    White Rose FPSOWhite Rose FPSO A Successful Harsh Environment FPSO A Successful Harsh Environment FPSO

    Phil Clark, SNAME Calgary November 19 th 2008

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    2/51

    - 2 -

    The White Rose ProjectThe White Rose Project

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    3/51

    - 3 -

    White Rose at First Oil

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    4/51

    - 4 -

    Grand Banks Harsh Environment

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    5/51

    - 5 -

    FPSO DesignFPSO Design

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    6/51

    - 6 -

    FPSO design challengesFPSO design challenges

    The ability to quickly and reliably disconnect the risers andvessel moorings and leave the location under self propulsion ifthreatened by an unmanageable iceberg

    The need for high structural integrity at low temperatures reinforcement for sea ice and ice impacts

    Remain on location for minimum 15 years

    Extensive green water protectionExtensive winterization for cold climate operations

    Enhanced radar for Iceberg detection

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    7/51

    - 7 -

    Project Management - St. Johns Newfoundland - Husky

    Hull - Korea - Samsung

    Turret - Middle East Abu Dhabi - SBM/Imodco

    Topsides - Newfoundland and Atlantic Canada - AMKC

    Operations - Newfoundland - Husky

    Topsides to HullInterface

    Interface Turret toTopsides

    Structural Interface Deck - Hull

    InterfaceTurretto Hull

    SBM

    AMKCSamsung

    FPSO Execution Strategy

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    8/51

    - 8 -

    Base Vessel DesignBase Vessel Design

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    9/51

    - 9 -

    Changes to the Hull Design

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    10/51

    - 10 -

    Vessel Specifications

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    11/51

    - 11 -

    Vessel Specifications

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    12/51

    - 12 -

    Vessel Specifications

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    13/51

    - 13 -

    Model Testing and Analysis

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    14/51

    White Rose Turret and Mooring SystemWhite Rose Turret and Mooring System

    Turret GantryStructure

    Centerline of Rotation

    of FPSO

    Risers(Generic)

    MooringLines

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    15/51

    - 15 -

    160 m142 mm DR35 StudlessChain

    142 mm DR35Studless

    Chain160 m

    142 mm DR35StudlessChain

    15m

    800 m128 mm DSpiral StrandWire

    120 m152 mm DR35 StudlessChain

    40m

    Clump Wts 1.9 te / m

    128 mm DSpiralStrandWire

    85m3 x 3 Pattern

    FPSO

    AnchoringRadius :1310 m

    Typical Anchor LegPile

    Buoy

    60m

    Mooring line composition

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    16/51

    - 16 -

    Gantry Structure

    TER

    Main Bearing

    Elastomeric Support

    Connecting Chain

    Main Connector

    Inflatable Seals

    Bottom Bearing

    Chain Hawse

    Travelling Hoist

    Swivel Stack

    Access

    Piping DeckChain Puller

    Access in Tur ret

    Fluid Connector

    Riser Buoy

    Riser

    Dis-connectable Turret Design

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    17/51

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    18/51

    - 18 -

    DisDis --connectable Buoyconnectable Buoy

    and Connectorsand ConnectorsStructuralConnector Hub

    QC / DC Chamber

    Buoy Structure

    Chain Hawse

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    19/51

    - 19 -

    Buoy Connector in TurretBuoy Connector in TurretStructureStructure

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    20/51

    - 20 -

    Topside Design

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    21/51

    - 21 -

    FPSO ConstructionFPSO Construction

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    22/51

    - 22 -

    March2002

    Aug 162005

    April 2004

    Q4 2005 -Q1 2006

    Q2 2003

    November2002

    August2002

    Project Sanction

    Turret FabricationCommences

    Hull FabricationCommences

    DevelopmentDrillingCommences

    First Oil

    FPSO ArrivalMarystown

    Sailaway

    August2002

    Topsides FabricationCommences

    Overall Schedule

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    23/51

    - 23 -

    Turret: Machining the Lower Bearing

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    24/51

    - 24 -

    Trial Fit of Buoy to Turret

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    25/51

    - 25 -

    Buoy Connector and Riser ValvesBuoy Connector and Riser Valves

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    26/51

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    27/51

    - 27 -

    Buoy showing QC/DC riser valvesBuoy showing QC/DC riser valves

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    28/51

    - 28 -

    Samsung Keel LayingSamsung Keel Laying

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    29/51

    - 29 -

    Samsung Float Up and Repositioning

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    30/51

    - 30 -

    Samsung Block Assembly

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    31/51

    - 31 -

    Moonpool Structure & Integration into Hull

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    32/51

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    33/51

    - 33 -

    Main Deck, Fire main & typical deck stools

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    34/51

    - 34 -

    Hull: Just Out of drydock

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    35/51

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    36/51

    - 36 -

    Arrival in Newfoundland Arrival in Newfoundland

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    37/51

    - 37 -

    SeaRose FPSO arrival MarystownSeaRose FPSO arrival Marystown

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    38/51

    - 38 -

    Approaching the piers Approaching the piers

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    39/51

    - 39 -

    Marystown Cow Head Fabrication FacilityMarystown Cow Head Fabrication Facility

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    40/51

    - 40 -

    Lampson Transi-lift Crane

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    41/51

    - 41 -

    Lampson TransiLampson Transi --lift counterweightlift counterweight

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    42/51

    - 42 -

    M45 Utility module liftM45 Utility module lift

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    43/51

    - 43 -

    Landing M45 ModuleLanding M45 Module

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    44/51

    - 44 -

    Winter 2004/Summer 2005

    f

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    45/51

    - 45 -

    Preparation for SailawayPreparation for Sailaway

    lS il A 16 thth 2005

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    46/51

    - 46 -

    Sailaway August 16Sailaway August 16 thth 20052005

    Whi R D di d Sh l T kWhi R D di d Sh l T k

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    47/51

    - 47 -

    White Rose Dedicated Shuttle TankersWhite Rose Dedicated Shuttle Tankers

    F C ib i SF t C t ib ti t S

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    48/51

    - 48 -

    Factors Contributing to SuccessFactors Contributing to SuccessCarry out comprehensive FEED to enable detailed functionalspecifications to be written.

    Incorporate a formal lessons learned process from the experience ofother FPSO programs.

    At sea service and maintenance of structure and equipment has to becomprehensively considered during detailed design operations inputis essential.

    Shipbuilders build ships, EPC contractors build O&G equipment. Dontmix the two cultures in one contract.

    Have logical and minimal contractual and technical interfaces andmanage them intensely.

    Use IT technologies extensively better to over-communicate.

    Establish a strong, but efficient management of change process.

    Establish an independent expert project review committee with periodicreviews of the project.

    FPSO service is very severe material and equipment selection fordurability and reliability is paramount.

    Jasmine Kn tsen: Connection trials

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    49/51

    - 49 -

    Jasmine Knutsen: Connection trials

    Heather Knutsen: First Cargo

  • 8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark

    50/51

    - 50 -

    Heather Knutsen: First Cargo