Support for BAYEX March 11, 2008 COL (RET) William Hatch Program Manager John Shockley – Project Leader

Upload: conrad-ball

Post on 05-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

Support for BAYEX

March 11, 2008

COL (RET) William Hatch – Program ManagerJohn Shockley – Project Leader

Page 2: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

2

JTEP Support for BAYEX—Summary

BART Tunnel, Port of Oakland: BART Derailment- GPS Tracking/ Networked video/Handheld video/ tactical voice for AAR- 3D terrain and simulated entities for Tabletop

UP Rail Yard, Port of Oakland:Terrorist Attack/HAZMAT- GPS Tracking/ Networked video/Handheld video/ tactical voice for AAR- Aerial Video- 3D terrain and simulated entities for Tabletop

APL Berths, Port of Oakland:Radiological Hazard- GPS Tracking/ Networked video/tactical voice for AAR- Survey Tracks-3D Terrain and simulated entities for Tabletop-SRI Operations Center

-Visitor + AAR Tent

Bay between Alameda Point and SF Pier 96: Ship Interdiction- Handheld video- Stretch goals/opportunities

- GPS track of helicopter, ship, & interdiction team

Page 3: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

3

JTEP Support for BAYEX—Tabletop Exercise: April 9, 0930-1500

Phase III-IV BART Tunnel, Port of Oakland: BART Derailment-3D Terrain for Tabletop-Simulated responders/CST

Phase II UP Rail Yard, Port of Oakland:Terrorist Attack/HAZMAT-3D Terrain for Tabletop-Simulated responders/CST

Phase III APL Berths, Port of Oakland: Radiological Hazard-3D Terrain for Tabletop-Simulated responders/CST

Simulation Driven Tabletop Exercise- April 9, 2008 0930-1500- SRI International, Menlo Park

Page 4: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

4

JTEP Support for BAYEX—Phase I:April 17, 1200-1900

APL Berths, Port of Oakland:Base Station and AAR/Visitor Tent

SF Bay between Alameda Point and SF Pier 96: Ship Interdiction- Handheld video- Stretch goals/opportunities:

-Enhanced Dismount Instrumentation (EDI)/Cell Phone Tracker (CPT) track of helicopter-EDI/CPT track of ship-CPT track of interdiction team

Page 5: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

5

JTEP Support for BAYEX—Phase II April 18 0800 to April 19 0600

UP Rail Yard, Port of Oakland:Terrorist Attack/HAZMAT- GPS Tracking (EDI/CPT) of First Responders/CST- Networked video- Handheld video- Tactical voice- Aerial Video via Civil Air Patrol- 3D Terrain for AAR

APL Berths, Port of Oakland:Base Station and AAR/Visitor Tent

Page 6: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

6

JTEP Support for BAYEX—Phase III: April 19 0100-1700

APL Berths, Port of Oakland:Radiological Hazard (0800-1700)- GPS Tracking (EDI/CPT) of First Responders/CST- Networked video- Handheld video- Tactical voice - Survey Tracks- 3D Terrain for AAR

APL Berths, Port of Oakland:Base Station and AAR/Visitor Tent

BART Tunnel, Port of Oakland: BART Derailment (0100-0530)- GPS Tracking (EDI/CPT) of First Responders/CST/ Victims- Networked video- Handheld video- Tactical voice - Survey Tracks- 3D Terrain for AAR

Page 7: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

7

JTEP Support for BAYEX—Phase IV: April 20 0100-0730

APL Berths, Port of Oakland:Base Station and AAR/Visitor Tent

BART Tunnel, Port of Oakland: Chemical Attack caused BART Derailment - GPS Tracking (EDI/CPT) of First Responders/CST/ Victims- Networked video- Handheld video- Tactical voice - Survey Tracks- 3D terrain for AAR

Page 8: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

8

Backup

Page 9: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

9

Technology Development –Cell Phone Tracker

• Requirement derived from experience at NOVEX and Ardent Sentry 07

– Need for a small, “cell-phone-sized” tracking unit for CST and first responder personnel

– Both IGRS and EDI considered too large

– Much of the EDI and IGRS functionality not needed for this application

• Internally developed specifications:

– Small, <3-4 x size of a cell phone

– Use existing smart phone technology (includes GPS) to reduce costs

– Variable update rate, based on on participant dynamics

– MANET capable

– Multiple frequencies—US and Euro GSM, 802.11

– Battery life ~ several hours

– Interface to other sensors

Page 10: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

10

JTEP Cell Phone Tracker (CPT)

Page 11: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

11

Cell Phone Tracker and EDI Comparison

Characteristic

Cell Phone Tracker Enhanced Dismount Instrumentation (EDI)

Size 2.4in x 4.3in x1.1in 9in x 13in x 2.5in

Weight <0.5 lb 8.1 lb

Battery Life 4-6 hours (could be increased for Ver. 2)

40 hours

Tracking GPS + Barometric aiding for improved height accuracy

GPS + Ultrasound for in-room/in-vehicle detection

Frequency 802.11 (2.4GHz)

GSM Cell Phone (850/900/1800/1900MHz)

802.11 (2.4GHz)

ISM Unlicensed Band (902-928MHz Freq. Hopping)

Update Rate Dynamically variable (1/sec to once every 20sec) dependent on participant movement

Variable (4/sec to once every 2s) dependent on participant count; set by base station

MANET Capable Yes Yes

Page 12: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

12

JTEP Communications Infrastructure for BAYEX

Page 13: Support for BAYEX March 11, 2008 COL (RET) William Hatch – Program Manager John Shockley – Project Leader

13

JTEP Integrated Video Environment