Environmental Assessment (EA) Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects to be implemented under Component 4 for the first phase and second phase and their locations maps in the following river basins: Ma, Ca, Ha Vang Rac, Gianh Nhat Le, Thach Han, Vu Gia Thu Bon, Tra Khuc Ve, Kone Ha Thanh, and Dinh. Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins) No. Provinces Subprojects 1 Thanh Hoa Maintaining, upgrading and treating the key parts of the left dyke of Cau Chay river (section from K0-K42) 2 Nghe An Upgrading dike site of Luong Yen Khai, Thanh Chuong 3 Nghe An Bridge combining with overflow connecting rescued roads, Nghi Loc and Vinh city 4 Ha Tinh Upgrading dike site Phuc Long Nhuong, Cam Xuyen district 5 Binh Dinh Upgrading anti-erosion embankment of Kone river for safety, An Nhon and Tuy Phuoc district 6 Quang Nam Repairing and upgrading Thach Ban Reservoir, Duy Xuyen district Table A1.2: List of potential subprojects under Component 4 for the second phase by provinces Total 9 provinces Nghe An 1 Repair, Upgrade, ensure safety for reservoirs Ban Muong, Cho Quan, Xop Thap, Khe Lau, Khe Lang and Lach Buoi 2 Rescued road of Hung Nguyen district (including Hung Lam, Hung Nhan, Hung Xuan, Hung Chau) 3 Embankment protecting Ca River, acrossing Đinh Son, district Anh Son. 4 Embankment protecting Ca River, acrossing Linh Son, district Anh Son. 5 Rescued road of Do Luong district (including Thai Son, Minh Son communes) 6 Upgrade dike Vach Bac, district Yen Thanh 7 Rescued road connecting national road 46 to Thanh Luong - Nam Hung. Ha Tinh E2993 v1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 10-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

1

ANNEX 1

Subprojects List and Location Maps

This annex presents a list of the proposed subprojects to be implemented under Component 4 for

the first phase and second phase and their locations maps in the following river basins: Ma, Ca, Ha Vang –

Rac, Gianh – Nhat Le, Thach Han, Vu Gia – Thu Bon, Tra Khuc – Ve, Kone – Ha Thanh, and Dinh.

Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins)

No. Provinces Subprojects

1 Thanh Hoa Maintaining, upgrading and treating the key parts of the left dyke of Cau

Chay river (section from K0-K42)

2 Nghe An Upgrading dike site of Luong Yen Khai, Thanh Chuong

3 Nghe An Bridge combining with overflow connecting rescued roads, Nghi Loc and

Vinh city

4 Ha Tinh Upgrading dike site Phuc Long Nhuong, Cam Xuyen district

5 Binh Dinh Upgrading anti-erosion embankment of Kone river for safety, An Nhon

and Tuy Phuoc district

6 Quang Nam Repairing and upgrading Thach Ban Reservoir, Duy Xuyen district

Table A1.2: List of potential subprojects under Component 4 for the second phase by provinces

Total 9 provinces

Nghe An

1 Repair, Upgrade, ensure safety for reservoirs Ban Muong, Cho Quan, Xop Thap, Khe Lau, Khe

Lang and Lach Buoi

2 Rescued road of Hung Nguyen district (including Hung Lam, Hung Nhan, Hung Xuan, Hung

Chau)

3 Embankment protecting Ca River, acrossing Đinh Son, district Anh Son.

4 Embankment protecting Ca River, acrossing Linh Son, district Anh Son.

5 Rescued road of Do Luong district (including Thai Son, Minh Son communes)

6 Upgrade dike Vach Bac, district Yen Thanh

7 Rescued road connecting national road 46 to Thanh Luong - Nam Hung.

Ha Tinh

E2993 v1 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

2

8 Dredging, treating jet to Cua Sot shelter, Loc Ha district

Quang Binh

9 Fishing boat habours in Nhat Le river basin

Quang Tri

10 Upgrade of Trieu Thuong reservoirs 1,2

11 Repair & Upgrade of Hydraulic Structures: Viet Yen – Vinh Phuoc

12 Upgrade of Phuoc Mon reservoir, Hai Le commune

13 Emergency anti- erosion embankment for Nai Cuu – Trieu Dong commune – Trieu Phong district

14 Embankment for Trieu Do commune – Trieu Phong district

15 Emergency anti-erosion embankment for Trieu Tai commune – Trieu Phong district

Da Nang

16 Upgrade ensure safety for Hoa Trung reservoir

17 Upgrade, widen flood drain for An Trach weir

18 Upgrade ensure safety for 4 reservoirs: Truoc Dong, Truong Loan, Hoc Khe, Ho Cau

19 Upgrade ensure safety for 2 small reservoirs: Dong Treo và Ho Thung

Quang Nam

20 Repair, upgrade Khe Tan reservoir, Đại Loc district

21 Build anti-erosion embankment for Thu Bon river, Phu Đa area, Duy Xuyen district

22 Repair, upgrade Chan Son reservoir, Đai Loc district

23 Build river embankment for Tan Binh village, Đien Trung commune, Đien Ban district

24 Build anti-landslide embankment for Bau Sau river, in the down-stream of Bau Nit weir, Đien Ban

district

Quang Ngai

25 Đuc Loi dam

26 Fishing boat habours and My A sea gates (phase 2)

Binh Dinh

27 Upgrade, repair overflow bridges of rescued road Đong Tuy Phuoc – An Nhon – Phu cat

Ninh Thuan

28 Upgrade dyke at the north of Dinh river

Page 3: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

3

A1.1.

Page 4: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

4

A1.2.

Page 5: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

5

A1.3.

Page 6: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

6

A1.4.

Page 7: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

7

A1.5.

Page 8: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

8

A1.6.

Page 9: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

9

A1.7.

Page 10: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

10

A1.8. WB 5 Sub-Projects and Environmental Background in the Kone river basin

Page 11: World Bank Document€¦ · Viet Nam Managing Natural Hazards Project (VN-Haz/WB5) 1 ANNEX 1 Subprojects List and Location Maps This annex presents a list of the proposed subprojects

Environmental Assessment (EA)

Viet Nam Managing Natural Hazards Project (VN-Haz/WB5)

11

A1.9. WB 5 Sub-Projects and Environmental Background in the Dinh river basin