    INSTRUCTION MANUAL

    CUSTOMER:M/s. KIS

    MODEL: SCT 250LE

    TYPE: SQUARE TYPE

    GEM EQUIPMENTS LIMITED

    S.F.NO 103A,

    ARASUR (PO)

    COIMBATORE-641 407

    INDIA

    PHONE: 0422-2360013, 2360130, 2363800.

    FAX: 0422-2360523EMAIL: [email protected]

    : [email protected]

    : [email protected]

  • 7/25/2019 SCT Assembly indtruction.pdf

    3/27

    FORWARD

    This manual contains information for Installation of FRP COOLING TOWER.

    This unit has been designed in such a way that it is reliable and maintenance

    free. Even then we feel that any machine or equipment has to be understood and

    handled with care so that it gives a good service. This manual will help to keep your

    Cooling Tower in its best condition. Please follow all instruction in this manual during

    installation of the Cooling Tower. If you have any problem or doubt please ask our

    service engineer, who would be able to guide you.

  • 7/25/2019 SCT Assembly indtruction.pdf

    4/27

    WARRANTY

    This equipment is warranted to be free defective material or workmanship for a

    period of 18 months from the date of shipment or 24 months from the date of

    commissioning whichever occurs earlier. Any equipment, material or parts found

    defective will be replaced free of charge.

  • 7/25/2019 SCT Assembly indtruction.pdf

    5/27

    INTRODUCTION

    Adequate knowledge about cooling tower maintenance and operation will allow you to

    perform inspections and service your own tower to ensure that performance and structural

    integrity do not decline over the life of your cooling tower. This knowledge will allow you to

    operate your cooling tower safely and with optimum performance. The following steps are

    intended to provide you incite and allow you to prevent or foresee problems that may occur as a

    result of normal operation.

    1. Tower Construction

    1.1 Type

    The is an induced draft counter flow design with a propeller type Fan blade mounted on

    the top of the cooling tower. The Square shaped tower provides High efficiency with proceeding

    Large Fan.

    1.2 Casing

    The Fiberglass Reinforced Polyester (FRP) is composed of fiberglass mat laminated from

    unsaturated polyester resin. The high structural strength of the material protects the unit against

    impact and cracking. Gel coat is applied for UV protection and to provide a glossy finish.

    2. Tower Support Framework

    2.1 Motor Support Frame

    Made of hot dipped galvanized steel or stainless steel depending on options you have

    chosen.

  • 7/25/2019 SCT Assembly indtruction.pdf

    6/27

    2.2 Air Inlet Louver

    The FRP louver is fitted on the air inlet to prevent foreign materials from falling into the

    basin. The air inlet louvers are constructed of corrosion-free FRP (Fiber Reinforced Plastic).

    They are minimizes splash out form cooling tower.

    In these louver systems circulating water droplets tend to splash out, the water droplets are

    captured on the inward sloping pass, minimizing splash out problems. This unique louver design

    completely encloses the basin area. There by reducing the splash out water.

    2.3 Filling

    Made of rigid polyvinyl chloride sheets which is embossed and corrugated into a

    honeycomb configuration that provides maximum air-to-water contact for higher levels of heat

    exchange.

    2.4 Water Distribution

    Centre pipe header are Mounted in centre of the cooling tower for even distribution of

    water over the fill material The branch pipe are fitted in the centre pipe for even distribution of

    water . Numerous Non Clog Nozzle are fitted in the branch pipe with equal distance.

    2.5 Fan Blade

    Fan Blades are propeller design providing quiet operation and maximum airflow-to-

    Horsepower ratios. It is important to check that fan blade is corrected properly. This can be

    identified by arrow markings on the fan blade.

    2.6 Motor

    The fan motor is equipped with gear Box and it is mounted on rigid galvanizing steel

    supports. The motor is totally enclosed IP55, flange type, 380 v, 3 ph, 50 Hz, induction weather

    proof with extended shaft. Fan is driven by drive shaft which will be engaged in Gear box which

    will reduce the fan rpm for required tip speed

  • 7/25/2019 SCT Assembly indtruction.pdf

    7/27

    TABLE OF CONTENTS.

    1. INTRODUCTION

    2. PREPARATION OF INSTALLATION

    3. STARTING

    4. OPERATIONAL CHECKS

    5. ASSEMBLY INSTRUCTION MANUAL

    6. MAINTENANCE & ADJUSTMENTS

    7. TROUBLE SHOOTING

    8. INSPECTION & MAINTENANCE SCHEDULE

  • 7/25/2019 SCT Assembly indtruction.pdf

    8/27

    ASSEMBLY INSTRUCTION MANUAL

  • 7/25/2019 SCT Assembly indtruction.pdf

    9/27

    INTRODUCTION

  • 7/25/2019 SCT Assembly indtruction.pdf

    10/27

  • 7/25/2019 SCT Assembly indtruction.pdf

    11/27

  • 7/25/2019 SCT Assembly indtruction.pdf

    12/27

  • 7/25/2019 SCT Assembly indtruction.pdf

    13/27

  • 7/25/2019 SCT Assembly indtruction.pdf

    14/27

    ASSEMBLY INSTRUCTION MANUAL

  • 7/25/2019 SCT Assembly indtruction.pdf

    15/27

    ASSEMBLY INSTRUCTION MANUAL

    1. ASSEMBLY OF VERTICAL POST:

    Quantity :4 Nos.

    Material: HDG

    Place the Vertical Post on the base frame as per Fig 1.

    VERTICAL POST 4 NOS

  • 7/25/2019 SCT Assembly indtruction.pdf

    16/27

    2. ASSEMBLY OF TOP & BOTTOM L-ANGLE:

    Place H1 L Angle on the First row of all Vertical Post using Bolt& Nut.

    Place H2 L Angle on the Second row of all Vertical Post using Bolt& Nut.

    TOP L-ANGLE (H2) 4 NOS

    BOTTOM L-ANGLE (H1) 4 NOS

  • 7/25/2019 SCT Assembly indtruction.pdf

    17/27

    3. ASSEMBLY OF TOP HOOD:

    Quantity: 4Nos.Material: FRP

    The Top support sheet is placed on the Top hood L angle & above that Top Hood is placed in

    Centre of the Tower.

    TOP HOOD 4 NOS

    FINAL VIEW OF TOP HOOD:

  • 7/25/2019 SCT Assembly indtruction.pdf

    18/27

    4. ASSEMBLY OF FILLS RING SUPPORT ANGLE & FILLS RING BED:

    Quantity - 3 Nos. (Support Angle.)Material - HDG.

    FILLS RING SUPPORT ANGLE - 3 NOS

    Quantity - 2 Nos. (Fills Ring Bed)Material - HDG.

    FILLS RING BED - 2 Nos

  • 7/25/2019 SCT Assembly indtruction.pdf

    19/27

    5. ASSEMBLY OF FRP SHEET:

    Qty: 12 NosMaterial : FRP

    FRP Sheet is outer portion of the tower, which is placed between all the vertical Posts.

    FINAL ASSEMBLY

    FRP SHEETS - 12 NOS

  • 7/25/2019 SCT Assembly indtruction.pdf

    20/27

    6. LOUVER ASSEMBLY:

    Quantity: 4 Nos.

    Material: FRP

    Louvers are placed below the fill ring bed to avoid over flow of water away the cooling tower.

    FRPLOUVER 4 NOS

  • 7/25/2019 SCT Assembly indtruction.pdf

    21/27

    7. ASSEMBLY OF FILLS:

    Qty : 175 Nos

    Material: PVC

    PVC Fills are C-12 with Honey comb packing are placed above the fill ring bed. They have high

    contact surface area.

    PVC FILLS 175 NOS

    8. DRIFT ELIMINATOR & PVC FILLS

    Quantity -4Nos.Material - PVC

    Method of Assembly:-

    Drift Eliminator are placed above the drift support, they are used reduce the drift loss of water.

    DRIFT ELIMINATOR 4 NOS

  • 7/25/2019 SCT Assembly indtruction.pdf

    22/27

    9. ASSEMBLY OF DISTRIBUTION HEADER & NOZZLE PIPE:

    HeaderPipe: 1 Nos. Nozzle Pipe: 8 NosMaterial : FRP Material: PVC

    The Centre pipe is placed between the motor bed post and it must suit to inlet sheet of FRP

    .Branch Pipe are fitted in the Centre pipe with 2 Nozzle.

    DRIFT SUPPORT ANGLE 2 NOS

    CENTER PIPE 1NO HOLDING CLAMP 2 NOS NOZZLE PIPE 8 NOS NOZZLE SUPP.ANGLES 6 NOS

  • 7/25/2019 SCT Assembly indtruction.pdf

    23/27

    10. ASSEMBLY OF MOTOR BED:

    Quantity: 1Nos.Material: HDG

    Motor bed is placed on top hood as shown in the fig.

    MOTOR BED ASSEMBLY 1 NO

    11. ASSEMBLY MOTOR & FAN:

    Quantity: 1Nos.Motor is placed on motor bed.

    NOZZLE PIPE

    MOTOR

    FAN

  • 7/25/2019 SCT Assembly indtruction.pdf

    24/27

    12. FAN GUARD ASSEMBLY:

    Quantity - 4 Nos.Material - MS HDG

    The FAN GUARD (G19) is mounted on the top of the fan inside the Motor Bed

    13. LADDER ASSEMBLY:

    Ladder Quantity (L) - 1 Nos.

    Ladder is placed in front of the tower.

  • 7/25/2019 SCT Assembly indtruction.pdf

    25/27

    4. MAINTENANCE AND ADJUSTMENTS

    4.1 NOZZLE HEAD

    First check whether the flow rate is normal. If correct, dismantle the head for cleaningand check.

    4.2 HEADER & NOZZLE PIPES

    The header pipe and the nozzle pipes must be kept clean to prevent any blockage in

    flow. For cleaning, remove the nozzle and loosen the nozzle pipes.

    4.3 CASING

    No coating is needed for the casing as it is made of FRP. If it becomes soiled, wash it

    with soap and water.

    4.4 FILLS

    No specific attention is necessary for fills with proper water quality control. Remember

    do not walks or stand directly on the fills, always place plywood or hardboard over the fills

    while repairing.

    4.5 WATER QUALITY CONTROL:

    Poor quality cooled water or air pollution causes corrosion, scale & algae growth, which

    not only impedes the performance of equipments but also damages the equipments.

    1. Make quality analysis of circulating & make up water.

    2. Water treatment is strongly recommended. Periodic blow down can also keep the

    operation within the acceptable water quality.

  • 7/25/2019 SCT Assembly indtruction.pdf

    26/27

    TROUBLE SHOOTING

    TROUBLE CAUSE REMEDYRise in cooling water

    temperature

    1. Excessive or inadequate

    cooling water.

    2. Irregular flow of air3. Recirculation of air from

    tower outer.

    4. Improper flow of air from

    fan.

    5. Blocking of the fills

    1. Adjust to the specified flow.

    2. Improve ventilation.

    3. Improve ventilation.

    4. Adjust the angle of fan blades.

    5. Clean the blocked area.

    Abnormal water flow 1. Blocking of the nozzle holes.

    2. Blocking of pipe.

    1. Clean nozzle.

    2. Clean header and nozzle pipes.Noise and vibration 1. Fan blade tips touching

    casing.2. Bending of fan shaft.

    3. Loose bolts.

    4. Motors bearing damages.

    5. Damage in fan and/or motor.6. Check Gearbox oil level.

    1. Adjust the fan mounting.

    2. Adjust bend at special shop.

    3. Tighten loose bolts.

    4. Repair or replace motor.

    5. Replace fan and/ or motor.

    6. Fill the gearbox with oil as

    required.

    Excessive current flow 1. Drop in voltage.

    2.Irregularities in the angles ofthe fan blades

    3. Damage in motor.

    4. Overload through excessiveair flow.

    1. Check supply voltage.

    2. Make careful adjustment.3. Repair or replace motor from

    manufacturer.

    4. Adjust fan blade angle.

    Water carry over 1.Block of the fill

    2. Excessive circulating water.

    3.Excessive air flow

    1. Eliminate blockage at the upper

    edge of the fill.2. Adjust the water flow with

    valve.

    3. Adjust fan blade angle.

  • 7/25/2019 SCT Assembly indtruction.pdf

    27/27

    INSPECTION AND MAINTENANCE SCHEDULE

    INSPECTIONARE

    A

    FAN

    MOTOR

    ELIMINATOR

    PVCFILLS

    WIRINGS

    STRUTURAL

    MEMBERS

    FRPCASING

    FLOATVALVE

    BLEEDVALVE

    FLOWC

    ONTROL

    VALVE

    G A O

    Inspect for clogging W W

    Check for unusual noise or

    vibration

    D D Y D

    Inspection keys and set screw S S

    Lubricate Y

    Check flow rate M

    Check for leakage S

    Inspect general condition Y Y Y S Y Y S

    Clean R S R R S Y R W

    Repaint R

    Completely open and close S

    D-Daily W-Weekly M-Monthly Q-Quarterly S-Semi annually

    Y-Yearly

    R- As required more frequent inspection and maintenance might be desirable.