Page 1: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

Start with a Vision in MindStart with a Vision in MindBP Greater Plutonio ProjectBP Greater Plutonio Project7th April 2005

PELC Conference 2005

Andy TillAngola DCT Program ManagerBP Exploration

Page 2: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

2

BackgroundBackground

Block 18 – 6 deepwater fields operated by BPFPSO – Floating production, storage & offloading vessel300m Long , 250kbbls / dayEPCm contract with Kellogg Brown & Root, UKFPSO Hull built by Hyundai Heavy Industries, KoreaFirst Oil Q2 2007BP investment of $3.3b

Page 3: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

3

Learning CycleLearning Cycle

PlanningStandardsSpecifications

DoingContractsData Collection Tools

ReflectingAssuranceAudit

LinkingCleansingCorrectionVision

Planning

Page 4: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

4

GPP Information management GPP Information management (Planning)(Planning)

Define Statement of Requirements during early stages of project (pre-feed)

Agree standards i.e. ISO 15926Agree project data and document requirements

Write the requirements in to the contractHandover requirements (Responsibilities / Accountabilities)Detailed standards (numbering / handover)

Clear Data ModelEarly Visibility of Data

Page 5: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

5

Core Data ModelCore Data Model

Page 6: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

6

Data CollectionData Collection (Doing) (Doing)

ICT

Phasset

Oracle Data Vault

Document Vault

Document Vault

Documentu

m

KBR

Oracle Data Vault

Supplier Electronic Documents

SDRL Document Register

EIHS Templates and SDRL Data Requirements

Import or Data Entry

Document Posting/ Review

Suppliers

Propid

P-H

Document Meta-Data

Engineering Data & Relationships

Supplier SDRL Documents

- Processes

V

Page 7: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

7

Close collaboration with: (Reflecting)Close collaboration with: (Reflecting)

KBR – EPCm ContractorPearson-Harper – Validation and Content & Data Collection ToolAveva – 3D Model & Engineering Portal

People Process

Technology

Page 8: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

8

The Learning Cycle (Revised)The Learning Cycle (Revised)

Page 9: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

9

What is your paradigm?What is your paradigm?

Electronic Data & DocumentsSingle windowGlobal Access

Page 10: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

10

Status of deliverablesStatus of deliverables

Page 11: Start with a Vision in Mind BP Greater Plutonio Project 7 th April 2005 PELC Conference 2005 Andy Till Angola DCT Program Manager BP Exploration

11

ConclusionConclusion

Write requirements in to the contract (2 Years 3 months to polish the data)Comprehensive information set available for HUC and Operations (required detail in EIHS) Confidence the information set will be complete for 1st Oil (data has been validated)Any electronic system is only as good as the data entered (consistency and cleansing)Angola has only scratched the surface of possibilitiesHave a Vision

People Process

Technology