sms arquitectos cv
DESCRIPTION
SMS ARQUITECTOS CVTRANSCRIPT
PROfiLE_ Adress: Sant Feliu 17, local 15 - 07012
Palma de Mallorca, ILLES BALEARS
T 971 240 284
F 971 257 872
Members: Alberto Sánchez, Aina Salvà
Web: www.smsarquitectos.com
Contact: [email protected]
ALBERTO SANCHEZ CV_
Alberto Sánchez studied architecture at the University of North London in the UK, where he graduated in 1999. He earned a degree in architecture recognition by the spanish ministry of Education in 2001. Currently a member of the Architect’s Association of the Balearic Islands and the Royal Institute of British Architects (RIBA) Before starting his own office he worked and collaborated with several offices as Caruso St John, London, Bosshardvaquer Architekten, Zurich and Coll-Leclerc (BCN).Main activities of the office involve public realm projects and a big interest for diffusion of architectural culture.
EDUCATiON_
2001:Reconocimiento del título de Arquitecto en España por parte del Ministerio de Educación.
June 1999:Professional Diploma in Architecture, University of North London. Reino Unido.
June 1996:Bachelor in Arts (Honours). Architecture. London Metropolitan University (former University of North London).
AWARDS_
2011FAD architecture award Shorlisted. Barcelona, Spain.Shorlisted at the Enor Ascensores architecture award. Vigo, Spain.
20101st prize Dance school and theater renovation. Casa del Poble de Esporles, Mallorca.Shortlisted for the Arquia Próxima, young architects awards Madrid.
2009Shortlisted at the AR Awards for Emerging Architecture 09. London. UK.
2008Shorlisted in the competition for a ferry terminal in Ciutadella, Menorca. Spain.
2007First prize in Competition for Repol headquarterss, Castellón, Spain.
2006First price for the competition for the extension and refurbishment of Badies Health center, Mallorca. Spain.
2005Shortlisted at the competition J5, Coria del Rio Sevilla. Spain.
2004Thrid price. Competition for a new primary school in Puigpunyent, Mallorca, Spain.Shortlisted. Competition for 86 housing units in Calvià. Spain.
PUBLiCACiONS_
EXÉ Nº4. Textures Metalliques.pg 79-93.
Tectónica nº22, Envolventes metálicas.
2G Dossier, Young Spanish architects, Editorial Gustavo Gili.
Architectural Review diciembre 2009, publicacion proyecto centro de salud de Badies.
Bauwelt nº 34, Septiembre 2009, publicación proyecto centro de salud de Badies.
Detail, españa, publicación proyecto centro de salud de Badies.
Revista Infodomus nº16. Repol competition. Pag 49-55
TC Cuadernos nº79. Repol competition. pag 182-185
Press notes on following magazines: On (nº286), Infodomus (nº14)
DP Magazine nº38. Interview.
Pulbication of lecture series “Arquitectura Caliente 07. Prospecciones de Arquitectura Contemporánea”
’Islaciudad, VII taller del COAIB’ pags, 088-097 / 032-042
EXHiBiTiONS_
Exhibition of “AR Awards for Emerging Architecture 09” with Badies health Centre. London December 2009.
Exhibition at the World architecture Festival, Barcelona.
Exhibition of the maritime passenger port terminal in Ciutadella. Menorca. Spain.
J5 housing exhibition, “Antiguo Convento Nuestra Señora de los Reyes”, Seville. Spain. ‘Aula Forestal en madera de eucalipto” COAG headquarters, Santiago de Compostela. Spain. ‘Aula Forestal en madera de eucalipto” COAG headquarters in Mondoñedo, Lugo. Spain.
90 units social housing fo the local housing authority, Palma, Spain.
Exhibition of the primary school in Puigpunyent in COAIB, Palma, Spain.
Exhibition of the primary school in Inca in Ajuntament d’Inca, Inca, Spain.
Exhibition of the university facilities at the UIB, Palma. Spain.
2009_
Competition for the New Maribor Art Gallery, Slovenia.Budget: -euros
Competition for a civic infraestructure.Day centre.Budget: 600.000eurosClient: Centre de recursos Socisanitaris de Mallorca
2008_
Competition for 18 dwelling public housing block in Sa Pobla, Mallorca. 1Budget: 1.800.000 eurosClient: IBAVI
Competition for the refurbishment and extension of the Artistic History Archive, Mallorca. 2Budget: 11.774.000 eurosClient: Ministerio de Cultura
Competition for a public kindergarten in Son Dameto, Palma. Mallorca. 3 Budget: -eurosClient: Ajuntament de Palma
Competition for 19 dwelling public housing block in Eivissa. 4Budget: -eurosClient: IMVISA
Competition for 38 dwelling public housing block in Eivissa.Budget: -eurosClient: IMVISA
2007_
Competition for maritime passenger port terminal in Ciutadella. Menorca. 5Budget: 4.293.105 eurosClient: Ports de les Illes BalearsHounorable mention
Competition for Grupo Repol’s production plant and headquarters in Almassora, Castellón. 6Budget: 1.800.000 eurosClient: Grupo Repol S.LFirst Prize
Competition for 50 dwelling public housing block in, Ourense. 7Budget: -Client: IGVS. Instituto de Vivienda e Solo de Galicia.
Primary school extension and new kindergarten Na Caragol, Artá, Mallorca.Budget: 2.500.000 eurosClient: IBISEC
Interior refurbishment and new classrooms for the Colegio Frances de Palma. Mallorca.Budget: 430.000 EurosClient: Asociación Cultural Francesa.
Scheme design for a new 25 rooms urban hotel in Palma. Mallorca.Client: -
2006_
Competition for a new university building in Palma, Mallorca.
1
2
3
4
5
6
7
8
Budget: -Client: COFIU
Competition for an extension of the Centre of Technologies and Information in Palma. Mallorca.Second clasifiedBudget: -Client: COFIU
Competition for 40 dwelling public housing block in Torre Baró. Bercelona. 8PEM: -Promotor: BAGURSA
Extension and refurbishment of Badies health centre in LLucmajor, Mallorca. 9First PrizeBudget: 840.000 Euros Promotor: IB-SALUT. Servei de Salut de les Illes Balears
Extension of Secondary school IES Josep Sureda i Blanes in Palma. Mallorca. 10Budget: 579.500 Euros Promotor: IBISEC
2005_
12 units housing block in Sa Pobla, Mallorca. 11Budget: 1.160.000 Euros Client: Promocions Ullaro SL
Competition for 20 dwelling public housing block in, Palma. Mallorca. Budget: 1.576.600 Euros Client: Patronat municipal del Habitatge
Competition for 10 dwelling public housing block in, Palma. Mallorca. Budget: 1.326.600 EurosClient: Patronat municipal del Habitatge
New primary school in El Toro, Calvià, Mallorca. 11Budget: 1.528.204,62 EurosClient: IBISEC
New 20 and 16 units housing blocks in Palma.Budget: 2.307.508 EurosClient: Victormar SL
2004_
Scheme design for a single housing in Binissalem, Mallorca.Budget:-Client:-
8 units housing block in Felanitx, MallorcaBudget: 817.793 EurosClient: Bicome 206 SL
Competition for a new primary school in Puigpunyent, Mallorca. 123rd PrizeBudget: 1.528.204,62 Euros. Client: IBISEC
J5 housing competition for young architects in Coria del Río. Sevilla. 13Selected projectBudget: -
9
10
11
12
13
14
16
15
Client: Consejeria de Obras Publicas y Transportes
Competion for a new primary school in Inca. Mallorca. 14Budget: 2.002.897 Euros.Client: IBISEC
86 public housing competition in Santa Ponça, Mallorca. 15Selected projectBudget: 5.265.000 EurosClient: IBAVI
Industrial production plant in Vila de Cruces, Pontevedra. 16Budget:-Client: Industrias Guerra
18
19
20
EXTENSiON AND REfURBiSHMENT Of BADiES HEALTH CENTRE, MALLORCA, SPAiN.1ST PRIZEBUDGET: 840.000 EURSURFACE: 692 m2CLIENT: Ib-salutTIPOLOGY: Health CentreESTATE: Built ----------------------------------------------------------------------------------------------
Badies, is an example of an extensive urban planning of the seventies with little urban qualities. In the last decade, it has undergone a population surge, necessitating an extension and refurbishment of existing health centre. The brief included works on existing building as well as an extension with new rooms for pediatrics, extraction and administrative staff to increase and improve the service provided. The urban structure of the site is formed by an endless maze of streets and buildings without hierarchy. In this context, the new health centre wants to strengthen the image an institutional building, in an area very much in need for hierarchy and urban structure. The commissioning of the project is set on an austere one storey building and the adjoining plot where building regulations leave room only for interventions that are a natural extension of the existing construction. The key factor to tackle was the fact that during building execution the health centre should remain open. The extension is proposed as an autonomous attachment directly “stuck” on to the existing building and a a series of phases have to be followed for minimizing the disorder to the health centre in operation. 1. Preparation of the existing building. Without interfering in the daily use of the health centre. Exterior “surgery” is done to existing construction in order to regulate the perimeter. 2. Construction of independent extension and when finished, reallocating the program from the existing centre.3. Refurbishment of existing building and demolition of separation wall for internal comunication.
STREET VIEW
ORIGINAL BUILDING
SHORTLISTED
HiGH SCHOOL EXTENSiON. PALMA, SPAiN.
BUDGET: 419.700€SURFACE: 719 m2CLIENT: IbisecTIPOLOGY: EducationESTATE: Built
----------------------------------------------------------------------------------------------
Resources map:The use of locally produced materials is the start of this project for achieving two objectives, first to reduce the ecological footprint by shrinking the “resource map” and second, to locate the building in a context much larger than the physical; the economic and the cultural. One of the few construction materials are available on the island that do not dependent on imports are those produced by the precast concrete industry. The implementation of concrete block as the ”new traditional” construction system in Mallorca, has developed a thriving industry of small manufacturers that use local aggregates in the manufacturing of a wide range of small pieces. It is an exercise that explores the visual capabilities of common elements used in local popular. The façade is made with blockwork of the company Palerm, and in their process only local aggregate has been used. Tests have been conducted to determine the load strength of the blocks that are not used in the usual position. Direct action:The new extension of the Josep Sureda i Blanes High school is situated directly after the volume of the existing school, without separating or moving away from it. In order to minimize costs, shared access with the existing school, such as stairs and lifts have been proposed. The 9m span structure is solved with prefabricated slabs creating a free column space for future extensions.
VIEW FROM PLAYGROUND
SHORTLISTED
SHORTLISTED
TEMPORARY SCHOOL iNTERiOR. PALMA.MALLORCA, SPAiN.
BUDGET: 355.209€SURFACE: 930.40 m2CLIENT: Mission laïque françaiseTIPOLOGY: SchoolESTATE: Built
----------------------------------------------------------------------------------------------
The need for a temporary solution, before moving to a larger and new school, came to be solved in the refurbishment of the ground floor of a seventies housing block. The project is conditioned by two extreme factors, first, the intervention was to be built in a record period of two months and secondly the project had to adjust to a really strict budget.This impelled by the insularity factor, which further expands the delivery time of materials, only allowing materials in stock on the island. Since the work was to be executed during summer months, the palette of materials available was drastically reduced from the choice of the door handles to the light fittings. About 90% of the material used in the projectec was in stock on the island.Without considering the adequacy of resources and the need for rapid implementation, basic elements are worked as ornamnets as the only decoration in the interior. Lighting is one of those elements and its installation follow pragmatic considerations where the winding tube routes avoid obstacles found in the existing space. Thus, downpipes and rainwater pipes pass through the corridors and classrooms and shape the “luminous constellation”.The openings in the corridor area are linned by a wooden and metal lattice structure, protecting areas ciruculación of students and filtering the light to the interior.
PRiMARY SCHOOL AND KiNDERGARDENNA CARAGOL, ARTA, SPAiN.
BUDGET: 1.844.421€SURFACE: 2098 m2CLIENT: IbisecTIPOLOGY: Kindergarden and primary SchoolESTATE: On site
----------------------------------------------------------------------------------------------
From the very beginning the school teachers and the client wanted to promote a particular educational scheme based on the idea of “one-room school”. This experimental idea, that is to be tested in this scheme, is based on open spaces with little partitions where students develop a higher sense of respect for the others. The layouts enhance the permeability from the classrooms to the bigger shred space, where activities occur and some of the classes are held simultaneously.The proposal for the new extension of the existing school is set in three separate volumes located at ground floor level in order to optimize the movement of land and their settlement on the plot. These three small-scale volumes are within the language of children, and the school breaks its total volume creating and new scale closer to a house and the surrounding buildings. Each of these pieces arises independently and are situated on the site depending on parameters such as topography, vehicle accesses, circulation spaces and playgrounds. The arrangement of the three volumes generate “in-between” spaces that thanks to their geometric, spatial and material qualities, outdoor activities can be easily performed.The resulting typology consists of a ring of classrooms around the multipurpose room generating a deep building perforated by generous skylights bringing light and ventilation to these spaces.
VIEW FROM ENTRANCE
A/18
The new school is set in a extensive low density residential area with no urban hierarchy.Our proposal structures the area with a strong institutional that wants to act as a magnet for urban pulse. The school is a compact block that potentiates sinergy and interactions with the users and the context as well as enhances the interaction between courses and facilitate movement, while it will create a strong institutional image. The idea of compacting allows us to release the maximum plot surface for the sports and recreation areas outdoors. This action of compressing the program needs of perforations for the ventilation and ilumination of classrooms, offices and circulation spaces. These perforations, as a result of the emptying of a solid will give the building a great volumetric complexity, where solid and void are of equal importance. The courtyards resulting from the drilling of the volume, they acquire a particular spatial condition becoming exterior rooms which may be used as outdoor classrooms. The exterior lattice around the building as a veil, will filter sunlight into the building and giving a glimpse of the outside. It protects windows of solar direct solar radiation while letting through indirect light. The lattice generating an active space between the inner enclosure and the veil through which evacuation routes are made on the first floor. The school is proposed as an structural system that, allows the possibility of changing throughout time without altering the structure. At the time of the project, there is already planned an extension to the building that will fit perfectlly inside the volume of the current plan.
VIEW FROM STREET
PRiMARY SCHOOL iN EL TORO, MALLORCA, SPAiNBUDGET: 1.528.204,62 €SURFACE: 2200 m2CLIENT: IBISEC.TIPOLOGY: Primary schoolESTATE: Standby
----------------------------------------------------------------------------------------------
38.01 8.48 1.30
1.30
8.00
9.19
28.77
8.4816.6
2
27.5
4
S.U.:139.53 m2S.V.: 1.30S.I.: 33.38
57.41
8.60
30.1
4
1.30
22.1
5
4.33
7.91
20.04
57.41
1.50
S.U.:200.00 m2S.V.: 7.50S.I.: 28.00
S.U.:11.48 m2 S.V.:1.30S.I.:1.30
7.00
S.U.:4.05M2S.V.:0.30S.I.:0.20
S.U.:3.25M2S.V.: --S.I.: --
8
6
4 5
S.U.:4.14M2S.V.:--S.I.:--
22
14
5S.U.:19.26S.V.:1.30S.I.:2.60
S.U.:22.34 m2S.V.: 1.30S.I.: 3.58
19
S.U.:10.22 m2S.V.: 1.30S.I.: 1.30
3
S.U.:14.45 m2S.V.: 1.30 S.I.: 2.60
18
S.U.:4.13 m2S.V.:--S.I.:--
23
2
S.U.:11.87 m2S.V.:1.44S.I.:1.44
10
12S.U.:58.57 m2S.V.:2.10S.I.:8.76
9
1
S.U.:52.24 m2S.V.: 2.60S.I.: 6.18
7
S.U.:4.34 m2S.V.:0.72S.I.:0.72
S.U.:118.56 m2S.V.:5.70S.I.:16.38
26
25
S.U.:2.40 m2
S.U.:59.20M2S.V.:2.80S.I.:11.68
S.U.: 52.84 M2
25
25
S.U.:84.19 m2
LEYENDA:1- ACCESO ALUMNOS PRIMARIA2- HALL PRINCIPAL Y ZONA COMÚN3- ACCESO ALUMNOS INFANTIL4- CONSEJERIA-REPROGRAFIA5- SECRETARIA6- OFICINA JEFE ESTUDIOS7- OFICINA DIRECCIÓN8- BIBLIOTECA9- APAS10- COMEDOR11- EXTENSIÓN DE AULAS INFANTIL12- AULA PSICOMOTRICIDAD13- ENFERMERIA14- CUARTO LIMPIEZA15- AULAS INFANTIL16- COCINA17- ALMACÉN BASURAS18- LAVABOS ALUMNOS19- ALMACÉN MATERIAL DEPORTIVO20- VESTUARIO PND21- VESTUARIO ALUMNOS22- GIMNASIO23- OFICINA MONITOR E. FÍSICA24- CUARTO INSTALACIONES25- PORCHES ZONA PRIMARIA26- PORCHES ZONA INFANTIL
S.U.:3.60M2
S.U.: 5.40 m2
S.U.:3.50 m2
CUADRO SUPERFÍCIES - PLANTA 0
SUP. CONS. CERRADA PB 1.151,40 M2SUP. CONS. PORCHES (50%) 152.43 M2SUP. CONS. PORCHES EXTERIORES (50 %) 30.89 M2
SUP. CONST. TOTAL 1.334,72 M2
SUP. ÚTIL TOTAL 1.102,70 M2
25
15
S.U.:5.68M2S.V.:0.72S.I.:0.72
Plano título:
Promueve:Escala:Fecha:
IBISEC
Nº plano:
Modificado:
A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com
Planta baja- Distribución
A1 1/100 A3 1/20024/03/06
A_P_0201
PROYECTO DE EJECUCIÓN
Ø1.50
V5B
V3
- 1.16
V3
V4
V5B
V3
V5B
V3V3V1
V3
V3
V4
V3
V3
V4
V2 V3
V6
V1
V2
V1
V2
V1
V2
V3
P4
P4
V5A
V5B
V5A
V6
V6
V5B V5C
1.71
V3 V3 V4 V3V3V4
P11
P12
P11
P1
P1
P1
P1
P1
P5
P1
P1
V3
V3
P1
21S.U.:4.04M2S.V.:0.30S.I.:0.20
S.U.: 5.30 m2S.V.: 0.72 S.I.: 0.72
S.U.:19.41 m2S.V.: 2.16 S.I.: 2.16
21S.U.:21.47 m2S.V.: 2.16 S.I.: 2.16
V3
S.U.: 5.25 m2S.V.: 0.38 S.I.: 0.38
18
S.U.:2.68 m2S.V.:0.30S.I.:0.20
20
18 S.U.:2.75 m2S.V.:0.38S.I.:0.38
18
S.U.:6.16 m2S.V.:0.80S.I.:0.80
13
S.U.: 4.12 m2S.V.: 2.40 S.I.: 0.85
V3V3 V3
16
20
P1
S.U.: 6.94 m2S.V.: 0.80 S.I.: 0.80
18
S.U.: 7.10 m2S.V.: 0.72 S.I.: 0.72
18
S.U.: 31.89 m2S.V.: 2.88 S.I.: 3.73
17
P1
1.65
S.U.:11.27S.V.: --S.I.: --
2
6.24
P1
V5B V5C
P9
S.U.:5.35S.V.:--S.I.:--
V5C
S.U.:5.68M2S.V.:0.72S.I.:0.72
P6
V3
V2
P2
S.U.:5.68M2S.V.:0.72S.I.:0.72
P2
15S.U.:59.20M2S.V.:2.80S.I.:11.68
S.U.:59.20M2S.V.:2.80S.I.:11.68
V2
15
P2
P1
V5B
P2
P2
P2
V2
V3
P2 V
2
P4
V2
V2
V2
V2
V2
P1
V2
V2
P1
V5B
V5C
V5B
P1
P1
P7
P7
P6
P10
V7
V5C
V5B
V5C
C7
P13
P1 P1
P1
C8
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
P1
C9
C12
C11
1.50
- 0.56
- 0.62- 0.56
- 0.06- 0.00
- 1.76
- 1.76- 1.70
- 0.06
- 0.56
6.66
7.33
1.20
1.20
SA
SB
SC
SESD SGSF
SESD SGSF
SA
SB
SC
A1 B B1 C D E F G G1 H I1 J K L M NI
25
S.U.:21.28 m2
S.U.:7.34 m2
25S.U.:6.76 m2
C20
C11C11C11
C20
K1 K2
A B B1 C D E F G G1 H I1 J K L M NI K1 K2
1
2
3
4
7
2a
3a
3b
4b
5
5a
6
6a
7a
1
2
3
4
7
2a
3a
3b
4b
5
5a
6
6a
7a
6.22 6.37 6.79 9.00 4.14 4.83
0.30
5.73 4.58 7.47
6.03 4.50 4.50 4.50 4.50 4.50 4.50 4.47 1.85 4.66 3.80 7.47
5b5b
4.55
4.50
4.50
4.50
4.63
4.43
2.92
1.58
3.15
1.09
2.10
1.60
2.98
0.05
7.47
4.73
3.45
4.00
4.31
4.32
0.65 0.36
0.30
A
A A1
cota acabado pavimentocota superior forjado
30.1
4
D_08 D_09
D_10
D_06
D_04
D_03
D_02
A_06 A_07
A_04 A_05
A_08 A_09
D_07 S_03
S_0
3
S_04
S_04
VIEW FROM PLAYGROUND
GROUND FLOOR
FIRST FLOOR
Ampliación
Plano título:
Promueve:Escala:Fecha:
IBISEC
Nº plano:
Modificado:
A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com
Secciones longitudinales
A1 1/100 A3 1/20024/03/06
A_S_0101
PROYECTO DE EJECUCION
Ampliación
SECCIÓN C-C'
B'B
SECCIÓN B-B'
Ampliación
SECCIÓN A-A'
C'C
A'A
3.54
7.08
0.00
-3.42
-1.16
3.54
7.08
0.00
-1.70
3.54
7.08
0.00
-3.42
-1.16
Ampliación
Plano título:
Promueve:Escala:Fecha:
IBISEC
Nº plano:
Modificado:
A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com
Secciones longitudinales
A1 1/100 A3 1/20024/03/06
A_S_0101
PROYECTO DE EJECUCION
Ampliación
SECCIÓN C-C'
B'B
SECCIÓN B-B'
Ampliación
SECCIÓN A-A'
C'C
A'A
3.54
7.08
0.00
-3.42
-1.16
3.54
7.08
0.00
-1.70
3.54
7.08
0.00
-3.42
-1.16
pk1 pk3 pk4 pk5 pk10pk6 pk11pk7 pk8 pk14 pk15pk12 pk13 pk23pk18
PORCHE 61 M2
pk22pk19 pk21pk2 pk9 pk16 pk17 pk20
PARKING PROFESORES 269,55 M2
ZONA RESERVA DE SOLAR. AMPLIACIÓN CP.
1
1- ACCESO ALUMNOS PRIMARIA2- ACCESO ALUMNOS INFANTIL3- EXTENSIÓN AULAS INFANTIL 174,50 M24- CONTADORES 1,62 M25- ACCESO RODADO 386,99 M26- ACCESO PEATONAL 136,18 + 61.08 M27- ZONA PAVIMENTADA INTERIOR 1.382,80M28- PISTA POLIDEPORTIVA 962,11 M29- ZONA JUEGOS PRIMARIA 226,87M210- ZONA DE JUEGOS INFANTIL 300,05 M211- PARKING PROFESORES 266,00 M212- PARKING ADAPTADO 18,78 M213- ZONA AJARDINADA 195.55 M214- HUERTA 95,81 M2
2
CUADRO PARÁMETROS - GENERAL
SUP. PARCELA 4.386.00 M2SUP. ZONA PAVIMENTADA TOTAL 2.244.88 M2SUP. ZONA TERRENO NATURAL 2141.12M2
7
Planta jardinería - Pavimentos exteriores
1/20024/03/06
U_PJ_0101
PROYECTO EJECUTIVO
S3PAVIMENTO ASFÁLTICO CON BORDILLOS PLANOS DE HORMIGÓN DE 20 CM EN ENCUENTROS Y BORDES.
S7TIERRA VEGETAL PARA HUERTA Y ZONA AJARDINADA
PAVIMENTOS EXTERIORES
S8PISTA DEPORTIVA EN BASE DE SOLERA DE HORMIGÓN CON TRAZADO DE PINTURA SEGÚN COLORES REGLAMENTARIOS.
S9ZONAS DE JUEGO EXTERIORES CON PAVIMENTO A BASE DE TIERRA Y ARENA FINA COMPACTADA.
pk24
PERFIL S1
S1S1
S2
S2
PE
RFIL S
2
S3
S3
PE
RFIL S
3
3.00
3.00
3.00
3.00
2.01
8.00
1.96
25.8
610
.19
2.01
8.00
1.95
36.0
5
3.05
3.05
54.26 57.30 7.65
N
LONG FAÇADES
GENERAL PLAN
LONG SETIONS
Plano título:
Promueve:Escala:Fecha:
IBISEC
Nº plano:
Modificado:
A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com
Secciones transversales
A1 1/100 A3 1/20024/03/06
A_S_0201
PROYECTO DE EJECUCION
A
A'
B
B'
SECCIÓN 2SECCIÓN 1
D
D'
SECCIÓN 3
SECCIÓN 4
D
D'
3.54
7.08
0.00
3.54
7.08
0.00
3.54
7.08
0.00
-0.56
-1.70
-3.42
3.54
7.08
0.00
Plano título:
Promueve:Escala:Fecha:
IBISEC
Nº plano:
Modificado:
A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com
Secciones transversales
A1 1/100 A3 1/20024/03/06
A_S_0201
PROYECTO DE EJECUCION
A
A'
B
B'
SECCIÓN 2SECCIÓN 1
D
D'
SECCIÓN 3
SECCIÓN 4
D
D'
3.54
7.08
0.00
3.54
7.08
0.00
3.54
7.08
0.00
-0.56
-1.70
-3.42
3.54
7.08
0.00
Plano título:
Promueve:Escala:Fecha:
IBISEC
Nº plano:
Modificado:
A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com
Secciones transversales
A1 1/100 A3 1/20024/03/06
A_S_0201
PROYECTO DE EJECUCION
A
A'
B
B'
SECCIÓN 2SECCIÓN 1
D
D'
SECCIÓN 3
SECCIÓN 4
D
D'
3.54
7.08
0.00
3.54
7.08
0.00
3.54
7.08
0.00
-0.56
-1.70
-3.42
3.54
7.08
0.00
Plano título:
Promueve:Escala:Fecha:
IBISEC
Nº plano:
Modificado:
A. Salvá + A. Marqués + A. Sánchez www.smsarquitectos.com
Alzado patio entrada 1
A1 1/50 A3 1/10024/03/06
A_A_0401
PROYECTO DE EJECUCION
A'
B'
AB
A-A' B-B'
PLANTA
M2 M3
M3
T1
E3
V5B
V5C
V5BV5B
V5B
V5C
V5C
V5B
V5B
S1
E2
E5
M2
M2
T1
M4
R3
R3
T6
M2 M3
M2T1
S1
M4R3
T1
E1 E1 M3
MUROS Y CERRAMIENTOS
M1 LADRILLO H-16+AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mm +CAMARA DE AIRE 20 mm+ LADRILLO H-8M2 BLOQUE DIAMANTE PREFABRICADO DE HORMIGÓN +AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mm +CAMARA DE AIRE 20 mm+ LADRILLO H-8M3 BLOQUE DIAMANTE PREFABRICADO DE HORMIGÓNM4 TABIQUE DE LADRILLO H-8M5 TABIQUE DE LADRILLO H-8+AISLANTEM6 TABIQUE DE LADRILLO H-16M7 TABIQUE DE LADRILLO H16+AISLANTE E=3cm+ CAMARA 2cm+TABIQUE DE LADRILLO H8M8 MURO DE HORMIGON VISTO e=30cm CON DRENAJE E IMPERMEABILIZANTE EN CARA EXTERIOR A PIE DE MURO M9 CELOSIA DE HORMIGÓN MARCA PREMAR MODELO CÉSPED O SIMILAR DE PIEZAS CON MEDIDAS 45X30X10 cm COLOR A DETERMINAR
COLOCADAS A JUNTA PARTIDA A UN TERCIO DE PIEZA JUNTA DE UNION DE CEMENTO COLA DE ALTA RESISTENCIAM10 FORJADO RETICULAR+ BARRERA DE VAPOR+ AISLANTE POLIESTIRENO EXTRUIDO e=3mm+FORMACION DE PENDIENTES +IMPERMEABIIZANTE+PROTECCION PESADA
ESTRUCTURA
E1 FORJADO RETICULAR DE HORMIGON h=25cm +CAPA DE COMPRESIÓN e=5cmE2 LOSA ARMADA DE HORMIGON e=22cmE3 SOLERA DE HORMIGON e=15 cm SOBRE ENCACHADO DE GRAVA + LAMINA ELASTOMERICA DE PVC e=1mmE4 SOLERA DE HORMIGON e=30 cm CON ARMADURA DE REFUERZO SOBRE ENCACHADO DE GRAVA + LAMINA ELASTOMERICA DE PVC E=1mmE4 PILAR DE HORMIGÓN CON MEDIDAS SEGÚN CUADRO DE PILARES, RECUBRIMIENTOS MINIMOS CUMPLIMENTADOSE5 LOSA ARMADA DE HORMIGON e=30cmE6 JACENA DE HORMIGON ARMADO CON MEDIDAS SEGÚN PLANOS DE ESTRUCTURAE7 LOSA ARMADA PARA FORMACION DE ESCALERA
REVESTIMIENTO DE PAREDES
R1 ZOCALO DE PROTECCIÓN h=110cm DE TERRAZO 2 CANTOS BISELADOS 40X40cm COLOCADAS SOBRE PARAMENTOS VERTICALES. R2 RECERCADO DE PUERTAS DE TERRAZO 40X20cm COLOCADAS SOBRE PARAMENTOS VERTICALES.R3 ENFOSCADO DE MORTERO DE CEMENTO FINO MAESTREADO SOBRE PARAMENTOS VERTICALES INTERIORES, ACABADO DE DOS CAPAS DE PINTURA PLASTICA
COLOR A DETERMINARR4 ENFOSCADO LISO DE MORTERO SOBRE PARAMENTOS VERTICALES EXTERIORES, ACABADO DE DOS CAPAS DE PINTURA HIDROFUGA COLOR A DETERMINARR5 ALICATADO 20X20 TOMADO CON CEMENTO COLA. COLOR A DETERMINARR6 ACABADO DE PLACAS DE LANAS MINERALES ACABADO BLANCO 60X60cm ESPESOR 19mm SOBRE PERFILES OMEGAS GALVANIZADAS
VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS VERTICALES R7 PANEL AISLANTE RECUBIERTO DE VIRUTAS DE MADERA CON CEMENTO GRIS TIPO CELENIT 120X60cm ESPESOR 50mm SOBRE PERFILES OMEGAS GALVANIZADOS
VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS VERTICALES R8 AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mmR9 RECERCADO DE HORMIGON GRIS PREFABRICADO e=4cmR10 ZOCALO DE PINTURA ESMALTADA SOBRE PARAMENTO VERTICAL. COLOR A DEFINIR
TECHOS
T1 FALSO TECHO COMPUESTO POR PLACAS DE LANAS MINERALES ACABADO BLANCO 60X60cm ESPESOR 19mm SOBRE PERFILES OMEGAS GALVANIZADASVISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION
T2 ENFOSCADO DE MORTERO DE CEMENTO FINO SOBRE PARAMENTOS DE TECHO INTERIORES, ACABADO DE DOS CAPAS DE PINTURA PLASTICA COLOR A DETERMINART3 ENFOSCADO LISO DE MORTERO SOBRE PARAMENTOS DE TECHO EXTERIORES, ACABADO DE DOS CAPAS DE PINTURA HIDROFUGA. COLOR A DETERMINART4 ACABADO DE PLACAS DE LANAS MINERALES ACABADO BLANCO 60X60cm ESPESOR 19mm SOBRE PERFILES OMEGAS GALVANIZADAS
VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS DE TECHOS T5 PANEL AISLANTE RECUBIERTO DE VIRUTAS DE MADERA CON CEMENTO GRIS TIPO CELENIT 120X60cm ESPESOR 50mm SOBRE PERFILES OMEGAS GALVANIZADOS
VISTOS DE 46mm CADA 60cm COLOCADOS EN UNA SOLA DIRECCION DIRECTAMENTE SOBRE PARAMENTOS HORIZONTALES T6 ACABADO DE PINTURA ANTIHUMEDAD. COLOR A DEFINIRT7 AISLAMIENTO POLIESTIRENO EXTRUIDO e=30mm
SOLADOS
S1 PAVIMENTO DE TERRAZO COLOR A ELEGIR E=30mm ACABADO PULIDO EN ZONAS INTERIORES Y APOMAZADO EN EXTERIORES CON TRATAMIENTO DE LIQUIDO HIDROFUGANTE
S2 PAVIMENTO DE CAPA DE HORMIGON REALIZADO IN SITU, e=10cm, PULIDO MECANICO, CORTE DE JUNTAS CON RADIAL Y SELLADOS3 PAVIMENTO SOBRE BASE GRANULAR DE 15cm, CON CAPA DE RODADURA S12 DE AGLOMERADO COLOCADA EN CALIENTE e= 4cm,BORDILLOS PLANOS DE HORMIGÓN
DE 20 cm A COLOCAR EN ENCUENTROS Y BORDES S4 PELDAÑO PIEZA PREFABRICADA DE HORMIGON e=30mm PARA COLOCAR SOBRE LOSA DE ESCALERAS5 LECHO DE GRAVA DIAMETRO MAXIMO A DETERMINAR EN OBRAS6 PAVIMENTO DE GRES ANTIDESLIZANTE S7 PAVIMENTO DE TIERRA VEGETAL PARA ZONA AJARDINADA Y HUERTAS8 PISTA DEPORTIVA EN BASE DE SOLERA DE HORMIGÓN SOBRE ENCACHADO Y TERRENO COMPACTADO, CON EL CORRESPONDIENTE TRAZADO EN PINTURA
SEGÚN COLORES REGLAMENTARIOS.S9 ZONAS DE JUEGO EXTERIORES CON PAVIMENTO A BASE DE TIERRA Y ARENA FINA COMPACTADAS10 PAVIMENTO VINILICO EN BASE DE SOLERA DE HORMIGÓN SOBRE ENCACHADO Y TERRENO COMPACTADOS11 ALFOMBRA VINILICA
M10 M10 M10 M10
E3 S1
8.70
14.1
2
2.65
4.91
2.20
0.46
1.99
1.86
3.300.611.990.601.990.09
0.31
1.19
0.19
1.99
0.49
1.99
0.95
1.19
0.61
1.99
1.75
0.10
M4
R3
S1E3S11
M4R3
S1 E1
T6
T6
T1T7 T7
E3 S1
R9
R9
R9
R9
R9R9
R9
R9
R9
R9
T1R9
R9 R9
S3
S3
S3
S3
S11
S11
S1
S1
S1 S1
S1
S10
E1 E2
CROSS SETIONS
PATIO ELEVATIONS
VIEW FROM ABOVE
GRUPO REPOL HEADQUARTERS, CASTELLÓN, SPAiN.
1ST PRIZE BUDGET: 1.800.000 eurosSURFACE : 9.700 m2CLIENT: Grupo REPOLTIPOLOGY: Office and manufacturaingESTATE: Draft design ----------------------------------------------------------------------------------------------
The proposal for Repol Group headquarters, rather than proposing an end result or finished product, our aim is to define a that acomodates a wide range of possibilities. We propose therefore an intervention to define a framework and a variable content that accommodates the needs and constraints of the future user. A structural system based Vierendeel trusses allow us to get long spans that not interfiere with the production area. This system also allows us to think in a new location for the administrative areas that traditionally are atached to the front façades. The office area can be now distributed over a huge area on top of the roof, inside the Vierendeel truses. This location open the possibility for organize offices as in a ground floor, where terraces, seating areas, outdoor meeting areas and landscaped courtyards can occur. Access to the offices is proposed as a promenade, culminating in the offices of the company, passing through a sequence of spaces and events that happen along the way. The ascension begins on the ramp outside and leads to the “piano nobile” where entrance of the offices and laboratory occur. This ascending tour has two routes: one immediate access by an elevator or stairs to the offices and an other that brings visitors thruoghou the succession of various laboratories allowing us to peep in to production area carried out in the adjacent hall. The façade of Repol Group, manufacturer of polymers, we propose the development and design of a plastic material in which the company can actively intervene, thus closing the cycle of production and use. We understand the facade as an abstraction of the sequence of a polymer, an unlimited series consisting of the repetition of the same unit. The basic element of this facade is a hexagonal panel manufactured in an injection mold where the products of Repol will be used.
VIEW FROM STREET