SOP PV Attaka
STANDARD OPERATING PROCEDURE
Pressure Vessel Inspection for Migas re-certification SOP Number
SOP-MIQA-ATTK- 001Page 2 of 4
Chevron Kalimantan OperationRev. Number
0Issued
September 2007Effective
September 2010
STANDARD OPERATING PROCEDURE
PRESSURE VESSEL INSPECTION FOR MIGAS RE-CERTIFICATION
Area/Dept.:
North Area Production / ProductionFacility/Section:
Attaka Field
Rev. NumberRev. DateDescriptionPrepared by
Setyo BUMIQA SpecialistReviewed by
Suhartono
MI & QA Supv
Approved by
______________
MI & QA Supt.
0September 5, 2007 FORMCHECKBOX New Issue FORMCHECKBOX Whole Document FORMCHECKBOX Partial
Chevron Kalimantan OperationOperationalExcellence
Management
SystemDocument ID
SOP-MIQA-ATTK- 001Page 1 of 4
1 General Description
This procedure will explain the steps to inspect the Pressure Vessel for re-certification. 2 HES NoticeSome possibility of personal injury may occur before and during activities. The inspectors has injury possibilities to i.e. finger pinch, back injury and falling down.3 Procedural Steps
Action NumberActionRemark (who & when)
I.Preparation
1Check all PPE to be worn, all equipment to be used have been calibrated properly, batteries in full capacity, work sheets and conduct daily tool box meeting.
2Obtain Safety Work Permit to Production Control Room and approved by HOM/HOP & Field Superintendent, attach the SOP and JSA related.
3Submit the list of pressure vessels will be inspected to Control Room.
4Inspection step and evaluation shall refer to CICO-QP-INS-009 Procedure For Certification and Inspection of Pressure Vessel
II.Execution
1The Pressure Vessels to be externally inspected is on stream. Do not operate all production facilities. Inform Control Room when anomalies occured.
2Ensure the scaffolding has been properly installed and approved by Scaffolding Inspector as an access to conduct unreachable inspection position (when required).
3Do not remove the painting without permissible of Production Operator in charge.
IIICompletion
1When the inspection of the first pressure vessel completed, inform control room that the inspector will inspect to the next pressure vessel, etc.
2Always keep the work place clean before leaving.
3Report to Production Control Room when inspection job have been finished for the day, sign off the Safe Work Permit and write a note Continued if the job will be continued the next day and Completed if the job have been finished.
4. DRAWING/P&ID & DOCUMENTNO.LOCATIONTAG NODESCRIPTION
1ATTAKA HOTELPV-WF-1103Oxygen Scavenger Tank
2ATTAKA HOTELH-PV-M7Gas Lift Receiver
3ATTAKA HOTELH-PV-2Test Separator
4ATTAKA HOTELH-PV-M12Gas Launcher
5ATTAKA HOTELV-1106HAir Receiver
6ATTAKA HOTELH-PV-4Gas Lift KOD
7ATTAKA HOTELH-PV-TK1Sump Tank
8ATTAKA HOTELH-PV-M6Gas Lift Receiver
9ATTAKA HOTELH-PV-M11Gas Receiver
10ATTAKA HOTELH-PV-M10Oil Pig Receiver
11ATTAKA HOTELATH-PV-AD-1AAir Dryer
12ATTAKA HOTELH-PV-1Gross Separator
13ATTAKA HOTELV-115 HVent Gas Scrubber
14ATTAKA HOTELATH-PV-AD-1BAir Dryer
15ATTAKA CPF-1450-1BHT. Cartridge Filter
16ATTAKA CPE-1450-1Glycol Exchanger
17ATTAKA CPV-11022nd Stg Compr In. Scrubber
18ATTAKA CPH-1450-3Still Column & Reflux Coil
19ATTAKA CPVS-1450-1Glycol Contactor
20ATTAKA CPF-1450-2AActivated Carbon Filter
21ATTAKA CPF-1450-2BActivated Carbon Filter
22ATTAKA CPH-1450-1Glycol Reboiler Heater
23ATTAKA CPH-1450-2Glycol Rebolier
24ATTAKA CPVS-88Knock Out Drum
25ATTAKA CPV-11032nd Stg Compr. KOD
26ATTAKA CPCP-PV-M3Gas Lift Receiver
27ATTAKA CPCP-PV-M2Gas Pig Launcher
28ATTAKA CPV-1105Lift Gas Compr. KOD
29ATTAKA CPVS-1450-2Gas Scrubber
30ATTAKA CPV-1101Recycling Separator
31ATTAKA CPATT-L-STA-2Gas Launcher
32ATTAKA CPV-121Knock Out Drum
33ATTAKA CPV-120Knock Out Drum
34ATTAKA CPVS-1450-3Glycol Flush Drum
35ATTAKA CPF-1450-1AHT. Cartridge Filter
4
5. TECHNICAL DATA
control information
DescriptionDate
Revision NoDateNotes
6 Associated Documents
CICo-QP-009 PROCEDURE FOR CERTIFICATION & INSPECTION OF PRESSURE VESSEL
4
3
5
#10A8
A
To sample point
#97
#8
#97
#6
#5
#4
#3
6
2
1
B
#10B
#PI8
#9fromFrom HE-901-A3
A
#2
#1
LCV 1106 A2
LCV 1106 A1
LCV 1106 B2
LCV 1106 B1
UV 85
UV 84
14
13
12
11
10
9
8
SPECTACLE BLIND
7
Plugged
To oil boot V-1101A