SCHEDULE AND PROGRAM FOR FEASIBILITY STUDY
GOLD PROSPECT, DOME TOWNSHIP
RED LAKE, ONTARIO
JANUARY 1 5, 1979 HARPER CONSULTING SERVICES INC
BONANZA RED LAKE EXPLORATIONS INC.
SCHEDULE AND PROGRAM FOR FEASIBILITY STUDY
GOLD PROSPECT, DOME TOWNSHIP
RED LAKE, ONTARIO
INTRODUCTION
The purpose of this report is to schedule and program
the acquisition of the data necessary for a Feasibility Study
of the Corporation's known body of gold mineralization located
on White Horse Island, Dome Township, Red Lake, Ontario.
PERIOD l - January l to April 30, 1979(4 months)
A. AT RED LAKE
1. Initial examination of shaft collar condition.
- capped? - open? - caved?
2. Opening discussions with local Ontario Mine Inspector
on permit requirements, safety, etc., with respect
to re-collaring shaft and de-watering mine.
3. Opening discussions with local hydro authorities re
establishing a power sub-station on White Horse
Island.
'1 . l'!ii(|ii i r i t '-:: M :: ID :i v:i i l M It l l i l v "l w;i l i- r l r:i nr;ju i r l :i l i DII
o T a .s i x e suitable for transporting mining equipment.
Page 2
f). Enquiries fi.s to docking and load i up," facilities
on While Horse Island and at Red Lake.
B. IN TORONTO
1. Opening discussions with Mines Inspection Branch,
Queen's Park.
2. Opening discussions with Ontario Hydro re power
sub-station.
3. Opening discussions with Ontario Ministry of En
vironment respecting control of mine discharge
water.
4. Opening discussions with Mining Corporation of
Canada (Noranda), Kilborn Engineering, etc., with
respect to undertaking Feasibility Study as a Con
sultant or as a Consultant Participant in
(a) Ore Reserve Calculations,
(b) Mine Viability Study as a salvage or as a
continuing operation,
(c) Mine re-habilitation study,
(d) Production potential.
PERIOD 2 May l to June 30, 1979 (2 months)
A. AT I?KI) l,A K M
1. Complete 1979 drill program from ire
Page 3.
2. Consider cementing any drill hole location found
on White Horse Island.
3. With snow and ice gone accurate evaluations can be
made respecting
(a) condition of shaft collar,
(b) docking and beaching fcir.il i t, ins on White Horse-
Is] and ,
(c) condition and repair needed to roads between
docks, shaft, power sub-station, building sites,
etc .
B. IN TORONTO
1. Calculation of tonnage and grade including results
of 1979 drill program.
2. Development of underground exploration program.
i.e. grouting, bulk sampling, underground drilling.
3. Board of Directors decision to proceed with full
scale Feasibility Study under Company control OR
under the control of a fully integrated Engineering
Consulting firm.
From this point it becomes increasingly difficult to
correctly project the progress of the Feasibility Study for one
Ciiliilii! (ire del cfiii l ne MIC :;|ii'i'i| w l l h which il;it;i r;in \ n- ; irriimii l nl.rd
If, as is probably the best course of action, the Corporation
Page 4,
retains a fully integrated Engineering Consulting Firm to carry
out the Feasibility Study then the Corporation should retain
the services of a Consulting Geologist and M Consulting Mining
Engineer who can supply overall direction to the integrated
Consulting Firm and act as intermediaries with the Board of
Directors. In short, if a system of technical controls and
checks is not instituted, the Corporation may find itself with
out quick and positive direction and the cost of studies may
mount solely because of indecision.
PERIOD 3 - July l to November 1 5, 1979(4.5 months)
A. AT RED LAKE
1. Prepare docking and beaching facilities on White
Horse Island suitable for off-loading supplies
and equipment.
2. Arrange for required water transportation.
3. Design and erection of needed facilities,
e.g. power sub-station, shaft collar, head frame,
etc.
(The above may be deferred until after freeze-up.)
B. IN TORONTO
1. Assembly of cost estimates respecting the; following:
a. re-collaring shaft;
Page 5.
(b) installation of head frame, hoist, etc.;
(c) installation of power sub-station and
roMMC'ct. i on t.o mining plant;
(d) de-watering and mine re-habilitation (ladderways,
timbers, guides, track, signal systems, etc.);
(e) underground mapping, sampling, bulk sampling,
diamond drilling, grouting, etc.
2. Open discussions respecting conditional financing.
3. Open discussions with Red Lake gold mill owners
respecting rental of facilities for custom milling.
4. Investigate the alternatives of mining and developing
through the existing shaft OR through a new decline
entry on Cable Point. The latter would reduce ore
handling charges and permit easier year round
operations.
The data comprising the Feasibility Study will be col
lected by different people at different times and unless there
is a systematic collection and storage of data there will be much
useless repetition and delay. Data stored in people's heads is
not readily available to a group of people.
A typical field report, particularly near the start of
the feasibility work, might consist of a semi-formal letter re-
porling on Ilir .stale of t he sim ft. collar, the dock, and an un
successful attempt to meet the local Mine Inspector, and some
Page 6.
two or three other items. As the number of such reports in
creases, a particular item becomes increasingly hard to find
among a stack of small reports and repetition results. The
answer is to maintain a Data Accumulation Brief.
A Data Accumulation Brief is maintained in chronological
order and indexed according to subject. Typical index headings
are :
Shaft CollarTransportation Facilities Docking and Loading Facilities Power Sub-station Environmental Requirements etc .
To prepare a Data Accumulation Brief is relatively simple.
Data from a letter report would be briefly summarized under the
appropriate headings together with the date and author of the
source report. A report on a specific subject would be included
in its entirety. The form of the Data Accumulation Brief is that
of a loose leaf notebook and its contents, in total or in part,
can be quickly reproduced for the convenience of someone engaged
in a specialized part of the Feasibility Study. The Data Accumu
lation Brief is, in actuality, Volume I of the Feasibility Study.
Unless instructions to the contrary are received, it is
the writer's intention to start a Data Accumulation Brief.
Respectfully submitted
mNfwi/rrNci sKuvirrir: INC.
Willowdale, Ontario H/ G. Harper, -P.ftng. January 15, 1979 President.
......... t .in m man 11 llll5aN84SW0062 63.36It DOME TWP
020
A? rv? f
BONANZA RED LAKE EXPLORATIONS LTD.
ELECTROMAGNETIC, MAGNETIC, ft GRADIENT SURVEYS
DOME TOWNSHIP, RED LAKE, ONTARIO
APRIL 1 2, \[)'7 'j"ARPER CONSULTING SERVICES
INC.
BONANZA RED T.AKTC EXPLORATIONS LTD.
KU'X'TKOMAGNKTK 1 , MAGIMKTir, X. (iKAD l KIMT NMRVKYN
DOMK TOWNSHIP, RKI) l,AKI',', ONTARIO
INTRODUCTION
Some experimental geophysical surveying has been done
over and about the known area of gold mineralization near White
Horse Island on a property under option to Bonanza Red Lake
Explorations Inc. The surveys were done from the ice surface
between January and April 1979. The surveys done were a Total
Field Magnetic survey, a Magnetic Gradient survey, and a VLF
E]ectromagneta c survey. The Magnetic Gradient survey was limited
to the water areas as the land areas are topographically too
uneven to permit reliable Magnetic Gradient surveying. All
surveys were limited by the transmission line of Ontario Hydro
which crosses part of the land and water areas within the
survey. The area surveyed is confined to portions of three
claims (KRL 11325, 111/12, fc 13251) and cover about 80 acres.
Previous geophysical surveying in the area is almost
nonexistent.
Some 35 to 40 years ago some magnetic surveying was
done near the shaft. A magnetic contour map exists today but
i l show.1 -; lin re;i d i nj'.s or contour interval :ind i .s considered
rodund;i n l, . In Mie middle I'MiO's some 1 ma.gnel, i c surveying was
rdone under the direction of R. A. Ferguson who was then
gathering data in preparation for his report G. R. -15 for the
Ontario Ministry of Natural Resources.
PURPOSE OF THE SURVEYS
The survey work was pxpor i men l,a l , - designed t,o search
for geophysical peculiarities in the vicinity of the known
gold mineralization and to see if these extended to the north
or south of the known gold mineralization.
SURVEY RESULTS fe INTERPRETATION
MAGNETIC GRADIENT SURVEY
Data for this survey is acquired by calculating the
'difference (positive or negative) between two magnetic readings
i at each station; the first reading taken four feet above ground
i levej. and the second eight feet above ground level. The calculated
(result enhances magnetic changes and has been found useful in
:areas of flat topography where the bedrock features are deep.f ,:buried and relatively smooth.
.' j ;
i 'I'll' ' l i r; i 11 i i Mi l : :n rv - v \v.-i: : l i m i l - -i l l . ) l li i - i . -. - i . , v - i - 11 | K . ri
;j(, ion of t li r: lake lying (.-M,s l. of Wliil.e Horse Islimd. No gradient
Page 3.
features of significance are distinguishable and the survey
results appear to be of minor value.
TOTAL F T ELD MAGNETIC SURVEY
Tt is quite clear I'rom the survey results t,hat the
Pome Slock has a genera My higher magnetic, level l hail the
intruded volcanics and sediments, although coach formational
group contains relatively small, isolated bodies that are
; strongly magnetic. The survey does not define the contact
i between the Pome Stock and the intruded rocks with precision
but one can make a reasonable inference as to its location.
VLF ELECTROMAGNETIC SURVEY
This survey is characterized by extremely wide fluc
tuation in the in phase and quadrature readings that are much
greater than normally experienced. One may infer that all of
the rocks in j;h.e survey area contain many small, discontinuous
but highly'conductive faults, fractures and seams which must
; strike in several different directions.f
,-A strong conductor, "A", strikes north-south and lies
' about ;400 feet east of the shaft. This is the fault zone inter-
: sected in drill hole H79-1 . Tt extends from 5S, the south limit
i i ' (' l li i - : -li rv i '\ , li' l i Hi - IN when- li l M -ci lin' -: : i -i im| i H i' a l i -i l anil l : :i
|'; lost - possibly terminated.
Page 4.
A second '/.otic o l .si. rong concluc l i v i l y l i os north of
Wh i l.o llorso Island bel.woon linos 4N and ION and west of the
baseline. This area lies within the Dome Stock and is not an
5extension of Conductor A. There is no simple, obvious expla
nation for this conductive zone.
COLLECTIVE RESULTS
All three surveys indicate unusual, but unde f i na.bl e ,
conditions between lines 4N and ION. Individually the unusual
survey results are not exceptionally intriguing but collectively
the results arouse curiousity particularly since many problems
begin near line -IN. For example, the water flow along a
diorite dike intersected on the second level of the mine occurs
at line 3N; the overburden thickens and drill holes are lost in
overburden at line 4N; and finally, no holes have been completed
north of line 4N when collared on a westerly bearing. The
writer suspects a major fault-fracture system lying between
lines 4N and ION and this inhibits diamond drill investigation
of the area. Perhaps the best policy is to start cross sectional
drilling north of line ION and then advance southerly.
CONCLUSIONS fe RECOMMENDATIONS
1. The surveys do riot reveal ;iny spec i a. l conditions related
Page 5.
to the known gold mineralization which can be projected
along strike and which can serve as a control or guide for
f i j l u r r' ri r i l l p rog r;irns .
The surveys suggest, sonic- form of east-west, trending
discontinuity occuring between lines 4N and ION. This
suggests thnt a future1 drill program should start, wit,h
cross sectional dri!ling along l ines "MN or l6N and then
progress southward.
Respectfully submitted
HARPER CONSULTING SERVICES INC.
Willowdale, Ontario April 12, 1979
H. G. Harper, P. 'En g. Presi dent.
52N84SWW62 63.3611 DOME 030
ft ZAP
BONANZA RED LAKE EXPLORATIONS INC
1979 DRILL PROGRAM
DOME TOWNSHIP, RED LAKE
ONTARIO
MAY 18, 1979 HARPER CONSULTING SERVICES INC.
BONANZA RED LAKE EXPLORATIONS INC.
1979 DRILL PROGRAM
DOME TOWNSHIP, RED LAKE
ONTARIO
INTRODUCTION
Bonanza Red Lake Explorations Inc. has just completed
a diamond drill program on its Dome Township gold prospect
and this Report summarizes the results of that program and
makes recommendations for future exploration. All details
pertaining to the drilling are recorded on the drill logs,
drill sections, and drill plan which accompanies this Report.
PREVIOUS DRILL PROGRAMS vs CURRENT DRILL PROGRAM
The partially developed bodies of gold mineralization
lie entirely under the water of Red Lake and therefore are
awkward to drill except when the lake is frozen. Consequently
many of the holes have been drilled on divers bearings from
White Horse Island, all of which makes correlation of drill
results difficult. A further complication has been the thick
bouldery overburden conditions under the waters of Red Lake
Page 2.
and, in the past, several holes drilled from the ice failed to
reach bedrock. For example, in 1939 Mackenzie Red Lake Gold
Mines Ltd. held an option on this property and planned a drill
program very similar to the current one. Holes were drilled
into the mineralized area from the ice on Red Lake. Holes l to
4 inclusive intersected the zone approximately on current sec
tions O to 3N inclusive and returned respectable gold values
across reasonable widths. The next eight drill holes failed
to penetrate the overburden and the drill program was abandoned.
The current drill program progressed slowly because of the same
problems. Only one drill hole was abandoned and two holes did
succeed in reaching bedrock where the earlier drilling failed.
The difficult overburden problem slowed the drilling to the
extent that the planned program could not be completed before
the ice weakened, forcing a drill stoppage.
DRILL RESULTS
Five holes B79-1 to 5 inclusive were completed and one
hole, not numbered, failed to reach bedrock and was abandoned.
All holes were cemented when completed.
The best intersection occurred in hole B79-1, where
17.02 feet averaged 0.159 ounces of gold per ton. Lower values
occurred both above and below this intersection.
Page 3.
Holes B79-2 and B79-4 were drilled on Line 4N in the
approximate area where Mackenzie Red Lake lost four drill holes
in 1939. Neither hole intersected a gold bearing vein. An
analysis of all available drill and underground data indicates
that the vein system is readily traceable to approximately Line
4N where suddenly all is gone. This is also the area where
overburden problems begin. An examination of the geophysical
survey data (see Report dated April 12, 1979) shows that all
magnetic and electromagnetic data undergoes a marked change in
this area, but the nature of the change is unknown. A wide
erratic shear zone seems the most likely explanation. A better
interpretation might be possible if north-south VLF surveying
was done in this area. Meanwhile, all drilling should keep
away from this area and move to the north where the geophysical
indications are more normal.
Hole B79-3 intersected some interesting veining on Line
IN below the 350 foot level. Low gold values were widespread,
the best assay being 0.31 ounces of gold across 1.5 feet. The
data suggests that the oreshoots have a plunge, probably to the
north.
Hole B79-5 was disappointing in that only low gold values
occurred in a very wide and good looking vein intersection. The
best value was 0.08 ounces across 3.0 feet with the vein having
an overall core length of twenty-one feet. The vein was inter
sected at a horizon lying between the 275 and 350 foot levels
Page 4
where earlier drilling shows respectable values above the 275
foot level.
FUTURE DRILLING
The geophysical hiatus occuring between Lines 3N and
8N has never been bridged by diamond drilling. It was the in
tention of the Mackenzie Red Lake program to cover this area
but it was not possible to carry it out. Indeed, they lost
four holes (see map) in the attempt. Also, they were not aware
of the geophysical discontinuity. The logical course of action
is for the next drill program to commence with cross sectional
drilling north of the discontinuity, say about Line ION, and
then move southward.
CONCLUSIONS AND RECOMMENDATIONS
1. The 1979 Drill Program and its related Geophysical
Program has provided some data on which future ex
ploration can be based.
2. It is apparent that the known ore shoots have a plunge
and the direction of this plunge should be established
by further drilling.
Page 5,
3. To the north, the drilling has encountered difficulties
because of thick and boulder rich overburden, and due
to a geological change of an uncertain nature as indi
cated by the geophysics. Probably the best solution is
to start drilling from the north, say Line ION, and
work south.
4. The known gold mineralization has not been traced south
of the shaft according to the old drill records. One
or two wildcat holes south of the shaft are amply
warranted.
5. A new claim was staked which squares out the east bound
ary of the Company's property. Sufficient drilling
(a 300 foot hole) should be done to bring this claim
to Lease.
6. The drill program for the 1980 winter season would
approximate 3500 feet and cost about 380,000.00.
This Report is respectfully submitted.
HARPER CONSULTING SERVICES INC.
fo r A* r.
WILLOWDALE, Ontario H. G. Harper, P.Eng. May 18th, 1979 President.
[AT
ITU
DE
:
^
3 r o o M
DEPA
RTU
RE:
^ -j- Z
o f
2LEVA
TION
: j^ /Cv^
f
700TAG
E
0-3?
iS- D
3S
7. 9
u.5
PRO
PERTY
; ^,
BE
AR
ING
: ^^
V.D
.
LO
CA
TIO
N:
^4
,^
/^^
)*3*2a
/?W
/*^4 fre/o
roSL
cxf
JH*.
DIP
: -S
-.S-
H. D
. ] STA
RTED
: /^
, x
CO
MPLETED
:fo
fj,j /7*
DR
ILL
ED
B
Y: ^^ tic
r i* H fo* T
*e.
//32T
- q OQ 'f
*
Wo '/Y
d-f Skiff.
AK
r
A/^/V
r -
21'
vc**h'f*J
DverivrJer}
T^N C
~-^* X
i ' * j
J*. jc.
f ^
^
^
l
f^d
J 1 f.
f l J
J J*
/ooA
iKg
^-/i
1/e.i'*. fctif~*
fi
' A
O
,x,W
*/
fi, v*'*k*f
- *o K
,*er*
f
t1*
-IS-S
Z
uni
of
tt-6/Sr
r^m
i -
tfx/W
/^J
/^ /M
Of-
^ /2-
1/fiHln
q
Qfc
m^U
l j^
^/fe./-
r^^x
22 M -
Z2,^
u-e
/tf- r*
'^^.
^^ Sfc-rio*/-
S.'/ir
if^
, Pin
-Kie
l. \
rh i / A/ ?
'iy
Seric
ite
f
/6/
J L
i '
'J- *
'V"
' 7
7
/V
t ' r
7 vo c T
( K
*/
P.ifew
7); k*x^.A
xr fs
iKf/-^
*/*
^
- -T
^.
^*
,fy
-
D^
0 /l TI/VV i * f fi
Ttf^'
^ ~ 3
no
cft'tr-i-ft. -f~
*r*
ej j
, * /c"*
*
^N
y
. ^ v
-'
SAM
PLE
FO
OT
AG
ES
O J
' A
.
5
Z'
*^
I&1
"
'li. l
/V
3.r .
/w^
172.1 -
17 ^
23H
-
237
Z 3 1 "
2.H l
esj. 1-2
?f-f
2r?.r - z^
-rZ
ti.s- -
zli-.S
z^r.r - z
is.ztt?
.* ~ 1
71. S
2.71. Z '
2.7 H- X
Z-7H
.? - 177.0
Z7?.e
- 2
7 f. -7
Z S1?. ? -2f1
-f
SAM
PLE
N
o.
Z22?
2-13.0
zzj ;
ZZ
JZ
21.0
H
2- l-o?
2233
2,0
18
2-*
1t
2./QO
Z2
.6 1
ZZ
02
-
Zio
1
Z2
.0 6
2.2.B ~7
WID
TH
FT
.
2*2.
2-11 1
0-1
3-0
1. D
f. 85
,0
JxD
?.o
5-o
^.o
3-y
o. ^
0. -7
HO
LE N
G.
879-5
*
\
Sh
etf
J o-T
Z,
DEPTH
: ^^^
LOG
GED
B
Y: ^
7
^/^
^u
ASSA
Y
DA
TAA
r/4
.
77/Vi
L.
A^l v.
A^
1 L
.v.v.
A/iu
M1/
iK-^r
.eg'h
-
TT
-
Ml
A^f'-
.
t'i
-
'
LATITU
DE
:
)EPAR
TUR
E :
SLEVA
TION
:
DO
TAG
E
3f7
.r
3 W. f
/e2
~
C
xriur"i!*rn i. , 75^
BE
AR
ING
:
V.D
.
LO
CA
TIO
N:
ndH
Zd
A^tl
/c*-^d
^'/'/j/f ra •ft CM. f
J- A. r.D
IP:
H.D
. 1 STA
RTED
:
DR
ILL
ED
B
Y:
CO
MPLETED
:
Dom
e. Sf^
L
- J
* *
W
- /*
o^c
/*au
,^
PuA
isc, ZX'/U
Pa*t**'h @
W
T) -v/-
y -
iXfi P
\ t. ; T
(rC. '*-5
S
3-b D ve.
^ Avo-i
^f
jyn
fiW
tvf*
^- rc
r^,V
.7
/A/D
6p
h) 01 f
SAM
PLE FO
OTA
GES
3*y.s- ^.r3fY
.i- -3
?7.r
3^.4
- -
5?A
f
-Y2.7
' "7 3 D
^30
'
f3*/
-75"/ -
yrr.2.V
i-i-.a,- y
s-^ z.
-79^ - 'Y
f
^?(?
- i-oa.s-
5"XS"-^
- ^/7
.5-
SAM
PLE N
o.
2Z
-/0
Hog
22.0 if
Z2
-I1
Zn
*
12-1 t
T,^
^
ILL
!
2nf
2.13.^
WID
TH
FT
.
3. Z
3.0
/•H
3.oH-*
1.13.0
3-0/.s"
/.f
HO
LE
N
O.
XS
/7-.S
ST
/r^/
^
^f
^
DEPTH
:
LOG
GED
B
Y:
ASSA
Y
DA
TAA
t /W
7T- rr
Tr
/l/1, 7
A//:'
A/1 i.
/WU
A/I L
A/i L-
A/l u-
/?
//Y//M
li uJV* r~
\^^
j
^^MIN
IN
r HA
X^
^g7 ^
A-
5-.^
^sG
\^5
3PF
R
L. ;
r^\f^
cfj^
/lt A
\si"7jrf Jv^9 ^.
LATITU
DE
riwra
ai-x
A * tt/.
V A
/B
EA
RIN
G:
DIP
:--A
C.
STAR
TED:
lO
MPLETED
:H
OLE
NO
.
DEPA
RTURE:
V.D
.H
. D.
DR
ILLED
BY
:D
EPTH:
SLEVA
TION
LO
CA
TIO
N:
,,3
is. .
^X
TLO
GG
ED
BY
SAM
PLE FO
OT
AG
ES
700TA
GE
SAM
PLE N
o.W
IDTH
F
T.
DA
TA
/Z/, 8
c dike.
-/y\inot-
T l 1 i
f f ovf
f 21 - H
i. s-2.0 f i,
A/ li.
/^•7
Zont-
/tc^lf-y.- 1 v i.f
I2/.8 -2.0?^
2.2.
H2. -7
J, dT
17
.0 l
7. t
/33 ~
20
3, o•0
1
- -3?
3- o
1 32-0 8
1l. D
r
X ^
- 7
. 6A
//L
l f\( Ib*; ions
ST)li
Z)' ki
- 3
5
OF
H
'OLE
//
MIN
ING
5 H.
C. HARPER
\rvy ///j /L
PKU
MSK
Ti : 3
0 w HZ a
ted
^±
ke /^
r^/c
rJ Tt i r,: — -^
rLA
TITUD
E :
^ x ^ 0 0
/V
)EPA
RT
UR
E:
s~f oo
^
SLEVA
TION
: j
ffi /^f
ROO
TAG
E
(J'*
*
^0
/v^. r
37/?^
39
3.0
70 7
L
BE
AR
ING
: ^.
vy-
V.D
.
LO
CA
TIO
N: ./V
^ ,r
^
DIP
: .^ ^--j w
(^ liX
l*I/.
' -J*
^
^
STA
RT
ED
: /;
^7^
DR
ILL
ED
B
Y:
^,,
/y
CO
MPLETED
: /^ ^/77
rr^/tV
o^
^,
c.
' 1 1 ^ ? cT
st/Pn
' f-" i
? C"c-
' /\/ -Z
C~/ jT
x' y4
X 7^
^ ' x .3
^ j ^ O
U
C. 'i-
*-3 5
s y f f
^x^i f- ^
r-\ /\ r
Jl/s/fcr
^i-^
rVftK
,
Alft,-U
l^
tJ- 1- reta
in- A
Ol&
ts-l*. -TO
^
/-T
H^^^
l/C
^tc
f.
^r
4-,'^
^M
4 ^
*^* f/^
-fo
p
AV
/W
K. v
VK
C
jfor
^ffff-
J
/ftC + fly.
' "
' ^
7J'J3 '
JT"*"
- o
ro ken ctK
.7
L,- J
-
/7\
l/.'/
- /bri-,
/ s?777d. '.y
i/ 7 (?***i ' e-
//oriLtr*
•f i f l^-f 3 H
yC '0/0 r
- .r* or- c.
A^.
'f L'
:/ ' -f
y ^ V^
/' -^
; 3 ^i.
^,
O
y y
X*1 L
\ [ ^ ''
O/
P
' L,
/Y' ix/'k-ri- f/e/L
-
6 -j-
S /i p-/ -
r^/h
yrl
Ui-T
c (5
/"i- 5r^rK
S
V- ^A
-OU
/M/S'^
a //?A o -/TOAI
T^hS
^C
*.
ZiT
l/e i r\ i A* .
W
-
5/^tJ
Z)o
mt
7 y
^/OVA/
c? c /oy.
S-P i/ K. o i5
" T^C
-/^ /V
i i K ^ H
1? 7
^.
K/
ffr'/c//^
DC
"-/- y
7 '
C n^(L
^/C
C/'.
~ Q
), (y
fTi)V\ o dlO
t~lv
-/t ,
5 It* tt f no yJ/K-X.
Pl'a
isS
t D
.ta
- H
SI.B
-V
i*.?
-m
J (l*
i- -V
^iH
Wfe
,-v
v v
,,l 3
jUvC
-^^3
' 5-c ? -
/y/h
er*
//-!.^/ 5
2-//^
-
TT
ipy, ^
^//b
/T,*
,'
SAM
PLE FO
OTA
GES
/7ff ~
7S ?^3
7,V
- 2
4';
3/-P
-
-27
37
/ -
3 7-
377 -
37
7
37
7
- 3
?5
3?tf -
3?3
J"
39
V-
5s
,
f?-?
.J-- ^75.7
y 73. 7 - ^.^'-r
^?^ - *?/
SAM
PLE N
o.
20
?2.
Zc??,2.06
V
-.06*
2.ol6lo
t 72o66
1&6T
2011
2c^f
2.070
WID
TH
F
T.
^.?
c, 63.67
3. (7
3.0
3- (93.J-
-2.0
/ Z
2. e3.0
HO
LE N
C .
^ ^
' Jj
1r^r^
x -/^
DEPTH
: ^ 7
LOG
GED
B
Y: r/
•Jvby
ASSA
Y
DA
TA(&
.J. ^M
.
A/I L
/VI L
-77
/W 4.
/ //t
rfTT.c/
-rPA/l U
7?
r^Mtlr^P
iK 1 Y
A^C
1
l i
J
^*
if *
j'
' J /
^
T* f\T •n
*T
rt "V.7
7 C
t^ --~j
J/~}6hjr\ z a
Ac-w i-^/f-t-
fc f,) /o f - rv 01 1 -*-t*^-
'HOLE NO. /o /7
~
s i
LATITUDE :
3EPARTURE :SLEVATION:
ROOTAGE
*
l
BEARIN
G :
V.D
.LO
CATIO
N:
DIP:
H. D
.STARTED:
[COMPLETED:
j ^
^ee-f ^ ^
2^D
RILLED BY :
; DEPTH : —
) LOGGED BY :
C-kl/i..^
iU,
-h Sfr i^
'ti
#x
/5/
/,y. fil'infrif
ffi, ve t k i'* y * *fr'ic{t —
——
——
t* lw
J:L
- J- k vt-rt- .
/^^/r
@ r
f PA
^ i
if foi/s —
/vv iKO
v O
J r* Zk
^/VD
O
P
A^O
i^
SAMPLE
FOO
TAG
ES
*M
-i?*-/fi -
^
H1^ ' *
lfilr -
*?rvfr -
-iM
l -
i':-/
SO
I- S- s S
ro? -s-;,
j- /i -
S^
S-'l -±
'1ST, f
- s-,1. 5
5/7, 3 - rz ,-
S-zt -
s-^i-rs-n.s- - r^-36"^ y. 3 - 5-27-3^7
3
- S-^F.
y^F
-5
32^
5"5Z -
r3 i'
5-3i- ^5
-3^
,5~3? —
5" ^u5"^o
- 5 V3
5-^J-
^'^
S 4 1 - 'f -li
foi-r- /7r
SAMPLE
No.
2.0 7 y2-0 72-
^o
7i
2.a?y
Z D 7i"
20
7^
,20 77
Hit
21I-L-
^^/31
U H
2,^/r-zo?t2 o? 72-2- /^^^/7
2-lJ 8
20-Jg
20 7*?
i 0^4
1,^
6
i.**7
it^p
ZO
? 1
WIDTH FT
.
3.03-03.0
3,o3.0it)f.o3. ^
3- 1?3, 02.3
A 7A 5
/.g
3,oC- 7V
-o
5oJ. 0
.2, o
3.0?.*
?.6
)
?.r
-^SAY
DATA
^M/U
-
77:
-0y.ol-01
.01
• or.oyAf'.lfpT
i-rr-1T^.5
/
77-^• os77-
.flyT
T77-
/v i u/V
,u
A/l"-
/U.L
l'i|i\fa*/
\fl Q: /
•j lil {lv
~
fi 'i?, H-
\\* \^ — i \ ^i X
0ii
^i
yx/
^F
ES
S?
.^-——
~-
MINING
C. MAR
^~ _ -'
f-in-
^.^^\\\
"ER 'SJ^y ,/
^^^^^fir* r
-Lj1n^
LATITUDEDEPARTURE:
-3+00
PROPERTY tBEA
RING
:V
.D.
DIP:
STARTED
: ^
CO
MPLETED
:/;^D
RILLED
BY:
ROLE NO.
B79"Z
T]
DEPTH: 3
S-S"SLBVATION
LOCA
TION
:II
- A
pp ro*A
n ^
! LOGGED BY:,
OTAGESA
MPLE
FOO
TAG
ESSA
MPLE
No.
WID
THFT
.-ASSAY
DATAO
* A*
\
/so-h
fra* l J fit
/ZD
- /S
'Oft
178.P
ink
(n-
X" -"? "/* *- '* fi
i on i
3 to-r* y
i H.
Tl/g
(
M /
HP
A/t'l
/..r-
-f 1
Off .8
- Z* 7- x
1.3
Ml
337-5
"/. o
/vi i3-V3
-i l*- 1 lv*, i o*. - " c^A. colot- ,
'•ft*'
St'j
A3
M '
J^jLA i
Ml
. 3 -
y i2
, OS
-- 7
~r
. 3A
/ll"
3/1
t-.^fZ
.5L
206 1Z. i.
OF
^•;
;
/-Z.
n
[ATITU
DE
: ' /. /io
oJS
DEPARTURE: *f-fo
o f
SLEVATION: j-rc
/ev^f
FOOTAGE
D- ^io
XIrf.?fJ
'g-~ f
/O
'
L?
/U
2&
3.S
3*ttf
l.
PROPERTY : g
BEARIN
G:
27d*
V.D
.LO
CATIO
N:
/JYai/^ {
snju
zd
/fi^
/J
/c f
vfllorj-f.w
^*
*.
DIP:
^//j,^ ^
5-^" .
H.D
. ZO
' ^
f-,*
1 STA
RT
ED
:^ ^ /^
COM
PLETED: ^
^f
DRILLED
BY:
/^/^
^,-^^Y
o
Tt^.*L
//sa^- *pp^r sic- ^ts* /r'/i/.f s-x^. /4xr
U'iZ
.f
ItJz'/irO
vtr
^rJe*
f^i^
o
- ('
/P/
/' ^
f\r\ VC
1 ! fL- "'
A Iff r* J
JV
/b
in - r ^a '.i (,,.t1 *i l - /6
T rouk^t
^ D re kfr\
C 0 i- 1
A •y
//' Celdt-e-a.
Klm
Ys
-r^tJiit,.
Udlc
^ic
, -
-F/ou/s; ^/W ^,?^y
^ /^^//^J
0^ S
X^^
d"TjO
y . b 1 Ae, le-
//fit
-rV^r /t/J-CJ
7 '
^ H ^ i- -f
5 *? "? 1 .
U.\ fif
\J
\J
S C( Si one.' {jt/otj
'ic.r-'t'^r c\
sorfiCKt *S 3o"C.A.
j, 1
f r
r, 7
' f-\/? y y
"'a ,'f -v " f\ 0
'J t~t)f J
^oixt\7 ci T
^ r 3 pt-, i T(.
LI r^c/^i" i
"x
f
* J, r f
o^ * 1 L (/K
xi ^ r 7/•ti'fi'ft.
l/ii/r&ntt-
.r~l o r i T, o ii ~
/7/^X/-/
i/Jr/a-6/d, fi\jr
faoi-tf~r\ ^ ^ r/ v-t
(Q i^-7~"
' J-- X
'i fs n 5 1 TI oh
/- cV s f- r ? /S c
w /.y
-/o- /K
r^Vor
r
^i. T/r/^fcrr
*/ PD
^y
'
5", ^ r i {~ ! r?^( 0-^ ,
f r PC T
•y T
" A
t -S
Ifj f nJK
,J t\f t t~k*c-tf 1 1 le.
vOtC
^^tcj
r^ j^
^/4
5 /-fcrt-J. U
or^t. Sf&
c^/t.
(j f- f v\ q f T*C .
SAMPLE
FOOTAGES
57- Y - ^-7
^/. r
- *?2. 7
_
S
y-
2 ^3. # - ^
s- . '2^^-^ - ^
^^
2^?
- 2 7o
27(5 -
2 7^./
2 72- X -
Z7?2
2-jr. a -
277- 7^
77./ . Z
7?
27-? -
^?/
^f
/ -
2?^
2?*i - 2 ?7. 2.
2j7.2 -
^f7
SAMPLE
No.
Zoo Z.200-5
2oo f
2.00 t-/
2. CO S"
200^
2.0072oo ?Zoo*)2.0 J 02-0 /X
2-0 /Z
^tf/3
20 /y
WIDTHFT
.
/•J
f. 2.
6.6
/. 32
-5
-e.o^^ i•2.1
/•9'•92-V3 -0
-5.2./- 8
HOLE NO . /^ 79 -7
1
S'teeJ' / o-f 3
DEPTH : ^^/.
LOGGED BY : /^^^
A
ASSAY DATA
6^. A*.
Ti-
Ti-
.cS
.0^
Ti^
Tr
-c?/•^r
•t?/•^3.O
-/"Tr•0
^
-o/
1iii!—
jATITU
DE
:)EPA
RTURE:
5LEVA
TION
:
?OOTAGE
,"'
PROPERTY : g
BBEA
RING
:V
.D.
LOCATION:
MJ* 2,3
&J
^^
^/e
n^cZ
r
T^c.
DIP:
H. D
. 1 STA
RTED:
COMPLETED:
DRILLED
BY:
5 1 1 1 c. IT ifr-J
- S" f a •f'/'
fi\ i"*o\' py. Som
e. "7/L.
}
.1 i i **
3
syD"*-'
of
1/6
.
5?n'c i Ve, W
y*1 - s. /' //V r-f/c ^ -
SAMPLE
FOOTAGES
**?
-21!
271 -2
fl2*3 -
ztr
2 ?5~ '2
f 7
2? 7
' 5 -"G
3 00 - 3 o 3
5d5-5 - ?
^^05~
-35?
30 a* - 5-J-
3/0 -3
/33/ 3
- 5^'
3/5
- -
3 /e-*
3/^
.^ -
3//^
3/^.^ - J/?3/5P -
32s3
20
-
3^3
-r
322,5- -
-52T
Szr^f -327.5-327.*r
- 33 t?
330 '3
32
.^332- s-
- 3 3 T
33^'
-?5?
35,P -
3 Vo3 ve -
3Y^-r3 12. y
-3 V
i"
SAMPLE
No.
^/.T
Hoik
2.0
17
2.0 t?
2-oiq202.0
20
2-1
2-OtZ
2.022,
2.02- y
2.02,5-
Zo
if,
20Z
.7
2-C
U
2.0
2^
Zo lo
2,0
31
2032.
20
53
2- 0 3V
20 3r^0
5^
^037
2-0
2J
20 3
f
WIDTHFT
.
-?.o2-0
2- D
2.0
3-0
3.0
2-0
3.0
2.0
3. o2-0
/.^e.iz/•i
Z,v
2'X
2. S2 -S2-Z2^
2. S"
3.0
2,0
2. r2- S
HOLE NC.
1377-1
1
5~^f(?7 2.
of 3
DEPTH
:LOGGED BY
:
.\SSAY
DATA
A;. A
n.
, 0 1
.02."Tl"-
.02,
,0V
-01'
-^.01*-0 1
-o/.5-8- 10
.OH
)-of
•c? 1
-03.0
5
.of
.27
-
• 02.
.fi/
.02.
•0?
• d V
.0)
—ii
-t —
i1 ,^T-^" \
' i
o |5^
V ' *^*-
1 ri
\"" "i
)vi^i-*1
"^
j
^ovr^y^
1B2-
^^7
OM^*L
.fli.^.53
LATITUDE :
)EPARTURE :SLEVATION:
DOTAGE
3V/-S--
s-z/
—.
-l,
PROPERTY : 3
BEARIN
G:
V.D
.LO
CATIO
N:
o^i^Ai ^ a
s\t^J /&
/I-C
Z'xp
/o rff' c'nr
-^~A.r.
DIP:
H. D
. 1 STARTED:
COMPLETED:
DRILLED BY:
Darnc s-fci
Int. ( 1 T
^3f
•y*0- y 3
a A- P y gr^^pc/for
t/ .
P 2- u n t.
e/ ^Ti? Ffitfas fa
5" i fe. . ~
Do p
l^L
l -
^ j
*fr,^c,
Jo a?A
.0
k (it^i. T
fnt'f'^
tf 5 "f
^f^
fS^
—R
ot} r
/OO
/f./^^ f^
2--
E A/D
O
/- H
o L f/\i j i- i
d- -/) 1
^^
.P/
^^^ ' -
f, 0
Hole,
c&r^f L./L/
upus&r-Ji;
fro~
v ^2., '
f^,, 3^)u^-.
p 'f
^-
-fi
^cPrhn/t
^O
Z'f
~~ —
/OO
r^Oih
ZtU
-scJ -O
s ^^ —
— g..
7i~
/oo n^t.'.k
src^/^
-OH X
^'"
"^
y^-^
/ M
INING
li 5 H. C.
HARF
V v^S
--^^^^^
SAMPLE
FOOTAGES
3-/JT - 3W
.53^. r
- 3
V7^'
^tf.i-
- 35-3
.1^
?^3.2
- SS-f.8
?Zt. 8 ~
3 i' 7- i"3S
'7-i'-
3 s- f- f
35V- ^ - 3 ^ y
v/r.r - v/^.y
Y^S\
^v\z^l
ER m
ili', y
7 y
"C*X i ^ ii^ il'Li'ib
SAM
PLE N
o.
2o*vZo*8zo
m
2-0
11
Z O So
lull.
2013
ZV
W
WIDTH FT
.
/.X3.03-7
/.-b2-7A 3
*.i
2-1
HOLE NO . x9 79 - X H
5^*
^ 3
a f 3
DEPTH:LOGGED BY
:
ASSAY DATA
Aj A
it
.(?3
TVTr
.02.
A/;/•0
'
Tr
TI"
r Ontario
Ministry of Nal
GEOPHYSICAL - GEOLO1 TECHNICAL DA": 63.3611 DOME TWP
300
Z O aC/5
W
tinO
TEC
Type of Survey(s) ^ '^Township or AreaClaim Holder ( s) jQfte'?d6Survey Company .^Qtf
Author of Report
AHHress of Aiithnr M
Covering Dates of Surv
Total Miles of Line Cu
SPECIAL PROVISKCREDITS REQUES'
ENTER 40 days (inc line cutting) for first survey.
ENTER 20 days for additional survey usi same grid.
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT FACTS SHOWN HERE NEED NOT Bfe REPEATED IN REPORT
HNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
t, f, ^ Ay i, - f Asl L,. /*~* f "'l4(V\J.4tt{(C f fatfMfit i ' '*-^K ItC, OlS^JtCt*/'
7) tr- Jjfe/dvK. L Uf .
IK** fl*d L* L 'f** late'fc^ ^e.ii . , t ' ^-^"
y Tt L/nri^PCcti ^nr l O t~is\ft*0 J f f * /*' T;t^dUvJ K c^e* 1*^1(2 /TIJCL 7 J *~c .
/y -(i, H&r-fl^j""f tif^d^ /W ^ttCe+^Ll
ey J /tt *fc Aju^Y ff^TT(linecutting to office)/
t w - 3 -tt fir i le/"
)NS DAYS FED Geophysical perdaim
—Electromagnetic ludes
— Mapn'"tTn'"tPi r, J , J f\//7/ /^-R aHir.mptrir ' * '
each —Other...
ng r,^i^E^al
nenrhfmiral
AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)
Mapnptompter
HATR. fJA v ; /T/
Res. Geol.Previous Surveys
File No. Type
Rlprtrnmagnetic RaHiotnptrir(enter days per claim)
//S*jJL77 STHNATTTPF- /f 1*7' /TC fTl* -1 Author of Report or Agent
Qualifications
Date Claim Holder
MINING CLAIMS TRAVERSED List numerically
/IS/ /3-2-ry(prefix) (number) /tttl"
1111^
TOT AT, CI, A IMS -^
If space insufficient, attach list
IND
UC
ED P
OLA
RIZ
ATI
ON
R
ESIS
TIV
ITY
H w
w ^
8 S
rt
rt
rt
—
i-l
"10
0
0
-^
CL
CL
rt rt
rt
rf
-0r*
f^
| Q.
rt
CfQ
p i-i P ^
*d
h3
g
tT
2 Si
rt
2
^
3
?
3I
S- I
Q 3
1 1
5"
OS
af*
ET/Q
Ji
1 0 rt}
rt}
rt
T D
O
H
*. i'
(^
- a-
3
p rt
g 3
MB"
3'
3 rt
rt- 3' rt
rtrt
0 P 5' D
W
S
Tl
rj
i-l
i-l
K
rt
rtrK
-Q
^1
"8
C
Cn
rt3
3n
o
•-.i
--^ o 0 3 P 5'
c-f
GR
AV
ITY
ELEC
TRO
MA
GN
ETIC
MA
GN
ETIC
Elevation
accuW fi O
3 SL
cT rt
p CL O
n o I-l n o rt- o' 3
w P CL rt
Sca constane 3
Parameters
mea va
t-1 rt CL ^ T -** r r '
5- i. ?!^^ V)
* 1
•?S*
< 4
r^
-H^5 u V S s •^ f •^ y f\ J a.
Method:
Frequency Ki 7** "^
S" hr)
T^Z
-^
-. n
Tt^
CL
^ cr p CA
, 3. rt
- rt
-^.
OJfc
Krt
? 5" ID —
C/3
-'
g" o rt- -^ ^
r i"
~A n
a^TT n H
H 3 3 rt D *"d P 3 s rt i — t 5' rt
Coil
configurati
Coil
separation
Arrnrary 1-4
.•x. ^
o •^ ?J i^ 5i T A,
^ 0*
t rV
Instrument
— r* 0^* B. > -x TX ^IN 5 ^ V V
.
. W
63
Q
^
a\S
S
5" o
EV
^ 3
Cr
S? s?
l. 3
^
rt
rt
0
^
^S'
S g'
i^
0 S-
S
rffci
1 r ^
^8
3^
g
0T
p
-.
rt
M J
3
3 S
- rt
5 CL
fj
0
g•^
-^ 2
&L
g1
C —
a^ 4: \, e^ c-
^ fX r 'T 5i r 5 W^
U r "s
9j a^ O \ t ^
rt ^
TV O -V Q Cj x c,. o t- ' ^J \ "L v fi, \ CiX • x x.
-^^v
.
ST O e VI
~^*" ^W
?~
-o ^C
L ^ ri r JT •*a
(O A Os
\i *^ ^ •L L ? f •^^ ^ IS ^ J *-l
r~^ 1* 4 b J r t •^
Instrument 3 rv y i ? ^ cr o~ ^" ^ ~v ^s t. f\ ^ v -^, ^
P ?
our 3' EL
vap
u) c
c 3 cr n •-i O i-h Crt
o 3 U) ON
r "z,
5'
cn
3*o
p nrt i-
l
S.
O
\(W K
o fo
O
G
Z O C/3 G J* W C/3
O p 3 O
O •13 S Sc rt < rt
H
Baseline Permanent Station
Inph* solid
52N04SWM62 63.36)1 DOME TWP200
Profil
IONKA EM 16
scne
O't
7f
Quadrature dashed line
BONANZA RED LAKE EXPLORATIONS INCDOME TWP. - RED LAKE, ONTARfO
Electromagnetic Survey
Scale. l-
5 H. C. HARPER "
APR l O 79
300 4OO Transmitting Ration. ANNAPOLIS, Md.
———— 2O N
(6N
BONANZA RED LAKEBaseline Permanent Station
under 6OO Gammas
jij Vf 6OO to TOO Gammas
TOO to 8OO Gammas
8OO to 9OO Gammas
9OO to IOOO Gammas
52N04SWM62 63.3611 DOME TWP
over IOOO Gammas
5S
EXPLORATIONS INCDOME TWP. - RED LAKE, ONTARIO
TOTAL FIELD MAGNETIC SURVEYGeometrics Proton Magnetometer G8I6
AMR .9
20N
N
Baseline Permanent Station
/^a *^
SCALE: l"s20V OF GRADIENT
52N04SW0062 63.3611 DOME TWP220
IOO 2OO JOG 4OO
45
55
BONANZA RED LAKE EXPLORATIONS INCDOME TWP. - RED LAKE, ONTARIO
MAGNETIC GRADIENT SURVEYGeometrics Proton Magnetometer G8I6
BONANZA RED LAKE E LORATIONS INC.DOME TWP.
COMPOSITE
Underground DevelodmentDrilling and
52NMSWW62 63.3611 DOME TWP
l A//13&0
f fas. f 000
52N04SWee62 63.3611 DOME TWP
J-" A l"
240
/.
H/es-f
S O00
fast
\
r- -', ' r ,~ Li^-:-'.: -.1 '"'.' i f- - - - ~* r' -y
MAY 2 i 79
52N04SWeeB2 63.3611 DOME TWP250
88
.
r*, o* : S H too /V ( L?-i
52Ne4SW8062 63.3611 DOME TWP 260 i
i o H. C. HARPER ™:l Ui
MAY 2 i 79
fi t Z*
lewl za.s'
52N04SWM62 63.3611 DOME TWP 27O
IfV+l 3fO
2 j 79
'r il-h, /r*r^-57-//I ^ 7"
.......J
f
/
/ .-ll
52N04SWee62 63.3611 DOME TWPS90
l/*/W M\\
\
MAY 2 l 79
/rooo/V
3 H. C. HARPER J}]
52Ne4SWe062 63.3611 DOME TWP
l t l
•vV*
i
vi
*u 7.
x
V
52N84SWM62 63.3611 DOME TWP
52N84SW*862 63.3611 DOME TWP
s0*0'
C-J
S2N04SWM62 63.3611 DOME
oQ
34-0
•rrrir —if-—inn
/C-/ J * .-
We**
52NB4SW0062 63.3611 DOME TWP 350
/rf/' / y,,"" J\r.
MAY 2 l 73*/.: / f6*0AS
t/,