    STATE OF LOCAL GOVERNANCE REPORT

    PY 2009

    Municipality of Alcantara

    LGPMS, Utilization Conference

    November 22, 2010

    Municipal Session Hall

  • 8/8/2019 State of Performance 2

    2/20

    Flow of Presentation

    Executive Summary

    State of Performance

    State of Development

    State of Poverty

    Financial Performance

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    3/20

    Executive Summary

    Overall Performance Index

    2.84

    Overall Development

    Index 3.07

    Municipality of Alcantara

    Province of Romblon

    3.28

    3.28

    3.463.05

    1.13

    0123

    45

    V

    A

    SE

    En

    5 Performance Indices

    3.91

    2.56

    2.75

    0

    1

    2

    3

    4

    5S

    EnE

    Development Indices

  • 8/8/2019 State of Performance 2

    4/20

  • 8/8/2019 State of Performance 2

    5/20

    Valuing Fundamentals of GovernanceService Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Participation

    (2.67)

    NGOs, POs and PS are represented in various LSB

    and involved in the implementation of LGU devt

    projects

    Below 50% of the LGU devt

    projects were implemented in

    partnership with NGOs and Pos

    Absence of feedback

    mechanism

    Transparency

    (2.60)

    Presence of communication mediums used to

    update the public on LGU Plans and programs

    Accessibility of public documents

    No other medium of

    communication in the LGU aside

    from the conduct of assembliesto update the public on LGU

    plans and programs

    Absence of Information Desk

    Financial

    Accountability

    (4.56)

    Effectiveness of LGU financial management

    system

    Functional BAC

    Most of the time, timely liquidation of cash

    advances is undertaken

    Financial MIS is automated

    Financial statements are published in local media

    Summary of Income & Expenditures is posted in

    at least three (3) conspicuous places in the LGU

    within 30 days from year end

    The LGU did not receive COA

    audit report

  • 8/8/2019 State of Performance 2

    6/20

    State of Performance

    Municipality of Alcantara

    Province of Romblon

    3.28

    3.28

    3.463.

    . 3

    234

    V

    A

    SE

    En

    Performance Indices

    2

    3

    4

    LL DP RG RAU CS HRMD

    3.33 3.43

    2. 6

    3.44

    2.7

    4.2

    Administrative Governance

  • 8/8/2019 State of Performance 2

    7/20

    Administrative Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Local

    Legislation

    (3.33)

    Legislative agenda supports EA

    Presence of a quality legislative tracking

    system

    Computerized Legislative Tracking

    System

    Percentage ofOrdinances

    enacted over legislative

    measures is below 80%

    Absence of these Codes:

    Local Investment and

    Incentive Code

    Market Code

    Health and Sanitation

    Code for Children

    GAD Code

    Development

    Planning

    (3.43)

    Functional LDC

    Presence of database for devt planning

    Presence of AIP and ELA

    Absence of GIS

    Absence of CDP & CLUP

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    8/20

    Administrative Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    RevenueGeneration (2.56)

    Presence of updated RPT maps Does not operate on a network thatis interlinked with computers in the

    offices of the Assessor, BPLO and the

    Treasurer

    No incentive scheme is provided

    No Revenue Generation Plan

    Civil remedies on tax delinquencies

    are not enforcedInefficient Tax Record Management

    Revenue

    Allocation and

    Utilization (3.44)

    Budgetary requirements and

    limitations are observed

    PS exceeds the limitation set by the

    LGC which is 55% for 4th to 6th class

    municipality

    Customer Service Civil Application

    (2.70)

    Set of steps in getting civil registryrecords is known to public

    Securing documents is easy and

    fast; procedures are clear and simple

    and made known to public

    Absence of database for civil registryrecords

    Absence of a system designed for

    indexing and processing of RPT

    documentsMunicipality of AlcantaraProvince of Romblon

  • 8/8/2019 State of Performance 2

    9/20

    Administrative Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Human ResourceManagement and

    Development

    (4.20)

    Permanency in the nature ofappointments is valued

    Staff Development is available

    Grievance system is in place

    Some of the recruitment andselection process and results are not

    posted

    Good performance is not

    recognized

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    10/20

    State of Performance

    Municipality of Alcantara

    Province of Romblon

    3.28

    3.28

    3.46

    3.05

    1.13

    0

    1

    2

    3

    4

    5V

    A

    SE

    En

    5 Performance Indices

    0

    1

    23

    4

    5

    HS EDU HBU PSDM

    4.34

    2.3

    4.2

    3

    Social Governance

  • 8/8/2019 State of Performance 2

    11/20

    Social Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Health Services(4.34)

    Functional LHBOn primary health care: referral system is

    established and medical staff or a physician is

    regularly stationed as scheduled

    Basic medicines are available most of the time

    Patients recording system is established

    Availability of the following maternal care on a

    regular basis:Safe motherhood and family planning

    consultation

    Pre-natal check-up

    Breast feeding campaign

    Post-partum care

    On child care, the following are present:

    Infant vaccinationMalnutrition program

    Information on proper child care

    Philhealth Cards are provided to poor families

    Regular medical missions is conducted in

    partnership with NGOs or with the PS

    Some basic medicalsupplies and equipments are

    available and functional but

    some are not

    No basic dental and oral

    health care services

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    12/20

    Social Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Education (2.30) Functional LSB

    SEF was utilized to finance various services such as:

    Educational Research

    Purchase of books and periodicals

    Sports development

    Absence of

    extension classes to

    include hiring of

    extension teachers

    There has been no

    support to basic

    education funded outof the general fund

    Absence of

    Alternative Learning

    System

    Housing and

    Basic Utilities

    (4.20)

    Presence of database for housing sector:

    informal settlers, makeshift houses and HHs with

    access to water supply and electricity

    No potential site

    for socialized housing

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    13/20

    Social Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Peace, Security

    and Disaster

    Management

    (3.00)

    Functional POC, LCPC and LDCC

    Presence of sites for protective services: police,

    and jail stations

    On disaster preparedness, the LGU employed

    these measures:

    Availability of evacuation centers

    Availability and ease of distribution of reliefgoods

    Availability of appropriate disaster equipage

    Ease of mobilizing medical and counseling

    services

    Ease if realigning budget

    On adequacy of services to disaster victims:

    Sufficient evacuation centers for all the victimsSufficient relief goods and services

    Sufficient first aid and medical services

    Absence of fire station

    No financial support to

    KP as mandated in

    Section 422 of the Local

    Government Code of

    1991

    Interpersonal disputeresolved through Lupong

    Tagapamayapa is below

    50%

    The LDCC was not able

    to integrate Disaster Risk

    Management in the

    ComprehensiveDevelopment Plan, LDIP

    and Annual Investment

    Program

    The LDCC was not able

    to formulate an

    Operations Manual

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    14/20

    State of Performance

    Munici ality f

    lcantara

    r vinc f

    l n

    3.28

    3.28

    3.463.05

    1.13

    0

    1

    2

    3

    4

    5V

    SE

    En

    5 Performance Indices

    0

    1

    2

    3

    4

    5

    GRI FISH EBIP

    4.38

    1.53

    3.25

    Economic Governance

  • 8/8/2019 State of Performance 2

    15/20

    Economic Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Support to

    Agriculture and

    Fishery Services

    (4.38) (1.53)

    Presence of these infrastructure

    support:

    Rehabilitation or construction of

    feeder roads or FMR

    Farmers and fisher folks are provided

    with credit facilitation services

    Presence of techno centre that provides

    research and development services to

    farmers

    Full provision of production support

    services to agriculture sector (planting

    materials etc.)

    FARMC is not organized

    Absence of irrigation system

    Absence of post harvest

    facilities and equipments

    No production services

    provided to fisher folks

    (fingerlings)

    Absence of market

    development services

    agriculture sector

    Bantay Dagat is not functional

    Below 50% of fishing

    households is benefiting from

    fishery extension and on-site

    research or facilities

    No alternative and innovative

    assistance to fisher folks

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    16/20

    Economic Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Entrepreneurship,

    Business and

    Industry Promotion

    (3.25)

    Presence of service standard known as

    CiCha that contains procedures in

    securing various permits

    Presence ofOSS and CAD

    Although there are more requirements,

    steps and signatories involved, processing

    time is within the standard processing

    time

    Permitting procedure is done

    manually

    Despite the presence of

    CiCha, the issuance of building,

    occupancy and business

    permits entails more

    documentary requirements,

    steps and signatories

    No support services to

    business, enterprises and

    industries (tax incentive,

    assistance in product labeling

    and packaging, etc.)

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    17/20

    State of Performance

    Municipality of Alcantara

    Province of Romblon

    3.28

    3.28

    3.463.05

    1.13

    0

    1

    2

    3

    4

    5V

    A

    SE

    En

    5 Performance Indices

    0

    1

    2

    3

    4

    5

    FOR H2O MAR URBAN

    1 1 11.53

    Environmental Governance

  • 8/8/2019 State of Performance 2

    18/20

    Environmental Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Forest and Coastal

    Marine Ecosystems

    Management (1.00)

    Management program on

    these ecosystems is not

    integrated in the CDP

    NGOs, POs and PS are not

    involve in the

    protection, management and

    rehabilitation of these

    ecosystems

    Freshwater Ecosystems

    Management (1.00)

    No freshwater protection or

    rehabilitation program

    integrated in the

    Comprehensive Development

    Plan

    NGOs, POs and PS are not

    involve in the protection or

    rehabilitation of this ecosystemMunicipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    19/20

    Environmental Governance

    Service Areas Ensuring & Reinforcing Factor/s Hindering Factor/s

    Urban Ecosystems

    Management (1.53)

    Functional ESWMB

    Solid waste collection is done most of

    the time

    Absence of the Ecological

    and Solid Waste Management

    Plan

    Only two (2) barangays out

    of twelve (12) have Material

    Recovery Facilities (MRF)

    No involvement of NGOs,

    POs and PS in the protection of

    the environment from air or

    water pollution

    Presence of open dumpsite

    Municipality of Alcantara

    Province of Romblon

  • 8/8/2019 State of Performance 2

    20/20

    Municipality of Alcantara

    Province of Romblon