  • Staveley Infrastructure

    Maintenance Depot

    Chesterfield Borough Council

    20th July 2016

  • • Masterplanning started

    pre-HS2

    • Collaborated with DCC

    and landowners

    – Economic benefits of

    IMD

    – Highways and

    transport impacts

    (CSRR)

    – Health impacts

    Background

    • 200-500 direct jobs

    • 100-125 indirect

    • Net benefit

    • Lobbied for changes to

    layout

    • Good skills fit

  • Emerging Masterplan

    • Remediation of 150ha brownfield land• 1500 new homes• 30ha new employment floorspace• Up to 800 new jobs on site (supporting 100-125 in wider

    area)• New local centre• Green and blue infrastructure (including Chesterfield

    Canal)• Flood mitigation

  • Phasing

  • Revised Layout

    • Results in better road layout• No more orphaned land parcels• Uses existing rail line• Questions about levels and access to depot• Potential as construction site

  • Access to IMD

    • Hall Lane• Chesterfield Canal• Markham Vale

    Enterprise Zone(Plot 14)

  • • Potential for ‘hands on’ training at satellite

    facility

    • Links to existing industry at Barrow Hill

    • In contact with Doncaster College

    HS2 Rail College

  • • Possibility of station

    • Benefits to Chesterfield,

    Bolsover and North East

    Derbyshire need to be

    explored and case made

    • Balanced against impact

    for other areas

    The Chesterfield Spur

  • Station Masterplanning

    • Head Start with adopted Town Centre Masterplan

    • Link Road to improve access from South

    • Commercial office led redevelopment

    • Improved station forecourt• Links to Chesterfield

    Waterside scheme (1500 homes and 30,000 sqmcommercial office floorspace

  • • Technical questions

    – IMD access

    – Chesterfield Canal

    • Case for Chesterfield Station

    – Economic benefits

    – Compatibility with town centre masterplan

    • Rail College – working with education and skills

    providers

    • Timing of access improvements (Regeneration route)

    Next Steps