Status of SNOLAB DevelopmentFraser Duncan
SNOLAB Workshop4 Oct 2008
2km overburden(6000mwe)
UndergroundLaboratory
SurfaceFacility
SNOLAB
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Muon Flux = 0.27/m2/day
MEI & HIME astro/ph 0512125
ExistingSNO Facility
SNOLAB
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
ExistingSNO Facility
Phase I
Relocate-Lab Entry-Personnel Facilities
UtilityArea- Chiller- Generator
SNOLAB
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
ExistingSNO Facility
Phase I
Relocate-Lab Entry-Personnel Facilities
UtilityArea- Chiller- Generator
Phase II
SNOLAB
Excavation Clean Rm LaboratoryArea Volume Area Volume Area Volume
Existing
Existing+ Phase I
Existing
+ Phase I &I I
20,049 f t2 582,993 f t3 12,196 f t2 470,360 f t3 8,095 f t2 412,390 f t3
1,863 m2 16,511 m3 1,133 m2 13,321 m3 752 m2 11,679 m3
65,340 f t2 1,367,488 f t3 41,955 f t2 1,049,393 f t3 26,117 f t2 837,604 f t3
6,072 m2 38,728 m3 3,899 m2 29,719 m3 2,427 m2 23,721 m3
77,636 f t2 1,647,134 f t3 53,180 f t2 1,314,973 f t3 32,877 f t2 1,043,579 f t3
7,215 m2 46,648 m3 4,942 m2 37,241 m3 3,055 m2 29,555 m3
Laboratory Space
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Construction (Underground) Project Management: by Acres (now Hatch Energy) – Satish Bhan
Project Manager.
Engineering: Design – Hatch Energy; Geotechnical – Itasca; Excavation - Macintosh.
Excavation: Contracted to J.S.Redpath Ltd.
Phase I: Began Nov 2004, completed May 2007
Phase II: Began Jun 2007, completed Jun 2008
Total excavation 6000 m2 / 39,000 m3.
Outfitting: Contracted to Comstock Canada Ltd with sub contracting for specialties.
Began Jun 2007
Done: Refuge station, Lab entrance
To Do: Completion of Utility Area (chillers, stp, fire water system); Ventilation in Ladder Labs, Cube Hall and Cryopit
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Excavation Status: Aug 2007
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Excavation Status: Today
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Lab Entry
Lab Entry
Lab Entry
Lab Entry
Lab Entry
Lab Entry
PersonnelArea
PersonnelArea
LadderLabs
Cube Hall
Cube Hall
Cryopit
Cryopit
Cryopit
Hall BottomAccess
ChillerRm
ChillerRm
STPRm
AccessDrift
Next Steps Contractors
Finish Utility Area: Finish chiller assembly; piping to waste water plant; fire water lines to 6600L; commission chillers, STP.
Finish work in Experimental Areas: running water lines to Cube Hall and Cryopit; hook up electrics; Building Automation System; Fire Alarm.
SNOLAB Fine cleaning of Personnel Area (showers, change
rooms, lunch room, meeting room). Fine cleaning of laboratory entrance (carwash, junction,
access drift to SNO facilities). Services including network Infrastructure, water
pretreatment (relocation), up size 13kV power feed, ...
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Finish Line Day 1
Support Facilities: Enlarged personnel area and material handling facilities.
Experimental Spaces: Existing SNO Cavern, Cube Hall, Ladder Labs all operated as Clean Rooms. Cube Hall and Ladder Labs will be “bare rooms” but with nearby services.
Day 2 Cryopit: Paint and fine clean. South Drift: Remove old carwash and personnel
facilities. Recover as experimental space. Underground “clean room” machine shop. Underground chemistry lab.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Day 1 Infrastructure Power Distribution
2000 kVA capacity at 600V. 400A/600V services to the experimental areas except the Cryopit (deferred). Able to accommodate a future backup generator.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Future
Day 1 Infrastructure Power Distribution
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Day 1 Infrastructure Cooling
300 T (1MW) Chiller; Chilled Water Loop: 250 PSIG, 5C. Distribution to SNO Utility, Cube Hall and Cryopit.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
CHILLER
Day 1 Infrastructure Ventilation
Main ventilation hard ducted. Distribution into Experimental areas with soft duct. 5-10 air changes per hour. HEPA filtered.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Day 1 Infrastructure Communications
Multimode 200 Mb/s capacity between surface and underground. 1 Gb/s off site.
Will complete a Gb/s single mode fibre link between underground and surface in the near future.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Day 1 Infrastructure
Other Services
Industrial water, fire water, forced drain, compressed air.
Ultrapure water from the SNO water purification plant.
LN2 supplied by transport dewar from surface.
Low Background Counting
1 existing HPGe Gamma Counter. Requesting funds for 2 additional counters.
Rn/Ra Emanation (Electrostatic Counters, Radon emanation.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Staff
Staff of ~40 Operations: Cleaning, material handling, maintenance,
lab supervision. Technical Support: Plant operations, chemistry, electrical,
electronics, instrumentation. Design: Primarily mechanical and process systems
expertise. Design work, reviews. Construction: Small construction group with expertise in
the SNOLAB related issues. Assists with experiment installation.
IT: Networking, system administration. Admin: Procurement, shipping and receiving, training.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Experimental Program The experimental program has concentrated on
astroparticle physics but has also had submissions from other fields such as seismology and fundamental constants.
Requests for space are reviewed by the Experiment Advisory Committee (EAC) which makes recommendations to the Director. To date 25 Letters of Interest or proposals have been
submitted, 13 of which have been recommended by the EAC as appropriate for pursing for siting at SNOLAB. Of these 8 have developed mature plans to come to SNOLAB.
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Day 1 Experiments
Experiment Solar Nu 0nuBB Other Space Allocated Status
SNO+ X X X X SNO Install
Cavern 2009
PICASSO X SNO Utility Running
Room
DEAP-1 X SNO Control Running
Room
X Cube Install
360 Hall 2009
X Cube Install
3600 Hall 2009
EXO X Install
2010?
X Ladder Install
Labs 2010?
HALO X Install
2009
PUPS Seismic Various Running
Locations
Dark Matter
Super nova
GeoNu
MiniCLEAN
DEAP/CLEAN
SuperCDMS
Personnel facilities
SNOCavern
Ladder Labs
Cube Hall
Cryopit
UtilityArea
Now:DEAP-1
2009: SNO+
Now:PICASSO-II
2010: SuperCDMS
Experimental Program2009: DEAP/CLEAN 3600,MiniCLEAN 360
Unallocated
Unallocated
Unallocated
Unallocated
SouthDrift
Unallocated
Phase IIIStub
UtilityDrift
Now:PUPS
Experiments expectedto request space soon:EXO 200 GasHALOPICASSO-III
Beyond Construction With the laboratory almost complete, construction
emphasis is shifting to facilitating the siting of experiments.
Cube Hall: Begin steel work for DEAP/CLEAN and MiniCLEAN.
SNO Cavern: Repair of liner floor and install of hold downs for SNO+.
SNO Utility Rm: Excavation of pit for SNO+ scintillator plant.
Renovation of South Drift, old Carwash, ...
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Schedule
Fraser Duncan SNOLAB Workshop 4-5 Oct 2008
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Contractor OutfittingCommission Major Systems
Cleaning Refuge Station
Cleaning Lab Entrance
* Relocate to New Lab Entrance
Cleaning Ladder Labs and Cube Hall
Paint Cryopit
Final Cleaning Cryopit
Renovate Old Refuge and Carwash
* Begin civil work for DEAP/CLEAN and MiniCLEAN in Cube Hall
* Begin Conversion of SNO Cavity for SNO+
2008 2009
Summary
Construction is almost complete! Ready to begin the installation of the Day 1
experiments. Civil work can being any time in the new laboratory areas. We plan to install steel in the Cube Hall at the
beginning of 2009. Some space has been allocated for
experiments but there is still significant room available.
SNOLAB is open for business.