Stave -1 status and other reports. Stave Loading Meeting, November 8 th 2011. G. Barbier , F. Cadoux , A. Clark, D. Ferrère , C. Husi , G. Iacobucci , A. La Rosa, J. Mesa, G. Pelleriti , M. Weber . Stave -1 about to be produced. October 6 th : Gluing of Genova flex onto stave - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Stave -1 status and other reports

Stave -1 status and other reports

Stave Loading Meeting, November 8th 2011

G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa, J. Mesa, G. Pelleriti, M. Weber

Page 2: Stave -1 status and other reports

Stave -1 about to be produced1. October 6th: Gluing of Genova flex onto stave2. October 10th : Gluing of Bonn flex onto the other side3. October 14th : Electrical probe of the flex after gluing4. October 18th : Wing folding of both flexes + Electrical test for line integrities5. November 1st : Middle support gluing6. Now: Trying to optimize the intermediate support mechanism for wire bonding7. Loading of <8 digital modules on Bonn flex side and 1 digital for Genova 8. Wing attachment9. Ready for wire bonding 10. Stave-1 ready for delivery at CERN for system test and readout

NB: Step 7. will start as soon as the last module (with a different module flex orientation) is received et tested! Expected soon from Genova

Wire bonding jig to reference the handling frame is made by University of Bern

2Loading to happen with jig v-1

Page 3: Stave -1 status and other reports

Stave -1 – Cradle for Wire bonding

3

Jigs designed and fabricated by University of Bern

It is expected minor modifications for stave 0

Tooling was sent since October 25th from Bern and lost by TNT (expected soon now!)

Page 4: Stave -1 status and other reports

• First 2-chip Digital modules: 9 in total• 2 single-chip module flexes glued and wire

bonded to the bare modules• Adapter card to interface USBPix and

module flexes• Test performed FE by FE (FE address is 7

for both chips)• Power provided via flat-ribbon-cable from

USBPix

Test setup with USBPix – Module reception tests Thanks to Alessandro & Yosuke

4

Special thanks to Fabian and Claudia for module delivery

Page 5: Stave -1 status and other reports

NB: Another module is expected soon from Genova with a different module flex orientation

Threshold scan (threshold and noise measurements) using standard configuration (FEs untuned)

2-chip digital modules tested so far – Module reception testsThanks to Alessandro & Yosuke

5

Page 6: Stave -1 status and other reports

Z=0

Stave-1 layout

Bonn flex side Genova flex side

16 15 13 12 9 8 7 5 4 3 1

FE id – Functional flex lines FE id – Functional flex lines

3 4

NB: • It is proposed to mount 9 digital modules and 7 dummy modules (si-wafers)• Genova flex need a “special” module flex type

6

Page 7: Stave -1 status and other reports

Few Pictures of raw stave-1

Stave could not fit into the handling frame Larger openings of one of the supports were made

Middle ring support also misaligned correction was made on the central support of the handling frame

Central support glued after modification7

Page 8: Stave -1 status and other reports

Other operation on stave -1

While waiting for the loading to happen:-Learning how to compensate the stave with intermediate support for operation like loading and especially wire bonding- Yesterday a baby SCT detector was attached to the face plate for trying two type of supports for wire bonding- When the wire bonding cradle will be received this will be tested by the operator with the two types of support. The simpler the better and this will have to be tested in real condition by doing pull test.

8

Page 9: Stave -1 status and other reports

Connecting PP0 on Genova flex side

Comments:-1st connector where DCS is was removed since it clashed with the end-support- PP0 connector access is limited once the stave is fixed on the handling frame

9

Page 10: Stave -1 status and other reports

List of bare full length staves received at UniGe

ID @ UniGe Origin What for? Comment

W-01 Wuppertal Thermal tests Now dismounted at UniGe

W-02 Wuppertal Thermal tests with Ceramic heaters Waiting for loading

W-03 Wuppertal Thermo-mechanical Shipped to Milano

C-01 CERN Stave-1 Waiting for loading

NB: All the staves got the middle support glued at UniGe

We request that the middle support gluing operation is done asap at Wuppertal since we have to crosscheck that it fits to the handling frame fixation points

W-02 – 1 defectW-03– 3 defects

10

Page 11: Stave -1 status and other reports

Big thanks to Gerard!!!

End-block clash – Stave design to be revisited

Clash found for integration around beam pipe

Current design is clashing

Older end-block design was ok!

11