7/27/2019 Sitrep 4-Monsoon Rains 08.18.13 Final http://slidepdf.com/reader/full/sitrep-4-monsoon-rains-081813-final 1/5 Cordillera Regional Disaster Risk Reduction and Management FOR THRU FROM SUBJECT Office of Civil Defense - Cord illera Administrative Region : SND & CHAIRMAN, NDRRMC : CDA & EXECUTIVE DIRECTOR, NDRRMC : ACTING REGIONAL DIRECTOR, OCD-CAR and CHAIRPERSON, Cordillera RDRRMC : SITREP 4: Effects of Enhanced Soirthwest Monsoon in CAR DATE : August 18,2013,2013 as of 1 1:00 AM General Overview: WEATHER - Southwest Monsoon is affeding the whole country. At 4:00 AM today, Tropical Depression "Maring" was estimated based on available data at 470 km east of Itbayat, Batanes (20.4oN, 126.9oE) with maximum sustained winds of 55 kph near the center. lt is forecasted to move east at 9kph. ondition eather c Province, City Weather Gondition PSWS Abra Moderate to Heaw rainshowers None Baguio Moderate to Heaw rainshowers None Benguet Moderate to Heaw rainshowers None Kalinqa Partlv Cloudy None Apayao Partly Cloudy None lfugao Cloudy with Light rainshowers None Mt. Province Cloudy with Light rainshowers None ANALYSIS: o The threshold that was set by Cordillera RDRRMC to implement pre- emptive evacuation is 150mm continuous rains. o For the past 2 days, moderate to heavy intermittent rainfall is experienced in Baguio city, Benguet and Abra. Rain fall in Baguio city for the past 2 days has been recorded at 148mm. Soil saturation is feared, that it might trigger landslide incidents and flash flooding at flood prone areas. o The effect of Enhanced Southwest Monsoon threatens Cordillera, most especially those residing in mountain slopes and flood prone areas. o The ar6as that were damaged by Typhoon Labuyo is expected to. be aggravated by this SW monsoon. Roads that were recently opened to traffic are expegted to close again. There were already reports of damaged provincial bridges due to this weather disturbance.

Upload: ocdcaradmin

Post on 02-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sitrep 4-Monsoon Rains 08.18.13 Final

7/27/2019 Sitrep 4-Monsoon Rains 08.18.13 Final

http://slidepdf.com/reader/full/sitrep-4-monsoon-rains-081813-final 1/5

Cordillera RegionalDisaster Risk Reduction

and Management

FOR

THRU

FROM

SUBJECT

Office of Civil Defense -Cord illera Administrative

Region

: SND & CHAIRMAN, NDRRMC

: CDA & EXECUTIVE DIRECTOR, NDRRMC

: ACTING REGIONAL DIRECTOR, OCD-CAR and CHAIRPERSON,

Cordillera RDRRMC

: SITREP 4: Effects of Enhanced Soirthwest Monsoon in CAR

DATE : August 18,2013,2013 as of 1 1:00 AM

General Overview:

WEATHER- Southwest Monsoon is affeding the whole country. At 4:00 AM today, Tropical

Depression "Maring" was estimated based on available data at 470 km east of

Itbayat, Batanes (20.4oN, 126.9oE) with maximum sustained winds of 55 kph nearthe center. lt is forecasted to move east at 9kph.

onditioneather c

Province, City Weather Gondition PSWS

Abra Moderate to Heaw rainshowers None

Baguio Moderate to Heaw rainshowers None

Benguet Moderate to Heaw rainshowers None

Kalinqa Partlv Cloudy None

Apayao Partly Cloudy None

lfugao Cloudy with Light rainshowers None

Mt. Province Cloudy with Light rainshowers None

ANALYSIS:o The threshold that was set by Cordillera RDRRMC to implement pre-

emptive evacuation is 150mm continuous rains.

o For the past 2 days, moderate to heavy intermittent rainfall is experienced in

Baguio city, Benguet and Abra. Rain fall in Baguio city for the past 2 days

has been recorded at 148mm. Soil saturation is feared, that it might

trigger landslide incidents and flash flooding at flood prone areas.

o The effect of Enhanced Southwest Monsoon threatens Cordillera, most

especially those residing in mountain slopes and flood prone areas.

o The ar6as that were damaged by Typhoon Labuyo is expected to. beaggravated by this SW monsoon. Roads that were recently opened to

traffic are expegted to close again. There were already reports of damaged

provincial bridges due to this weather disturbance.

Page 2: Sitrep 4-Monsoon Rains 08.18.13 Final

7/27/2019 Sitrep 4-Monsoon Rains 08.18.13 Final

http://slidepdf.com/reader/full/sitrep-4-monsoon-rains-081813-final 2/5

SITUATION

ABRAo Sweling of Ahra river is reported affecting BANGUED Municipality (the

capital town). Streets of Brgy Sta Rosa and Kabuluan are experiencing

flooding. A pre emptive evacuation to affected communities is being

organized bythe MDRRMC Bagued and PDRRMC.

o Eight landslides along the pads of San lsidro, Bucay and Pidigan were

reported. Affeded roads are closed to traffic.

o San lsidro bridge already overflowed.

BAGUIO CITYo Experiencing continuous rains

o Attended to minor inciderts of minor erosion and fallen trees

o Monitoring the water level at Brgy. City Camp Lagoon-

BENGUETo Tublay: Pre emptive evacuation is being prepared for the residents of Brgty

Amabassador, sitio Mamuyod due to possible landslide

t Baguio - Dalupirip and Beckel road closed to traffic.

o Gunel - Bokod - Kabayan - Abatan road closed to traffic.

MT PROVINCEo Bailey bridge along Cagayan via tabuk - enrile road was damaged and

under repair.

Actions taken:

OGD.CARo ocD-cAR maintains the BLUE ALERT STATUS to fully focus on

monitoring, information dissemination, and public warning for the

possible etfects of the enhanced Southwest monsoon in the region.

o Scheduled a live local media interview to warn the publi0 on the

impending threat of landslides and flash floods.

r Close coordination with concerned DENR - MGB, DPWH and

pDRRMOs. All PDRRMOs are on alert status and monitoring their

area of jurisdiction.

. Continuous monitoring of the LDRRMO especially MDRRMOof

Tublay for pre-emptive evacuation. ln addition, coordinated with AbrapDRRMO for possible evacuation of affected residerits in low-lying

areas.

o lnformation Dissemination through Smart lnfo board is continubus due

to the enhanced monsoon rains.

PIA & PNPr Assisting OCD-CAR in disseminating weather advisories and alert to

the Public. ,

Page 3: Sitrep 4-Monsoon Rains 08.18.13 Final

7/27/2019 Sitrep 4-Monsoon Rains 08.18.13 Final

http://slidepdf.com/reader/full/sitrep-4-monsoon-rains-081813-final 3/5

DPWH. Assets are still prepositioned to landslide prone areas.

r Clearing operations ongoing on closed roads.

Loca| DRRMC

Abra PDRRMCr All PDRRMCs are activated and on red alert status.

o Emergency meeting is ongoing.

o All response agencies are activated.

o Attended to local media queries and alerted the puHic.

. 501$ EBDE and PNP activated.

Benguet PDRRMC

. All PDRRMCs are ac'tivated.

o Emergency meeting is ongoing.

o All response agencies are activated.

+ o Attended to local media queries and alerted the public.

. Deployed assets to assist in road clearing operalions.

Baguio City CDRRMC: The City DRRMCs are ac'tivated.

. All response agencies are ion standby at City Hall.

r Attended to local media queries and alerted the public

o Responded to emergencY calls-

La Trinidad. Deployed assets to assist in road clearing operations

o Ctosely monitors the flash flood prone areas.

r The MDRRMC are activated, including BDRRMCS

r All response agencies are ac'tivated

. Attended to local media queries and alerted the public

Mt. Province PDRRMC, lfugao PDRRMC, Kalinga PDRRMC & Apayao

PDRRMCr On alert status activated.

. Monitoring the possible impact of SW Monsoon in theirAOR.

. Alerting the public through telil blasts via SMART lnfo board onweather update.

Page 4: Sitrep 4-Monsoon Rains 08.18.13 Final

7/27/2019 Sitrep 4-Monsoon Rains 08.18.13 Final

http://slidepdf.com/reader/full/sitrep-4-monsoon-rains-081813-final 4/5

-

ROAD STATUS

Area Status Remarks & Actions TakenBAGUIO CITY

1. Kennon Road along km.

2ffi-450, Camp 6 (carantes

seclion)ONE LANE PASSABLE

. Caused by enhancedSW monsoon

. Ongoing roadclearing operation c/oDPWH

BENGUET

1. Shilan-Beckel Road km

262+000 CLOSED TO TRAFFIC

r Caused byTY Labuyoand aggravated by SWmonsoon

. Ongoing road clearingoperation c/o DPWH

o Continuousmonitorinq*

2. Benguet- NuevaVizcaya Rd, KO271+800,Guesset Section

CLOSE/OPENSITUATION

. Caused byTYLabuyo andaggravated by SWmonsoon

. Ongoing road

clearing operation c/oDPWH

r Continuous

monitorino

3. Benguet- Nueva

Vizcaya Rd, LamutArea(Ambuclao Road)

CLOSED TO TRAFFIC

. Caused by enhancedSW monsoon

o Ongoing road.

clearing operation c/oDPWH

Continuousmonitorino

IFUGAO

1. Kiangan-Tinoc Road CLOSED TO TRAFFIC . Caused by the effectsof SW Monsoon

. Ongoing road

clearing operation c/oDPWH

MT. PROVINGE

1. Mt. Province- Cagayan via

Tabuk- Enrile Rd- SitioGawa, Annabel, Sadanga

2. Bailey Bridge is underreoair

CLOSED TO TRAFFIC

. Caused byTYLabuyoand aggravated by SWmonsoon

r, Ongoing repairs. Continuousmonitoring

. Due to damaged bridge

Page 5: Sitrep 4-Monsoon Rains 08.18.13 Final

7/27/2019 Sitrep 4-Monsoon Rains 08.18.13 Final

http://slidepdf.com/reader/full/sitrep-4-monsoon-rains-081813-final 5/5

r

ABRA1. Abra - Kalinga National

Road alt{m.474CLOSED TO TRAFFIC o Caused by enhanced

SW Monsoon. 6ngoing rroad

clearing operation c/oDPWH

DAM STATUS

DamCrlticalLevel

Dam l-evelprevious

Dam Levelcunent

Opened gates

Binga 575 m asl 574.66 573.73 Four (4) GatesAmbuclao 752 m asl 75r.53 750.61 Four (41Gates

San Roque 290 m asl 248.89 25{.0{ no sates open