Panj-Amu River Basin Sector Project (RRP AFG 48042) Supplementary Document 17 Supplementary Document 17: List of Candidate Subprojects

Upload: dinhkhanh

Post on 25-May-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Sector Project (RRP AFG 48042) Supplementary Document 17

Supplementary Document 17: List of Candidate Subprojects

Page 2: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

i

Contents

Selection of Priority (Pre-screened) Subprojects ...................... 1 I.

First Priority (Candidate) Subprojects ........................................ 6 II.

Annex: Baseline Survey Information for 62 Shortlisted Projects ...... 9

Page 3: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

1

Selection of Priority (Pre-screened) I.Subprojects

1. To identify the irrigation schemes (subprojects) to be rehabilitated and upgraded (R&U), a list of projects was prepared in July 2015 by the River Basin Agency (RBA) staff in collaboration with the six sub-basins. 2. In November 2015, a long list of schemes was prepared by FS team using the RBA list and, in addition, Ministry of Energy and Water (MEW) and other prioritized projects from other donors (FAO, USAID etc.). This list (which is available on request) includes 408 subprojects covering all six sub-basins with an estimated total budget of USD 164 million. Data on each subproject is scare and not considered as accurate. 3. The MEW, RBA and Sub-Basin Agencies (SBAs) were then asked to identify the priority subprojects for rehabilitation and upgrading on this list. This resulted in a list of 62 subprojects1 which was presented and agreed in December 2015 with stakeholders from MEW and Ministry of Agriculture, Irrigation and Livestock (MAIL). Since much of the data on these projects was considered inaccurate, a survey was undertaken of each subproject to determine the command area, location and a more accurate description of the R&U needs, and data on the list updated. Details are provided in Annex 1. 4. This list was exported onto MS Excel and then evaluated by the feasibility study team using the following eligibility and prioritisation criteria. 5. Eligibility criteria (If not eligible, cancelled)

An irrigation rehabilitation and upgrading project. i.e. Not for example a river training project, dam or building.

No major environmental impact Not in an environmentally protected area Approved by government (i.e. government priority) No major social impact, i.e., no significant resettlement impact as outlined in the

ADB Safeguard Policy Statement (June 2009) for category A for resettlement.

6. Prioritisation criteria:

Command area size: Small - less than 400ha (0 points), Medium - 400-3000 ha (3 points), >3000ha (6 points).

Command area of sub-basin (>3000ha, 3 points, <3000ha 0 points) Accessibility: Within 2 hours of SBA (1 point) Accessibility: No major winter cut-off (1 point)

7. Preference (i.e. additional scoring in the prioritisation) was given to schemes with a command area of over 400ha so that project efficiencies (economies of scale) could be

1 The RBA and SBAs were then asked to identify three priority subprojects as representative projects for which

feasibility designs would be undertaken. The RBA and SBAs were asked to select projects that were of high priority (as these would be the first to be rehabilitated under the new Project) and in relatively secure and accessible areas. The three chosen were Laqi, Seyaab and Sharawan-Takhar schemes.

Page 4: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

2

achieved. Working on smaller schemes leads to greater logistical and operational expenses (per ha or $ investment) and the economic internal rate of returns of smaller schemes tend to be lower. 8. In order to prioritise schemes that are grouped together and not geographically dispersed, prioritisation was also given to the command area of schemes in particular sub-basins. This prioritisation also brings important economies of scale making supervision easier without wasting time travelling. 9. Points were initially considered for the following criteria but considered not useful to include:

Technical Criteria: Presence of headworks (1 point if exists) and technically feasible to build a headwork if none existed (1 point if feasible). It was not considered possible to decide whether it was technically feasible or not to build a headwork if none existed based on the data available so schemes were given a 1. It was also considered that it is generally feasible to build a headwork in any canal as long as the positioning of the headwork is correctly located (e.g. away from the main intake if needed). These criteria then essentially cancelled each other out so became irrelevant.

Technical Criteria: Non-Risky (1 point if non-risky). This criteria was considered redundant as the risky types of projects (e.g. dams and river training) had already been excluded.

Technical Criteria: Sufficient hydrology (1 point if sufficient flow). All rivers in the basin are considered to have sufficient flow and if not then this is partly justification anyway for project interventions. No data was available from the surveys on the flow at intakes and it is considered that such criteria is best examined during feasibility studies.

Logistical & Security Criteria: Safe area (1 or 0). While being an important criteria it is considered that the security situation is so fluid to become meaningless in terms of selection. A safe area one day may become an unsafe area the next and vice-versa. The security context is best reviewed at the time of feasibility study, and should continue to be reviewed through implementation.

10. Ineligible projects were termed as cancelled. Eligible projects were then categorised into three categories as follows:

1st priority (>=6) 2nd Priority (3-5) 3rd Priority (0-2)

11. Seven projects were considered not eligible (priority 0) leaving 55 eligible subprojects. These subprojects were then ranked to give a list of 20 1st priority subprojects (one scheme, Sharawan-Takhar, has been divided into two subprojects however, so 21 in total), 24 2nd priority subprojects, and 11 3rd priority subprojects. 12. A full list of subprojects with their ranking is given in Table 1 below with locations shown on the following map. Note that a subproject refers to an irrigation scheme in this case. The complete table (available on request) includes information on the exact location (Northings and Eastings), structure names and types, estimated number of households and beneficiaries, and an estimated budget, as well as the scoring. It also includes information on the canal length and command area as initially estimated by RBA/SBA before the survey was undertaken. This is useful to see the deviation between actual surveyed figures (a lot) which shows how data should always be ground trothed if possible.

Page 5: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

3

Table 1: List of shortlisted schemes (including cancelled subprojects)

NO SN Sub- basin Province District Canal Name Surveyed Command Area (ha)

Command Area Type

Surveyed Canal Length

(km)

Overall rank

Priority No.

1 1 Upper Panj Sub Basin Badakhshan Wakhan Ishmurgh 281 Small 4.74 6 3

2 2 Upper Panj Sub Basin Badakhshan Shaghnan Behshar 393 Small 15.54 6 3

3 3 Upper Panj Sub Basin Badakhshan Zibak Zibak 114 Small 2.20 7 3

4 4 Upper Panj Sub Basin Badakhshan Ishkashim Dah Khowja 643 Medium 13.23 9 2

5 5 Upper Panj Sub Basin Badakhshan Ishkashim Zargaran 106 Small 3.14 6 3

6 6 Upper Panj Sub Basin Badakhshan Ishkashim BarBazar 92 Small 3.51 6 3 7 7 Upper Panj Sub Basin Badakhshan Eshkashim Khoshpak 97 Small 7.92 6 3

8 8 Upper Panj Sub Basin Badakhshan Eshkashim Sharifian 485 Medium 6.54 9 2

9 1 Kokcha Sub Basin Badakhshan Baharak Kocha Hasar 715 Medium 3.62 13 1

10 2 Kokcha Sub Basin Badakhshan Baharak Sar-e-Shar 1703 Medium 15.00 13 1

11 3 Kokcha Sub Basin Badakhshan Darayem Dara Mahmood 309 Small 9.68 10 2

12 4 Kokcha Sub Basin Badakhshan Yaftel Markaz Yaftal Pain 250 Small 8.35 10 2

13 5 Kokcha Sub Basin Badakhshan Shohada Tarang 114 Small 6.82 9 2

14 6 Kokcha Sub Basin Badakhshan Faizabad Jata 0 None

0 0

15 7 Kokcha Sub Basin Badakhshan Jurm Pataguzar 40 Small 5.19 10 2

16 8 Kokcha Sub Basin Badakhshan Teshkan Bazar 85 Small 5.35 10 2

17 9 Kokcha Sub Basin Badakhshan Jurm Meer 59 Small 2.31 10 2

18 10 Kokcha Sub Basin Badakhshan Argo Ganda Chishma 319 Small 8.49 9 2

19 11 Kokcha Sub Basin Badakhshan Jurm Ahangaran 56 Small 2.97 10 2

20 12 Kokcha Sub Basin Badakhshan yaftel Gazanak 90 Small 4.05 10 2

21 13 Kokcha Sub Basin Badakhshan Baharak Farhad 519 Medium 14.91 13 1

22 14 Kokcha Sub Basin Badakhshan Kishim Seyaab 400 Medium 12.80 13 1

23 1 Lower Panj Sub Basin Takhar Dashtqala Dashtqala 6247 Large 25.09 14 1 24 2 Lower Panj Sub Basin Takhar Darqad Qaghni 466 Medium 8.63 11 1 25 3 Lower Panj Sub Basin Takhar Dashtqala Talajat-Guzar 291 Small 8.03 10 2 26 4 Lower Panj Sub Basin Takhar Dashtqala Saraq 125 Small 3.33 10 2 27 5 Lower Panj Sub Basin Takhar Khojabahauddin Qataqjar 1907 Medium 15.46 13 1

28 6 Lower Panj Sub Basin Takhar ChaAb Yatim Tepa 12200 Large 48.00 14 1

29 7 Lower Panj Sub Basin Takhar Khojabahauddin Arpoli 724 Medium 7.64 13 1

30 8 Lower Panj Sub Basin Takhar Khojabahuddin Momen Abad 1449 Medium 12.32 11 1

31 9 Lower Panj Sub Basin Unknown Unknown Hazara Qishlaq 522 Medium

6 3

32 1 Taloqan Sub Basin Takhar Bangi Afaqi 25 Small 3.24 10 2

33 2 Taloqan Sub Basin Takhar Taloqan center Nar e Chaman 1014 Medium 12.00 11 1 34 3 Taloqan Sub Basin Takhar Baharak -Takhar Ainabik 148 Small 4.26 10 2 35 4 Taloqan Sub Basin Takhar Taloqan Center Shorab 842 Medium 12.00 12 1

36 5 Taloqan Sub Basin Takhar Taloqan center Qulbars 835 Medium 12.00 13 1

37 6 Taloqan Sub Basin Takhar Kalafgan Dasht Ragh 145 Small 6.95 10 2 38 7 Taloqan Sub Basin Takhar Taloqan center Laghmaniha 48 Small 3.93 10 2 39 8 Taloqan Sub Basin Takhar Farkhar Fringard 44 Small 3.20 10 2

40 9 Taloqan Sub Basin Takhar Taloqan Center Sharawan-Takhar 12953 Large 82.00 14 1

41 10 Taloqan Sub Basin Kunduz Khanabad District Khanabad River 0 None

0 0

42 11 Taloqan Sub Basin Kunduz Khanabad Barrage Area 0 None

0 0

43 12 Taloqan Sub Basin Kunduz Kunduz Center Naqi Kunduz 647 Medium 10.00 13 1

44 13 Taloqan Sub Basin Kunduz Kunduz Center Gul Tepa 6063 Large 29.88 16 1

45 14 Taloqan Sub Basin Kunduz Khanabad Chogha Olya 279 Small 7.95 10 2

46 1 Lower Kunduz Sub Basin Kunduz Chardara Chardara 15904 Large 61.03 16 1

Page 6: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

4

47 2 Lower Kunduz Sub Basin Kunduz Qalazal Qala I Zal 4120 Large 27.00 14 1 48 3 Lower Kunduz Sub Basin Baghlan Central Baghlan Hasan Tal Dam 0 None

0 0

49 4 Lower Kunduz Sub Basin Baghlan Baghlan Building 0 None

0 0

50 5 Lower Kunduz Sub Basin Baghlan Jelga Chinar Taqa 49 Small 3.22 10 2

51 6 Lower Kunduz Sub Basin Kunduz Qalazal Aqtepa 4260 Large 24.00 16 1

52 7 Lower Kunduz Sub Basin Kunduz Aliabad Abdullah 1367 Medium 11.00 11 1

53 8 Lower Kunduz Sub Basin Baghlan Firing Dasht Rubat 112 Small 5.33 10 2

54 9 Lower Kunduz Sub Basin Baghlan Firing Maidan 145 Small 6.33 10 2

55 10 Lower Kunduz Sub Basin Kunduz Aliabad Laqi 163 Small 15.31 10 2

56 1 Upper Kunduz Sub Basin Bamyan Bamyan center Gurwana 0 None

0 0

57 2 Upper Kunduz Sub Basin Bamyan Saighan Khoja Ganj 30 Small 2.43 7 3

58 3 Upper Kunduz Sub Basin Bamyan Kahmard Doshakh 105 Small 5.62 7 3

59 4 Upper Kunduz Sub Basin Bamyan Saighan Haqib Bazar 0 None

0 0

60 5 Upper Kunduz Sub Basin Bamyan Bamyan centre Sorkh Joi 160 Small 6.07 6 3

61 6 Upper Kunduz Sub Basin Bamyan Bamyan centre Saidabad 403 Medium 6.20 10 2

62 7 Upper Kunduz Sub Basin Bamyan Bamyan centre Kakrak 25 Small 2.71 7 3

Page 7: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

5

Figure 1: Location of subprojects

Page 8: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

6

First Priority (Candidate) Subprojects II.

13. In order to estimate the costs of the priority schemes considered for R&U, a range of costs for various works in the main canal, and secondary and tertiary, plus the headworks, were estimated based on experience from Panj-Amu River Basin Project (P-ARBP) and the three representative subprojects. Larger headworks are generally required for larger schemes. For main canal works, there are usually economies of scale for the size of the command area. For secondary and tertiary canals the cost really depends on the intensity of R&U to be undertaken.

Table 2: Cost ranges used for R&U

Command Area Headworks

(US$)

Main canal

(US$/ha)*

Secondary/tertiary

structures (US$/ha)*

< 400 ha 200,000 1,100 500-800

400 < ha < 3000 350,000 700 500-800

> 3000 ha 500,000 350 500-800

*For main canals, this is the average cost per hectare. For secondary and tertiary canals this is the expected cost based on areas of schemes where intensive priority work will be undertaken.

14. Applying these costs to the first priority subprojects gives total costs of US$36 million for headworks and works on the main canal (MEW led works, except two pilot projects for MAIL costing approximately $1.7 million) (Output 1) and $7.5 million for works on the secondary and tertiary canals (MAIL led works) (Output 2). Additional funds, which currently total approximately US$9.4 million, could be used for R&U on second-ranked priority schemes. 15. Data on the number of households per scheme were also calculated by taking the estimated number of households per hectare (a figure of 0.75 was used2), to give a number of households per scheme (based on the command area). The total number of beneficiaries was then calculated by estimating the average household size per district (from Central Statistics Office data). This gives an estimated total figure of 55,874 households and 407,245 beneficiaries. 16. A list of first priority (candidate) subprojects, and associated data is given in Table 4 below. Note that the costs are estimated and will be verified during feasibility and detailed design stages. Costs associated with main canals and headworks to be undertaken by MEW (with the exception of the two pilot projects to be done by MAIL – see footnote to Table 4) are costed under output 1.1. Costs associated with secondary and tertiary canals to be undertaken by MAIL are costed under output 2.1.

2 In the representative subprojects the figure ranged from 0.75 households per hectare to 1 household per ha.

Various studies indicate ranges from 0.2hh/ha to 1hh/ha in Afghanistan. Thus, the lower of the figures of the representative subprojects is used of 0.75hh/ha.

Page 9: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

7

Table 3: List of First Priority (Candidate) Subprojects

Sub-Basin Province District Canal Name

Surveyed

Command

Area (ha)

Summary

Description

MEW –

headworks

($)

MEW - main

canal

conveyance and

distribution ($)

MAIL-

secondary and

tertiary canals

($)

Total ($)

Total

scheme

cost $/ha

Estimated

# hh

Estimated #

beneficiaries

1 Kokcha Badakhshan Baharak Kocha Hasar 715

Headwork, offtakes,

canal lining, wash

protection, bank

protection, 5 culverts

350,000** 500,500** 71,500 922,000 1,290 536 4,440

2 Kokcha Badakhshan Baharak Sar-e-Shar 1,703

Cross-regulator,

offtakes, canal lining,

wash protection, bank

protection, 1 culvert

1,192,100 170,300 1,362,400 800 1,277 10,576

3 Kokcha Badakhshan Baharak Farhad 519

Headwork, offtakes,

canal lining, wash

protection, bank

protection, 5 culverts

350,000 363,300 51,900 765,200 1,474 389 3,223

4 Kokcha Badakhshan Kishim Seyaab* 400

Cross-regulators,

offtakes, wash

protection, bank

protection

406,742 40,000 446,742 1,117 300 2,142

5 Lower Panj Takhar Dashtqala Dashtqala 6,247

Offtakes, bank

protection, canal

extension

2,186,450 624,700 2,811,150 450 4,685 28,580

6 Lower Panj Takhar Darqad Qaghni 466

Headwork, offtakes,

wash protection, bank

protection, 2 culverts

350,000 326,200 46,600 722,800 1,551 350 2,219

7 Lower Panj Takhar Khojabahauddin Qataqjar 1,907 Off-takes, bank

protection, 1 culvert 1,334,900 190,700 1,525,600 800 1,430 13,730

8 Lower Panj Takhar ChaAb Yatim Tepa 12,200

Cross-regulators,

offtakes, canal lining,

bank protection, 2

culverts

4,270,000 1,220,000 5,490,000 450 9,150 52,155

9 Lower Panj Takhar Khojabahauddin Arpoli 724

Headwork , spillway,

cross-regulators,

offtakes, bank

protection

350,000** 506,800** 72,400 929,200 1,283 543 5,213

10 Lower Panj Takhar Khojabahuddin Momen Abad 1,449

Cross-regulators,

offtakes, canal lining,

bank protection, 2

culverts

1,014,300 144,900 1,159,200 800 1,087 10,433

11 Taloqan Takhar Taloqan center Nar e Chaman 1,014 Bank protection 709,800 101,400 811,200 800 761 5,605

12 Taloqan Takhar Taloqan Center Shorab 842

Headwork, canal

lining, wash

protection, bank

protection, spillway,

controlled gate and

sluice gate

350,000 589,400 84,200 1,023,600 1,216 632 4,654

13 Taloqan Takhar Taloqan center Qulbars 835 Bank protection 584,500 83,500 668,000 800 626 4,615

14 Taloqan Takhar Taloqan Center Sharawan-

Takhar 11,122

Cross-regulators, off-

takes, canal lining,

wash protection, bank

3,892,700 1,112,200 5,004,900 450 8,342 61,477

Page 10: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

8

Sub-Basin Province District Canal Name

Surveyed

Command

Area (ha)

Summary

Description

MEW –

headworks

($)

MEW - main

canal

conveyance and

distribution ($)

MAIL-

secondary and

tertiary canals

($)

Total ($)

Total

scheme

cost $/ha

Estimated

# hh

Estimated #

beneficiaries

protection

15 Taloqan Takhar TaloqanCenter Sharawan-

Takhar* 1,831

Cross-regulators, off-

takes, canal lining,

wash protection, bank

protection

2,006,978 183,100 2,190,078 1,196 1,373 10,121

16 Taloqan Kunduz Kunduz Center Naqi Kunduz 647

Cross-regulators, off-

takes, wash

protection, bank

protection

452,900 64,700 517,600 800 485 3,945

17 Taloqan Kunduz Kunduz Center Gul Tepa 6,063

Headworks, off-takes,

wash protection, bank

protection, 2

controlled spillway

and 1 divider

500,000 2,122,050 606,300 3,228,350 532 4,547 36,969

18 Lower Kunduz Kunduz Chardara Chardara 15,904

Headwork, canal

lining, wash

protection, bank

protection

500,000 5,566,400 1,590,400 7,656,800 481 11,928 87,074

19 Lower Kunduz Kunduz Qalazal Qala I Zal 4,120

Headwork, spillway,

intake retaining wall,

cross-regulators, off-

takes, canal lining,

wash protection, bank

protection

500,000 1,442,000 412,000 2,354,000 571 3,090 24,813

20 Lower Kunduz Kunduz Qalazal Aqtepa 4,260

Headwork, cross-

regulators, off-

takes, bank

protection, dividers

and spillway

500,000 1,491,000 426,000 2,417,000 567 3,195 25,656

21 Lower Kunduz Kunduz Aliabad Abdullah 1,367

Off-takes, bank

protection, three

spillways

956,900 136,700 1,093,600 800 1,025 8,581

22 Lower Kunduz Kunduz Aliabad Laqi* 163

Headwork, cross-

regulators, off-

takes, canal lining,

wash protection, bank

protection

200,000 160,349 16,300 376,649 2,311 122 1,023

74,498 3,950,000*** 32,076,269**** 7,449,800 43,476,069 584 55,874 407,245

* Representative subprojects. Note that Laqi is in fact a second-priority subproject but has been included on this list since it will be included in the first contract package.

** The design and construction of headworks and main canal for Kocha Hasar and Arpoli schemes will be undertaken by MAIL as a pilot to test their capacity to implemented larger scale more complex irrigation R&U works.

*** Approximately $3,250,000 through MEW and $700,000 through MAIL.

**** Approximately $31,068,969 through MEW and $1,007,300 through MAIL

Note: Two subprojects (14 and 15 in the list above) are in the same scheme – Sharawan-Takhar. Due to the size of this scheme additional work will be undertaken representing an additional subproject. Hence, 21 schemes but 22 subprojects.

Page 11: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

9

Annex: Baseline Survey Information for 62 Shortlisted Projects

17. The following pages/fiches (included in hard copy but a separate document in soft copy) list a brief description of each subproject (including cancelled ones) following a survey undertaken in December 2015. The surveys were undertaken by staff from the sub-basin offices using GPS devices so that command areas and the location of intakes/headworks could be plotted onto satellite imagery using geographic information system (GIS). Staff were first trained on the use of such GPS. However, following plotting on the GIS some errors were observed, which should be collated during project start-up and the GIS and individual fiches updated.

TQ-12 (Naqi Kunduz) - Canal Headwork coordinates in the master database are incorrect, and the command area in the GIS needs to be checked (status early 2011).

TQ-05 (Qulbars) - Canal Headwork coordinates in the Master database are incorrect. UK-06 (Saidabad) - Command area is missing TQ-10 (Khanabad River) - Command area is missing LP-09 (Hazara Qiahlaq) - Command area is missing and/or inconsistent with 2016

surveys LP-06 (Yatim Tepa) - Command area is missing and/or inconsistent with 2016 survey.

Page 12: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UK-01

Sub-Basin Upper Kunduz

Canal Name Gurwana

Length (km) 0.62

Command Area (ha) 0

Remarks Protection wall

Eastings 67.821400

Northings 34.820933

Project Priority Cancelled

Command Area Class N/A

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m) 1 Length = 4000m

Others (please specify)

Page 1 of 64

Page 13: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UK-02

Sub-Basin Upper Kunduz

Canal Name Khoja Ganj

Length (km) 2.43

Command Area (ha) 30

Remarks Field survey

Eastings 67.516567

Northings 35.183783

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 3000m, width = 0.8 m

Cross-regulator 1 In intake

Off-takes 15 Along the canal

Canal lining (m) 1 Length = 3000m, Width = 0.8 m

Torrent (wash) protection 10 1- Sianaw, 2- Hawza, 3- Yaqob, 4- Faqiryar, 5- Aliaqa, 6- Kazim, 7- Edris, 8-

Hakim, 9- Natiq, 10- Mahmod

Canal bank protection (m) 1 Length = 1000m, width= 1.5m

River bank protection (m)

Others (please specify)

Page 2 of 64

Page 14: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UK-03

Sub-Basin Upper Kunduz

Canal Name Doshakh

Length (km) 5.62

Command Area (ha) 105

Remarks Field survey

Eastings 67.767317

Northings 35.400400

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 1- Petaw canal length = 5000m, width = 0.5m, 2- Girow canal length = 3000m,

width = 0.5m

Cross-regulator 2 1- Cross-regulator in Intake 2- Cross-regulator in dam area

Off-takes 25 Along the canal

Canal lining (m) 1 Length = 8000m

Torrent (wash) protection 7 Along the canal

Canal bank protection (m) 1 Length = 700m

River bank protection (m) 1 Length = 1200m

Others (please specify) 1 Rehabilitation of water dam and protection wall beside the dam Length =

500m, Width = 4m and Height = 5m

Page 3 of 64

Page 15: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UK-04

Sub-Basin Upper Kunduz

Canal Name Haqib Bazar

Length (km) 1.11

Command Area (ha) 0

Remarks Protection wall

Eastings 67.699750

Northings 35.180933

Project Priority Cancelled

Command Area Class N/A

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection 1 Length = 20 m, width = 20m near to road

Canal bank protection (m)

River bank protection (m) 1 Length = 3000m

Others (please specify)

Page 4 of 64

Page 16: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UK-05

Sub-Basin Upper Kunduz

Canal Name Sorkh Joi

Length (km) 6.07

Command Area (ha) 160

Remarks Field survey

Eastings 67.666850

Northings 34.727017

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 4000m, width = 1.2m

Cross-regulator 2 1- in intake, 2- Sorkh Joy

Off-takes 120 Along the canal

Canal lining (m) 1 Length = 4000m

Torrent (wash) protection 4

Canal bank protection (m) 1 Length = 4000m

River bank protection (m)

Others (please specify)

Page 5 of 64

Page 17: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UK-06

Sub-Basin Upper Kunduz

Canal Name Saidabad

Length (km) 6.20

Command Area (ha) 403

Remarks Master Table

Eastings 67.844605

Northings 34.770754

Project Priority Priority 2

Command Area Class Medium

Parameter Value Description

Canal headwork 1 Canal length = 7000m, width = 1.5m

Cross-regulator 3 1- in intake, 2- in escape, 3- in Khawal area

Off-takes 45 Along the canal

Canal lining (m) 1 Length = 7000m from intake to end of canal

Torrent (wash) protection 5 1- Qoway Lala, 2- Chak Bakhsh Saidabad, 3- Saidabad, 4- Chakani, 5- ?

Canal bank protection (m) 1 Length = 600m, width = 1.5m and height 2m from intake to divider

River bank protection (m) 1 Length = 500m, width = 2m and height 2.5m from intake to divider

Others (please specify) 5 5 culvert is need from intake to Saidabad village

Page 6 of 64

Page 18: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UK-07

Sub-Basin Upper Kunduz

Canal Name Kakrak

Length (km) 2.71

Command Area (ha) 25

Remarks Field survey

Eastings 67.851383

Northings 34.811633

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 3000m, width = 0.8 m

Cross-regulator 1 In intake

Off-takes 6 From intake to Sialayak Bazar

Canal lining (m) 1 Length = 3000m

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m) 1 3000 m protection wall from intake to police checkpoint

Others (please specify)

Page 7 of 64

Page 19: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-01

Sub-Basin Lower Kunduz

Canal Name Chardara

Length (km) 61.03

Command Area (ha) 15,904

Remarks Field survey

Eastings 68.880883

Northings 36.492300

Project Priority Priority 1

Command Area Class Large

Parameter Value Description

Canal headwork 1 Canal length = 90 km

Cross-regulator

Off-takes

Canal lining (m) 5 1- L = 2 km, 2- L = 3 km, 3- L= 2.5 km, 4- L = 6 km, 5- L = 1 km

Torrent (wash) protection 5 1- L = 20m W = 2m, 2- L = 10m, W = 1.5 m, 3- L = 15m W 1.5m, 4- L = 12m, 5- L

= 11m

Canal bank protection (m) 1 Length = 800m

River bank protection (m) 1 Length = 500m

Others (please specify) Length of this canal is too much and it needs more structures

Page 8 of 64

Page 20: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-02

Sub-Basin Lower Kunduz

Canal Name Qala I Zal

Length (km) 27.00

Command Area (ha) 4,120

Remarks Master Table

Eastings 68.565511

Northings 36.896179

Project Priority Priority 1

Command Area Class Large

Parameter Value Description

Canal headwork 1 it needs to build intake and to 1 km retaining wall to both side

Cross-regulator 3 Length = 12m, Width 7.5m

Off-takes 20 Length = 8m, Width 0.5m

Canal lining (m) 10 Length = 4m, Width 2m

Torrent (wash) protection 1 Length = 80m, Width 15m

Canal bank protection (m) 3 L1 = 60m, L2 = 80 m, L3 = 100

River bank protection (m) 4 L = 200m

Others (please specify) Spillway needs to be build, L1 = 20m, W = 8m, L2 = 60m W = 4m

Page 9 of 64

Page 21: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-10

Sub-Basin Lower Kunduz

Canal Name Laqi

Length (km) 15.31

Command Area (ha) 163

Remarks Prioritized project

Eastings 68.901914

Northings 36.421536

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1

Cross-regulator 3 1- Kisatopak, 2- Espand Kamar, 3- Nematullah

Off-takes 6 1- Qondoq 26 ha, 2- Kisa Topak 22 ha, 3- Espand Kamar 18 ha, 4- Arbab Sher Ali

11 ha, 5- Abdul Hakim & Haji Sakhidad 31 ha, 6- Nematullah 41 ha

Canal lining (m) 2 L = 300m

Torrent (wash) protection 7 1- Cheshma Gandab, 2- Sang e Sorakh, 3- Dojar, 4- Chebguzar1, 5- Chebguzar2,

6- Haji Qudos, 7- Haikal

Canal bank protection (m) 2 L = 80m

River bank protection (m)

Others (please specify)

Page 10 of 64

Page 22: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-03

Sub-Basin Lower Kunduz

Canal Name Hasan Tal Dam

Length (km) 0.39

Command Area (ha) 0

Remarks Dam

Eastings 68.904433

Northings 36.222283

Project Priority Cancelled

Command Area Class N/A

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m)

Others (please specify) 1 DAM, L = 15 km, W = 1900m. This need retaining wall, this dam is for irrigation

proposes

Page 11 of 64

Page 23: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-04

Sub-Basin Lower Kunduz

Canal Name Building

Length (km)

Command Area (ha) 0

Remarks Building

Eastings 68.753933

Northings 36.173900

Project Priority Cancelled

Command Area Class N/A

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m)

Others (please specify) Pathway, car parking, water tanker and generator

Page 12 of 64

Page 24: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-05

Sub-Basin Lower Kunduz

Canal Name Chinar Taqa

Length (km) 3.22

Command Area (ha) 49

Remarks Field survey

Eastings 69.298250

Northings 35.936317

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 5km, Width = 2.9m

Cross-regulator 3 1- L = 2.5m W = 1.2m, 2- L = 3m W = 0.9m, 3- L = 1m W = 0.5m

Off-takes 3 1- L = 300m W = 0.5m, 2- L = 1.6 km W = 0.9m, 3- L = 140m W = 0.6 m

Canal lining (m) 1 L = 750m W = 1.2m

Torrent (wash) protection 6 1- L = 8m W = 5m, 2- L = 6m W = 6m, 3- L = 15m W = 12m, 4- L = 8m W = 2.5m,

5- L = 4m W = 2.5m, 6- L = 8m W = 2.5m

Canal bank protection (m) 2 1- L = 50m W = 1.8m, 2- L = 15m W = 1.5m

River bank protection (m) 1 L = 100m, W = 1.8m

Others (please specify) 2 Two culverts, 1- W = 4m L = 0.8m, 2- W = 4m L = 0.9m

Page 13 of 64

Page 25: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-06

Sub-Basin Lower Kunduz

Canal Name Aqtepa

Length (km) 24.00

Command Area (ha) 4,260

Remarks Master Table

Eastings 68.590384

Northings 36.893223

Project Priority Priority 1

Command Area Class Large

Parameter Value Description

Canal headwork 1 Need to be build the intake

Cross-regulator 3 L = 12 m, W = 7.5m

Off-takes 20 L = 6m, W = 0.6m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 3 L1 = 150m, L2 = 300m, L3 = 160m

River bank protection (m) 4 L1 = 60m, L2 = 100m, L3 = 130m, L4 = 150m

Others (please specify) 7 3 divider and 4 spillway need along to the canal

Page 14 of 64

Page 26: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-07

Sub-Basin Lower Kunduz

Canal Name Abdullah

Length (km) 11.00

Command Area (ha) 1,367

Remarks Master Table

Eastings 68.884000

Northings 36.546100

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes 20 L = 6m, W = 0.6m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 3 L1 = 200m, L2 = 50m, L3 = 50m

River bank protection (m) 3 L1 = 500m, L2 = 500m (in Haji Hossain), L3 = 300m (in Kisa Topak)

Others (please specify) 3 There is needs three spillways L= 10m, W = 4.2m

Page 15 of 64

Page 27: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-08

Sub-Basin Lower Kunduz

Canal Name Dasht Rubat

Length (km) 5.33

Command Area (ha) 112

Remarks Field survey

Eastings 69.643833

Northings 36.110800

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 8.5km, Width = 2.7m

Cross-regulator 1 L = 1.2 m W = 1.3m

Off-takes 19 W = 0.8m, L = 200m, L = 400m, L = 800m, L = 3.5km

Canal lining (m) 1 L = 50m, W = 1.2 m

Torrent (wash) protection 2 1- W = 1.5m L = 15m, 2- W = 20m L = 4m

Canal bank protection (m) 8 1- W= 1.2m, L=110m, 2- w=1m, L=20m, 3- w=1.4m, L=20m, 4- w=1.2m, L=20m,

5- w=1.2m, L=10m, 6- w=1.2m, L=10m, 7- w=1.5m, L=15m, 8- w=1.2m, L=5m

River bank protection (m) 2 1- L=30m, W=1.5m, 2- L=30m, W=1.5m, 3- L=20m, w= 2.5m

Others (please specify) 1 one culvert, L=1m, W =4m

Page 16 of 64

Page 28: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LK-09

Sub-Basin Lower Kunduz

Canal Name Maidan

Length (km) 6.33

Command Area (ha) 145

Remarks Field survey

Eastings 69.642383

Northings 36.109533

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 30 km, W = 1.8 m

Cross-regulator 2 1- w=1.2m, L = 2m, 2- w= 1.5m, L= 2.2m

Off-takes 46 w=0.8

Canal lining (m) 2 1- L=200m, w=1.4m, 2- L= 1200m, w= 1.2m

Torrent (wash) protection 8 1- w=4m, L=20m, 2- W= 4m, L= 14m, 3-W=8m, L=12m, 4- W=20m, L= 24m, 5-

W= 8m, L= 10m, 6- W=6m, L=12m, W=40m, L= 50m, 8- W=20m, L= 6m

Canal bank protection (m) 24 1- L= 100m, W=1.8m, 2- L=100m, W=1.5, 3- L=50m,W= 1.4M, 4- L=30M,

W= . m, - L= m, W= . m, - L= m, W= . m, - L= m, W= . m….

River bank protection (m) 2 1- L= 120m, W= 1.8M, 2- L= 100m, W= 1.2m

Others (please specify)

Page 17 of 64

Page 29: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-01

Sub-Basin Taloqan

Canal Name Afaqi

Length (km) 3.24

Command Area (ha) 25

Remarks Field survey

Eastings 69.364167

Northings 36.656283

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 2 1- L = 7km, W = 3m, 2- L = 12km, W = 3m

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection 2 1- Syphon L = 60m, W = 3m, 2- L = 12m, W = 3m

Canal bank protection (m)

River bank protection (m)

Others (please specify)

Page 18 of 64

Page 30: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-02

Sub-Basin Taloqan

Canal Name Nar e Chaman

Length (km) 12.00

Command Area (ha) 1,014

Remarks Master Table

Eastings 69.599351

Northings 36.706951

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L = 1.5km - 2km, W = 3m

River bank protection (m)

Others (please specify)

Page 19 of 64

Page 31: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-03

Sub-Basin Taloqan

Canal Name Ainabik

Length (km) 4.26

Command Area (ha) 148

Remarks Field survey

Eastings 69.415933

Northings 36.750333

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 4km, W = 3m

Cross-regulator

Off-takes 2 1- L = 1.5km, W = 3m, 2- L = 2km, W = 3m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L = 150m, W = 1.5m

River bank protection (m)

Others (please specify)

Page 20 of 64

Page 32: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-04

Sub-Basin Taloqan

Canal Name Shorab

Length (km) 12.00

Command Area (ha) 842

Remarks Master Table

Eastings 69.606422

Northings 36.676488

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork 1 L = 280m

Cross-regulator

Off-takes 4

Canal lining (m) 1 L = 500m

Torrent (wash) protection 1 Syphon L = 450m

Canal bank protection (m) 1 L = 1.5km

River bank protection (m) 1 L = 200m

Others (please specify) Automatic spillway, Controlled gate and sluice gate

Page 21 of 64

Page 33: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-05

Sub-Basin Taloqan

Canal Name Qulbars

Length (km) 12.00

Command Area (ha) 835

Remarks Master Table

Eastings 69.446411

Northings 36.735353

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L = 1.5km, W = 3m

River bank protection (m)

Others (please specify)

Page 22 of 64

Page 34: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-06

Sub-Basin Taloqan

Canal Name Dasht Ragh

Length (km) 6.95

Command Area (ha) 145

Remarks Field survey

Eastings 70.055833

Northings 36.918400

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 15km, W = 3m

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection 2 1- Syphon L = 15m, W = 3m, 2- L = 12m, W = 3m

Canal bank protection (m)

River bank protection (m)

Others (please specify)

Page 23 of 64

Page 35: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-07

Sub-Basin Taloqan

Canal Name Laghmaniha

Length (km) 3.93

Command Area (ha) 48

Remarks Field survey

Eastings 69.549517

Northings 36.721117

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 7km, W = 3m

Cross-regulator

Off-takes 1 L = 5km, W = 2m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L = 120m, W = 0.6 - 3m

River bank protection (m) 1 L = 300m, W = 2m

Others (please specify)

Page 24 of 64

Page 36: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-08

Sub-Basin Taloqan

Canal Name Fringard

Length (km) 3.20

Command Area (ha) 44

Remarks Field survey

Eastings 69.864200

Northings 36.470200

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 5km, W = 3m

Cross-regulator

Off-takes 1 L = 4m, W = 2m

Canal lining (m)

Torrent (wash) protection 1 Syphon L = 8m, W = 3m

Canal bank protection (m)

River bank protection (m) 1 L = 150m, W = 2m

Others (please specify) 1 L = 200m, W = 2m

Page 25 of 64

Page 37: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-09

Sub-Basin Taloqan

Canal Name Sharawan-Takhar

Length (km) 82.00

Command Area (ha) 12,953

Remarks Prioritized project

Eastings 69.591000

Northings 36.713056

Project Priority Priority 1

Command Area Class Large

Parameter Value Description

Canal headwork Existing headwork

Cross-regulator 12 1-Amanullah, 2- Baghak2, 3- Konchi, 4- Eshan Saeed, 5- Haji Musa, 6- Och Ariq,

7- Sasmaq, 8- Haji Abdul Qayum, 9- Yangi Ariq, 10- Abil Ariq, 11- Haji Latif, 12-

Keshwari

Off-takes 10 1-Amanullah 162 ha, 2- Baghak2, 31 ha, 3- Konchi (existing off-take to

rehabilitate) 1110 ha, 4- Eshan Saeed (existing off-take; to construct CR) 173

ha, 5- Haji Musa 109 ha, 6- Sasmaq (existing off-take, rehabilitation of, 7- Haji

Abdul Qayum 42 ha, 8

Canal lining (m) 1 L = 80m

Torrent (wash) protection 3 1- Major Qishlaq, 2- Sultan Mahmood, 3- Haji latif

Canal bank protection (m) 8 1- Baghak2, 200m, 2- Qara Parchaw 300m, 3- Qara parchaw 400m, 4- Safar Ali

200m, 5- Och Ariq 80m, 6- Yangi Ariq 100m on main, 7- Chapaq Ariq 200m, 8-

Jelom Khor 150m

River bank protection (m)

Others (please specify)

Page 26 of 64

Page 38: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Page 27 of 64

Page 39: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-10

Sub-Basin Taloqan

Canal Name Khanabad River

Length (km)

Command Area (ha) 0

Remarks Protection wall

Eastings 69.155417

Northings 36.696881

Project Priority Cancelled

Command Area Class N/A

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes 4 L = 6m, W = 5.2

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m) 1 From barrage to Char saraka, L = 4.6km

Others (please specify)

Page 28 of 64

Page 40: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-11

Sub-Basin Taloqan

Canal Name Barrage Area

Length (km)

Command Area (ha) 0

Remarks Protection wall

Eastings 69.156635

Northings 36.696233

Project Priority Cancelled

Command Area Class N/A

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m)

Others (please specify) 2 Retaining wall L1 = 800m, L2 = 850m, one generator room and mechanic room

Page 29 of 64

Page 41: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-12

Sub-Basin Taloqan

Canal Name Naqi Kunduz

Length (km) 10.00

Command Area (ha) 647

Remarks Master Table

Eastings 68.985708

Northings 36.659886

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator 4 L = 12m, W = 7m

Off-takes 10 L = 10m, W = 4.5m

Canal lining (m)

Torrent (wash) protection 2 Need to be build the check dam L = 300m, Width of wash = 100m

Canal bank protection (m) 4 L1 = 50m, L2 = 70m, L3 = 90m, L4 = 300m (retaining wall)

River bank protection (m)

Others (please specify) Based on Mirab's information this table filled

Page 30 of 64

Page 42: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-13

Sub-Basin Taloqan

Canal Name Gul Tepa

Length (km) 29.88

Command Area (ha) 6,063

Remarks Field survey

Eastings 68.882333

Northings 36.733750

Project Priority Priority 1

Command Area Class Large

Parameter Value Description

Canal headwork Canal length = 24km

Cross-regulator 13 L = 12m, W = 70 m

Off-takes 50 (in total are 180 off-takes along the canal) L = 6m, W = 0.6m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 3 L1 = 1000m, L2 = 1000m L3 = 400m (retaining wall)

River bank protection (m)

Others (please specify) 5 5 spillway and one divider along the canal, L = 10m, W = 5.8m

Page 31 of 64

Page 43: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code TQ-14

Sub-Basin Taloqan

Canal Name Chogha Olya

Length (km) 7.95

Command Area (ha) 279

Remarks Field survey

Eastings 69.224683

Northings 36.723033

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 L = 12m, W = 5.4m, (canal length = 14km)

Cross-regulator

Off-takes 15 L = 6m, W = 0.6m (total 26 small and big off-takes along the canal)

Canal lining (m)

Torrent (wash) protection 4 L = 15m, W = 6m

Canal bank protection (m) 1 L = 1000m

River bank protection (m) 5 in 5 parts gabion work that length of each one is 15m to the intake to protect it

Others (please specify) 2 2 controlled spillway and one divider

Page 32 of 64

Page 44: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-01

Sub-Basin Kokcha

Canal Name Kocha Hasar

Length (km) 3.62

Command Area (ha) 715

Remarks From SBA

Eastings 70.896139

Northings 37.003528

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork 1 Canal length = 4km, W = 1.5m

Cross-regulator

Off-takes 10 L = 2.5m, W = 2m (length and width of all offtakes are same)

Canal lining (m) 8 Total length = 800m and W = 2.5m

Torrent (wash) protection 6 Lenth of each wash is 9m and width is 7m

Canal bank protection (m) 3 At three parts L = 150m, W = 1.5m

River bank protection (m)

Others (please specify) 5 5 culvert

Page 33 of 64

Page 45: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-02

Sub-Basin Kokcha

Canal Name Sar-e-Shar

Length (km) 15.00

Command Area (ha) 1,703

Remarks Master Table

Eastings 70.909146

Northings 37.009517

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator 1 L = 5m, W = 4m

Off-takes 10 L = 3m, W = 2m (all same)

Canal lining (m) 6 1- W=4m, L=30m, 2- W=4m, L=40m, 3- W=6m, L=50m, 4- W=3m, L=150m, 5-

W=4m, L= 40m, 6- W=2.5m, L=200m

Torrent (wash) protection 3 1- L = 25, W = 3m, 2- L = 15m, W = 3m, 3- L = 20m, W = 3m, 4- L = 30m, W = 3m

Canal bank protection (m) 1 L = 200m, W = 2m

River bank protection (m)

Others (please specify) 1 According to the people request there is need one culvert

Page 34 of 64

Page 46: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-03

Sub-Basin Kokcha

Canal Name Dara Mahmood

Length (km) 9.68

Command Area (ha) 309

Remarks Field survey

Eastings 70.504600

Northings 36.854550

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork Canal length = 11km, W = 1.5m, height of canal wall is less it should be

increased 50 cm more

Cross-regulator

Off-takes 7 L = 5m, W = 2m (all off-takes same)

Canal lining (m) 8 Total in 8 location that Length is 150m and Width 2m

Torrent (wash) protection 15 l = 7m, W = 4m

Canal bank protection (m)

River bank protection (m)

Others (please specify) 7 7 culverts are need

Page 35 of 64

Page 47: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-04

Sub-Basin Kokcha

Canal Name Markaz Yaftal Pain

Length (km) 8.35

Command Area (ha) 250

Remarks Field survey

Eastings 70.454317

Northings 37.314750

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork Canal length= 10km, W = 1m, along the canal about 10m the canal wall is less it

should be increased

Cross-regulator

Off-takes 5 L=5m, W=1m

Canal lining (m) 10 Total lining is L= 600m, W= 2m

Torrent (wash) protection 15 Three wahses are 12m length, 7m width, the others are L=8m and W=5m

Canal bank protection (m)

River bank protection (m)

Others (please specify) 4 4 culverts are need

Page 36 of 64

Page 48: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-05

Sub-Basin Kokcha

Canal Name Tarang

Length (km) 6.82

Command Area (ha) 114

Remarks Field survey

Eastings 71.092817

Northings 37.053900

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 6km, W = 2m

Cross-regulator

Off-takes 10 L= 2m, W= 1m, (all off-takes same)

Canal lining (m) 1 L = 300m, W = 3m

Torrent (wash) protection 7 1- w=5m, L=8m, 2- w=6m, l=10m, 3- w=3m, L=7m, 4- w=12m, L=15m, 5-

w=10m, L= 15m, 6- w= 3m, L=6m, 7- w= 5m, L= 6.5m

Canal bank protection (m) 1 L= 300m, W= 5m (left and right start from intake)

River bank protection (m)

Others (please specify) 6 5 small culverts and 1 big culvert for passing vehicles

Page 37 of 64

Page 49: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-06

Sub-Basin Kokcha

Canal Name Jata

Length (km) 0.57

Command Area (ha) 0

Remarks Protection wall

Eastings 70.522850

Northings 37.141133

Project Priority Cancelled

Command Area Class N/A

Parameter Value Description

Canal headwork (when the protection work be done will be covered 3000 Jerib more irrigation

land)

Cross-regulator

Off-takes

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) (when the protection work be done to the left side, then the houses will be

protected)

River bank protection (m) 1 L = 500m

Others (please specify)

Page 38 of 64

Page 50: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-07

Sub-Basin Kokcha

Canal Name Pataguzar

Length (km) 5.19

Command Area (ha) 40

Remarks Field survey

Eastings 70.825733

Northings 36.973883

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 5km, w = 1.5m

Cross-regulator

Off-takes 12 L = 2m, W = 1m (all off-takes same)

Canal lining (m) 1 L = 350m, W = 3m (start from intake)

Torrent (wash) protection 8 1- L = 5m, W = 20m, 7 others L = 5m, W = 10m

Canal bank protection (m)

River bank protection (m) 1 L = 350m

Others (please specify) 5 5 culvert is need

Page 39 of 64

Page 51: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-08

Sub-Basin Kokcha

Canal Name Bazar

Length (km) 5.35

Command Area (ha) 85

Remarks Field survey

Eastings 70.283367

Northings 36.875300

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 4km, W = 1.5m (the height of intake wall is less, it should be

increased 30 cm more)

Cross-regulator

Off-takes 6 L = 2m, W = 1.2m (all same)

Canal lining (m) 6 Total L = 150m, W = 2m

Torrent (wash) protection 4 1- L = 10m, W = 5m, 2- L= 6m, W = 15m, 3- L=10m,w= 5m, 4- L= 12m, W= 30m

Canal bank protection (m)

River bank protection (m)

Others (please specify) 4 4 culverts are need

Page 40 of 64

Page 52: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-09

Sub-Basin Kokcha

Canal Name Meer

Length (km) 2.31

Command Area (ha) 59

Remarks Field survey

Eastings 70.819317

Northings 36.890150

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 3km, W = 1.3m

Cross-regulator 1 L = 10m, W = 1.4m

Off-takes 11 L = 2m, W = 1m (all off-takes same)

Canal lining (m) 1 L = 100m, W = 3m (started from intake)

Torrent (wash) protection

Canal bank protection (m) 1 L = 100m

River bank protection (m)

Others (please specify)

Page 41 of 64

Page 53: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-10

Sub-Basin Kokcha

Canal Name Ganda Chishma

Length (km) 8.49

Command Area (ha) 319

Remarks Field survey

Eastings 70.448250

Northings 37.018217

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 8km, W = 3m

Cross-regulator 1 L = 6m, W = 2m

Off-takes 12 L = 3m, W = 2m (all off-takes are same)

Canal lining (m) 3 1- w=2.5, L=30m, 2- w=2.5m, L=6m, 3- w=2.5m, L=16m

Torrent (wash) protection 4 L=5m, W=3m (all washes are same)

Canal bank protection (m) 1 L = 150m, W= 3m(in intake)

River bank protection (m)

Others (please specify) 7 7 culverts are need

Page 42 of 64

Page 54: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-11

Sub-Basin Kokcha

Canal Name Ahangaran

Length (km) 2.97

Command Area (ha) 56

Remarks Field survey

Eastings 70.828583

Northings 36.861600

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 3km, W = 1.5m

Cross-regulator 1 L= 20m, W= 1.2m

Off-takes 5 L = 2m, W = 1m (all off-takes same)

Canal lining (m) 1 L = 130m, W = 4m (From intake to Chinar)

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m)

Others (please specify)

Page 43 of 64

Page 55: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-12

Sub-Basin Kokcha

Canal Name Gazanak

Length (km) 4.05

Command Area (ha) 90

Remarks Field survey

Eastings 70.515350

Northings 37.302650

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 Canal length = 5km, W = 1.2 m

Cross-regulator

Off-takes 7 L = 2m, W = 1.5m (all off-takes are same)

Canal lining (m) 7 Total L = 200m, W = 2m

Torrent (wash) protection 10 5 wash L = 20m, W = 10m, 5 other wash L = 10m, W = 7m

Canal bank protection (m) 5 5 culvert is need

River bank protection (m)

Others (please specify)

Page 44 of 64

Page 56: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-13

Sub-Basin Kokcha

Canal Name Farhad

Length (km) 14.91

Command Area (ha) 519

Remarks Field survey

Eastings 70.938333

Northings 36.965817

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork 1 Canal length = 10km, W = 2.5m, it need 200 m lining

Cross-regulator

Off-takes 8 L = 3m, W = 2m (all off-takes are same)

Canal lining (m) 5 1- L=100, W=4m 2- L=120m, w=4m, 3- L=100m, w=4m, 4- L=200m, W= 2m, 5-

L=50m, w=2m

Torrent (wash) protection 1 L= 100m, w= 5m

Canal bank protection (m) 1 L=50m, w=2m

River bank protection (m)

Others (please specify) 5 5 culvert is need

Page 45 of 64

Page 57: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code KK-14

Sub-Basin Kokcha

Canal Name Seyaab

Length (km) 12.80

Command Area (ha) 400

Remarks Prioritized project

Eastings 70.094700

Northings 36.819183

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork Existing headwork

Cross-regulator 3 1- Qomandan Zarin, 2- Haji Wali, 3- Pul Seyab Dare Hairatan

Off-takes 4 1- Qomandan Zarin 16 ha, 2- Haji Wali 30 ha, 3- Pul Seyab Dare Hairatan 26 ha,

4- Ghara Dara 26 ha

Canal lining (m)

Torrent (wash) protection 12 1- Haji Gul Mad Pul Seyab, 2- Hairatan, 3- Tejari Khail by, 4- Qurban Bai, 5-

Sheryani, 6- Naw Pul, 7- Khyal, 8- Maida Kocha, 9- Kocha Zabi, 10- Ghara Dara,

11- Kocha Posht Maktab Gumbaz, 12- Dara Posht Clinic Gumbaz

Canal bank protection (m) 18 1- Near to Nezamuddin house 150m, 2- Jawar Machin Khalid 20m, 3- Haji Gul

Mad Pul Seyab 100m, 4- Qomandan Zarin 50 ha, 5- Haji Wali 80m, 6- Pul Seyab

Dara Hairatan 30m, 7- Hairatan 50m, 8- Dare Qabrestan 90m, 9- Tejari Khail by

50m, 10- Qurban Bai 100m, 1

River bank protection (m)

Others (please specify)

Page 46 of 64

Page 58: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Page 47 of 64

Page 59: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-01

Sub-Basin Lower Panj

Canal Name Dashtqala

Length (km) 25.09

Command Area (ha) 6,247

Remarks Field survey

Eastings 69.466350

Northings 37.095850

Project Priority Priority 1

Command Area Class Large

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes 4 1- L= 2.5km, w= 1.5m, 2- L=3km, w=1m, 3- L= 4km, w= 2m, 4- L= 2km, w= 1m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L= 800m, w= 10m

River bank protection (m)

Others (please specify) This canal needs 20km to be development

Page 48 of 64

Page 60: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-09

Sub-Basin Lower Panj

Canal Name Hazara Qishlaq

Length (km)

Command Area (ha) 522

Remarks Master Table

Eastings 69.586150

Northings 37.450440

Project Priority Priority 3

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator 1 W= 30m, L= 27m

Off-takes 1 W= 4m, L= 27m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m)

Others (please specify)

Page 49 of 64

Page 61: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-02

Sub-Basin Lower Panj

Canal Name Qaghni

Length (km) 8.63

Command Area (ha) 466

Remarks Field survey

Eastings 69.532650

Northings 37.489733

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork 1 L= 10km, w= 4m

Cross-regulator

Off-takes 2 L=1.5m, w= 1.5m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L = 100m

River bank protection (m) 1 L = 200m

Others (please specify) 2 2 culverts are need along the canal

Page 50 of 64

Page 62: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-03

Sub-Basin Lower Panj

Canal Name Talajat-Guzar

Length (km) 8.03

Command Area (ha) 291

Remarks Field survey

Eastings 69.464883

Northings 37.104267

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 L = 10km, W = 5m

Cross-regulator

Off-takes 3 1- L=10m, w=1.5m, 2- L=12m, w= 2m, 3- L= 8m, w= 1m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 3 1- L= 200m, 2- L= 500m, 3- L= 700m

River bank protection (m) 1 L= 10km

Others (please specify) 1 Spillway L = 20m, w= 1.5

Page 51 of 64

Page 63: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-04

Sub-Basin Lower Panj

Canal Name Saraq

Length (km) 3.33

Command Area (ha) 125

Remarks Field survey

Eastings 69.474150

Northings 37.082650

Project Priority Priority 2

Command Area Class Small

Parameter Value Description

Canal headwork 1 L = 3km, W = 3m

Cross-regulator

Off-takes

Canal lining (m) 1 L = 1200m, W = 3m

Torrent (wash) protection

Canal bank protection (m) 1 L = 12500m, W = 3m

River bank protection (m) 1 L = 800m

Others (please specify) This canal is under serious threat of Kokcha river

Page 52 of 64

Page 64: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-05

Sub-Basin Lower Panj

Canal Name Qataqjar

Length (km) 15.46

Command Area (ha) 1,907

Remarks Field survey

Eastings 69.530400

Northings 37.406333

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator

Off-takes 4 1- L = 4m, w= 1.5m, 2- L= 4m, w= 2m, 3- L= 4m, w= 2m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L = 100m

River bank protection (m) 1 L = 200m

Others (please specify) 1 1 culvert is need

Page 53 of 64

Page 65: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-06

Sub-Basin Lower Panj

Canal Name Yatim Tepa

Length (km) 48.00

Command Area (ha) 12,200

Remarks Master Table

Eastings 69.705095

Northings 37.568893

Project Priority Priority 1

Command Area Class Large

Parameter Value Description

Canal headwork

Cross-regulator 2 1- W = 2m, 2- W = 2.5m

Off-takes 2 1- W = 1.5m, 2- W = 2m

Canal lining (m) 1 L = 200m

Torrent (wash) protection

Canal bank protection (m) 1 L = 100m

River bank protection (m) 1 L = 150m

Others (please specify) 2 2 culverts are need along the canal

Page 54 of 64

Page 66: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-07

Sub-Basin Lower Panj

Canal Name Arpoli

Length (km) 7.64

Command Area (ha) 724

Remarks Field survey

Eastings 69.467600

Northings 37.378200

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork 1 Canal length = 15km, W = 5m

Cross-regulator 1 L = 8m, W = 4m

Off-takes 4 1- w= 2m, 2- w= 2m, 3- w= 1.5m, 4- w= 1.5m

Canal lining (m)

Torrent (wash) protection

Canal bank protection (m) 1 L = 200m

River bank protection (m) 1 L = 1500m

Others (please specify) 1 Spillway L = 10m, W = 6m

Page 55 of 64

Page 67: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code LP-08

Sub-Basin Lower Panj

Canal Name Momen Abad

Length (km) 12.32

Command Area (ha) 1,449

Remarks Field survey

Eastings 69.567933

Northings 37.435600

Project Priority Priority 1

Command Area Class Medium

Parameter Value Description

Canal headwork

Cross-regulator 2 1- L = 4m, w= 2m, 2- L = 4m, w = 2m

Off-takes 3 1- W = 1.5m, 2- w = 1.5m, 3- w = 1.5m

Canal lining (m) 1 1- L = 200m, w = 2m

Torrent (wash) protection

Canal bank protection (m)

River bank protection (m) 1 L = 100m

Others (please specify) 2 2 culverts are need along the canal

Page 56 of 64

Page 68: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-01

Sub-Basin Upper Panj

Canal Name Ishmurgh

Length (km) 4.74

Command Area (ha) 281

Remarks Field survey

Eastings 72.442683

Northings 36.979983

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 L = 160m, w= 1.3m

Cross-regulator 2 L = 5m, w = 1m

Off-takes 10 L = 5m, w = 0.4m

Canal lining (m) 5 L = 250m

Torrent (wash) protection 2 L = 300m

Canal bank protection (m) 3 L = 250m

River bank protection (m) 1 L = 180m

Others (please specify) it need 600m covered canal

Page 57 of 64

Page 69: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-02

Sub-Basin Upper Panj

Canal Name Behshar

Length (km) 15.54

Command Area (ha) 393

Remarks Field survey

Eastings 71.472667

Northings 37.634983

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 w = 1.2m, L= 300m

Cross-regulator 2 w = 1.2m, L= 10m

Off-takes 7 w = 0.4m, L = 7m

Canal lining (m) 3 L = 350m

Torrent (wash) protection 6 L = 320m

Canal bank protection (m) 14 L = 310m

River bank protection (m)

Others (please specify) 5 it need 295m coverd canal

Page 58 of 64

Page 70: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-03

Sub-Basin Upper Panj

Canal Name Zibak

Length (km) 2.20

Command Area (ha) 114

Remarks Field survey

Eastings 71.356433

Northings 36.527567

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 w = 0.9m, L = 150m

Cross-regulator 2 w = 0.8m, L = 10m

Off-takes 13 w= 0.4m, L = 5m

Canal lining (m) 1 L = 50m

Torrent (wash) protection 7 L = 280m

Canal bank protection (m) 7 L = 250m

River bank protection (m) 1 L = 50m

Others (please specify) it need 380m covered canal

Page 59 of 64

Page 71: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-04

Sub-Basin Upper Panj

Canal Name Dah Khowja

Length (km) 13.23

Command Area (ha) 643

Remarks Field survey

Eastings 71.560300

Northings 36.695767

Project Priority Priority 2

Command Area Class Medium

Parameter Value Description

Canal headwork 1 w = 1.5m, L = 200m

Cross-regulator 2 w = 1m, L = 3m

Off-takes 10 w = 0.8m, L = 6m

Canal lining (m) 4 L = 400m

Torrent (wash) protection 6 L = 450m

Canal bank protection (m) 5 L = 600m

River bank protection (m) 1 L = 100m

Others (please specify) it need 270m covered canal

Page 60 of 64

Page 72: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-05

Sub-Basin Upper Panj

Canal Name Zargaran

Length (km) 3.14

Command Area (ha) 106

Remarks Field survey

Eastings 71.580350

Northings 36.712167

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 2 w = 1m, L = 150m

Cross-regulator 3 w = 1m, L = 4m

Off-takes 6 w = 0.8m, L = 5m

Canal lining (m) 2 L = 50m

Torrent (wash) protection 5 L = 150m

Canal bank protection (m) 2 L = 500m

River bank protection (m) 2 L = 200m

Others (please specify) it need 300m covered canal

Page 61 of 64

Page 73: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-06

Sub-Basin Upper Panj

Canal Name BarBazar

Length (km) 3.51

Command Area (ha) 92

Remarks Field survey

Eastings 71.571100

Northings 36.702117

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 w = 1m, L = 350m

Cross-regulator 2 w = 0.8m, L = 7m

Off-takes 6 w = 0.45m, L = 4m

Canal lining (m) 1 L = 80m

Torrent (wash) protection

Canal bank protection (m) 5 L = 290m

River bank protection (m) 1 L = 50m

Others (please specify)

Page 62 of 64

Page 74: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-07

Sub-Basin Upper Panj

Canal Name Khoshpak

Length (km) 7.92

Command Area (ha) 97

Remarks Field survey

Eastings 71.532850

Northings 36.671917

Project Priority Priority 3

Command Area Class Small

Parameter Value Description

Canal headwork 1 w = 1.2m, L = 400m

Cross-regulator 2 w = 0.8m, L =1m

Off-takes 5 w = 0.4m, L = 6m

Canal lining (m) 2 L = 200m

Torrent (wash) protection 6 L = 180m

Canal bank protection (m) 7 L = 350m

River bank protection (m) 1 L = 50m

Others (please specify) it need 280m covered canal

Page 63 of 64

Page 75: Supplementary Document 17: List of Candidate Subprojects …€¦ ·  · 2016-10-19Supplementary Document 17: List of Candidate Subprojects . i Contents ... 11 3 Kokcha Sub Basin

Panj-Amu River Basin Project (P-ARBP)

Baseline Survey of Sub-Projects (Jan 2016)

Project Code UP-08

Sub-Basin Upper Panj

Canal Name Sharifian

Length (km) 6.54

Command Area (ha) 485

Remarks Field survey

Eastings 71.415717

Northings 37.229633

Project Priority Priority 2

Command Area Class Medium

Parameter Value Description

Canal headwork 1 w = 1.2m, L = 150m

Cross-regulator 3 w = 0.3, L = 5m

Off-takes 6 w = 0.4m, L = 10m

Canal lining (m) 3 L = 350m

Torrent (wash) protection 10 L = 380m

Canal bank protection (m) 8 L = 180m

River bank protection (m) 1 L = 60m

Others (please specify) it need 180m covered canal

Page 64 of 64