statistical process control 2

Upload: surya-bakshi

Post on 10-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Statistical Process Control 2

    1/14

  • 8/8/2019 Statistical Process Control 2

    2/14

    Statistical process control is applied after a processhas been stabilized so that any deviation from the

    stability can be handled easily.

    There are four types of attribute charts used for non

    measurable defect and defective controlling

    N and NP Charts for the control of number of

    defectives or non- conforming C and U Charts for the control of the defects or non-

    conformities

  • 8/8/2019 Statistical Process Control 2

    3/14

    Used at places where various defectscould occur in a single product that is

    being manufactured

    The sample size of inspection is fixed

    for this chart.

  • 8/8/2019 Statistical Process Control 2

    4/14

    Standard Deviation is given by (np (p-1))

    Upper Control Limit

    np + 3(np (p-1))

    Lower Control Limit

    np - 3(np (p-1))

    Where

    p = fraction of defectives

    n = sample size

  • 8/8/2019 Statistical Process Control 2

    5/14

  • 8/8/2019 Statistical Process Control 2

    6/14

    Used at places where various defectscould occur in a single product that is

    being manufactured

    The sample size of inspection is variable

    for this chart.The proportion of defectives are plotted

    and analyzed for improvement of the

    rocess

  • 8/8/2019 Statistical Process Control 2

    7/14

  • 8/8/2019 Statistical Process Control 2

    8/14

  • 8/8/2019 Statistical Process Control 2

    9/14

  • 8/8/2019 Statistical Process Control 2

    10/14

  • 8/8/2019 Statistical Process Control 2

    11/14

  • 8/8/2019 Statistical Process Control 2

    12/14

  • 8/8/2019 Statistical Process Control 2

    13/14

  • 8/8/2019 Statistical Process Control 2

    14/14

    IMPLEMENTATION CHART

    http://j/FOR%20PRINT/C%20CHART%20IMPLEMENTATION%2030.6.10.xlshttp://j/FOR%20PRINT/C%20CHART%20IMPLEMENTATION%2030.6.10.xls