session 1 2
TRANSCRIPT
08-01-2014
1
Introduction to Lean
Manufacturing
1
Trainers: Priyank Tewari and Shashank Sharma
What is Lean Manufacturing?
• A systematic approach to the identification and elimination of all forms of wastefrom the production process
• Lean concepts were initially developed and implemented by the Toyota Motor Corporation
2
08-01-2014
2
• In simple words, it is a methodology thatreduces your costs by eliminating wastes inyour production processes and increasesthe profit margin and the morale of yourenterprise
• Techniques like: 5S, JIT, KANBAN, KAIZEN, POKA YOKE, SOP, 6-Sigma
What is Lean Manufacturing?
3
Overview of Lean Management
• The purpose of lean is to remove all forms of waste from the value stream.▫ Waste includes cycle time, labor,
materials, and energy.
• The chief obstacle is the fact that waste often hides in plain sight, or is built into activities.
4
08-01-2014
3
“If LEAN MANAGEMENT principles
are applied to Manufacturing, it is
called LEAN MANUFACTURING”
5
1. Elimination of Waste: eliminate any activities that do not add value in an organization. Includes overproduction, waiting time, processing, inventory, and motion.
2. Increased Speed and Response: better process designs allow efficient responses to customers needs and the competitive environment.
3. Improved Quality: Poor quality creates waste, so improving quality is essential to the lean environment.
4. Reduced Cost: simplifying processes and improving efficiency translates to reduced costs.
6
4 basic principles of Lean Management
08-01-2014
4
Concept of Friction, Waste, or Muda
7
“Understanding of friction, waste, ormuda is the foundation of the leanManufacturing”
7 type of wastes in Manufacturing
1. Transportation (between workstations, or between supplier and customer)
2. Inventory
3. Motion
4. Waiting, including time in queue
5. Over-production
6. Over-processing: Non-value-adding activities
7. Defects: Cost of poor quality, scrap, rework, and inspection
8
08-01-2014
5
TIM WOOD!
9
An 8th waste has also been identified
10
• Un-utilized or under-utilized talent
• Arises when companies do not involve all of their employees in continuous improvement
08-01-2014
6
Waste Often Hides in Plain View
• We cannot eliminate the waste of material, labor, or other resources until we recognize it as waste.▫ A job can consist of 75 percent waste (or even
more).
• People become used to "living with it" or "working around it."
11
Demonstration of waste
• The solution is obvious in retrospect, but first, we have to understand that there is waste (or a problem).
• Building a wall
• Cleaning dirty parts
12
08-01-2014
7
“Waiting” waste – A golf analogy
• In a four hour golf game, the golf club is in contact with the ball for less than 2 seconds
▫ The same proportion of value-adding to non-value-adding time prevails in many factories.
• Additional analogies:
▫ Waiting for other players = waiting for tools
▫ Walking = transportation
▫ Selecting a club and addressing the ball = setup
13
14
08-01-2014
8
7 type of wastes in Services
1. Delay: Customers waiting for service
2. Duplication: Re-entering data or repeating details
3. Unnecessary Movement: poor ergonomics while delivering the service
4. Unclear communication: Excessive clarification or communication over use of the service
5. Incorrect Inventory: Out of stock
6. Opportunity lost: Lost customers which now have to be retained
7. Errors: Transaction errors, lost/damaged goods
15
"I believe that the average farmer puts to a really useful purpose only about 5 per cent. of the energy he expends. … Not only is everything done by hand, but seldom is a thought given to a logical arrangement. A farmer doing his chores will walk up and down a rickety ladder a dozen times. He will carry water for years instead of putting in a few lengths of pipe. His whole idea, when there is extra work to do, is to hire extra men. He thinks of putting money into improvements as an expense. … It is waste motion— waste effort— that makes farm prices high and profits low"
--- (Henry Ford, 1922, My Life and Work).
What do Manufacturing greats say about waste?
16
08-01-2014
9
Eliminating waste can lead to reduced
costs and better bottom line or profit
margins
• Exercise <insert case study>
17
1. Production with defects
2. Wastage in the use of resources
3. Bad product quality
4. De-motivated employees
5. High yields on expense of customer satisfaction
Industrial Sector faces problems related to
production and processes
18
08-01-2014
10
Manufacturers are always worrying!
1. Transport
2. Inventory
3. Motion
4. Waiting
5. Overproduction
6. Over Processing
7. Defects
Manufacturers have to
constantly worry about eliminating
these wastes!
19
Why should Manufacturers worry?1. This leads to high cost of production which greatly
impacts the profit margins
2. Big manufacturing enterprises like Railways, Maruti, Tata Motors, JCB etc. want only high quality, zero defect products to be sourced from the MSMEs
3. Foreign players coming due to FDI will only purchase products from companies which have the most sound production processes
4. Competition is becoming increasingly fierce and there is no room for errors or wastes in your production processes
20
08-01-2014
11
What are the benefits of Lean
Manufacturing?
1. Improved profit margins and reduced costs
2. Improved quality and fewer defects
3. Reduced Inventory
4. Space requirement decreases
5. Enhanced overall manufacturing flexibility
6. Makes continuous improvement possible
7. Creates safer working environment
8. Improves employee morale
21
Green Lean Manufacturing
• "…we will not so lightly waste material simply because we can reclaim it—for salvage involves labour. The ideal is to have nothing to salvage."
—Henry Ford, Today and Tomorrow
• Pioneered by Henry Ford in the 1900’s
22
08-01-2014
12
Ford's Green Manufacturing
• Recovery and reuse of solvents
• Distillation of waste wood for chemicals yielded enough money to pay 2000 workers.
▫ Kingsford charcoal
• Design of parts and processes to minimize machining waste
• Reuse of packaging materials
• Slag � paving materials and cement
23
Identification of Material and Energy
Wastes• Material and energy waste can easily be built
into a job.
• Elimination of these wastes is central to "green" manufacturing and the ISO 14001 standard and, more importantly, very profitable.
• We cannot, however, remove this waste before we identify it.
24
08-01-2014
13
Discussion
• Do you know of processes in which materials are thrown away (or recycled)?
▫ If so, can the process or product be redesigned to reduce the waste?
▫ Could the discarded materials be reused or recycled in some manner?
• Can energy-intensive processes be made more efficient?
25
power source
regeneration
26
08-01-2014
14
Lean Manufacturing
Tools & Techniques
27
5S - CANDO
• 5S-CANDO, a systematic approach to cleaning and organizing the workplace, suppresses friction.
• Seiri (Sort)= Clearing up▫ "When in doubt, throw it out."
• Seiton (Set in order)= Organizing (Arranging)▫ "A place for everything and everything in its place."
• Seiso (Shine)= Cleaning (Neatness)
• Seiketsu (Standardize)= Standardization (Ongoing improvement, holding the gains)
• Shitsuke (Sustain)= Discipline
28
08-01-2014
15
Visual Control
• "Basically, the intent is to make the status of the operation clearly visible to anyone observing that operation" (Wayne Smith, 1998).
• "Visual controls identify waste, abnormalities, or departures from standards" (Caravaggio, in Levinson, 1998)
29
Examples of Visual Control
• 5S-CANDO (arranging)
• Jidoka or automation▫ Andon lights and buzzers announce tool status.
• JIT: kanban squares, cards, containers.▫ Lines on the floor to mark reorder points
• Safety: colored labels for materials
• Statistical process control charts: should be clearly visible.
30
08-01-2014
16
Visible Management
• A visible production management system should indicate:(1)What the operation is trying to make
� Measure the takt rate, or desired production per unit time.
(2)What the operation is achieving
(3)What problems hinder the production goal?
31
Just in Time (JIT) system
• In a pull system, employees at a given operation (work station) go to the source of the required parts, such as machining or subassembly, and withdraw the units as they need them.
• By pulling parts from each preceding workstation, the entire manufacturing process is synchronized to the final-assembly schedule.
• Finished goods are made to coincide with the actual rate of customer demand, resulting in minimal inventories and maximum responsiveness.
32
08-01-2014
17
Just in Time (JIT) system
• JIT systems are sometimes called a Kanbansystem.
• A kanban is a flag or a piece of paper that contains all relevant information for an order.
• Slips, called kanban cards, are circulated within the system to initiate withdrawal and production items through the production process.
• The Kanban cards are simple visual controls.
33
Small Batch and Single-Piece Flow
• Batching is the process of producing large quantities of items as a group before being transferred to the next operation.
• Lean operating systems seek to reduce batch sizes using single-piece flow.
• A transfer batch is part of the original batch (lot) size that is completed at one workstation and moved to the next downstream workstation.
34
08-01-2014
18
Drawbacks of Batch Processing
• Running equipment (e.g. a heat treatment furnace) at less than full load, wastes capacity. Waiting for a full load wastes time.▫ Waste of capacity is not a problem except at a
constraint operation (Goldratt's Theory of Constraints).
• Batches introduce waiting time when they arrive at single-unit tools en masse.▫ Batch-and-queue forces extra cycle time (waiting) into
the operation.
35
Batch versus Single-Piece Flow
Processing
36
08-01-2014
19
Single-Unit Processing Reduces Cycle
Time• Wayne Smith (1998) defines manufacturing cycle efficiency as (Value-adding time)/(Total cycle time)▫ This is often less than 1 percent.
▫ Remember the Golf analogy: the club head is in contact with the ball for less than two seconds in a typical game.
37
Single-Minute Exchange of Die (SMED)
1. Internal setup requires the tool to stop.
▫ Reduce internal setup time, or convert internal to external setup.
2. External setup can be performed while the tool is working on another job.
3. SMED reduces cycle time by facilitating smaller lot sizes, mixed model production, and/or single-unit flow
38
08-01-2014
20
• SMED refers to quick setup or changeover of tooling and fixtures in processes so that multiple products in smaller batches can be run on the same equipment.
• Reducing setup time frees up capacity that can be producing output, and therefore, generating revenue.
• Example: An Oil company reduced machine setup from 9.3 hours to 9 minutes!
39
Single-Minute Exchange of Die (SMED)
Error-Proofing (Poka-Yoke)
• Error-proofing makes it difficult or impossible to do the job the wrong way.
• Slots and keys, for example, prevent parts from being assembled the wrong way.
• Process recipes and data entry also can be error-proofed.
40
08-01-2014
21
Lean Six - Sigma
41
• Six Sigma and Lean concepts and methods are often combined into Lean Six Sigma
• Both are driven by customer requirements
• Both try to eliminate waste, reduce costs, speed things up, and improve quality
• Both focus on real money savings
• Both rely on a systematic methodology
Quality at source
• Quality at the Source
• Quality at the source focuses on doing it right the first time.
• Continuous Improvement
• Six Sigma compliments lean systems to assure high-quality output.
42
08-01-2014
22
Total Productive Maintenance
• TPM is focused on ensuring that operating systems will perform their intended function reliably.
• TPM works to prevent equipment failures and downtime, maximizing equipment effectiveness and uptime.
• TPM tries to predict equipment failure rates and perform maintenance before a problem arises.
• The principles of TPM also include employee “ownership” of the equipment.
43
KAIZEN
• Japanese word meaning▫ Kai - gradual and orderly change, Zen -
for the better
• involves everyone in the organization in small improvements using conventional knowledge and tools
• without large capital investments.
44
08-01-2014
23
KAIZEN
• SDCA to PDCA – standardized work [Deming’s cycle]
• Quality first▫ If something can be improved, a measure must exist
by which improvement can be quantified – quality characteristics
• Upstream management
• Speak with data
• Variability control and recurrence prevention
45
Key Steps in Transforming
a Company to the Lean Approach
1. Establish a steering team—conduct strategic planning session
2. Train the steering team and the model line team in the disciplines of lean
3. Perform PQR (product-quantity-routing) analysis4. Identify value streams—select a value stream5. Calculate model line takt time6. Value stream map the model line—assemble current
state map7. Balance the line—assign standard work8. Establish standard WIP (inventory levels)9. Test the system (virtual cell)—document results
46
08-01-2014
24
Key Steps in Transforming
a Company to the Lean Approach
10. Setup reduction event11. Conduct 5S event—apply TPM techniques12. Establish visual signals—reduce paperwork13. Explore alternative flow patterns14. Develop block layout15. Develop detailed layout16. Execute move17. Select next value stream and repeat
47
Lean Leadership
• Three Models:
1. “Old” Dictator style: “Do it MY way”
2. The 1980’s “Empowerment” style: “Do it YOUR way”
3. “Lean” style: “Follow me and let’s figure this out together”
48
08-01-2014
25
Summary
• Business activities can contain enormous quantities of built-in waste (muda, friction).
• The greatest obstacle to the waste's removal is usually failure to recognize it.
• Lean manufacturing includes techniques for recognition and removal of the waste.
• This delivers an overwhelming competitive advantage.
49
A journey of continuous improvement
50