QUARRY PLANALONG WITH
ENVIRONMENT MANAGEMENT PLANOF
LOW GRADE LIMESTONE QUARRY
VILLAGE SENWARTEHSIL – BILHA , DIST. – BILASPUR (C.G.)
TOTAL AREA – 1.00 Hect.
(Non Forest Land)
The Quarry plan is submitted as per the provisions of rule 24, rule 63 to 66 of
Chhattisgarh Minor Mineral Rules, 2015
ApplicantM/s Dilip Buildcon Pvt. Ltd.
Proponent-Sanjeeve Kumar Singh
Prepared by RQP
Silverline Exploration Pvt. ltd. Ashutosh Kumar Sanyashi (RQP No. RQP/DGMCG/83/2016)
Karnbhoomi 54/950 Satyaprem Vihar
-
CONSENT LETTER
The Quarry Plan along with Environmental Management Plan of low grade limestone Quarry
village Senwar has been prepared by Shri Ashutosh Kumar Sanyashi, (RQP No.
RQP/DGMCG/83/2016) under Chhattisgarh Minor Mineral Rules, 2015 for approval. The
lease hold area is located in Village- Senwar, Tehsil - Bilha, District – Bilaspur C.G covering
an area of 1.00 hectares.
The Director Geology and Mining, Chhattisgarh / competent Authority is hereby requested to
make further correspondence regarding this Quarry Plan with the person and address
mentioned below-
Ashutosh Kumar Sanyashi
(RQP No. RQP/DGMCG/83/2016)
Silverline Exploration Pvt ltd.
Karnbhoomi 54/950 Satyaprem Vihar
An undertaking in this regard is being submitted that the Quarry Plan so prepared by the
recognized person is with my knowledge and consent and shall be acceptable to me in all
respects. I have clearly understood the contents of the Quarry Plan and agree to implement.
Place: Applicant
Date: M/s Dilip Buildcon pvt. Ltd.
-
CERTIFICATE FOR FULL CONSULTATION
This is to certify that the Quarry Plan along with Environmental Management Plan of low grade limestone Quarry village Senwar of the applicant Ms Dilip buildcon , located in Village- Senwar, Tehsil - Bilha, District – Bilaspur of Chhattisgarh State covering lease hold area 1.00 hectares has been prepared by Shri Ashutosh Kumar Sanyashi, in full consultation with me and I have understood its contents and agree to implement the same in accordance with the law.
Place: Applicant
Date: M/s Dilip Buildcon pvt. Ltd
-
CERTIFICATE OF COMPLIANCE AND CORRECTNESS
1. Certified that the provisions of related Act and rules have been considered in
the Quarry Plan of low grade limestone Quarry village Senwar area of 1.00 hectares
in Village- Senwar, Tehsil - Bilha, District – Bilaspur of Chhattisgarh State, which
belongs to the applicant Ms .Dilip Buildcon Pvt. Ltd.
2. Certified further that the provisions mentioned in Act, Rules and Regulations
have been considered in the Quarry Plan and wherever specific permissions are
required, the applicant will approach to the concerned competent authorities including
D.G.M.S. for the same.
3. There is no violation against provision of Rules, Regulations of MMR, 1961
and there is no danger to human life.
4. The information furnished in the Quarry Plan is true and correct to the best of
our knowledge.
Place- Raipur Ashutosh Kumar Sanyashi
Date ................
RQP No. - RQP/DGMCG/83/2016
-
I N D E X
SR.NO.
CONTENTS OF QUARRY PLAN PAGE NO.
1 General 1
2 Location 2-3
3 Geology and Exploration 4-6
4 Reserve 7-8
5 Development and Production Programme 9-13
6 Manpower deployment 14
7 Use of Minerals 14
8 Waste Disposal Arrangements 15
9 Environment Management Plan 16-20
10 Measures to be taken for reclamation of land 21
11 Quarrying Closure Plan 22-23
12 Any Others Relevant Information 24
-
PLATES
SR. NO PARTICULARS SCALE
1. Key plan 1:50,000
2. Location plan Not to scale
3. Khasra plan 1:4,000
4. Surface Geological Plan 1:1,000
5. Geological section 1:1,000
6. Google Map Not to scale
7. 1year development and production plan 1:1000
8. 1year development and production section 1:1000
-
ANNEXURE
SR.
NO
PARTICULARS ANNEXURE NO.
1. Copy of LOI Annexure-1
2. Copy of Khasra Details Annexure-2
3. Copy of Gram Panchayat NOC Annexure-3
-
Scanned by CamScanner
-
Scanned by CamScanner
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 3
The Khasra-wise detail of the applied lease area is as under:
Khasra No. Area Type of land
(Ha) (Acres)
Part of 681 1.00 2.471 Govt. Land
B. Attach a map showing boundaries of the quarry lease, adjoining area, roadways,
railways, natural drainage system and other surface features, if any. It is preferred that
the area be marked on a Survey of India topographical map or a cadastral map or forest
map as the case may be. However if none of these are available, the area should be
marked on a plan prepared especially for the purpose on a scale of 1: 50000 linking it
with any important reference point available in and around the area.
Key plan with demarcated area in Survey of India topographical map on scale 1:50,000 is
enclosed as Plate No.1
Infrastructure Facilities:
Sr. No. Available Facilities Village Distance from the Area
1. District headquarter Bilaspur About 22km
2. Nearest Railway Station Chakarbhatha About 10 km
3. Tehsil Bilha About16km
4. Nearest Airport Raipur About 80km
5. Nearest Forest - -
6. Nearest River / Nala - Arpa River about
10 km
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 4
CHAPTER-3
GEOLOGY AND EXPLORATION
A. Briefly describe the general topography explaining whether it is a Plain land or hilly area
and local geology of the mineral deposit within the leasehold. Attach a geological plan on
1:1,000 scale with 1m contour intervals.
Topography
The area is almost a flat terrain which is devoid of vegetation. It is about 1.0km from the village
Senwar in the South direction.
The maximum elevation is about 270 m has been shown in the map/plan.
The lease area has been surveyed on a scale of 1:1,000 with contour interval of one meter.
Climate
The climate is sub-tropical, semi arid, continental and monsoon type. Thus, it has hot summers, cool
winters and small rainy season.
Regional geology
Regionally, the area under study comes under the Chhattisgarh basin. Chhattisgarh basin is the largest
Purana basin of Bastar craton. The craton have several smaller basins like Khariar, Ampani, Indravati
and sabari (Sukma), besides many outliers like Keshkal, Singanpur and Chedrapal. Chhattisgarh basin
covering as area of about 36000 sq. km unconformably overlies the basement granite-gneiss and
volcanics of the Bastar Craton. The southern and eastern margins of the basin have depositional
contact with the basement, whereas the western and northern margins of the basin are fault bounded.
The succession of the basin comprises dominantly of sandstones, shale and carbonates with
subordinate conglomerate and tuffs at different stratigraphic levels.The strata are gently dipping at an
angle of 2-10º, however, along the NS faults. It is bounded by the Kotri-Dongargarh orogen in the
west, Satpura mobile belt in the north, Gondwana graben of Mahanadi in the northeast and the Eastern
Ghats mobile belt in the southeast. In the south, the basin overlies the basement gneiss enclosing the
Sonakhan greenstone belt. Chhattisgarh basin is the third largest Purana basin after the Vindhayan and
Cuddapah, and extends for about 300 km in the E-W and 200 km in the N-S directions, with an
irregular rectangular configuration.
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 5
The detailed lithostratigraphy of Chhattisgarh basin is as under:
Group Formation(thickness in m) Lithology
Raipur Group (1900 m)
Maniari Shale (70) Purple shale, dolomite, gypsum
Hirri Dolomite (70) Grey dolomite
Tarenga Shale (180)Dolomitic shale, shale-chert beds, purple shale, limestone
Chandi Limestone (670)Stromatlitic dolomite, limestone, glauconitic sandstone, shale
Gunderdehi Shale (430) Shale with limestone interbeds, arenite-shale, ignimbrite
Charmuria Limestone (490)Phosphatic limestone with shale interbeds, cherty limestone and phosphatic dolomite, chert-shale interbeds
------------------------------------------Unconformity----------------------------------------
Chandrapur Group (400 m)
Kansapathar Sandstone (200) Glauconitic sandstone
Chaporadih Shale (200) Shale with areniteinterbeds
Lohardih Conglomerate(20) Purple arkose, gritty arenite and basal conglomerate
----------------------------------------Unconformity----------------------------------------------------
Singhora Group (400 m)
Chhuipali Shale (300) Shale with chert, limestone, dolomite, siltstone
Bhalukona Sandstone (20) Sandstone, siltstone, minor shale
Saraipali Shale (60)Variegated shale with siltstone, limestone, porcellanite, felsic tuff
Rehatikhol Conglomerate (20) Felspathic arenite, arkose and basal conglomerate
----Nonconformity----
Crystalline basement of Bastar craton
Local Geology:
The area around Senwar village comes under Maniari Formation of Raipur Group of Chhattisgarh
Supergroup. Maniari Formation comprises Purple shale, dolomite, gypsum and dolomite
interbands with Limestone-shale intercalation /ferruginous glauconitic arenite and shale identified
as Pendri member.
The area showing a nature and extent of the mineral body
The area around Senwar which is situated in Tehsil Bilha is covered by limestone of Maniari
formation which lies upon Hirri formation of Raipur Group of Chhattisgarh Supergroup. This
mineral body is homogeneous in nature. On the basis of detailed geological mapping nearby
pits etc of the area and lithology of the area following sequence can be established:
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 6
Soil
Low Grade Limestone
A Surface Geological Plan and Geological Cross Section on a scale of 1:1000 are
attached, showing general topography and geology of the area.
B. Describe briefly prospecting / exploration work done to date viz. geological mapping
with the evidence already existing about the mineral deposit in the area or in the
vicinity.
Not applicable asquarry area is less than five hectares.
C. Describe briefly, exploration proposed to be carried out year wise, for the next five years
indicating same on the geological plan.
Not applicable asquarry area is less than five hectares and this is a case of temporary permit.
D. Spot or spots where the Quarrying operation is proposed and proposed maximum depth
of quarrying operation.
The Low grade limestone is covered by soil about 0.5 m.In the instance matter the depth of
Low grade limestone has been considered 5.5 m below from surface for the calculation of
reserves., non mining zone or barrier zone of 7.5m will be kept all along the lease boundary
as per the provision of rule 111 (2) of Metalliferous Regulations, 1961. Similarly, the pit
slope is considered 450 as per the provision of rule 61 (2) (i) of Chhattisgarh Minor Mineral
Rules, 2015. The proposed method of quarrying will be open cast.
-
Scanned by CamScanner
-
Scanned by CamScanner
-
Scanned by CamScanner
-
Scanned by CamScanner
-
Scanned by CamScanner
-
Scanned by CamScanner
-
Scanned by CamScanner
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 14
CHAPTER- 6
MANPOWER DEPLOYMENT
State average daily employment and statutory personals:
The quarrying activity has fare chances of employment of local people. In this quarry about 25
employees will be required for quarrying of low grade limestone. Because the quarry operation is
being extending beyond the depth of 6m hence it attack provision of mines act 1952 & metaliferous
mines act 1956. Accordingly the statutory deployment of technical personals is required and one
supervisor required to safety and scientifically exploitation of minerals.
Employment Potential of the quarrying activity and crushing plant operation is listed in the table.
S No. Designation Nos.
1 Mines Manager 1
2 Mines Foreman 1
4 Mining mate 1
6 Driller/ Helper 2
7 Blaster/ Helper 2
8 Unskilled Workers 18
Total 25
CHAPTER- 7
USE OF MINERAL
Describe the utilization of mineral and type of industry.
Stones have the great importance as road metals in the instance case. Bigger size stone as blocks are
used to fill the foundation of road etc. while small pieces are also usually mixed with cement and
other ingredients to create mortar if required.
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 15
CHAPTER-8
WASTE DISPOSAL ARRANGEMENTS
a) Selection of dumping site:
The area selected for dumping is around the lease boundary of the quarry lease area. Location of
the proposed dumping site is shown in development and production plan (Plate no. 7).
b) Maximum height and spread of dump:
About 0.277 ha area, will be proposed to accommodate this soil material, Dumping of soil will
be stack up the height of 2.0m.
c) Stacking of sub-grade materials:
About 10 % waste material will be generated. This sub grade material is nothing but the crushed
and breakage part of stone. This is usable material and will be used by the permit holder. Hence
it is proposed to stack this sub grade material in a suitable place temporary before shipment.
d) Selection of site for stacking:
Not applicable
e) Height and spread of stacks:
Not applicable
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 16
CHAPTER-9
Environment Management Plan
The environment management plan is a complete package of impact mitigations, waste minimization,
management and institutional measures to be taken during implementation and operation of mining to
eliminate the adverse environmental impacts or to reduce them to the acceptable level.
The environmental features which are likely to be affected by mining activities are land use,
topography, drainage pattern, soil, air quality, water resources and water quality, ecology and human
health.
All the above mentioned features are addressed in this plan to ensure the sustainable development and
judicious utilization of non-renewable resources with keeping the pollution level within permissible
assimilative limit. The details are summarizing below:
1. Quarrying area: The lease area is 1.00 ha. It is a non forest, non agricultural and govt. land.
Arpa river is about 10 km in east of the lease area.
No any area of archaeological important structure, sanctuaries lying within 5 km radius.
2.0 Land use pattern:
Articles Land use at the end of period in Hect.
Forest Land
Agri. Land
Govt. Land
A. Lease Area 1.00 Nil Nil 1.00
B. Quarrying & allied1. Area under pits 0.723 Nil - 0.7232. Area for dumping 0.277
(along lease boundary )Nil - 0.277
(along lease boundary )
3. Area for road - Nil - -
4. Area for Infrastructure - Nil - -5. Plantation 0.277(On dump) Nil - 0.277(On dump)6. Storage of Mineral - Nil - -
7. Storage of fines - - -8. Crushing unit - - -9. Un-used area - -
Total 1.00 - 1.00
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 17
3.0 Human Settlement:
Nearest village Senwar is present about 1.0km north of the lease area. No villages or human
dwelling are within the quarry lease area. So there will not be any need for re-settlement. The
human settlement in the buffer zone is given below. (Within the radius of 5km)
4.0 Land Environment:
The proposed quarrying operations will only be confined to the quarry area of 1.00 ha and it is not
going to affect the surrounding areas. Inside the area, the proposed production will be carried out by
excavation and dumping of waste material will be on the selected area within the lease area.
The reclamation of the entire area is not possible due to non availability of sufficient quantity of
material / waste rock; hence, at the end of the secession of quarry, this pit may further be converted
into a water pond and used as a natural water harvesting system for collection of rain water. This will
recharge the ground water and may be used by local people.
The extents of land use in hectare for quarrying purposes in each year are given in table:
5.0 Air Environment:
From the proposed open cast Quarrying operation, the main air pollutant would be dust or
particulate matter generated by rock/waste extraction, handling operations, transportation.
Although the impact of these are localised, transitory and intermittent and their effect on
Sr. No. Name of village Distance(km) Direction1 Senwar 1.0 N2 Bhatgaon 1.5 W
3 Kaya 1.5 SE4 Bitkul 2.5 W5 Guma 2.0 S
Particulars Area required in Hect. During 1st Year
quarrying 0.723Dumping (soil) 0.277(along lease boundary)Afforestation 0.277(along lease boundary)
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 18
environment will be insignificant. However, following mitigation measures will be adopted to
minimize the air pollution:
1. Regular water sprinkling to suppress the dust on haul roads, service roads and mining face
by sprinklers and truck mounted water tankers.
2. Grading of haul roads, service roads time to time, to remove the accumulated dusty
materials.
3. Proper maintenance of the earth moving equipments and vehicles, checking of exhaust
emission and imposing of speed restrictions on them.
4. Avoiding of overloading of dumpers during the transportation.
5. Development of green belt along quarrying area boundary and soil dumps.
6. Periodical monitoring of air quality to take steps to control the pollutants.
6.0 Water Environment:
Likely impact of Quarry on water table
The area does not falls in notified area under Water Act 1974. The quarrying activity will be confined
to the lease area and there are no perennial streams or nalas present over there. No ground water
pollution will be there as the rock or waste/soil dump of this deposit does not contain any harmful
ingredients, which could leach down to the water table that is much below the lowest quarry bench
level. More over the quarrying activity confined strictly on outcrop and also below surface in one year
plan
Water will not be used for any processing applications in the present quarrying area. Hence, there is
no question of effluent generation. The water will be used only for sprinkling on haul roads, dust
suppression purposes, Loading, afforestation purposes and domestic use like washing/drinking etc.
Details of modification/diversion of natural drainage system /Obstruction of water channels and
measures taken
No modification / diversion are required.
Measures taken for minimizing silting and contamination of water
Not required.
Top soil management:
Before the commencement of excavation, soil filled in fractures of rock wherever encountered
will selectively be removed and stacked to further use for reclamation/ afforestation purposes on
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 19
hard terrain and waste dumps. Retention wall will be prepared along the soil dump for prevention
of Contamination of Agriculture land and surface Water.
Tailing Dam Management:
No tailing dam is proposed
Requirement of water for quarrying operations
Water is not required for quarrying operation. Although small quantity of water is required for
drinking and dust suppression purpose which will be meet out from the bore well/river nearby.
Source of water
Arpa River is about 10 km in east from the lease area.
7. Noise & Vibration:
Noise & vibration will generate due to blasting but measures will be taken to keep the noise/
vibration within the permissible norms of limit by using nitrates / gun power for soft and limited
controlled blasting which will reduce the noise and vibration to considerable extend.
Mitigation measures:
1. All machineries and transport vehicles will be properly maintained to minimise the noise
generation.
2. Dense plantation around the quarry area will reduce propagation of noise outside the core
of the quarry and also arrests dust.
3. Controlled blasting will limits the vibration considerably.
Storage of explosive (like capacity and type of explosive magazine)
Blasting will be done by licensed contractor hence magazine is not required in the quarrying site.
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 20
8. Human Environment:
The contributing factors that affect the health of people are dust, gaseous pollutants, noise in the
quarry. These are categorized as occupational hazards. The various quarrying operations like
loading/unloading and vehicle movement involve risks and will have to be performed with safety
norms.First –Aid kit and emergency medicines will be kept at quarry site along with a display board
showing the contact no of nearby Medical Doctor / Hospital.
Social Infrastructure
It is expected that the project will lead to much needed employment opportunities in the villages
which will contribute to the socio-economic development of this area.
Rehabilitation and Resettlement (R & R) Plan
Not required as the area is away from village and free from rehabilitation.
Stabilization and Vegetation of dumps:
Dump slopes will be stabilized by planting saplings, grass and good root bearing saplings such as
local species. Retention wall will be made along the dump to channelize the rainwater out of the
dumping area. Development of green belt along quarrying area boundary by planting about 400 trees
during one year period.
Sewerage System
In view of the personals engaged in the project a sewerage system will be developed nearby the
quarry area as per the provisions of clause 20 of Mines Act 1952. This may avoid polluting the land /
water / air of the area.
Environmental Monitoring:
To assess the prevailing quality of the air, water, noise etc. a regular monitoring of these
parameters will be made to arrive at improvement/ protection measures.
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 21
CHAPTER-10
Measures to be taken for reclamation of land
Mined out land
The estimated geological reserve in the area is 87988 tons up to depth of 5.5m from ground level. In
this quarry plan period a total of 0.773 ha area has been earmarked for quarry workings. Whereas, in
this plan period, production during one year will be 87941 tons(35176m3) in 1st year . Ultimate pit
limit is fixed keeping pit slope at the angle of 45o. Part of the first year dump will be taken up for
afforestation.
Storage and prevention of topsoil
The topsoil to be encountered in this plan period will be selectively removed and stacked in the area
of 0.277 ha of the quarry area. For preventing of erosion of soil a retention wall will be made along
the soil dump, and height of dump will maximum be maintained up to 2.0m.
Proposal for reclamation of land affected by quarrying activities at the end of the temporary
permit of one year:
At the cessation of quarrying operations after the extractions of minerals, the consolidated waste
dumps will be stabilized and plantation will be taken up above them. The step benches will be made
and Afforestation work will be carried out on them. Care will be taken to transfer the topsoil
preserved separately to put it back on the minedout area and the dump surfaces along with the grass
cover.
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 22
CHAPTER-11
Quarrying Closure Plan
Quarry Closure Plan is not required for a temporary permit as per sub rule (2) of rule 58 of
Chhattisgarh Minor mineral Rules, 2015, as amended. The area applied of 1.00 hectare falls between
the Latitude 21°56'55.06"N to 21°56'58.37"N and Longitude 82° 8'8.63"E to 82° 8'12.21"E
in the survey of India Toposheet No 64 K/1. The area comes under Bilha Tehsil of District Bilaspur.
Land Use:
The estimated geological reserve in the area is 87988 tons up to depth of 5.5m from ground level. In
this quarry plan period a total of 0.773 ha area has been earmarked for quarry workings. . Whereas, in
this plan period, production during one year will be 87941 tons(35176m3) in 1st year
Quarrying Method:
This deposit is proposed to be worked by semi mechanized open-cast mining method using wheel
Loader and dumpers etc. The benches of mine will be made from the surface and bench height
will be maintained at 1.5m in this plan period.
Reasons for Closure:
The quarry depth will not be blocked . The quarry owner may exploit the same and proceed
further deep after taking due clearances according to acts and rules applicable. Hence the detailed
quarry closure plan is not required at this stage.
Statutory Obligation:
Any legal statutory obligations from State Government, Mineral Resource Department, Ministry
of Environment & Forest, State and Central Pollution Control Board or by any other Private.
Organization will be implemented.
Quarrying Machinery:
Most of the quarrying machinery deployed will be hired. After the mine closure, these will be
returned back to their respective owners.
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 23
Safety and Security:
The total area excavated will be fenced properly with single opening left for the workers engaged
in closure plan work.
Disaster Management & Risk Assessment:
No high risk accidents are anticipated, as the project is an open cast manual type of quarrying
operation in a fairly stable area and free from land subsidence, earthquake etc. no tailing dam is
proposed and risks associated with it will not come into picture.
However, in case anything happens then the designated Mines Manager will take care and manage
the situation. A communication and transport facility will be provided by the lease owner at their
disposal which will help in evacuating persons involved in any accidents.
Care and maintenance during temporary discontinuance:
During such time, the area will be fenced and temporary staff will be arranged for taking care and
maintenance.
Financial Assurance
Financial Assurance of Rs. 25000/- will be submitted to the authorities as the lease area is 1.00 ha.
(25000.00 Rs. Per hectare as per Rule 29 (1) of Chhattisgarh Minor Mineral Rules 2015
-
QUARRY PLAN OF LOW GRADE LIMESTONEArea – 1.00 Ha Village – Senwar
Tehsil- Bilha District –Bilaspur (C.G.)
Page | 24
CHAPTER-12
ANY OTHERS RELEVANT INFORMATION
No other relevant information is required.
* * * * *
Signature
Recognized Qualified Person
-
TOPOSHEET NO 64 K/1
KEY PLANOF
LOW GRADE LIMESTONE QUARRYVILLAGE - SENWAR, AREA - 1.00 Ha , DIST.-BILASPUR(C.G.)
APPLICANT- M/S DILIP BUILDCON PVT. LTD.
PLATE NO. 1
0 0.5 1.0 1.5 2.0 2.5 km
SCALE 1: 50,000
Limestone quarry
5km Radius
-
LOCATION MAP OF LOW GRADE LIMESTONE QUARRY
limestone quarry
PLATE NO. 2
-
KHASRA MAP
PLATE NO. 3
-
PLA
TE
NO
-6
GO
OG
LE
MA
PO
FS
HA
LE
ST
ON
E Q
UA
RR
YV
ILL
AG
E - S
EN
WA
R, A
RE
A - 1.00 H
a , DIST
.-BIL
ASP
UR
(C.G
.)A
PP
LIC
AN
T- M
/S DIL
IP B
UIL
DC
ON
PV
T. L
TD
.
(NO
T T
O SC
AL
E)
500 m
radius
-
Scanned by CamScanner
-
Scanned by CamScanner
-
Scanned by CamScanner
-
Scanned by CamScanner