SLOVAK PATHWAY TOWARDS 2020

Zuzana Mjartanová Ministry of Economy of the Slovak Republic

8 June 2016

Page 2: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

OUTLINE OUTLINE

1. Towards 2020

a) Targets

b) Support

2. Fulfillment

3. Future strategy

Page 3: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

TARGETS FOR RES

• Directive 2009/28/ES on the promotion of the energy use from

renewable sources

• 14 % RES in gross final energy consumption (6,7 % in 2005) –

80 PJ

• 10 % RES in transport

• National renewable energy action plan 2010 – 15,3 % RES in gross

final energy consumption

• 24,0 % electricity from RES

• 14,6 % heat from RES

• 10,0 % RES in transport

Page 4: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

SECTORAL TARGETS

Page 5: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

SECTORAL TARGETS

Page 6: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

TECHNOLOGIES

Page 7: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

LEGISLATION AND STRATEGIC DOCUMENTS

• Act No. 309/2009 Coll., on the promotion of renewable energy

sources and high-efficiency cogeneration

• FiT and priority rules for electricity

• obligation to add certain amount of biofuels to diesel and

petrol

• Act No. 382/2013 Coll.

• Support for small installations

• Energy Policy of the Slovak Republic 2014

• Shift to RES in heat

Page 8: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

RES SUPPORT

• Operational aid: FiT in electricity

• Investment Aid

2007-2014 Operational Programme

Competitiveness and Economic Growth

Innovative technologies, use of RES

In total 672 million EUR

2014-2020 Operational Programme

Quality of Environment

„Green the households“ program of Slovak

Innovation and Energy Agency

Page 9: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

ELECTRICITY

Page 10: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

RES ELECTRICITY SUPPORT

Support limit

(up to)

Support September 2009 -

April 2011

May 201 1-

June 2013

July 2013 -

December 2013 since 2014

1) priority connection of the

facility to the regional

distribution system, priority

access to the system, priority

transmission, distribution and

supply of electricity without limit without limit without limit without limit

2) electricity offtake (for the

price of electricity covering the

losses)

125 MW,

resp. 200 MW

125 MW,

resp. 200 MW

125 MW,

resp. 200 MW

125 MW,

resp. 200 MW

3) additional payment (1)

solar energy plants 125 MW 100 kW 30 kW 30 kW

biomass 125 MW 125 MW 125 MW 40 GWh annually

hydropower 125 MW 125 MW 5 MW 5 MW

other RES 125 MW 125 MW 125 MW 125 MW

4) taking over balance

responsibility 4 MW 1 MW 1 MW 1 MW

[1] The amount of the supported electricity is dependent on the capacity of the facility.

The capacity limit in years 2009-2013 was 10 MW, since 2014 it is 5 MW.

Page 11: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

RES IN HEAT GENERATION

Page 12: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

RES IN HEAT GENERATION

• Financial support from EFSI in between 2014 – 2020: RES from

heat and small RES installations

• Reconstruction of existing heat sources (fossil fuels based) to

biomass (max 20 MW of thermal input)

• Construction of new installations (heat pumps, geothermal,

biogas, landfill gas)

• Small RES: heat pumps, biomass boilers, solar collectors

Page 13: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

FULFILLMENT

• 2001: 30 PJ from RES

• 2011: 54 PJ – increase comparable to domestic coal extraction

• 2014: around 12 %

• Transport: 2014: 6,6 %, challenge to meet advanced biofuels target (0,5 % in

2020)

9,5%

Binding target 14 %

15,3%

6,7%

10,3%

11,9%

8,90%

12,7%

8,20%

10,00%

11,4%

14,0%

0%

2%

4%

6%

8%

10%

12%

14%

16%

18%

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

National action plan Reality Indicative trajectory - directive

Page 14: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

RES IN ELECTRICITY

nuclear 57% thermal

13%

hydro 17%

RES + other 13%

Electricity generation in 2014

nuclear 24%

thermal 33%

hydro 32%

RES + other 11%

Installed generation capacity in 2014

• NAP RES: 24 % in gross final consumption – 2014: 23 %

• Between 2009 – 2012: 600 MW in „big“ photovoltaic

-> increase of financial burden for end consumers

-> accommodation of electricity in the grid

Page 15: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

NEW STRATEGY

• Principle of minimizing costs while applying an integrated approach to utilising RES and decreasing greenhouse gas emissions

• Priority is using technologies whose investment costs could be to a large extent covered by market

• Shift from electricity towards RES heat generation

• Shift to support of local and distributed RES installations:

-> streamlining of administrative procedures

-> benefits for prosumers

Page 16: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

MEASURES UNTIL 2020

• Development strategy of small plants in Slovakia 2013

• 2013: amendment of RES Act (in force since 1 January 2014 ):

-> definition of a „small plant“ (up to 10 kW)

-> definition of prosumer:

„electricity generation in small plant by the producer, if is not applying for

support by supplementary payment under legal obligation and who is also

electricity consumer in households, and his annual electricity generation is

not 1,5 times higher than 12 months real consumption“

-> Simplification of connection to the distribution network

-> Installation of smart meter – free of charge

Page 17: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

FINANCIAL SUPPORT

• Use of EFSI in the period 2014-2020: for support of RES in heat

generation and small installations

• „Green the households“ program:

• Small photovoltaic on the rooftops / buildings up to 10kW

• Solar collectors

• Biomass boilers

• Heat pumps

Page 18: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

ROAD TO 2030

• Action plan covers period up to 2020

• 2030: no binding national / regional objectives

-> no binding NAPs – only indicative National energy and climate

plans under Energy Union governance

-> bottom-up approach

-> use of synergies

• Slovakia aims for gradual removal / phase-out of support schemes

• Market-based approach towards all low carbon sources

• Self-consumption, storage

Page 19: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

THANK YOU FOR YOUR ATTENTION. [email protected]

Page 20: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

BACKUP

Page 21: SLOVAK PATHWAY TOWARDS 2020 - rekk.hu to 2020_RES.pdfSLOVAK PATHWAY TOWARDS 2020 Zuzana Mjartanová Ministry of Economy of the Slovak Republic 8 June 2016

Hlavný názov prezentácie

Measure Type of measure Expected outcome Target group

Mandatory bio-components blending

regulatory Increased RES utilisation in transport

Fuel producers

Support for RES in business sector

financial

(EU funds)

Electricity and heat generation from RES

investors

Support for RES in households

financial biomass boilers installation

Solar collectors installation households

Support for electricity generation

(feed in tariffs)

legislative Electricity generation increase of 2,5 TWh

investors

Support of heating networks reconstruction

financial

(EU funds)

Energy savings, support of district heating

investors

Biomethane generation regulatory Utilisation of agricultural

biomass investors

Support of RES utilisation in business sector

financial

(EU funds) RES heating production investors

Support of RES for heating and cooling in public buildings

financial

(EU funds)

Heating and cooling production in public

buildings Public administration

Establishment of licensing system for installers

regulatory Quality improvement of heat

generation facilities installers