starfire energy’s 10 kg/day rapid ramp nh system development€¦ · 12/11/2019  · modular...

19
1 Starfire Energy’s 10 kg/day Rapid Ramp NH 3 System Development Funded by ARPA-E 2015 Open # DE-AR0000685 DOE SBIR # DE-SC0019846 Colorado OEDIT # CTGG1 19-3593 Starfire Energy Inc Joe Beach, CEO Rapid Ramp

Upload: others

Post on 14-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

1

Starfire Energy’s 10 kg/day Rapid Ramp NH3

System Development

Funded by ARPA-E 2015 Open # DE-AR0000685DOE SBIR # DE-SC0019846Colorado OEDIT # CTGG1 19-3593

Starfire Energy IncJoe Beach, CEO

Rapid Ramp

Page 2: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

2

Starfire Energy is a clean energy company

● Research, development, deployment● Solar, hydrogen, business background● 7 full-time, 2 part-time staff

Page 3: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

3

Clean power plants into clean fuel factories

New US Great Plains wind● $0.012 – $0.020/kWh● 50% – 65% capacity factor

New US Southwest solar● $0.04 - $0.07/kWh● 20% - 30% capacity factor

Page 4: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

4

Clean power plants into clean fuel factories

New US Great Plains wind● $0.012 – $0.020/kWh● 50% – 65% capacity factor

New US Southwest solar● $0.04 - $0.07/kWh● 20% - 30% capacity factor

Page 5: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

5

Fuel synth. must mesh with variable power

New US Great Plains wind● $0.012 – $0.020/kWh● 50% – 65% capacity factor

New US Southwest solar● $0.04 - $0.07/kWh● 20% - 30% capacity factor

Page 6: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

6

“Rapid Ramp NH3”: flexible ammonia synth.

● N2 and H2 used as they are made● No massive reactant buffering

NitrogenUnit

HydrogenUnit

Rapid RampNH3

AmmoniaStorage

Air

Water

CleanElectricity

N2

H2

NH3

Page 7: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

7

Monolith catalyst & NH3 adsorption are key

Monolith catalyst● High catalyst utilization● Near-zero pressure drop

NH3 adsorption removal● No liquefaction constraints● Any reactor P or T

N2

H2

NH3

N2

H2

Adsorption Bed

Saturated

Unsaturated

Page 8: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

8

Implementing process in 10 kg/day system

● PSA nitrogen● AEM hydrogen● 30 bar e-chem

H2 compress.

● Pneumatic N2 press. boost

Page 9: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

9

Building 10 kg/day system as we speak

Electrolyzer

AirCompressor

Air Dryer

N2Booster N2 PSA

Heat Exchanger & Reactor

CirculationPump

LiquefactionCompressor

Regen.Pump

Page 10: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

10

10 kg/day is first of several iterations

● 10-25x scaling increments to 50 tpd● Each scale has a purpose● Integration, modularization, market

validation, mass production

ProofOf

Concept

LaboratoryScale

Reactor

10 kg/dayIntegrated

System

100 kg/dayModularSystem

2 tpdCustomer

Offtake

50 tpdSystemsFor sale

SmallSystemsFor sale

2 tpdSystemsFor sale

2016-2017 2018 2019 2020 2021 2022 2023

50 tpdSystemDesign

Page 11: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

11

Modular systems reduce business risk

● Cost $10M’s instead of $1000M● Add units as need increases● Deploy near end-use● Deploy near clean energy

VS

Increase number of modular units

Increase unit size

Two ways to increase capacity

Page 12: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

12

Unit size & mass prod. reduce NH3 cost

● Assumes 65% CF, $0.01/kWh● Unit size dictated by capex and desired initial NH3 cost● Mass production continues to drive down cost

Page 13: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

13

Synthesis tech refinement continues

● Lower capex membrane-less H2

● Variable-power membrane N2 ● Better adsorbent material & process● Capex – operating pressure – NH3 cost

Page 14: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

14

Expanding into NH3 fuel utilization

● Monolith NH3 cracking catalysts● Natural gas burner conversion ● High purity, high pressure H2 from NH3

Catalyst

Page 15: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

15

Expanding Starfire Energy’s NH3 team

Year Staff

2015 1

2016 2

2017 3

2018 4

2019 7 + 1 part-time

Page 16: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

16

Questions?

● Monolith catalyst & NH3 adsorption● 10 kg/day system being built● Iterate to 50 tpd modular system● Mass produce to drive down costs● Developing NH3 fuel utilization tech

Page 17: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

17

Additional slides

Page 18: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

18

Synthesis rate ramps with reactant flow

0 300

150

30

60

90

120 180

210

240

270

Haber-Bosch

Rapid RampCapability

Low CapEx

Operating Pressure, bar

Page 19: Starfire Energy’s 10 kg/day Rapid Ramp NH System Development€¦ · 12/11/2019  · Modular systems reduce business risk Cost $10M’s instead of $1000M Add units as need increases

19

“Rapid Ramp” demonstrated

● 75% H2, 25% N2

● Flow increased by opening recirculator throttle valve

● Rate follows flow very closely● Rate ramp rate = flow ramp rate