Page 1: Siddhirganj 2x120 mw peaking power plant

Power plant Siddhirganj 2x120 MW Peaking Power Plant

Page 2: Siddhirganj 2x120 mw peaking power plant

Electricity Generation Company Of Bangladesh Limited An enterprise of Bangladesh power

development board (BPDB)23.11.1996 registration Name was Meghnahat Power Company Ltd

(Private Limitrd )16.02.2004, Remaned: EGCB Ltd 15.01.2009: Public Limited Company

Page 3: Siddhirganj 2x120 mw peaking power plant

Vision “Generation of quality electricity for the

betterment of the nation”‘Fitness of use’1. Frequency2. Voltage 3. Reliability 4. Availability

Page 4: Siddhirganj 2x120 mw peaking power plant

Mission ‘to excel in electricity business by generation

efficient, reliability and cost effective electricity in an environmentally responsible manner to satisfy our customers’.

Page 5: Siddhirganj 2x120 mw peaking power plant

Plants Siddhirganj 2x120 MW PPPHaripur 412 MW CCPPSiddhirganj 335 MW CCPP

Page 6: Siddhirganj 2x120 mw peaking power plant

Siddhirganj 2x120 MW PPP

MD FAZLUI RHAMN(CE)124563 Lac TakaADB & GOB25 YEARS LIFE Bharat Heavy Electricals Limited (BHEL), IndiaSub contractor: Bengal Electric Limited (BEL) COD: 05.02.20122 GT, SIMPLE cycle Natural gas 4.17 acres 31%209.54 MW

Page 7: Siddhirganj 2x120 mw peaking power plant

Power Plant Gas Coal Oil WindSun Air/H2(fuel cell)Potential energy of water /hydro Tidal Geothermal Ocean wave Nuclear energy (natural or uranium dioxide enriched 3.2%

U235 )

Page 8: Siddhirganj 2x120 mw peaking power plant

Power plant Gas turbine Steam turbine Combine cycle power plant Solar plant Wind turbine Atomic power plant Cole power plant Hydro power plant /mini hydro

Page 9: Siddhirganj 2x120 mw peaking power plant

Gas turbine/open cycle

Page 10: Siddhirganj 2x120 mw peaking power plant

Advantages Quick start and synchronize to grid O&M easy Less manpower Operating cost low

Page 11: Siddhirganj 2x120 mw peaking power plant

Disadvantages Starting unit means starting motor, 1305 kw1800 rpm stop, self sustaining speed Compressor power requires Low output efficiency, exhaust high

temperature Combating chamber tem high, so life time

short

Page 12: Siddhirganj 2x120 mw peaking power plant

Component SMCOMPRESSOR GENERATOR GAS TURBINE TRANSFORMER

Page 13: Siddhirganj 2x120 mw peaking power plant

Maintenance CI=combustion inspection (flow slip, liner,

transition pitch), after 12000h HGPI= hot gas path inspection (flow slip,

liner, transition pitch, turbine blade, nozzle change generator bearing, turbine bearing, all sensor(tem, vibration) after 24000h )

MI= major inspection (Generator rotor decoupling , retaining ring, generator inspection with HGPI work )

Page 14: Siddhirganj 2x120 mw peaking power plant

Blade Nozzle

Page 15: Siddhirganj 2x120 mw peaking power plant
Page 16: Siddhirganj 2x120 mw peaking power plant
Page 17: Siddhirganj 2x120 mw peaking power plant

VID_20160830_103108.3gp

Page 18: Siddhirganj 2x120 mw peaking power plant

Siddhirgang 2X120 MW PPPGBC;2020KW, Induction motor 19-22=50MW Above 22 kg/cm2 require above 50-110MW Compressor 3 stage

Page 19: Siddhirganj 2x120 mw peaking power plant

One line diagram of Sid 2x120MW PPP

Page 20: Siddhirganj 2x120 mw peaking power plant

Generator turbine shaft

Page 21: Siddhirganj 2x120 mw peaking power plant

Transformer 2 GT(102/136/170MVA)2 MVUAT(10/12MVA)2 UAT (1.6MVA)2 SAT (2.5MVA)

Page 22: Siddhirganj 2x120 mw peaking power plant

Motors Induction (star/delta)(6.6KV, 415V, 230V)6.6KV(GBC, SM)De shunt motor (125V DC)

Page 23: Siddhirganj 2x120 mw peaking power plant

IA/PAPlant air(for cleaning)Instrument air (control pneumatic valve )Nitrogen (sealing, inert gas , purging )

Page 24: Siddhirganj 2x120 mw peaking power plant

Chiller Cooling purpose Administrative building Center control room

Page 25: Siddhirganj 2x120 mw peaking power plant

Switch gear Air CB Vacuum CB SF6 GCBFuse Relay

Page 26: Siddhirganj 2x120 mw peaking power plant

Switchyard CT PT Isolator

Page 27: Siddhirganj 2x120 mw peaking power plant

Safety Fire protection system Heat detector Smoke detector UV detector Water system

Page 28: Siddhirganj 2x120 mw peaking power plant

Water treatment system Input : river water Port able water DM water

Page 29: Siddhirganj 2x120 mw peaking power plant

employeesEngineers Finance Acc.HRStaffsTechnicalSecurity

Page 30: Siddhirganj 2x120 mw peaking power plant

Thanks Lecture prepared by