White Rose FPSOWhite Rose FPSO A Successful Harsh Environment FPSO A Successful Harsh Environment FPSO
Phil Clark, SNAME Calgary November 19 th 2008
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
2/51
- 2 -
The White Rose ProjectThe White Rose Project
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
3/51
- 3 -
White Rose at First Oil
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
4/51
- 4 -
Grand Banks Harsh Environment
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
5/51
- 5 -
FPSO DesignFPSO Design
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
6/51
- 6 -
FPSO design challengesFPSO design challenges
The ability to quickly and reliably disconnect the risers andvessel moorings and leave the location under self propulsion ifthreatened by an unmanageable iceberg
The need for high structural integrity at low temperatures reinforcement for sea ice and ice impacts
Remain on location for minimum 15 years
Extensive green water protectionExtensive winterization for cold climate operations
Enhanced radar for Iceberg detection
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
7/51
- 7 -
Project Management - St. Johns Newfoundland - Husky
Hull - Korea - Samsung
Turret - Middle East Abu Dhabi - SBM/Imodco
Topsides - Newfoundland and Atlantic Canada - AMKC
Operations - Newfoundland - Husky
Topsides to HullInterface
Interface Turret toTopsides
Structural Interface Deck - Hull
InterfaceTurretto Hull
SBM
AMKCSamsung
FPSO Execution Strategy
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
8/51
- 8 -
Base Vessel DesignBase Vessel Design
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
9/51
- 9 -
Changes to the Hull Design
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
10/51
- 10 -
Vessel Specifications
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
11/51
- 11 -
Vessel Specifications
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
12/51
- 12 -
Vessel Specifications
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
13/51
- 13 -
Model Testing and Analysis
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
14/51
White Rose Turret and Mooring SystemWhite Rose Turret and Mooring System
Turret GantryStructure
Centerline of Rotation
of FPSO
Risers(Generic)
MooringLines
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
15/51
- 15 -
160 m142 mm DR35 StudlessChain
142 mm DR35Studless
Chain160 m
142 mm DR35StudlessChain
15m
800 m128 mm DSpiral StrandWire
120 m152 mm DR35 StudlessChain
40m
Clump Wts 1.9 te / m
128 mm DSpiralStrandWire
85m3 x 3 Pattern
FPSO
AnchoringRadius :1310 m
Typical Anchor LegPile
Buoy
60m
Mooring line composition
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
16/51
- 16 -
Gantry Structure
TER
Main Bearing
Elastomeric Support
Connecting Chain
Main Connector
Inflatable Seals
Bottom Bearing
Chain Hawse
Travelling Hoist
Swivel Stack
Access
Piping DeckChain Puller
Access in Tur ret
Fluid Connector
Riser Buoy
Riser
Dis-connectable Turret Design
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
17/51
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
18/51
- 18 -
DisDis --connectable Buoyconnectable Buoy
and Connectorsand ConnectorsStructuralConnector Hub
QC / DC Chamber
Buoy Structure
Chain Hawse
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
19/51
- 19 -
Buoy Connector in TurretBuoy Connector in TurretStructureStructure
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
20/51
- 20 -
Topside Design
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
21/51
- 21 -
FPSO ConstructionFPSO Construction
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
22/51
- 22 -
March2002
Aug 162005
April 2004
Q4 2005 -Q1 2006
Q2 2003
November2002
August2002
Project Sanction
Turret FabricationCommences
Hull FabricationCommences
DevelopmentDrillingCommences
First Oil
FPSO ArrivalMarystown
Sailaway
August2002
Topsides FabricationCommences
Overall Schedule
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
23/51
- 23 -
Turret: Machining the Lower Bearing
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
24/51
- 24 -
Trial Fit of Buoy to Turret
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
25/51
- 25 -
Buoy Connector and Riser ValvesBuoy Connector and Riser Valves
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
26/51
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
27/51
- 27 -
Buoy showing QC/DC riser valvesBuoy showing QC/DC riser valves
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
28/51
- 28 -
Samsung Keel LayingSamsung Keel Laying
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
29/51
- 29 -
Samsung Float Up and Repositioning
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
30/51
- 30 -
Samsung Block Assembly
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
31/51
- 31 -
Moonpool Structure & Integration into Hull
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
32/51
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
33/51
- 33 -
Main Deck, Fire main & typical deck stools
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
34/51
- 34 -
Hull: Just Out of drydock
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
35/51
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
36/51
- 36 -
Arrival in Newfoundland Arrival in Newfoundland
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
37/51
- 37 -
SeaRose FPSO arrival MarystownSeaRose FPSO arrival Marystown
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
38/51
- 38 -
Approaching the piers Approaching the piers
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
39/51
- 39 -
Marystown Cow Head Fabrication FacilityMarystown Cow Head Fabrication Facility
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
40/51
- 40 -
Lampson Transi-lift Crane
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
41/51
- 41 -
Lampson TransiLampson Transi --lift counterweightlift counterweight
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
42/51
- 42 -
M45 Utility module liftM45 Utility module lift
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
43/51
- 43 -
Landing M45 ModuleLanding M45 Module
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
44/51
- 44 -
Winter 2004/Summer 2005
f
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
45/51
- 45 -
Preparation for SailawayPreparation for Sailaway
lS il A 16 thth 2005
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
46/51
- 46 -
Sailaway August 16Sailaway August 16 thth 20052005
Whi R D di d Sh l T kWhi R D di d Sh l T k
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
47/51
- 47 -
White Rose Dedicated Shuttle TankersWhite Rose Dedicated Shuttle Tankers
F C ib i SF t C t ib ti t S
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
48/51
- 48 -
Factors Contributing to SuccessFactors Contributing to SuccessCarry out comprehensive FEED to enable detailed functionalspecifications to be written.
Incorporate a formal lessons learned process from the experience ofother FPSO programs.
At sea service and maintenance of structure and equipment has to becomprehensively considered during detailed design operations inputis essential.
Shipbuilders build ships, EPC contractors build O&G equipment. Dontmix the two cultures in one contract.
Have logical and minimal contractual and technical interfaces andmanage them intensely.
Use IT technologies extensively better to over-communicate.
Establish a strong, but efficient management of change process.
Establish an independent expert project review committee with periodicreviews of the project.
FPSO service is very severe material and equipment selection fordurability and reliability is paramount.
Jasmine Kn tsen: Connection trials
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
49/51
- 49 -
Jasmine Knutsen: Connection trials
Heather Knutsen: First Cargo
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
50/51
- 50 -
Heather Knutsen: First Cargo
-
8/10/2019 SNAME Nov 2008 Whiterose- Phil Clark
51/51