    Summer Project 2013

    Prof. R.S Mani

    Prof. M.Manoharan

    Project Co- ordinators

    VIT Business School

  • 7/28/2019 Summer Project2013 Guidelines

    2/12

    Summer Project 2013

    One of the key components of the MBA

    Programme Minimum Period of 6 weeks (April June)

    Students should do Project work only

    Recruiters prefer Project work/skill

    Guide allocation will be communicated

  • 7/28/2019 Summer Project2013 Guidelines

    3/12

    Summer Project 2013

    Total Credits for this course - 5

    Evaluation Report 50 marks

    Oral Presentation Viva-voce 50 marks

    Total 100 marks

  • 7/28/2019 Summer Project2013 Guidelines

    4/12

    Summer Project 2013

    Key points to note

    Company Selection

    Acceptance letter from the organisation selected Industry Guide contact details

    Date of commencement

    Research topic

    Periodical reporting to the Guide once in a week

    Interim feedback from the organisation

    Letter of completion, Certificate and attendance are must

    Unethical Practices should be avoided (Plagiarism)

    Genuineness of the report will be verified

  • 7/28/2019 Summer Project2013 Guidelines

    5/12

    Summer Project 2013

    Project should be done preferably in the functional

    area (Finance/HR/Marketing/ Systems/ Operations)

    Should adhere to rules & regulations of the

    organisation where project is done

    HR policies of the organisation should be followed

    (e.g. dress code, leave rules etc.,)

    Any action or activities which are detrimental to

    the reputation of the University will be viewed

    seriously

  • 7/28/2019 Summer Project2013 Guidelines

    6/12

    Summer Project 2013

    Absentees and Failures

    Completed the programme but failed to submit reportwill be treated as Not Completed and permittedto submit report & attend viva in subsequentsemester

    If fails to complete programme (i.e-min of 25 workingdays) will be treated as Not Completed and he/sheshould do the course in subsequent year

  • 7/28/2019 Summer Project2013 Guidelines

    7/12

    Summer Project 2013

    Structure of the Report

    Cover Page (format, font ,logo usage)

    Certificates (from Company& VITBS)

    Contents

    Chapter 1- Introduction and Design of the Study

    1.1 Importance of the study

    1.2 Statement of the problem

    1.3 Objective & scope of the study

    1.4 Period of the study

    1.5 Collection of data (Primary & secondary)

    1.6 Sampling methods

    1.7 Statistical tools

    1.8 Hypothesis setting1.9 Chapter scheme

  • 7/28/2019 Summer Project2013 Guidelines

    8/12

    Summer Project 2013

    Chapter 2 Review of Literature

    Previously carried out research and publicationsrelated to your research topic (source: Journals, magazines and

    internet with proper footnotes)

    Chapter 3 Company Profile

    3.1 Brief History3.2 Organisation structure

    3.3 Functions , Products & services

    3.4 Financial data (sales, growth etc)

  • 7/28/2019 Summer Project2013 Guidelines

    9/12

    Summer Project 2013

    Chapter 4 Analysis and Interpretation

    4.1 Data Collection

    4.2 Tabulation

    4.3 Statistical tools selection and adoption

    4.4 Analysis and interpretation

    Chapter 5 Suggestions and Conclusion

    5.1 Findings

    5.2 Suggestions

    5.3 Conclusion

    5.4 Topic for future research

    Appendices

    i. Bibliography

    ii. Questionnaire

  • 7/28/2019 Summer Project2013 Guidelines

    10/12

    Sl.No Description Particulars

    1 Name of the student

    2 Register Number

    3 Name of the organisation where project is to be done

    4

    Organisation type

    MNC/Listed co.,/NGO/Partnership/Pvt.,/ Branch/ if others

    (pl. specify)

    5Whether acceptance /consent letter from organisation

    received (copy to be attached) YES / NO

    6Contact details of Industry Guide

    ( Tel., & e-mail)

    7

    Functional Area

    ( Finance/HR&OB/ Marketing/ Prodn.& Oper./ Systems/

    General Mgmt.,/ other pl. specify)

    8 Project topic

    9Date of Commencement

    10Interaction with Guide

    ( Min. once in a week)

    Week 1 2 3 4 5 6

    Date

    REPORT CARD

  • 7/28/2019 Summer Project2013 Guidelines

    11/12

    Summer Project 2013

    Important Dates to remember

    4th July 2013 Last date for rough draft submission

    16th July 2013 Last date for approval of the draft

    30th July 2013 Final submission of Report

    Between 1st

    5th Aug 2013

    Tentative date for Viva-voce.

  • 7/28/2019 Summer Project2013 Guidelines

    12/12

    Thank You