  • Scanned by CamScanner

  • QUARRY PLANALONG WITH

    ENVIRONMENT MANAGEMENT PLANOF

    LOW GRADE LIMESTONE QUARRY

    VILLAGE SENWARTEHSIL – BILHA , DIST. – BILASPUR (C.G.)

    TOTAL AREA – 1.00 Hect.

    (Non Forest Land)

    The Quarry plan is submitted as per the provisions of rule 24, rule 63 to 66 of

    Chhattisgarh Minor Mineral Rules, 2015

    ApplicantM/s Dilip Buildcon Pvt. Ltd.

    Proponent-Sanjeeve Kumar Singh

    Prepared by RQP

    Silverline Exploration Pvt. ltd. Ashutosh Kumar Sanyashi (RQP No. RQP/DGMCG/83/2016)

    Karnbhoomi 54/950 Satyaprem Vihar

  • CONSENT LETTER

    The Quarry Plan along with Environmental Management Plan of low grade limestone Quarry

    village Senwar has been prepared by Shri Ashutosh Kumar Sanyashi, (RQP No.

    RQP/DGMCG/83/2016) under Chhattisgarh Minor Mineral Rules, 2015 for approval. The

    lease hold area is located in Village- Senwar, Tehsil - Bilha, District – Bilaspur C.G covering

    an area of 1.00 hectares.

    The Director Geology and Mining, Chhattisgarh / competent Authority is hereby requested to

    make further correspondence regarding this Quarry Plan with the person and address

    mentioned below-

    Ashutosh Kumar Sanyashi

    (RQP No. RQP/DGMCG/83/2016)

    Silverline Exploration Pvt ltd.

    Karnbhoomi 54/950 Satyaprem Vihar

    An undertaking in this regard is being submitted that the Quarry Plan so prepared by the

    recognized person is with my knowledge and consent and shall be acceptable to me in all

    respects. I have clearly understood the contents of the Quarry Plan and agree to implement.

    Place: Applicant

    Date: M/s Dilip Buildcon pvt. Ltd.

  • CERTIFICATE FOR FULL CONSULTATION

    This is to certify that the Quarry Plan along with Environmental Management Plan of low grade limestone Quarry village Senwar of the applicant Ms Dilip buildcon , located in Village- Senwar, Tehsil - Bilha, District – Bilaspur of Chhattisgarh State covering lease hold area 1.00 hectares has been prepared by Shri Ashutosh Kumar Sanyashi, in full consultation with me and I have understood its contents and agree to implement the same in accordance with the law.

    Place: Applicant

    Date: M/s Dilip Buildcon pvt. Ltd

  • CERTIFICATE OF COMPLIANCE AND CORRECTNESS

    1. Certified that the provisions of related Act and rules have been considered in

    the Quarry Plan of low grade limestone Quarry village Senwar area of 1.00 hectares

    in Village- Senwar, Tehsil - Bilha, District – Bilaspur of Chhattisgarh State, which

    belongs to the applicant Ms .Dilip Buildcon Pvt. Ltd.

    2. Certified further that the provisions mentioned in Act, Rules and Regulations

    have been considered in the Quarry Plan and wherever specific permissions are

    required, the applicant will approach to the concerned competent authorities including

    D.G.M.S. for the same.

    3. There is no violation against provision of Rules, Regulations of MMR, 1961

    and there is no danger to human life.

    4. The information furnished in the Quarry Plan is true and correct to the best of

    our knowledge.

    Place- Raipur Ashutosh Kumar Sanyashi

    Date ................

    RQP No. - RQP/DGMCG/83/2016

  • I N D E X

    SR.NO.

    CONTENTS OF QUARRY PLAN PAGE NO.

    1 General 1

    2 Location 2-3

    3 Geology and Exploration 4-6

    4 Reserve 7-8

    5 Development and Production Programme 9-13

    6 Manpower deployment 14

    7 Use of Minerals 14

    8 Waste Disposal Arrangements 15

    9 Environment Management Plan 16-20

    10 Measures to be taken for reclamation of land 21

    11 Quarrying Closure Plan 22-23

    12 Any Others Relevant Information 24

  • PLATES

    SR. NO PARTICULARS SCALE

    1. Key plan 1:50,000

    2. Location plan Not to scale

    3. Khasra plan 1:4,000

    4. Surface Geological Plan 1:1,000

    5. Geological section 1:1,000

    6. Google Map Not to scale

    7. 1year development and production plan 1:1000

    8. 1year development and production section 1:1000

  • ANNEXURE

    SR.

    NO

    PARTICULARS ANNEXURE NO.

    1. Copy of LOI Annexure-1

    2. Copy of Khasra Details Annexure-2

    3. Copy of Gram Panchayat NOC Annexure-3

  • Scanned by CamScanner

  • Scanned by CamScanner

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 3

    The Khasra-wise detail of the applied lease area is as under:

    Khasra No. Area Type of land

    (Ha) (Acres)

    Part of 681 1.00 2.471 Govt. Land

    B. Attach a map showing boundaries of the quarry lease, adjoining area, roadways,

    railways, natural drainage system and other surface features, if any. It is preferred that

    the area be marked on a Survey of India topographical map or a cadastral map or forest

    map as the case may be. However if none of these are available, the area should be

    marked on a plan prepared especially for the purpose on a scale of 1: 50000 linking it

    with any important reference point available in and around the area.

    Key plan with demarcated area in Survey of India topographical map on scale 1:50,000 is

    enclosed as Plate No.1

    Infrastructure Facilities:

    Sr. No. Available Facilities Village Distance from the Area

    1. District headquarter Bilaspur About 22km

    2. Nearest Railway Station Chakarbhatha About 10 km

    3. Tehsil Bilha About16km

    4. Nearest Airport Raipur About 80km

    5. Nearest Forest - -

    6. Nearest River / Nala - Arpa River about

    10 km

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 4

    CHAPTER-3

    GEOLOGY AND EXPLORATION

    A. Briefly describe the general topography explaining whether it is a Plain land or hilly area

    and local geology of the mineral deposit within the leasehold. Attach a geological plan on

    1:1,000 scale with 1m contour intervals.

    Topography

    The area is almost a flat terrain which is devoid of vegetation. It is about 1.0km from the village

    Senwar in the South direction.

    The maximum elevation is about 270 m has been shown in the map/plan.

    The lease area has been surveyed on a scale of 1:1,000 with contour interval of one meter.

    Climate

    The climate is sub-tropical, semi arid, continental and monsoon type. Thus, it has hot summers, cool

    winters and small rainy season.

    Regional geology

    Regionally, the area under study comes under the Chhattisgarh basin. Chhattisgarh basin is the largest

    Purana basin of Bastar craton. The craton have several smaller basins like Khariar, Ampani, Indravati

    and sabari (Sukma), besides many outliers like Keshkal, Singanpur and Chedrapal. Chhattisgarh basin

    covering as area of about 36000 sq. km unconformably overlies the basement granite-gneiss and

    volcanics of the Bastar Craton. The southern and eastern margins of the basin have depositional

    contact with the basement, whereas the western and northern margins of the basin are fault bounded.

    The succession of the basin comprises dominantly of sandstones, shale and carbonates with

    subordinate conglomerate and tuffs at different stratigraphic levels.The strata are gently dipping at an

    angle of 2-10º, however, along the NS faults. It is bounded by the Kotri-Dongargarh orogen in the

    west, Satpura mobile belt in the north, Gondwana graben of Mahanadi in the northeast and the Eastern

    Ghats mobile belt in the southeast. In the south, the basin overlies the basement gneiss enclosing the

    Sonakhan greenstone belt. Chhattisgarh basin is the third largest Purana basin after the Vindhayan and

    Cuddapah, and extends for about 300 km in the E-W and 200 km in the N-S directions, with an

    irregular rectangular configuration.

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 5

    The detailed lithostratigraphy of Chhattisgarh basin is as under:

    Group Formation(thickness in m) Lithology

    Raipur Group (1900 m)

    Maniari Shale (70) Purple shale, dolomite, gypsum

    Hirri Dolomite (70) Grey dolomite

    Tarenga Shale (180)Dolomitic shale, shale-chert beds, purple shale, limestone

    Chandi Limestone (670)Stromatlitic dolomite, limestone, glauconitic sandstone, shale

    Gunderdehi Shale (430) Shale with limestone interbeds, arenite-shale, ignimbrite

    Charmuria Limestone (490)Phosphatic limestone with shale interbeds, cherty limestone and phosphatic dolomite, chert-shale interbeds

    ------------------------------------------Unconformity----------------------------------------

    Chandrapur Group (400 m)

    Kansapathar Sandstone (200) Glauconitic sandstone

    Chaporadih Shale (200) Shale with areniteinterbeds

    Lohardih Conglomerate(20) Purple arkose, gritty arenite and basal conglomerate

    ----------------------------------------Unconformity----------------------------------------------------

    Singhora Group (400 m)

    Chhuipali Shale (300) Shale with chert, limestone, dolomite, siltstone

    Bhalukona Sandstone (20) Sandstone, siltstone, minor shale

    Saraipali Shale (60)Variegated shale with siltstone, limestone, porcellanite, felsic tuff

    Rehatikhol Conglomerate (20) Felspathic arenite, arkose and basal conglomerate

    ----Nonconformity----

    Crystalline basement of Bastar craton

    Local Geology:

    The area around Senwar village comes under Maniari Formation of Raipur Group of Chhattisgarh

    Supergroup. Maniari Formation comprises Purple shale, dolomite, gypsum and dolomite

    interbands with Limestone-shale intercalation /ferruginous glauconitic arenite and shale identified

    as Pendri member.

    The area showing a nature and extent of the mineral body

    The area around Senwar which is situated in Tehsil Bilha is covered by limestone of Maniari

    formation which lies upon Hirri formation of Raipur Group of Chhattisgarh Supergroup. This

    mineral body is homogeneous in nature. On the basis of detailed geological mapping nearby

    pits etc of the area and lithology of the area following sequence can be established:

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 6

    Soil

    Low Grade Limestone

    A Surface Geological Plan and Geological Cross Section on a scale of 1:1000 are

    attached, showing general topography and geology of the area.

    B. Describe briefly prospecting / exploration work done to date viz. geological mapping

    with the evidence already existing about the mineral deposit in the area or in the

    vicinity.

    Not applicable asquarry area is less than five hectares.

    C. Describe briefly, exploration proposed to be carried out year wise, for the next five years

    indicating same on the geological plan.

    Not applicable asquarry area is less than five hectares and this is a case of temporary permit.

    D. Spot or spots where the Quarrying operation is proposed and proposed maximum depth

    of quarrying operation.

    The Low grade limestone is covered by soil about 0.5 m.In the instance matter the depth of

    Low grade limestone has been considered 5.5 m below from surface for the calculation of

    reserves., non mining zone or barrier zone of 7.5m will be kept all along the lease boundary

    as per the provision of rule 111 (2) of Metalliferous Regulations, 1961. Similarly, the pit

    slope is considered 450 as per the provision of rule 61 (2) (i) of Chhattisgarh Minor Mineral

    Rules, 2015. The proposed method of quarrying will be open cast.

  • Scanned by CamScanner

  • Scanned by CamScanner

  • Scanned by CamScanner

  • Scanned by CamScanner

  • Scanned by CamScanner

  • Scanned by CamScanner

  • Scanned by CamScanner

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 14

    CHAPTER- 6

    MANPOWER DEPLOYMENT

    State average daily employment and statutory personals:

    The quarrying activity has fare chances of employment of local people. In this quarry about 25

    employees will be required for quarrying of low grade limestone. Because the quarry operation is

    being extending beyond the depth of 6m hence it attack provision of mines act 1952 & metaliferous

    mines act 1956. Accordingly the statutory deployment of technical personals is required and one

    supervisor required to safety and scientifically exploitation of minerals.

    Employment Potential of the quarrying activity and crushing plant operation is listed in the table.

    S No. Designation Nos.

    1 Mines Manager 1

    2 Mines Foreman 1

    4 Mining mate 1

    6 Driller/ Helper 2

    7 Blaster/ Helper 2

    8 Unskilled Workers 18

    Total 25

    CHAPTER- 7

    USE OF MINERAL

    Describe the utilization of mineral and type of industry.

    Stones have the great importance as road metals in the instance case. Bigger size stone as blocks are

    used to fill the foundation of road etc. while small pieces are also usually mixed with cement and

    other ingredients to create mortar if required.

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 15

    CHAPTER-8

    WASTE DISPOSAL ARRANGEMENTS

    a) Selection of dumping site:

    The area selected for dumping is around the lease boundary of the quarry lease area. Location of

    the proposed dumping site is shown in development and production plan (Plate no. 7).

    b) Maximum height and spread of dump:

    About 0.277 ha area, will be proposed to accommodate this soil material, Dumping of soil will

    be stack up the height of 2.0m.

    c) Stacking of sub-grade materials:

    About 10 % waste material will be generated. This sub grade material is nothing but the crushed

    and breakage part of stone. This is usable material and will be used by the permit holder. Hence

    it is proposed to stack this sub grade material in a suitable place temporary before shipment.

    d) Selection of site for stacking:

    Not applicable

    e) Height and spread of stacks:

    Not applicable

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 16

    CHAPTER-9

    Environment Management Plan

    The environment management plan is a complete package of impact mitigations, waste minimization,

    management and institutional measures to be taken during implementation and operation of mining to

    eliminate the adverse environmental impacts or to reduce them to the acceptable level.

    The environmental features which are likely to be affected by mining activities are land use,

    topography, drainage pattern, soil, air quality, water resources and water quality, ecology and human

    health.

    All the above mentioned features are addressed in this plan to ensure the sustainable development and

    judicious utilization of non-renewable resources with keeping the pollution level within permissible

    assimilative limit. The details are summarizing below:

    1. Quarrying area: The lease area is 1.00 ha. It is a non forest, non agricultural and govt. land.

    Arpa river is about 10 km in east of the lease area.

    No any area of archaeological important structure, sanctuaries lying within 5 km radius.

    2.0 Land use pattern:

    Articles Land use at the end of period in Hect.

    Forest Land

    Agri. Land

    Govt. Land

    A. Lease Area 1.00 Nil Nil 1.00

    B. Quarrying & allied1. Area under pits 0.723 Nil - 0.7232. Area for dumping 0.277

    (along lease boundary )Nil - 0.277

    (along lease boundary )

    3. Area for road - Nil - -

    4. Area for Infrastructure - Nil - -5. Plantation 0.277(On dump) Nil - 0.277(On dump)6. Storage of Mineral - Nil - -

    7. Storage of fines - - -8. Crushing unit - - -9. Un-used area - -

    Total 1.00 - 1.00

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 17

    3.0 Human Settlement:

    Nearest village Senwar is present about 1.0km north of the lease area. No villages or human

    dwelling are within the quarry lease area. So there will not be any need for re-settlement. The

    human settlement in the buffer zone is given below. (Within the radius of 5km)

    4.0 Land Environment:

    The proposed quarrying operations will only be confined to the quarry area of 1.00 ha and it is not

    going to affect the surrounding areas. Inside the area, the proposed production will be carried out by

    excavation and dumping of waste material will be on the selected area within the lease area.

    The reclamation of the entire area is not possible due to non availability of sufficient quantity of

    material / waste rock; hence, at the end of the secession of quarry, this pit may further be converted

    into a water pond and used as a natural water harvesting system for collection of rain water. This will

    recharge the ground water and may be used by local people.

    The extents of land use in hectare for quarrying purposes in each year are given in table:

    5.0 Air Environment:

    From the proposed open cast Quarrying operation, the main air pollutant would be dust or

    particulate matter generated by rock/waste extraction, handling operations, transportation.

    Although the impact of these are localised, transitory and intermittent and their effect on

    Sr. No. Name of village Distance(km) Direction1 Senwar 1.0 N2 Bhatgaon 1.5 W

    3 Kaya 1.5 SE4 Bitkul 2.5 W5 Guma 2.0 S

    Particulars Area required in Hect. During 1st Year

    quarrying 0.723Dumping (soil) 0.277(along lease boundary)Afforestation 0.277(along lease boundary)

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 18

    environment will be insignificant. However, following mitigation measures will be adopted to

    minimize the air pollution:

    1. Regular water sprinkling to suppress the dust on haul roads, service roads and mining face

    by sprinklers and truck mounted water tankers.

    2. Grading of haul roads, service roads time to time, to remove the accumulated dusty

    materials.

    3. Proper maintenance of the earth moving equipments and vehicles, checking of exhaust

    emission and imposing of speed restrictions on them.

    4. Avoiding of overloading of dumpers during the transportation.

    5. Development of green belt along quarrying area boundary and soil dumps.

    6. Periodical monitoring of air quality to take steps to control the pollutants.

    6.0 Water Environment:

    Likely impact of Quarry on water table

    The area does not falls in notified area under Water Act 1974. The quarrying activity will be confined

    to the lease area and there are no perennial streams or nalas present over there. No ground water

    pollution will be there as the rock or waste/soil dump of this deposit does not contain any harmful

    ingredients, which could leach down to the water table that is much below the lowest quarry bench

    level. More over the quarrying activity confined strictly on outcrop and also below surface in one year

    plan

    Water will not be used for any processing applications in the present quarrying area. Hence, there is

    no question of effluent generation. The water will be used only for sprinkling on haul roads, dust

    suppression purposes, Loading, afforestation purposes and domestic use like washing/drinking etc.

    Details of modification/diversion of natural drainage system /Obstruction of water channels and

    measures taken

    No modification / diversion are required.

    Measures taken for minimizing silting and contamination of water

    Not required.

    Top soil management:

    Before the commencement of excavation, soil filled in fractures of rock wherever encountered

    will selectively be removed and stacked to further use for reclamation/ afforestation purposes on

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 19

    hard terrain and waste dumps. Retention wall will be prepared along the soil dump for prevention

    of Contamination of Agriculture land and surface Water.

    Tailing Dam Management:

    No tailing dam is proposed

    Requirement of water for quarrying operations

    Water is not required for quarrying operation. Although small quantity of water is required for

    drinking and dust suppression purpose which will be meet out from the bore well/river nearby.

    Source of water

    Arpa River is about 10 km in east from the lease area.

    7. Noise & Vibration:

    Noise & vibration will generate due to blasting but measures will be taken to keep the noise/

    vibration within the permissible norms of limit by using nitrates / gun power for soft and limited

    controlled blasting which will reduce the noise and vibration to considerable extend.

    Mitigation measures:

    1. All machineries and transport vehicles will be properly maintained to minimise the noise

    generation.

    2. Dense plantation around the quarry area will reduce propagation of noise outside the core

    of the quarry and also arrests dust.

    3. Controlled blasting will limits the vibration considerably.

    Storage of explosive (like capacity and type of explosive magazine)

    Blasting will be done by licensed contractor hence magazine is not required in the quarrying site.

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 20

    8. Human Environment:

    The contributing factors that affect the health of people are dust, gaseous pollutants, noise in the

    quarry. These are categorized as occupational hazards. The various quarrying operations like

    loading/unloading and vehicle movement involve risks and will have to be performed with safety

    norms.First –Aid kit and emergency medicines will be kept at quarry site along with a display board

    showing the contact no of nearby Medical Doctor / Hospital.

    Social Infrastructure

    It is expected that the project will lead to much needed employment opportunities in the villages

    which will contribute to the socio-economic development of this area.

    Rehabilitation and Resettlement (R & R) Plan

    Not required as the area is away from village and free from rehabilitation.

    Stabilization and Vegetation of dumps:

    Dump slopes will be stabilized by planting saplings, grass and good root bearing saplings such as

    local species. Retention wall will be made along the dump to channelize the rainwater out of the

    dumping area. Development of green belt along quarrying area boundary by planting about 400 trees

    during one year period.

    Sewerage System

    In view of the personals engaged in the project a sewerage system will be developed nearby the

    quarry area as per the provisions of clause 20 of Mines Act 1952. This may avoid polluting the land /

    water / air of the area.

    Environmental Monitoring:

    To assess the prevailing quality of the air, water, noise etc. a regular monitoring of these

    parameters will be made to arrive at improvement/ protection measures.

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 21

    CHAPTER-10

    Measures to be taken for reclamation of land

    Mined out land

    The estimated geological reserve in the area is 87988 tons up to depth of 5.5m from ground level. In

    this quarry plan period a total of 0.773 ha area has been earmarked for quarry workings. Whereas, in

    this plan period, production during one year will be 87941 tons(35176m3) in 1st year . Ultimate pit

    limit is fixed keeping pit slope at the angle of 45o. Part of the first year dump will be taken up for

    afforestation.

    Storage and prevention of topsoil

    The topsoil to be encountered in this plan period will be selectively removed and stacked in the area

    of 0.277 ha of the quarry area. For preventing of erosion of soil a retention wall will be made along

    the soil dump, and height of dump will maximum be maintained up to 2.0m.

    Proposal for reclamation of land affected by quarrying activities at the end of the temporary

    permit of one year:

    At the cessation of quarrying operations after the extractions of minerals, the consolidated waste

    dumps will be stabilized and plantation will be taken up above them. The step benches will be made

    and Afforestation work will be carried out on them. Care will be taken to transfer the topsoil

    preserved separately to put it back on the minedout area and the dump surfaces along with the grass

    cover.

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 22

    CHAPTER-11

    Quarrying Closure Plan

    Quarry Closure Plan is not required for a temporary permit as per sub rule (2) of rule 58 of

    Chhattisgarh Minor mineral Rules, 2015, as amended. The area applied of 1.00 hectare falls between

    the Latitude 21°56'55.06"N to 21°56'58.37"N and Longitude 82° 8'8.63"E to 82° 8'12.21"E

    in the survey of India Toposheet No 64 K/1. The area comes under Bilha Tehsil of District Bilaspur.

    Land Use:

    The estimated geological reserve in the area is 87988 tons up to depth of 5.5m from ground level. In

    this quarry plan period a total of 0.773 ha area has been earmarked for quarry workings. . Whereas, in

    this plan period, production during one year will be 87941 tons(35176m3) in 1st year

    Quarrying Method:

    This deposit is proposed to be worked by semi mechanized open-cast mining method using wheel

    Loader and dumpers etc. The benches of mine will be made from the surface and bench height

    will be maintained at 1.5m in this plan period.

    Reasons for Closure:

    The quarry depth will not be blocked . The quarry owner may exploit the same and proceed

    further deep after taking due clearances according to acts and rules applicable. Hence the detailed

    quarry closure plan is not required at this stage.

    Statutory Obligation:

    Any legal statutory obligations from State Government, Mineral Resource Department, Ministry

    of Environment & Forest, State and Central Pollution Control Board or by any other Private.

    Organization will be implemented.

    Quarrying Machinery:

    Most of the quarrying machinery deployed will be hired. After the mine closure, these will be

    returned back to their respective owners.

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 23

    Safety and Security:

    The total area excavated will be fenced properly with single opening left for the workers engaged

    in closure plan work.

    Disaster Management & Risk Assessment:

    No high risk accidents are anticipated, as the project is an open cast manual type of quarrying

    operation in a fairly stable area and free from land subsidence, earthquake etc. no tailing dam is

    proposed and risks associated with it will not come into picture.

    However, in case anything happens then the designated Mines Manager will take care and manage

    the situation. A communication and transport facility will be provided by the lease owner at their

    disposal which will help in evacuating persons involved in any accidents.

    Care and maintenance during temporary discontinuance:

    During such time, the area will be fenced and temporary staff will be arranged for taking care and

    maintenance.

    Financial Assurance

    Financial Assurance of Rs. 25000/- will be submitted to the authorities as the lease area is 1.00 ha.

    (25000.00 Rs. Per hectare as per Rule 29 (1) of Chhattisgarh Minor Mineral Rules 2015

  • QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar

    Tehsil- Bilha District –Bilaspur (C.G.)

    Page | 24

    CHAPTER-12

    ANY OTHERS RELEVANT INFORMATION

    No other relevant information is required.

    * * * * *

    Signature

    Recognized Qualified Person

  • TOPOSHEET NO 64 K/1

    KEY PLANOF

    LOW GRADE LIMESTONE QUARRYVILLAGE - SENWAR, AREA - 1.00 Ha , DIST.-BILASPUR(C.G.)

    APPLICANT- M/S DILIP BUILDCON PVT. LTD.

    PLATE NO. 1

    0 0.5 1.0 1.5 2.0 2.5 km

    SCALE 1: 50,000

    Limestone quarry

    5km Radius

  • LOCATION MAP OF LOW GRADE LIMESTONE QUARRY

    limestone quarry

    PLATE NO. 2

  • KHASRA MAP

    PLATE NO. 3

  • PLA

    TE

    NO

    -6

    GO

    OG

    LE

    MA

    PO

    FS

    HA

    LE

    ST

    ON

    E Q

    UA

    RR

    YV

    ILL

    AG

    E - S

    EN

    WA

    R, A

    RE

    A - 1.00 H

    a , DIST

    .-BIL

    ASP

    UR

    (C.G

    .)A

    PP

    LIC

    AN

    T- M

    /S DIL

    IP B

    UIL

    DC

    ON

    PV

    T. L

    TD

    .

    (NO

    T T

    O SC

    AL

    E)

    500 m

    radius

  • Scanned by CamScanner

  • Scanned by CamScanner

  • Scanned by CamScanner

  • Scanned by CamScanner