1
Cutting the Electric Bill by $18,600 a Month Northwest Regional Water Reclamation Facility Fox Lake, IL
Wisconsin Wastewater Operators AssociationWisconsin Dells, WIOctober 10, 2012
Greg Droessler, P.E.Clark Dietz Inc.
![Page 2: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/2.jpg)
2
Village of Fox Lake
Fox LakeFox Lake Lake County Lake County
Project Location Project Location
![Page 3: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/3.jpg)
3
Village of Fox Lake
Northwest Regional Water Reclamation Facility
![Page 4: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/4.jpg)
Cutting Energy Costs
Goal: Focus on the big ticket items!
Aeration / Biological Process Changes
Conventional Activated Sludge vs. MLE System
High speed turbo blowers w/ D.O. Controls
Fine bubble membrane diffusers
Biogas Fueled Generator
Offsets power demand at the main feed
4
![Page 5: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/5.jpg)
Biological Process
What is driving the project?
Existing 9 MGD plant expanded to 12 MGD
Replace 20+ year old equipment as part of the facility upgrades
Biological Nutrient Removal (BNR) required
Chemical phosphorus removal
Modified Ludzack-Ettinger (MLE) for Total Nitrogen reduction
5
![Page 6: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/6.jpg)
MLE Process
6
What is an MLE system?
BNR process primarily for Total Nitrogen reduction
Designed for TN removal below 10 mg/L
![Page 7: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/7.jpg)
Biological Nutrient Removal
In addition to the blower change, the plant will begin to operate the MLE process
No aeration in the first tank to create an anoxic zone = less oxygen demand.
7
![Page 8: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/8.jpg)
Reduction in Aeration Demand
Conventional Activated Sludge: 10,540 scfm
Required 2-400 HP blowers
MLE Design: 6,100 scfm
Requires 1-200 HP blower
8
![Page 9: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/9.jpg)
Existing Blowers / D.O. Control
Size: 4- 400 hp centrifugal blowers
Flexibility: Inability to throttle flow, inoperable D.O. Control system
Inefficient: 3-4 times the required D.O. levels in the aeration basins
9
![Page 10: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/10.jpg)
High Speed Turbo Blowers
High Speed Turbo Blowers have become an increasingly popular choice
Achieving air demands with less horsepower
Using D.O. controls and VFD drives to minimize the amount of air used
10
![Page 11: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/11.jpg)
Why High Speed Turbo Blowers?
Lower horsepower on the motor [200hp]
Ability to meet full range of air flows
Provide just the air needed, 2 mg/L vs. 5-8 mg/L D.O.
Bottom Line: Lower energy bill each month!
11
![Page 12: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/12.jpg)
Fine Bubble Diffusers
It’s not just blowers for aeration savings, new fine bubble membrane diffusers were added.
Replace 20-year old ceramic disk diffusers
Increase the transfer efficiency from 20-25% SOTE to 35% SOTE
12
![Page 13: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/13.jpg)
Aeration Savings
Annual Electric Savings: 2,956,500 kWh
Estimated Annual Cost Savings: $190,000
Nearly $16,000 / month in savings (blowers)
About $13,000 / month in actual savings (subtract the mixer / recycle pump HP)
13
![Page 14: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/14.jpg)
Biogas Utilization
About 40,000 cu. ft. / day in wasted biogas
Increased mixing = increased biogas production
Will run a 150 kW biogas generator
14 Goal: Put the wasted gas to use!
![Page 15: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/15.jpg)
Biogas Utilization
Dual-feed boilers
Digester heating
Building heat
Engine generators
15
![Page 16: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/16.jpg)
Biogas Utilization
Is running a biogas generator worth it?
150 kW x 24 hr. = 3,600 kWh / day
This equals about $250 / day
$7,500 / month in power savings
Running at 75% of the time, this equals $67,500 per year in savings
16
![Page 17: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/17.jpg)
Project Costs
Aeration / Biological System Upgrades (blowers, mixers, diffusers, and D.O. Controls = $1.7 mil.
$307,831 DCEO grant for the project
Projected payback = 7.5 years
Biogas Utilization Project (generator, biogas conditioning, piping and electrical = $763,000)
$200,000 DCEO grant for the project
Projected payback = 10 years
17
![Page 18: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/18.jpg)
Total Savings
Average Electric Costs: $50,000/mo.*
Blower / Aeration Savings: $13,000/mo.*
Biogas Generator Savings: $ 5,600/mo.**
Projected savings: $18,600/mo.*
38% electrical savings annually.
* Using an average cost of $0.07 / kWh** Based on 1,500 hours of operation / year
18
![Page 19: Session E1 Cutting Power Costs.pdf - WWOA](https://reader031.vdocument.in/reader031/viewer/2022022007/6210878993ad5d2bae71fd54/html5/thumbnails/19.jpg)
19
Questions…..?