supplier apqp training advanced product quality planning

32
Jun 8, 2022 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Supply Chain Management Group Supplier APQP Training Advanced Product Quality Planning “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." GOAL : FLAWLESS LAUNCH !

Upload: stu

Post on 12-Jan-2016

221 views

Category:

Documents


9 download

DESCRIPTION

Supplier APQP Training Advanced Product Quality Planning. GOAL : FLAWLESS LAUNCH !. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Supplier APQP Training Advanced Product Quality Planning

Apr 21, 2023 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution."

Supply Chain Management Group

Supplier APQP TrainingAdvanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution."

GOAL : FLAWLESS LAUNCH !

Page 2: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 2

Supply Chain Mgmt Group

Supplier APQP Overview

APQP is: A structured method for defining & executing the

actions necessary to ensures a product satisfies the customer.

Supplier Led

Required of all designated component manufacturing.

Maximize the opportunity to achieve a defect free product launch and beyond.

Page 3: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 3

Supply Chain Mgmt Group

Supplier APQP Overview

Scope: To define the process through the sourcing decision of a new or modified product by a Supplier to Dana to the approval of the PPAP.

Reasons for APQP – Cost Avoidance – Scrap, Engineering Changes

Robust Products – Durable / Reliable

Robust Processes – Stable / Capable

Clearly defined & understood launch requirements

Builds solid Supplier relations

Synergy

Page 4: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 4

Supply Chain Mgmt Group

Dana Supplier Quality Manual

5. Supplier Advance Product Quality Planning (APQP)  Suppliers are required to conform to the latest

edition of the AIAG Advance Product Quality Planning Manual, located at http://www.aiag.org, for the introduction of a new or significantly modified production product to Dana.

Page 5: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 5

Supply Chain Mgmt Group

Supplier APQP

APQP Required

Program Launches & Select Resourcing Actions Supplier Responsible for complete APQP

• Supplier Development Engineer validates all APQP Elements through documentation and objective evidence submitted in the APQP Workbook.

• Supplier Development on-site review only occurs for suppliers who consistently fail to submit objective evidence to the APQP timeline and/or at risk suppliers as identified by the Program Team

Page 6: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 6

Supply Chain Mgmt Group

Supplier APQP Status Report

Page 7: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 7

Supply Chain Mgmt Group

In order to initiate APQP Activity with a Supplier the following is required –

Date the Dana LOI or Purchase Order Was issued

Date The Dana Tooling Order was or will be issued.

Prototype Sample quantities and timing.

Requested PPAP Date

WITHOUT THIS INFORMATION SUPPLIER DEVELOPMENT CANNOT INITIATE THE APQP ACTIVITY.

Page 8: Supplier APQP Training Advanced Product Quality Planning

Apr 21, 2023 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution."

Supply Chain Management Group

Supplier APQP Elements

What is the requirement?

Page 9: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 9

Supply Chain Mgmt Group

Supplier APQP Status Report Elements

Page 10: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 10

Supply Chain Mgmt Group

Supplier APQP Status Report Elements

Page 11: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 11

Supply Chain Mgmt Group

Supplier APQP Status Report Elements

Page 12: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 12

Supply Chain Mgmt Group

Supplier APQP Status Report Elements

Page 13: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 13

Supply Chain Mgmt Group

Supplier APQP Status Report Elements

Page 14: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 14

Supply Chain Mgmt Group

Supplier APQP Status Report Elements

Page 15: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 15

Supply Chain Mgmt Group

Supplier APQP Status Report Elements

Page 16: Supplier APQP Training Advanced Product Quality Planning

Apr 21, 2023 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution."

Supply Chain Management Group

Supplier APQP Status Report Elements

What are we looking for as Objective Evidence

Page 17: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 17

Supply Chain Mgmt Group

Objective Evidence Required – Elements 1 - 3

Page 18: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 18

Supply Chain Mgmt Group

Objective Evidence Required – Elements 4 - 7

Page 19: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 19

Supply Chain Mgmt Group

Objective Evidence Required – Elements 8 - 10

Page 20: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 20

Supply Chain Mgmt Group

Prototype Sample Inspection Requirements

All prototype samples furnished by suppliers shall conform to the following requirements for their applicable Dana Product Group.

Commercial Vehicle & Light Vehicle Driveline Technologies - Each part is to be serialized on a non critical surface (consult with the applicable Engineering Group for non critical surface identification). The preferred identification is Part Number and Consecutive Dash Number. (Example: Part Number -1, -2, etc....).

An inspection report is to be furnished for each serialized part for all critical/significant dimensions as designated on either the Dana Drawing or Engineering Specification.

At minimum, the inspection report shall include - date inspected, Inspector's signature, part & serial dash number, revision level, part name, purchase order number, part dimension/tolerance/actual dimension & the Gage R&R reports for all inspection tools utilized( for CMM submit a copy of the current Calibration Certificate).

Page 21: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 21

Supply Chain Mgmt Group

Prototype Sample Inspection Requirements

The inspection report shall be in pdf file format and named with the Dana Program, Part Number and Date. (Example: Program Name_Part Number_ Month-Day-Year.pdf).

The inspection report shall be shipped with the prototype samples. Prototype samples received without the accompanying inspection report will be rejected. Any Metallurgical/Heat Treat/Physical Test results available for the prototype parts should be included with the inspection report furnished.Any additional inspection requirements, outside of that listed above, will be delineated on the prototype quote request and listed on the prototype purchase order.

In all cases prototype samples that do not conform to the Dana Drawing and/or Specifications shall not be shipped prior to receipt of an approved Engineering Change or Deviation. A copy of the approval document shall be included with the prototype part shipment.

Page 22: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 22

Supply Chain Mgmt Group

Objective Evidence Required – Elements11 - 12

Page 23: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 23

Supply Chain Mgmt Group

Objective Evidence Required – Elements 13 - 15

Page 24: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 24

Supply Chain Mgmt Group

Objective Evidence Required – Elements 16 - 19

Page 25: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 25

Supply Chain Mgmt Group

Objective Evidence Required – Elements 20 - 23

Page 26: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 26

Supply Chain Mgmt Group

Additional Dana PPAP Requirements

Dana Facilities, receiving previously PPAP approved carryover parts, have the right to request a new PPAP submission (default Level 3) when the initial PPAP approval, evidenced by a signed PSW, is dated back 1 year or older. The supplier furnishing the carryover part will be advised when this requirement applies by the respective Dana Facility.

Suppliers furnishing parts being PPAP’d for the first time and shipped to multiple Dana Facilities shall submit the complete Level 3 PPAP to the Dana Facility designated on their Purchase Order. For the remainder of the Dana ship to points they shall provide an approved copy of the PSW prior to shipping any production parts.

Suppliers desiring to ship the same part number from multiple manufacturing sites must obtain the approval of the Dana Receiving Facility, Dana Engineering and Dana’s end customer where applicable.

Page 27: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 27

Supply Chain Mgmt Group

Safe Launch

The purpose of the Safe Launch Plan is to protect Dana Facilities from receiving quality non-conformances during critical new product launch periods and validate the supplier's Production Control Plan during volume production runs. It is in addition to all normal process inspections and evaluations outlined in the Production Control Plan and is a post processing, off-line, separate and independent from the normal manufacturing process check. Use of any in process inspection/containment stations requires the prior approval of Dana.

The Safe Launch Plan shall be in effect for a minimum of 90 days or the first 5 supplier production runs, whichever is longer, from the start of PPAP Approved part shipments to the receiving Dana facility. If any discrepant parts are received by a Dana facility during the Safe Launch period it shall be extended for a timeframe to be determined by the receiving Dana facility.

Page 28: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 28

Supply Chain Mgmt Group

Safe Launch

Any non-conformances discovered at a Dana facility during the Safe Launch period require immediate and irreversible corrective action within 72 hours of notification. In addition, any non-conformances discovered at a Dana facility requires supplier, or supplier designated, representation on site at the Dana facility to initiate sorting and containment actions, back through their organization, within 24 hours.

Page 29: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 29

Supply Chain Mgmt Group

Safe Launch

The Safe Launch Plan shall include 100% evaluation of --

All Dana designated Critical and/or Significant Characteristics (Variable)

All Customer attachment( pass through) characteristics identified by Dana Engineering (Attribute)

All Significant Characteristics to the process identified by the supplier (Variable)

Verification that the packaging and labeling conforms to the Supplier Packaging Specification form approved by the receiving Dana facility. (Attribute)

Page 30: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 30

Supply Chain Mgmt Group

Safe Launch

Data from safe launch inspections shall be forwarded to both the Dana Receiving Plant & [email protected], for each production lot shipped, so it is received prior to the production lot.

Product shipped to Dana that has been evaluated in the Safe Launch process shall be identified by means of a Green Sticker, attached to every individual carton, signed by the person accountable to perform this function.

Failure to implement a robust Safe Launch Process, containing these requirements as a minimum, will result in a Supplier being placed on Restricted Shipping 2 and other possible consequences.

Page 31: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 31

Supply Chain Mgmt Group

Customer Attachment Points

Customer Attachment Points:

Customer Attachment Points will be communicated to suppliers by designation, ( <CAP> ), on Dana Product Drawings.

Customer Attachment Points require Poke-A-Yoke at the source of manufacture.

If Poke-A-Yoke cannot be achieved an alternative control plan method must be proposed by the supplier and be approved by Dana.

Page 32: Supplier APQP Training Advanced Product Quality Planning

“"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work without the prior express written authorization of Dana Corporation. Unauthorized use may result in prosecution." Apr 21, 2023 32

Supply Chain Mgmt Group