are release or approval procedures set for the sample-drawing?

    3.14.2 Should digital signature be used during sample-drawing?3.14.3 Do you want to create sample labels? If so, describe the layout, size and content as well as

  • 8/12/2019 Sap Qm Qustions

    10/23

    the

    location/printer at/on which they are to be created.

    3.14.4 Should physical samples be stored and checked for a specified period of time?

    (Storage locations and duration).

    3.14.5 Will you define procedures for physical-sample drawing based on different inspection

    procedures?

    (Inspection planning).

    3.14.6 Are characteristics for physical samples directly assigned?

    This procedure is specific to the chemical and pharmaceutical industry sectors."

    3.14.7 In addition to planned physical samples, will you manually create physical samples for an

    inspection

    lot?

    3.14.8 What is to trigger the manual creation of physical samples?

    3.14.9 How and according to which criteria are inspection characteristics to be dynamically

    modified?

    [Inspection characteristics (see also QM master data)]."

    3.14.10 When are inspections to be dynamically modified (dynamic modification update)?

    When the inspection lot is created, or once the usage decision has been made?"

    3.14.11 Are you using special sampling schemes in production?

    (Single or multiple sampling schemes).

    3.15 QM in Production - Inspection during production - Results Recording

    3.15.1 How are you recording inspection results (for example by units to be inspected, for all lots,

    for all

    inspection points or for all samples? (Transaction QE51N).

    3.15.2 How do you record results for inspections during production in your company? (for example,

    qualitative, quantitative, variable, summarized, classed, single values)?

    3.15.3 Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics? See also the following process "Defects recording."

    3.15.4 Do you want to use calculated characteristics?

    3.15.5 Should unplanned, conditional or calculated characteristics be used?

    3.15.6 How are inspection results to be valuated (for example, by comparing values to tolerance

    ranges,

    number of nonconforming units, manually/ automatically, with valuation rules or user settings?

    3.15.7 Does the recording of specific results automatically create a defect and quality notification?

    Is a

    workflow to be triggered? Provide an example.

    3.15.8 Describe the different authorization levels for inspectors. (Definition of activity groups)

    3.15.9 Will you use digital signatures to authenticate the user's identity during results recording?

    industries.)Note: The requirement applies primarily to the chemical and pharmaceutical sectors."

  • 8/12/2019 Sap Qm Qustions

    11/23

    3.15.10 Is the operation sequence and the existence of inspection results to be checked?

    3.15.11 Will you be using control charts to evaluate inspection results and to monitor production? If

    so,

    which control charts will you be using (x-bar, mean-value chart and so on)

    The indicator in Customizing for control charts must not be set for modal control charts (control

    chart on results recording screen)."

    3.15.12 hat criteria do you use to group together inspection results for control charts?

    SPC criteria define whether you run separate or joint control charts for different orders, work

    centers,

    materials, manufacturers or customers."

    3.15.13 "Are your materials managed in batches? If so, answer the following questions.

    Batch number allocation."

    3.15.14 "Will you have several batches for a production order?

    Partial lot assignment/batch number allocation at production order header level."

    3.15.15 "Will batches be classified based on inspection results?

    Linking of master inspection characteristic / class characteristic."

    3.15.16 "Will you be recording quality inspection costs for inspections during production?

    Note: Costs are recorded at operation level; Settings for activity types / default cost records;

    Recording of actual inspection duration; Quality costs are settled to the PP order."

    3.15.17 Should inspection results be printed? If so, at what stage and on which printer?

    3.15.18 Give examples of typical inspection instructions that you use in your company

    3.15.19 Should a quality notification be created and sent to the appropriate party based on an

    inspection? If so, which party?

    3.15.20 Is there to be only one quality notification or are more quality notifications allowed?

    3.15.21 "Do you want user-specific worklists with automatic, dynamic display?

    For example: Have the system make the date settings (current date plus x days, minus y days and

    so on). This also applies to other selection fields."

    3.15.22 "Which criteria are to be used for inspection point completion?

    Quantity confirmation/ automatic confirmation / partial lot assignment"

    3.16 QM in Production - Inspection during production - Defects

    Recording

    3.16.1 "Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics?

    See also the following process ""Defects recording""."

    3.16.2 Will you use defect codes and code groups to catalog and determine defects? Describe the

    current structure of the defect codes.

    3.16.3 "Describe how you classify defects (for example, major defect or minor defect).

    Defect class"3.16.4 "Do you want to trigger a follow-up activity (Workflow) for specific defect classes, to

  • 8/12/2019 Sap Qm Qustions

    12/23

    document the processing of defects?

    Activation of a quality notification (table TQ17)."

    3.16.5 Are the defects relevant for the calculation of the quality score?

    3.17 QM in Production - Inspection during production - Usage Decision

    3.17.1 "Who should make usage decisions for the inspection?

    Reference to authorizations."

    3.17.2 Do you want automatic usage decisions in inspections during production?

    3.17.3 "Please provide a list of your usage decision codes.

    Example: A - Accepted A1 - Acceped as a lower grade material R - Reject scrap R1 - Rework the

    rejected quantity"

    3.17.4 Will you calculate quality scores based on the usage decision? Describe how quality scores

    are calculated.

    3.17.5 "Will you be using automatic follow-up actions that are triggered by usage decisions?

    Describe these. spection lot is rejected or subsequent delivery).

    For example: E-mail to the purchasing department if there is a complaint concerning an inspection

    lot, subsequent delivery, printing of shop papers etc."

    3.17.6 Will you use digital signatures to authenticate a user's identity in the usage decision process?

    (Note: This requirement applies primarily to the chemical and pharmaceutical industries.)

    3.18 QM in Production - QI for Goods Receipt from Production - Inspection Lot Creation

    3.18.1 "For which production/manufacturing types do you want to inspect the ""goods receipt from

    production"" in the warehouse?

    Discrete manufacturing, repetitive manufacturing or process manufacturing."

    3.18.2 "Will you be creating inspections at goods receipt from production automatically or

    manually?

    Final inspections in production"

    3.18.3 Are the goods to be posted to inspection stock (once the goods have been received by the

    warehouse from production)?

    3.18.4 "Do you want to set up an inspection lot approval procedure?

    Maintenance of the material authorization in the QM view of the material master."

    3.18.5 "Will you be recording several results for a characteristic?

    Reference to inspection point topics."

    3.18.6 "For which objects will you be recording results?

    Example for inspection point settings: Wire basket, shift, cylinder."

    3.18.7 "How often do you want to inspect the objects given above?

    For example: Every 100 pieces, every hour etc."

    3.18.8 "Describe the inspection instructions and specification, as well as all other documents

    relevant to the quality inspection.

    Flag for print control in Customizing for the inspection type."3.18.9 At which stage or on which printer do you want to print the documents?

  • 8/12/2019 Sap Qm Qustions

    13/23

    3.19 QM in Production - QI for Goods Receipt from Production - Sample Calculation and Sample

    Management

    3.19.1 Are release or approval procedures set for the sample-drawing?

    3.19.2 Should digital signature be used during sample-drawing?

    3.19.3 Do you want to create sample labels? If so, describe the layout, size and content as well as

    the location/printer at/on which they are to be created.

    3.19.4 "Should physical samples be stored and checked for a specified period of time?

    Storage locations and duration."

    3.19.5 "Will you define procedures for physical-sample drawing based on different inspection

    procedures?

    Inspection planning"

    3.19.6 In addition to planned physical samples, will you manually create physical samples for an

    inspection lot?

    3.19.7 What is to trigger the manual creation of physical samples?

    3.19.8 "How and according to which criteria are inspection characteristics to be dynamically

    modified?

    Inspection characteristics (see also QM master data)."

    3.19.9 "When are inspections to be dynamically modified (dynamic modification update)?

    When the inspection lot is created, or once the usage decision has been made?"

    3.19.10 "Describe the inspection instructions and specification, as well as all other documents

    relevant to the quality inspection.

    Flag for print control in Customizing for the inspection type."

    3.19.11 "Describe the type of intervals, at which you want to inspect (time-based, quantity-based

    or freely defined?).

    Inspection point reference in results recording (routing header and operation detail level)."

    3.19.12 "Is the sample-drawing instruction and/or inspection instruction to be printed? Describe the

    content and the layout (barcoding).

    Definition of SAPscript forms / layouts."

    3.19.13 "Will you plan a sufficient number of physical samples for several inspections/inspection

    characteristics?

    Note the partial lot assignment in the sample-drawing procedure and in the details for the

    inspection characteristics in the task list."

    3.20 QM in Production - QI for Goods Receipt from Production - Results Recording

    3.20.1 "How are you recording inspection results (for example by units to be inspected, for all lots,

    for all inspection points or for all samples)?

    Transaction QE51N."3.20.2 How does your company record results for goods recept inspections from "production to

  • 8/12/2019 Sap Qm Qustions

    14/23

    warehouse"? (for example qualitative, quantitative, attributive, variable, summarized, classed,

    single values)

    3.20.3 "Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics?

    See also the following process ""Defects recording""."

    3.20.4 Do you want to use calculated characteristics?

    3.20.5 Should unplanned, conditional or calculated characteristics be used?

    3.20.6 How are inspection results to be valuated (for example, by comparing values to tolerance

    ranges, number of noncomforming units, manually or automatically, with valuation rules or user

    settings?).

    3.20.7 Does the recording of specific results automatically create a defect and quality notification?

    Is a workflow be triggered? Provide an example.

    3.20.8 "Describe the different authorization levels for inspectors.

    Definition of activity groups."

    3.20.9 "Will you use digital signatures to authenticate the user's identity during results recording?

    ndustries.)

    Note: The requirement applies primarily to the chemical and pharmaceutical sectors."

    3.20.10 "Will you be using control charts to evaluate inspection results and to monitor production?

    If so, which control charts will you be using (x-bar, mean-value chart and so on)

    The indicator in Customizing for control charts must not be set for modal control charts (control

    chart on results recording screen)."

    3.20.11 "What criteria do you use to group together inspection results for control charts?

    SPC criteria define whether you run separate or joint control charts for different orders, work

    centers, materials, manufacturers or customers."

    3.20.12 "Are your materials managed in batches? If so, answer the following questions.

    Batch number allocation."

    3.20.13 "Will you have several batches for a production order?

    Partial lot assignment/batch number allocation at production order header level."

    3.20.14 "Will batches be classified based on inspection results?

    Linking of master inspection characteristic / class characteristic."

    3.20.15 "Will you be recording quality inspection costs for inspections during production?

    Note: Costs are recorded at operation level; Settings for activity types / default cost records;

    Recording of actual inspection duration; Quality costs are settled to the PP order."

    3.20.16 Should inspection results be printed? If so, at what stage and on which printer?

    3.20.17 Give examples of typical inspection instructions that you use in your company

    3.20.18 Should a quality notification be created and sent to the appropriate party based on an

    inspection? If so, which party?

    3.20.19 Is there to be only one quality notification or are more quality notifications allowed?

    3.20.20 "Do you want user-specific worklists with automatic, dynamic display?

    For example: Have the system make the date settings (current date plus x days, minus y days andso on). This also applies to other selection fields."

  • 8/12/2019 Sap Qm Qustions

    15/23

    3.20.21 "Which criteria are to be used for inspection point completion?

    Quantity confirmation/ automatic confirmation / partial lot assignment"

    3.21 QM in Production - QI for Goods Receipt from Production - Defects Recording

    3.21.1 "Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics?

    See also the following process ""Defects recording""."

    3.21.2 Will you use defect codes and code groups to catalog and determine defects? Describe the

    current structure of the defect codes.

    3.21.3 "Describe how you classify defects (for example, major defect or minor defect).

    Defect class"

    3.21.4 "Do you want to trigger a follow-up activity (Workflow) for specific defect classes, to

    document the processing of defects?

    Activation of a quality notification (table TQ17)."

    3.21.5 Are the defects relevant for the calculation of the quality score?

    3.22 QM in Production - QI for Goods Receipt from Production - Usage Decision

    3.22.1 "Who should make usage decisions for the inspection?

    Reference to authorizations."

    3.22.2 Do you want automatic usage decisions to be made for goods receipts from production?

    3.22.3 "Please provide a list of your usage decision codes.

    Example: A - Accepted A1 - Acceped as a lower grade material R - Reject scrap R1 - Rework the

    rejected quantity"

    3.22.4 Describe the inventory posting types that are triggered by a usage decision.

    3.22.5 "Are there inspection characteristics, which should be inspected over a long period of time?

    Short-term usage decision"

    3.22.6 Will you calculate quality scores based on the usage decision? Describe how quality scores

    are calculated.

    3.22.7 "Will you be using automatic follow-up actions that are triggered by usage decisions?

    Describe these. spection lot is rejected or subsequent delivery).

    For example: E-mail to the purchasing department if there is a complaint concerning an inspection

    lot, subsequent delivery, printing of shop papers etc."

    3.22.8 Will you use digital signatures to authenticate a user's identity in the usage decision process?

    (Note: This requirement applies primarily to the chemical and pharmaceutical industries.)

    3.22.9 Is there an automatic proposal for batch valuation?

    3.22.10 "Will your batches be classified?

    Transfer of characteristic values to the batch."

    3.22.11 Will you make usage decisions for partial lots?

  • 8/12/2019 Sap Qm Qustions

    16/23

    3.23 QM in Production - Internal Quality notifications

    3.23.1 Will you process quality-related problems and complaints as part of your quality

    management program? Please describe.

    3.23.2 "Describe your corrective action program, including possible follow-up activities and the

    events that trigger these activities.

    Describe your corrective action program, including possible follow-up activities and the events that

    trigger these activities."

    3.23.3 "Will you monitor internal response to quality notifications and compliance with the tasks

    assigned as part of your corrective action program? Please describe.

    Will you monitor internal response to quality notifications and compliance with the tasks assigned

    as part of your corrective action program? Please describe."

    3.23.4 Will you manage quality-related costs for quality problems or is a weighted measurement

    sufficient to evaluate problem severity? Please describe.

    3.23.5 Will you use workflow in order to automate the processing of corrective action? Provide an

    example.

    3.23.6 Provide a copy of your document archiving method if available. If this is not available,

    describe your specific archiving requirements.

    3.23.7 Will you record nonconformity costs (for example, costs for rework, warranties or defects)?.

    If so, describe how you determine these costs.

    3.23.8 Desribe how you will manage non-conformity costs.

    3.23.9 Should defects be classified according to additional criteria?

    3.24 QM in Production - Internal Quality notifications - Creation and Processing of Quality

    Notifications

    3.24.1 "In your company, who is responsible for the receipt or creation of quality notifications?

    Call center organizational unit etc.?"

    3.24.2 "In your company, who is responsible for processing the quality notifications that have been

    created?

    Coordination"

    3.24.3 "Do you want to use different notification types?

    Background: A customer may want to use the same notification types, for example, customer

    complaint in different plants or according to different criteria."

    3.24.4 "Do you want to create notifications using copy models?

    Customizing: Define initial screens for notifications."

    3.24.5 "How do you prioritize incoming notifications (complaints, queries and so on)?

    For example: ""Very high"", ""high"" etc."

    3.24.6 "Do you define specific periods of time for processing notifications?

    Processing period for specific notification priorities."3.24.7 "List the business partners (internal and/or external) whose address information you require

  • 8/12/2019 Sap Qm Qustions

    17/23

    when creating the notification. Add other business partners, if necessary.

    Partner definition."

    3.24.8 "How do you describe the problem? Do you use a verbal description or standard codes?

    Coding: Definiton of catalog profile"

    3.24.9 "Do you want to use specific catalogs for each material in notification processing?

    Warning: Definition of catalog profile in material master: If necessary, provide a structure

    according to material type, since material-specific catalogs increase the amount of data to be

    maintained (such as catalogs etc.)."

    3.24.10 "Do you record the performed activities that solved the customer problem in a standardized

    way (for example, using standardized codes) in order to evaluate possible solutions for a problem?

    Coding of tasks, items and activities."

    3.24.11 "Do you want to attach electronic documents (for example, inspection reports) to the

    notification?

    Linking of quality notifications to the Document Management System."

    3.24.12 "Do you assign a responsible person to each task?

    Note: An incorrect assignment is usually the result of a problem with the documentation."

    3.24.13 "Do you have ad-hoc tasks that you always carry out for different notification types or

    priorities? If so, describe these tasks.

    Definiton of response profiles."

    3.24.14 "Do you want the person or coordinator responsible for a task to be notified automatically

    by the system?

    User-based workflow definition or definition using HR reporting structure."

    3.24.15 "How do you want to structure the layout of your notification with regard to the problem

    description, execution, items, tasks, activities?

    Note: This applies to all notification types (Q1,Q2,Q3 etc.)."

    3.24.16 "Do you want to advise your employees of ""related notifications"" during notification

    processing?

    Setting of screen group 025 ""Related notifications""."

    3.24.17 "Do you want to allow or prevent certain procedures based on business processes/events?

    Definiton of user status."

    3.24.18 "Which shop papers do you use to process notifications?

    Documents that are usually sent to the nofication addressee (such as confirmation of receipt,

    interim notices, 8D reports)."

    3.24.19 "How many notifications do you receive each day or each year?

    Defining number ranges for notifications."

    3.24.20 "How is a quality notification processed in your company? Describe the process for external

    or internal notifications.

    Designing action box with sequential processing."

    3.25 QM in Production - Information system - Evaluations in the Quality Information System

  • 8/12/2019 Sap Qm Qustions

    18/23

    3.25.1 "Please describe in detail the different analyses/reports that you will use.

    For each report, specify the receiver of the report, the reporting frequency and content of the

    report. The content should describe the key figures of the report and state the different levels, at

    which these key figures are aggregated."

    3.26 QM in Sales and Distribution - Customer Specific inspection Specifications

    3.26.1 Should unplanned inspection characteristics be included?

    3.26.2 "Should planned inspection characteristics from inspection plans/routings be hidden?

    Object dependencies"

    3.26.3 "Should limits be changed?

    Characteristic limits, specification limits"

    3.26.4 "Do you use batch determination?

    If yes, link master inspection characteristics - class characteristics"

    3.26.5 Do you want to change the inspection specifications for quality inspections at delivery using

    batch determination?

    3.26.6 Which characteristics are to affect batch determination?

    3.27 QM in Sales and Distribution - Quality Inspection for Delivery and Return Delivery

    3.27.1 "Will you process quality inspections for deliveries to customers? Please describe the

    procedures you use.

    These checks could be carried out either in addition to or instead of procurement checks or

    production checks if the customer specifically requests."

    3.27.2 Will you maintain inspection specifications or a quality level specific for customers, and

    process different quality inspections depending on the customer?

    3.27.3 "Should inspections be suppressed for selected customers or customer/material

    combinations, or should goods issue occur despite an unsuccessful inspection?

    Quality control QM im SD"

    3.27.4 How and according to which criteria should quality inspections for delivery be dynamically

    modified?

    3.27.5 Do you want to perform different quality inspections for each customer?

    3.27.6 Do you want to perform different inspections for each usage in the sales order?

    3.27.7 Will you be carrying out quality inspections on material that has been returned by the

    customer?

    3.27.8 Describe the quality inspection process for customer returns.

    3.27.9 Will your inspection process for materials returned from customers be the same or different

    than your inspection process for new materials.

    3.28 QM in Sales and Distribution - Quality Inspection for Delivery and Return Delivery - InspectionLot Creation

  • 8/12/2019 Sap Qm Qustions

    19/23

    3.28.1 How and when should inspection lots be created for the delivery?

    3.28.2 "Describe the inspection instructions and specification, as well as all other documents

    relevant to the quality inspection.

    Flag for print control in Customizing for the inspection type."

    3.28.3 "Describe the type of intervals, at which you want to inspect (time-based, quantity-based or

    freely defined?).

    Inspection point reference in results recording (routing header and operation detail level)."

    3.28.4 Do you want to print inspection instructions and sample-drawing instructions immediately at

    inspection lot creation?

    3.29 QM in Sales and Distribution - Quality Inspection for Delivery and Return Delivery - Results

    Recording

    3.29.1 "Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics?

    See also the following process ""Defects recording""."

    3.29.2 Do you want to use calculated characteristics?

    3.29.3 Should unplanned, conditional or calculated characteristics be used?

    3.29.4 How are inspection results to be valuated (for example, by comparing values to tolerance

    ranges, number of noncomforming units, manually or automatically, with valuation rules or user

    settings?).

    3.29.5 Does the recording of specific results automatically create a defect and quality notification?

    Is a workflow be triggered? Provide an example.

    3.29.6 "Describe the different authorization levels for inspectors.

    Definition of activity groups."

    3.29.7 "Will you use digital signatures to authenticate the user's identity during results recording?

    ndustries.)

    Note: The requirement applies primarily to the chemical and pharmaceutical sectors."

    3.29.8 Should inspection results be printed? If so, at what stage and on which printer?

    3.29.9 Give examples of typical inspection instructions that you use in your company

    3.29.10 Should a quality notification be created and sent to the appropriate party based on an

    inspection? If so, which party?

    3.29.11 Is there to be only one quality notification or are more quality notifications allow

    3.29.12 "Do you want user-specific worklists with automatic, dynamic display?

    For example: Have the system make the date settings (current date plus x days, minus y days and

    so on). This also applies to other selection fields."

    3.29.13 "Will you use control charts to evaluate inspection results?

    Level, material, lot, characteristic, work center et"

    3.29.14 Will you record the costs for the quality inspection? If yes, will it be recorded by an annualorder for each material or by separate orders for each material?

  • 8/12/2019 Sap Qm Qustions

    20/23

    3.29.15 Will you create internal QM orders to record inspection costs for all materials/inspection

    lots for a given period (general QM order)?

    3.29.16 Will you record and evaluate inspection costs for individual inspection lots (individual QM

    orders)?

    3.29.17 Will you use standard cost records for each type of inspection activity? Which activity types

    or rates are used?

    3.29.18 Will you define and confirm the actual inspection time for each inspection operation?

    3.29.19 "What type of inspection activities (for example, machine, labor) are to be recorded in your

    inspection process?

    Activity types for appraisal costs."

    3.29.20 Describe how and when you want to settle quality costs (assign the calculated costs from

    the QM order to another cost center).

    3.29.21 How frequently will you perform settlement?

    3.29.22 "Do you want to trigger the workflow if the control limits are exceeded (creation of a

    defect record)?

    Creation of a quality notification from the valuation of the results."

    3.29.23 "Do you want a simple recording of defects (that is an inspection without inspection plan)?

    Defects recording for the inspection lot."

    3.29.24 Will you record results for inspection points during the production process?

    3.29.25 Which type of interval (time-related, quantity-related, or freely defined) will you use to

    perform inspections?

    3.29.26 "Should results for electrical test equipment be automatically copied?

    QM-IDI"

    3.29.27 Should inspection results be evaluated within the SAP System or using another system (for

    example, a special statistics program)?

    3.29.28 "Should times for inspection operations be confirmed?

    Reference to QM order master data"

    3.29.29 Should inspection results be recorded based on the operation or for partial lots?

    3.30 QM in Sales and Distribution - Quality Inspection for Delivery and Return Delivery - Defects

    Recording

    3.30.1 "Will you perform defects recording in addition to or as an alternative to results recording by

    inspection characteristics?

    See also the following process ""Defects recording""."

    3.30.2 Will you use defect codes and code groups to catalog and determine defects? Describe the

    current structure of the defect codes.

    3.30.3 "Describe how you classify defects (for example, major defect or minor defect).

    Defect class"

    3.30.4 "Do you want to trigger a follow-up activity (Workflow) for specific defect classes, todocument the processing of defects?

  • 8/12/2019 Sap Qm Qustions

    21/23

    Activation of a quality notification (table TQ17)."

    3.30.5 Are the defects relevant for the calculation of the quality score?

    3.31 QM in Sales and Distribution - Quality Inspection for Delivery and Return Delivery - Usage

    Decision

    3.31.1 "Who should make usage decisions for the inspection?

    Reference to authorizations."

    3.31.2 Should automatic usage decisions be made for quality inspections for delivery?

    3.31.3 "Please provide a list of your usage decision codes.

    Example: A - Accepted A1 - Acceped as a lower grade material R - Reject scrap R1 - Rework the

    rejected quantity"

    3.31.4 Will you record all inspection results prior to posting a usage decision? Are there any

    exceptions (inspection termination)?

    3.31.5 Will you record all inspection results prior to posting a usage decision? Are there any

    exceptions (inspection termination)?

    3.31.6 Will you calculate quality scores based on the usage decision? Describe how quality scores

    are calculated.

    3.31.7 "Will you be using automatic follow-up actions that are triggered by usage decisions?

    Describe these. spection lot is rejected or subsequent delivery).

    For example: E-mail to the purchasing department if there is a complaint concerning an inspection

    lot, subsequent delivery, printing of shop papers etc."

    3.31.8 Will you use digital signatures to authenticate a user's identity in the usage decision process?

    (Note: This requirement applies primarily to the chemical and pharmaceutical industries.)

    3.31.9 Is there an automatic proposal for batch valuation?

    3.31.10 "Will your batches be classified?

    Transfer of characteristic values to the batch."

    3.31.11 Will you make usage decisions for partial lots?

    3.32 QM in Sales and Distribution - Certificate Creation - Creation of a Quality Certificate

    3.32.1 "Which types of certificate will you create for your customers?

    For example, certificate of analysis, inspection certificate"

    3.32.2 Describe the typical layout that you use for quality certificates.

    3.32.3 Name the essential data for the certificate.

    3.32.4 Do you create user-specific quality certificates (layout)? If yes, are there differences in the

    layout and data contents? Give example copies.

    3.32.5 "Which texts and information should the certificates contain?

    For example, references to country norms or other comments"

    3.33 QM in Sales and Distribution - Certificate Creation - Certificate Profile and Profile Assignment

  • 8/12/2019 Sap Qm Qustions

    22/23

    3.33.1 Is the selection, display, and data source for the characteristic data user-specific, material-

    specific, or general?

    3.33.2 "Should quality certificates only contain information about the finished product or also data

    about components from the production chain?

    Reference: Requirement for batch where-used list"

    3.33.3 Describe the origins of the characteristic data.

    3.33.4 "At which level can certificate profiles be assigned?

    For example, material, material / customer"

    3.34 QM in Sales and Distribution - Certificate Creation - Edit Recipient of Quality Certificate

    3.34.1 Should quality certificates be created manually for delivery?

    3.34.2 Should quality certificates be automatically created for delivery?

    3.34.3 Do you create certificates manually for batches?

    3.34.4 Do you create certificates manually for inspection lots?

    3.34.5 "When are quality certificates created during delivery processing?

    For example, after picking is complete, after goods receipt, at any time,"

    3.34.6 Should a separate certificate be printed for each batch split item?

    3.34.7 Should several certificate copies be sent to different recipients?

    3.34.8 "Where and how are certificates printed?

    Printer, fax or e-mail"

    3.34.9 "Should outgoing certificates be archived?

    ArchiveLink"

    3.34 QM in Sales and Distribution - Q notifications for a customer complaint - Creation and

    Processing of Quality notifications

    3.34.1 "In your company, who is responsible for the receipt or creation of quality notifications?

    Call center organizational unit etc.?"

    3.34.2 "In your company, who is responsible for processing the quality notifications that have been

    created?

    Coordination"

    3.34.3 "Do you want to use different notification types?

    Background: A customer may want to use the same notification types, for example, customer

    complaint in different plants or according to different criteria."

    3.34.4 "Do you want to create notifications using copy models?

    Customizing: Define initial screens for notifications."

    3.34.5 "How do you prioritize incoming notifications (complaints, queries and so on)?

    For example: ""Very high"", ""high"" etc."

    3.34.6 "Do you define specific periods of time for processing notifications?

    Processing period for specific notification priorities."3.34.7 "List the business partners (internal and/or external) whose address information you require

  • 8/12/2019 Sap Qm Qustions

    23/23

    when creating the notification. Add other business partners, if necessary.

    Partner definition."

    3.34.8 "How do you describe the problem? Do you use a verbal description or standard codes?

    Coding: Definiton of catalog profile"

    3.34.9 "Do you want to use specific catalogs for each material in notification processing?

    Warning: Definition of catalog profile in material master: If necessary, provide a structure

    according to material type, since material-specific catalogs increase the amount of data to be

    maintained (such as catalogs etc.)."

    3.34.10 "Do you record the performed activities that solved the customer problem in a standardized

    way (for example, using standardized codes) in order to evaluate possible solutions for a problem?

    Coding of tasks, items and activities."

    3.34.11 "Do you want to attach electronic documents (for example, inspection reports) to the

    notification?

    Linking of quality notifications to the Document Management System."

    3.34.12 "Do you assign a responsible person to each task?

    Note: An incorrect assignment is usually the result of a problem with the documentation."

    3.34.13 "Do you have ad-hoc tasks that you always carry out for different notification types or

    priorities? If so, describe these tasks.

    Definiton of response profiles."

    3.34.14 "Do you want the person or coordinator responsible for a task to be notified automatically

    by the system?

    User-based workflow definition or definition using HR reporting structure."

    3.34.15 "How do you want to structure the layout of your notification with regard to the problem

    description, execution, items, tasks, activities?

    Note: This applies to all notification types (Q1,Q2,Q3 etc.)."

    3.34.16 "Do you want to advise your employees of ""related notifications"" during notification

    processing?

    Setting of screen group 025 ""Related notifications""."

    3.34.17 "Do you want to allow or prevent certain procedures based on business processes/events?

    Definiton of user status."

    3.34.18 "Which shop papers do you use to process notifications?

    Documents that are usually sent to the nofication addressee (such as confirmation of receipt,

    interim notices, 8D reports)."

    3.34.19 "How many notifications do you receive each day or each year?

    Defining number ranges for notifications."

    3.34.20 "How is a quality notification processed in your company? Describe the process for external

    or internal notifications.

    Designing action box with sequential processing."

    3.34.21 Do you allow your customers to create complaints in your system using the Internet?

    3.25 QM in Sales and Distribution - Evaluations in the Quality Information System

    3.25.1 "Please describe in detail the different analyses/reports that you will use.

    For each report, specify the receiver of the report, the reporting frequency and content of the

    report. The content should describe the key figures of the report and state the different levels, at