southside green - team 4

16
April 10 through 12, 2014 Study Area B – Team 4 Study Area A Study Area B Study Area C http://www.southsidegreen.com Michele Acitelli Jason Borne Frank Dawson Joe Fello Tracy Hudak AJ Schwartz Gregory Scott Addy Smith-Reiman

Upload: m-damon-weiss

Post on 13-Jun-2015

42 views

Category:

Design


0 download

TRANSCRIPT

Page 1: Southside Green -  Team 4

April 10 through 12, 2014

Study Area B – Team 4

Study Area A

Study Area B

Study Area C

http://www.southsidegreen.com

Michele AcitelliJason Borne

Frank DawsonJoe Fello

Tracy HudakAJ Schwartz

Gregory ScottAddy Smith-Reiman

Page 2: Southside Green -  Team 4

April 10 through 12, 2014

Study Area B – East Carson Street to Mary Street

http://www.southsidegreen.com

Page 3: Southside Green -  Team 4

April 10 through 12, 2014

Study Area B – Conduit Corridor Design Features

http://www.southsidegreen.com

• Boulevard Concept– Safe Passage for Pedestrians, Bicyclists and Motorists– Maintain Residential Parking

• Green Infrastructure Controls– Reduction in Combined System Overflow– Vegetated Bioswales and Tree Pods/Trenches– Pervious Paving (Parking Areas)– Stone Infiltration Beds

• Platform for Community Programming– Performative Platform adjacent to Brew House– Triangular Plaza (Dining/Café Space)– Gateway Area Adjacent to Carson Street

Page 4: Southside Green -  Team 4

April 10 through 12, 2014

Program Space

http://www.southsidegreen.com

Page 5: Southside Green -  Team 4

April 10 through 12, 2014

Program Space

http://www.southsidegreen.com

Page 6: Southside Green -  Team 4

April 10 through 12, 2014

Program Space

http://www.southsidegreen.com

Page 7: Southside Green -  Team 4

April 10 through 12, 2014

Program Space

http://www.southsidegreen.com

Page 8: Southside Green -  Team 4

April 10 through 12, 2014

Program Space

http://www.southsidegreen.com

Deck Cross Section

Page 9: Southside Green -  Team 4

April 10 through 12, 2014

Bioswale

http://www.southsidegreen.com

Page 10: Southside Green -  Team 4

April 10 through 12, 2014

Program Space

http://www.southsidegreen.com

Plaza/Café Space

Page 11: Southside Green -  Team 4

April 10 through 12, 2014

Bioswale

http://www.southsidegreen.com

Roadway Cross Section

Page 12: Southside Green -  Team 4

April 10 through 12, 2014

Stormwater Details

http://www.southsidegreen.com

Page 13: Southside Green -  Team 4

April 10 through 12, 2014

Residential

http://www.southsidegreen.com

Page 14: Southside Green -  Team 4

April 10 through 12, 2014

Residential

http://www.southsidegreen.com

Roadway Cross Section

Page 15: Southside Green -  Team 4

April 10 through 12, 2014

Transition

http://www.southsidegreen.com

Page 16: Southside Green -  Team 4

April 10 through 12, 2014

Stormwater Impact

http://www.southsidegreen.com

Available Storage Volume1" Rainfall Volume