> 101 4268 Lozells Avenue, Burnaby, BC V5A 0C6 > Tel: 604.444.0204 > > www.surehazmat.com June 20, 2019 City of Vancouver Environmental Services/Real Estate & Facilities Management Suite 320 507 West Broadway, Vancouver, BC V5Z 0B4 Attention: Ramon Blandino Hazardous Building Materials Technician Reference: Pre-Renovation Building Materials Investigation 4 th Floor 814 Richards Street, Vancouver, BC Sure Hazmat and Testing has, in accordance with your request, completed an investigation for hazardous materials and to identify any immediate hazards to workers during the renovation of the west side of the fourth floor of the building located at 814 Richards Street in Vancouver, BC. The scope of our investigation was based on the client’s renovation plans. Renovation activities were limited to the west side of the fourth floor and include: - Demolition of interior partition walls, - Removal of all flooring materials, - Disturbance of acoustical ceiling tiles, - Disturbance to ventilation ductwork, The work area was unoccupied at the time of the investigation. Sampling was destructive in nature and included limited demolition of walls and floors to determine the presence of any concealed hazardous materials. Representative samples of suspect asbestos-containing building materials were collected and analyzed. A total of forty five (45) samples were collected and analyzed for the presence of asbestos fibres. Five (5) samples were collected and submitted for analysis of lead content. A visual inspection was conducted of thermostatic controls for the presence of mercury. A visual inspection was conducted for the presence of older light fixtures with suspect PCB-containing ballasts. A visual inspection was performed for evidence of rodent activity and fungal contamination. SURE Hazmat and Testing

Upload: others

Post on 22-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

> 101 – 4268 Lozells Avenue, Burnaby, BC V5A 0C6 > Tel: 604.444.0204 > > www.surehazmat.com

June 20, 2019

City of Vancouver Environmental Services/Real Estate & Facilities Management Suite 320 – 507 West Broadway, Vancouver, BC V5Z 0B4 Attention: Ramon Blandino – Hazardous Building Materials Technician Reference: Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

Sure Hazmat and Testing has, in accordance with your request, completed an investigation for hazardous materials and to identify any immediate hazards to workers during the renovation of the west side of the fourth floor of the building located at 814 Richards Street in Vancouver, BC. The scope of our investigation was based on the client’s renovation plans. Renovation activities were limited to the west side of the fourth floor and include:

- Demolition of interior partition walls, - Removal of all flooring materials, - Disturbance of acoustical ceiling tiles, - Disturbance to ventilation ductwork,

The work area was unoccupied at the time of the investigation. Sampling was destructive in nature and included limited demolition of walls and floors to determine the presence of any concealed hazardous materials. Representative samples of suspect asbestos-containing building materials were collected and analyzed. A total of forty five (45) samples were collected and analyzed for the presence of asbestos fibres. Five (5) samples were collected and submitted for analysis of lead content. A visual inspection was conducted of thermostatic controls for the presence of mercury. A visual inspection was conducted for the presence of older light fixtures with suspect PCB-containing ballasts. A visual inspection was performed for evidence of rodent activity and fungal contamination.

SURE Hazmat and Testing

Page 2: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

2

SURE Hazmat

Building Systems

Item Details

Date of construction 1972

Exterior cladding Not included within scope of renovation

Roof Not included within scope of renovation

Interior wall and ceiling finishes

Drywall and plaster finishes, acoustic ceiling tiles

Flooring finishes Vinyl sheet flooring, vinyl floor tiles, ceramic tiles, carpet

Analytical Methodology Asbestos Samples dropped off for Analysis at Asbestos Analytical Services Ltd. and were analyzed at the in- in accordance with the NIOSH 9002 PLM Bulk Sampling Analytical Method using polarized light microscopy and dispersion staining techniques. The detection limit of this method is listed as <0.5%. A copy of the Asbestos Bulk Results spreadsheet is attached to this report for your information and records. All records should be retained for a period of ten years as required by WorkSafe BC.

Lead-Based Finishes Suspect leaded paint finishes were submitted to Maxxam Analytics for analysis of lead content. For leaded paint finishes, samples were digested using nitric acid/hydrogen peroxide followed by analysis using Inductively Coupled Plasma Spectroscopy (ICAP) and/or Inductively Coupled Plasma/Mass Spectroscopy (ICPMS). The federal Hazardous Products Act (HPA) under Surface Coating Materials regulation defines leaded paint or lead-based surface coating materials with a total lead concentration of 0.009% or 90 µg/g. This is the current accepted standard by WorkSafe BC for identification of lead-based paint. Paint finishes that contain lead equal to or greater than 90 µg/g are considered to present a risk to pregnant women & children and a risk assessment must be conducted by a qualified person prior to the performance of any work that impacts lead-based paint finishes in work areas with high risk individuals in adjacent occupied areas.

Page 3: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

3

SURE Hazmat

Asbestos-Containing Material Results Please refer to attached bulk sample results and sample location drawings for specific sample locations. Three (3) samples of window glazing mastic were collected from windows present on the North interior partition walls. All three samples were determined to be asbestos-containing. Exterior windows were observed to have non-asbestos rubber glazing mastic. 12”x12” beige vinyl floor tiles and mastic were collected from beneath the vinyl floor tiles in the central network room and both were determined to be asbestos-containing. The asbestos-containing vinyl floor tiles and mastic are present beneath the vinyl sheet flooring, vinyl floor tiles and raised flooring throughout the central network room. Three (3) samples of mastic were collected from the underside of the West Staff Room Sink. All three samples were determined to be asbestos-containing. Four (4) samples of drywall taping compound were collected from the perimeter walls:

- Main Area – North perimeter wall - Main Area – West perimeter wall - Southwest Office – West Perimeter wall – 2 layers

Three (3) of the four samples were determined to be asbestos-containing. Based on these results all perimeter walls are considered to have asbestos-containing drywall taping compound. The top layer of drywall was determined to be non-asbestos in the Southwest Office, however it is present on top of asbestos-containing drywall taping compound. No other asbestos-containing materials were identified in the scope of work. Non-Asbestos Material Results Fourteen (14) samples of drywall taping compound were collected from the interior partition walls and walls around the stairwells/elevators. All fourteen (14) samples were determined to be non-asbestos. The North, West and South perimeter walls are the only areas identified to have asbestos-containing drywall taping compound. Drywall finishes were only observed to be double layered on the West Wall of the Southwest Office. Destructive testing was not conducted on the east walls between the unit and the stairwells/hallway as they were not scheduled for demolition. Vinyl sheet flooring was sampled from the following areas and was determined to be non-asbestos:

- Northeast exit – beige - Central network room – beige (also observed in mechanical room) - West staff room – grey

Vinyl floor tiles were sampled from the following areas and were determined to be non-asbestos:

- Central network room – top layer -12”x12” grey (present on top of ACM beige vinyl floor tiles)

- West staff room – bottom layer Visually similar vinyl floor tiles were observed in the South central hallway, room south of the west staff room and room adjacent to the South Stairwell. Three (3) samples of mortar were collected from beneath the ceramic tiles in the West Staff Room and all three samples were determined to be non-asbestos.

Page 4: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

4

SURE Hazmat

Three (3) samples of mastic were collected from the Central network room beneath the raised floor support and all three samples were determined to be non-asbestos. Three (3) samples of grey duct mastic were collected and three (3) samples of beige duct mastic were collected. All six samples were determined to be non-asbestos. Three (3) samples of skim coat and plaster were collected from the Columns and wall adjacent to the South Stairwell. All three samples were determined to be non-asbestos. All acoustic ceiling tiles were date stamped 2014 and are not considered to be asbestos-containing. Lead-Based Finish Results Suspect leaded paint finishes were sampled from the renovation area. Table 1 shows the concentration of lead in paint for these samples.

Table 1 – Paint Sample Results

Sample #

Sample Location Lead

Concentration (µg/g)

HPA Standard Level (µg/g)

Condition

L01 Interior grey drywall paint <2.0 90 Good

L02 Interior blue drywall paint 3.2 90 Good

L03 Interior green drywall

paint 7.1 90 Good

L04 West staff room –

ceramic tile glazing <2.0 90 Good

L05 Interior wood trim

varnish 179 90 Good

Note: Bold values exceed standard level

The concentration of lead was above the Health Canada & HPA standard level of 90 µg/g for the interior wood trim varnish. The concentration of lead was below the Health Canada & HPA standard level of 90 µg/g for the other four samples collected. Other Hazardous Materials Fluorescent light fixtures with ballasts suspected to contain PCBs are present in the building. Mercury-vapour fluorescent light tubes were observed in the scope of work. Five thermostatic controls with liquid mercury vial are present in the scope of work. (Please refer to sample location drawings) Silica is one of the most common hazards on a construction site. Cutting, breaking, crushing, drilling, grinding, or blasting concrete or stone releases dust that can expose workers to airborne silica.

Page 5: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

5

SURE Hazmat

Conclusions and Recommendations Asbestos Asbestos-containing materials are present in the following locations:

Drywall taping compound on West, North and South perimeter drywall walls only.

Vinyl floor tiles & mastic present as the bottom layer throughout the central network room (beneath vinyl sheet flooring, vinyl floor tiles and raised flooring)

Window glazing mastic on the windows present on interior partition walls in the North Area of the scope of work.

Mastic present on the underside of the metal sink in the West Staff Room All asbestos-containing materials must be removed prior to demolition activities by a qualified hazardous materials contractor using appropriate work procedures as defined by WorkSafe BC. The survey was based on the client’s renovation scope of work. If the scope of the renovation changes to include any areas or materials not included in this investigation, Sure Hazmat and Testing should be contacted to investigate prior to disturbance. Approximate Quantities

Table 2 – Approximate quantities

Asbestos-containing Material Approximate Quantity

Drywall taping compound – N,W,S Perimeter Walls

2,100 ft2

Vinyl floor tiles and mastic 500 ft2

Sink mastic One sink

Window glazing mastic 5 windows

**Please note these quantities are rough estimates and should be verified on site by an abatement contractor when pricing the abatement. WorkSafe-BC Requirements This section is intended to aid in compliance with WorkSafe BC regulations, and is not intended to replace a Risk Assessment conducted on site by a qualified person prior to the start of asbestos abatement work. Prior to the performance of any work that impacts asbestos-containing materials, it is a regulatory requirement that a qualified person perform a Risk Assessment. This requirement is in compliance with the WorkSafe-BC Occupational Health & Safety (OH&S) Regulation Part 6 “Substance Specific Requirements”; specifically Section 6.6 subsections (1), (2), (3) and (4). The following recommendations are presented:

Page 6: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

6

SURE Hazmat

During the removal of asbestos-containing drywall taping compound, Modified Moderate Risk asbestos safe work procedures must be followed, including the following at a minimum:

Supply appropriate notification to WorkSafe BC,

Personal Protective Equipment must include full-face Powered Air Purifying (PAPR) respiratory protection fitted with P100 filters and approved disposable coveralls with head and foot covers,

Application of amended water to the asbestos materials being disturbed,

Complete isolation of the work area by means of a full polyethylene enclosure,

Use of asbestos barrier tape and warning signs around the perimeter of the work area,

Use of HEPA-filtered, DOP tested negative air units, exhausted outside the building,

Creation of a negative pressure atmosphere within the work area,

HEPA-equipped vacuum for local exhaust ventilation and to ensure removal of all asbestos materials,

Full shower decontamination facilities for overhead work,

Air monitoring. During the removal of asbestos-containing vinyl floor tiles, floor tile mastic, window mastic and sink mastic, Moderate Risk asbestos safe work procedures must be followed, including the following at a minimum:

Supply appropriate notification to WorkSafe BC,

Personal Protective Equipment must include tight-fitting half face piece respiratory protection fitted with P100 filters and approved disposable coveralls with head and foot covers,

Application of amended water to the asbestos materials being disturbed,

Use of asbestos barrier tape and warning signs around the perimeter of the work area,

HEPA-equipped vacuum for local exhaust ventilation and to ensure removal of all asbestos materials,

Hand and face wash station,

Air monitoring. To comply with Part 6 of the WorkSafe-BC OH&S Regulation, specifically Section 6.32 relating to documentation, the client should acquire copies of the asbestos abatement contractor’s Notice of Project (NOP), abatement procedures, air monitoring results and any documentation issued to WorkSafe-BC. These documents are required to be stored and held for 10 years. Lead Lead based finishes are present in the following locations:

Interior wood trim varnish The presence of lead based paint finishes does not pose an immediate hazard to building occupants when present in good condition and left undisturbed. As per the WorkSafe BC publication “Lead-Containing Paints and Coatings Preventing Exposure in the Construction Industry” all lead-containing waste materials must be sampled and analyzed using the standard Toxicity Characteristic Leaching Procedure (TCLP). This procedure is designed to determine the leachability of lead in liquid and solid wastes. During demolition safe work procedures should be followed when disturbing lead-based finishes. A Risk Assessment should be conducted on site by a qualified person prior to the start of lead abatement work.

Page 7: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

7

SURE Hazmat

Polychlorinated Biphenyls (PCBs) Older suspect light ballasts must be inspected prior to removal of fixtures for the manufacturer’s identification code to determine the presence of PCBs. If the light ballast is PCB-containing, the ballast must be disposed of in an impermeable waste container for disposal by a qualified hazardous materials contractor. Confirmed PCB-containing light ballasts must be handled and removed following appropriate work procedures as defined by WorkSafe BC OH&S regulation. Disposal of PCBs must be performed in accordance with BC Ministry of Environment Hazardous Waste regulation. Mercury Fluorescent lights with mercury-vapour tubes are present in the building. Avoid breaking large quantities of mercury-vapour tubes indoors. Workers handling broken tubes should wear nitrile gloves covered by leather gloves, at a minimum, to avoid exposure to residual mercury on the tubes. When thermostatic controls with liquid mercury vials are disposed of, the mercury vials must remain intact and packaged in an impermeable waste container for disposal by a qualified hazardous materials contractor. Disposal must be conducted in accordance with the BC Ministry of Environment Hazardous Waste regulations. Silica and Nuisance Dusts Control measures must be implemented on all job sites where demolition or renovation activities are taking place. An exposure control plan (ECP) must be developed to reduce the risk of silica and nuisance dust exposure for workers. Engineering controls must be applied to avoid or modify operations which have the potential to generate significant quantities of hazardous dusts. Controlled work practices such as the use of water and ventilation equipment serve to reduce the amount of respirable dust in the work environment. Personal protective equipment such as respiratory protection provide protection for workers on the site. Limitations

This report is intended for the exclusive use of the client to determine the likely locations of hazardous materials prior to planned renovations. This report is compliant with WorkSafeBC section 20.112 for the scope of the renovation only. For a full building demolition additional inspection(s) and destructive sampling is required. This report is not a Specification or Scope of Work and the use of this document as such will be at the sole risk of the user. The contents of this report were based on a site visit conducted by Sure Hazmat and Testing personnel. Please note that some asbestos products may not have been accessible on the day of our survey and may remain unidentified. Asbestos products are sometimes used behind wall partitions, on mechanical systems located in pipe chases, in sub-floors or other concealed areas, and assumptions have been made as to the likely contents of those areas. Should a suspect material be encountered, all work must be stopped and Sure Hazmat will investigate immediately.

Page 8: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

8

SURE Hazmat

If further clarification is required, please contact our office. Thank you for having Sure Hazmat and Testing perform this work for you. Prepared by: Reviewed by:

Ryan Verhelst, B.Sc, Project Manager John Shaw, Principal Sure Hazmat and Testing Sure Hazmat and Testing Encl. Laboratory Bulk Report Maxxam Analytics Lab Report Sample Location Drawings Site Photographs

Ref: 14461-R01

Page 9: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

9

SURE Hazmat

Photo # 1 – Interior windows with asbestos-containing window glazing mastic and wood trim with lead-based varnish

Photo # 2 – Asbestos-containing window glazing mastic on interior windows

Page 10: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

10

SURE Hazmat

Photo # 3 – Asbestos-containing vinyl floor tiles and mastic present beneath the top layers of vinyl sheet flooring and vinyl floor tiles in the Central Network Room

Photo # 4 – Asbestos-containing vinyl floor tiles in the Central Network Room

Page 11: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC

11

SURE Hazmat

Photo # 5 – Asbestos-containing mastic present on the metal sink in the West Staff Room

Page 12: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Asbestos Analytical Services Ltd.

7 - 2883 East Kent Avenue N., Vancouver, BC, V5S 3T9

AASL #B02508. 4th Floor, 814 Richards Street, Vancouver, BC Page 1 of 6

ASBESTOS ANALYSIS REPORT

AASL Report #: B02508

Project Location: 4th Floor, 814 Richards Street, Vancouver, BC Analyst: Gabrielle Sutton

Reference #s: 14461, City of Vancouver Report Date: 13JUN2019

Number of Samples: 45 Method: NIOSH Method 9002

# B02508 Sample Sub-Sample Sample Description / Location Results ASB

1 ** 01 Single Phase - black

Window Glazing Mastic, Interior Partition Wall Window, Northwest

1 - 10 % Chrysotile Asbestos > 90 % Non-Fibrous

T

2 ** 02 Single Phase - black

Window Glazing Mastic, Interior Partition Wall Window, North Central

1 - 10 % Chrysotile Asbestos > 90 % Non-Fibrous

T

3 ** 03 Single Phase - black

Window Glazing Mastic, Interior Partition Wall Window, Northeast

1 - 10 % Chrysotile Asbestos > 90 % Non-Fibrous

T

4. 1 04 Layer 1 - clear off-white & light beige, pliable

Beige Vinyl Sheet Flooring, Storage Room Adjacent Northeast Exit

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

4. 2 04 Layer 2 - grey fibrous

Beige Vinyl Sheet Flooring, Storage Room Adjacent Northeast Exit

Asbestos Fibres Not Detected 20 - 40 % Cellulose Fibres 10 - 20 % Synthetic Fibres 1 - 10 % Fibrous Glass 1 - 5 % Wollastonite Fibres > 35 % Non-Fibrous

---

4. 3 04 Layer 3 - light beige mastic

Beige Vinyl Sheet Flooring, Storage Room Adjacent Northeast Exit

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

5. 1 05 Layer 1 - clear off-white & light beige, pliable

Vinyl Sheet Flooring, Top Layer, Central Network Room, North

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

5. 2 05 Layer 2 - grey fibrous

Vinyl Sheet Flooring, Top Layer, Central Network Room, North

Asbestos Fibres Not Detected 20 - 40 % Cellulose Fibres 10 - 20 % Synthetic Fibres 1 - 10 % Fibrous Glass 1 - 5 % Wollastonite Fibres > 35 % Non-Fibrous

---

5. 3 05 Layer 3 - light beige mastic

Vinyl Sheet Flooring, Top Layer, Central Network Room, North

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

6. 1 06 Layer 1 - black mastic

Vinyl Floor Tile and Mastic, Bottom Layer, Central Network Room, North

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

6. 2 ** 06 Layer 2 - beige tile

Vinyl Floor Tile and Mastic, Bottom Layer, Central Network Room, North

1 - 10 % Chrysotile Asbestos > 90 % Non-Fibrous

T

6. 3 06 Layer 3 - black mastic

Vinyl Floor Tile and Mastic, Bottom Layer, Central Network Room, North

10 - 20 % Chrysotile Asbestos > 85 % Non-Fibrous

T

7. 1 ** 07 Layer 1 - light grey tile

Vinyl Floor Tile and Mastic, 12"x12" Top Layer, Central Network Room, South

Asbestos Fibres Not Detected 1 - 5 % Synthetic Fibres 1 - 5 % Cellulose Fibres 0.5 - 1 % Wollastonite Fibres > 90 % Non-Fibrous

---

7. 2 07 Layer 2 - black mastic

Vinyl Floor Tile and Mastic, 12"x12" Top Layer, Central Network Room, South

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

Page 13: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Asbestos Analytical Services Ltd.

AASL #B02508. 4th Floor, 814 Richards Street, Vancouver, BC Page 2 of 6

# B02508 Sample Sub-Sample Sample Description / Location Results ASB

8 ** 08 Single Phase - grey, pliable

Vinyl Sheet Flooring, Top Layer, West Staff Room Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

9. 1 09 Layer 1 - clear glue, thin / grey, hard

Vinyl Floor Tile and Mastic, Bottom Layer, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

9. 2 ** 09 Layer 2 - pale grey tile

Vinyl Floor Tile and Mastic, Bottom Layer, West Staff Room

Asbestos Fibres Not Detected 1 - 5 % Synthetic Fibres 1 - 5 % Cellulose Fibres 0.5 - 1 % Wollastonite Fibres > 90 % Non-Fibrous

---

9. 3 09 Layer 3 - black mastic

Vinyl Floor Tile and Mastic, Bottom Layer, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

9. 4 09 Layer 4 - orange mastic

Vinyl Floor Tile and Mastic, Bottom Layer, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

10. 1 * 10 Layer 1 - grey cementitious, hard

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 1 - 5 % Cellulose Fibres > 95 % Non-Fibrous

---

10. 2 10 Layer 2 - black mastic

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

10. 3 10 Layer 3 - orange mastic

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

11. 1 * 11 Layer 1 - grey cementitious, hard

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 1 - 5 % Cellulose Fibres > 95 % Non-Fibrous

---

11. 2 11 Layer 2 - black mastic

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

11. 3 11 Layer 3 - orange mastic

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

12. 1 * 12 Layer 1 - grey cementitious, hard

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 1 - 5 % Cellulose Fibres > 95 % Non-Fibrous

---

12. 2 12 Layer 2 - black mastic

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

12. 3 12 Layer 3 - orange mastic

Ceramic Tile Mortar, Under Ceramic Tiles, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

13 ** 13 Single Phase - gold & dark brown mastic

Mastic, Underside of Sink, West Staff Room 10 - 30 % Chrysotile Asbestos > 80 % Non-Fibrous

T

14 ** 14 Single Phase - gold & dark brown mastic

Mastic, Underside of Sink, West Staff Room 10 - 30 % Chrysotile Asbestos > 80 % Non-Fibrous

T

15 ** 15 Single Phase - gold & dark brown mastic

Mastic, Underside of Sink, West Staff Room 10 - 30 % Chrysotile Asbestos > 80 % Non-Fibrous

T

16 ** 16 Single Phase - black, hard, pliable

Mastic, Under Raised Floor Support, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

Page 14: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Asbestos Analytical Services Ltd.

AASL #B02508. 4th Floor, 814 Richards Street, Vancouver, BC Page 3 of 6

# B02508 Sample Sub-Sample Sample Description / Location Results ASB

17 ** 17 Single Phase - black, hard, pliable

Mastic, Under Raised Floor Support, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

18 ** 18 Single Phase - black, hard, pliable

Mastic, Under Raised Floor Support, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

19 ** 19 Single Phase - grey mastic

Beige Mastic, Ductwork, Mechanical Room Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

20 ** 20 Single Phase - grey mastic

Beige Mastic, Ductwork, Mechanical Room Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

21 ** 21 Single Phase - grey mastic

Beige Mastic, Ductwork, Mechanical Room Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

22 ** 22 Single Phase - grey, rubbery

Grey Mastic, Ductwork, Central Network Room Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

23 ** 23 Single Phase - grey mastic

Grey Mastic, Ductwork, Central Network Room Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

24 ** 24 Single Phase - grey mastic

Grey Mastic, Ductwork, Central Network Room Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

25. 1 25 Layer 1 - thin grey / dark blue / beige / blue / off-white / pale blue (paint)

Drywall Taping Compound, East Interior Partition Wall, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

25. 2 25 Layer 2 - white Drywall Taping Compound, East Interior Partition Wall, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

25. 3 25 Layer 3 - cream fibrous

Drywall Taping Compound, East Interior Partition Wall, West Staff Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

26. 1 26 Layer 1 - thin pale blue (paint)

Drywall Taping Compound, West Interior Partition Wall, Closet, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

26. 2 26 Layer 2 - white Drywall Taping Compound, West Interior Partition Wall, Closet, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

26. 3 26 Layer 3 - cream fibrous

Drywall Taping Compound, West Interior Partition Wall, Closet, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

27. 1 27 Layer 1 - thin light grey / light peach / pale blue / blue / pale pink / light grey (paint)

Drywall Taping Compound, North Interior Partition Wall, Southeast Office

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

27. 2 27 Layer 2 - white Drywall Taping Compound, North Interior Partition Wall, Southeast Office

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

27. 3 27 Layer 3 - beige fibrous

Drywall Taping Compound, North Interior Partition Wall, Southeast Office

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

Page 15: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Asbestos Analytical Services Ltd.

AASL #B02508. 4th Floor, 814 Richards Street, Vancouver, BC Page 4 of 6

# B02508 Sample Sub-Sample Sample Description / Location Results ASB

28. 1 28 Layer 1 - thin light grey / light peach / blue / pale pink / light grey (paint)

Drywall Taping Compound, Interior Partition Wall, Hall Between Staff and Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

28. 2 28 Layer 2 - white Drywall Taping Compound, Interior Partition Wall, Hall Between Staff and Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

28. 3 28 Layer 3 - cream fibrous

Drywall Taping Compound, Interior Partition Wall, Hall Between Staff and Network Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

29. 1 29 Layer 1 - thin dark blue / beige / blue / grey / off-white (paint)

Drywall Taping Compound, Northeast Interior Partition Wall

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

29. 2 29 Layer 2 - white Drywall Taping Compound, Northeast Interior Partition Wall

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

30. 1 30 Layer 1 - thin light blue (paint)

Drywall Taping Compound, Interior Partition Wall, North Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

30. 2 30 Layer 2 - white Drywall Taping Compound, Interior Partition Wall, North Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

30. 3 30 Layer 3 - cream fibrous

Drywall Taping Compound, Interior Partition Wall, North Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

31. 1 31 Layer 1 - thin light grey / beige / blue / pink / pale grey (paint)

Drywall Taping Compound, Interior Partition Wall, East Wall, Southwest Office

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

31. 2 31 Layer 2 - white Drywall Taping Compound, Interior Partition Wall, East Wall, Southwest Office

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

31. 3 31 Layer 3 - beige fibrous

Drywall Taping Compound, Interior Partition Wall, East Wall, Southwest Office

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

32. 1 32 Layer 1 - thin light blue (paint)

Drywall Taping Compound, East Wall, Southeast Office Adjacent Stairs

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

32. 2 32 Layer 2 - white Drywall Taping Compound, East Wall, Southeast Office Adjacent Stairs

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

32. 3 32 Layer 3 - weave Drywall Taping Compound, East Wall, Southeast Office Adjacent Stairs

Asbestos Fibres Not Detected 70 - 90 % Fibrous Glass > 15 % Non-Fibrous

---

32. 4 32 Layer 4- white Drywall Taping Compound, East Wall, Southeast Office Adjacent Stairs

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

32. 5 32 Layer 5 - beige fibrous

Drywall Taping Compound, East Wall, Southeast Office Adjacent Stairs

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

Page 16: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Asbestos Analytical Services Ltd.

AASL #B02508. 4th Floor, 814 Richards Street, Vancouver, BC Page 5 of 6

# B02508 Sample Sub-Sample Sample Description / Location Results ASB

33. 1 33 Layer 1 - thin light grey / beige / blue / pale grey (paint)

Drywall Taping Compound, Top Layer, West Perimeter Wall, Southwest Office

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

33. 2 33 Layer 2 - white Drywall Taping Compound, Top Layer, West Perimeter Wall, Southwest Office

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

33. 3 33 Layer 3 - cream fibrous

Drywall Taping Compound, Top Layer, West Perimeter Wall, Southwest Office

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

34. 1 34 Layer 1 - off-white

Drywall Taping Compound, Bottom Layer, West Perimeter Wall, Southwest Office

1 - 5 % Chrysotile Asbestos > 95 % Non-Fibrous

T

34. 2 34 Layer 2 - orange-beige fibrous

Drywall Taping Compound, Bottom Layer, West Perimeter Wall, Southwest Office

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

35. 1 35 Layer 1 - thin off-white (paint)

Drywall Taping Compound, West Perimeter Wall, Main Area

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

35. 2 35 Layer 2 - off-white

Drywall Taping Compound, West Perimeter Wall, Main Area

1 - 5 % Chrysotile Asbestos > 95 % Non-Fibrous

T

35. 3 35 Layer 3 - cream fibrous

Drywall Taping Compound, West Perimeter Wall, Main Area

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

36. 1 36 Layer 1 - thin off-white (paint)

Drywall Taping Compound, North Perimeter Wall, Main Area

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

36. 2 36 Layer 2 - off-white

Drywall Taping Compound, North Perimeter Wall, Main Area

1 - 5 % Chrysotile Asbestos > 95 % Non-Fibrous

T

36. 3 36 Layer 3 - orange-beige fibrous

Drywall Taping Compound, North Perimeter Wall, Main Area

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

37. 1 * 37 Layer 1 - white, hard

Drywall Taping Compound, East Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

37. 2 37 Layer 2 - beige fibrous

Drywall Taping Compound, East Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

38. 1 38 Layer 1 - thin light blue (paint)

Drywall Taping Compound, West Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

38. 2 38 Layer 2 - white Drywall Taping Compound, West Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

38. 3 38 Layer 3 - beige fibrous

Drywall Taping Compound, West Wall, Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

39. 1 39 Layer 1 - thin light blue (paint)

Drywall Taping Compound, Southeast Wall, Mechanical Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

39. 2 39 Layer 2 - white Drywall Taping Compound, Southeast Wall, Mechanical Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

39. 3 39 Layer 3 - cream fibrous

Drywall Taping Compound, Southeast Wall, Mechanical Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

Page 17: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Asbestos Analytical Services Ltd.

AASL #B02508. 4th Floor, 814 Richards Street, Vancouver, BC Page 6 of 6

# B02508 Sample Sub-Sample Sample Description / Location Results ASB

40 * 40 Single Phase - white, hard, thick

Drywall Taping Compound, East Perimeter Wall, Main Area

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

41 * 41 Single Phase - off-white, lumpy, thick

Skim Coat and Plaster, Column, Main Area Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

42 * 42 Single Phase - off-white, lumpy, thick

Skim Coat and Plaster, Column, Northeast Corner Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

43. 1 * 43 Layer 1 - off-white, lumpy, thick

Skim Coat and Plaster, Perimeter Wall, Southeast Stairwell

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

43. 2 * 43 Layer 2 - white, hard

Skim Coat and Plaster, Perimeter Wall, Southeast Stairwell

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

44. 1 44 Layer 1 - thin light grey / beige / blue / pale grey (paint)

Drywall Taping Compound, Interior Partition Wall, South Central

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

44. 2 44 Layer 2 - white Drywall Taping Compound, Interior Partition Wall, South Central

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

45. 1 45 Layer 1 - thin dark blue / beige / blue / off-white (paint)

Drywall Taping Compound, Interior Partition Wall, Main Area at Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

45. 2 45 Layer 2 - white Drywall Taping Compound, Interior Partition Wall, Main Area at Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Non-Fibrous

---

45. 3 45 Layer 3 - cream fibrous

Drywall Taping Compound, Interior Partition Wall, Main Area at Central Network Room

Asbestos Fibres Not Detected 90 - 100 % Cellulose Fibres > 1 % Non-Fibrous

---

Comments

Samples analyzed in accordance with NIOSH Laboratory Method 9002 American Industrial Hygiene Association (AIHA) BAPAT Program Laboratory Number 204301 Estimated Limit of Detection is <0.5 % ASB = Asbestos present/absent in material T = Asbestos Present AASL Asbestos Analytical Services Ltd. will not accept any responsibility as to the manner of interpretation or application of these results. * Sample preparation included grinding process. ** Sample preparation included ashing process.

Analyst: _________________________

Gabrielle Sutton, B.A.

Date: June 13, 2019

_________________________

Reviewed By: Gabrielle Sutton, B.A.

Original Signed By

Original Signed By

Page 18: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

BV LABS JOB #: B944009Received: 2019/06/06, 16:20

CERTIFICATE OF ANALYSIS

Your Project #: CITY OF VANCOUVER

Report Date: 2019/06/10Report #: R2735023

Version: 1 - Final

Attention: Ryan Verhelst

Sure Hazmat & Testing101-4268 Lozells AvenueBURNABY, BCCANADA V5A 0C6

Your C.O.C. #: 578202-155-01

Site Location: 814 RICHARDS ST

Sample Matrix: Solid# Samples Received: 5

Analyses QuantityDateExtracted

DateAnalyzed Laboratory Method Analytical Method

Elements by ICP-AES (acid extr. solid) 5 2019/06/07 2019/06/07 BBY7SOP-00018 EPA 6010c R3 m

Remarks:

Bureau Veritas Laboratories are accredited to ISO/IEC 17025 for specific parameters on scopes of accreditation. Unless otherwise noted, procedures usedby BV Labs are based upon recognized Provincial, Federal or US method compendia such as CCME, MDDELCC, EPA, APHA.

All work recorded herein has been done in accordance with procedures and practices ordinarily exercised by professionals in BV Labs profession usingaccepted testing methodologies, quality assurance and quality control procedures (except where otherwise agreed by the client and BV Labs in writing). Alldata is in statistical control and has met quality control and method performance criteria unless otherwise noted. All method blanks are reported; unlessindicated otherwise, associated sample data are not blank corrected. Where applicable, unless otherwise noted, Measurement Uncertainty has not beenaccounted for when stating conformity to the referenced standard.

BV Labs liability is limited to the actual cost of the requested analyses, unless otherwise agreed in writing. There is no other warranty expressed or implied.BV Labs has been retained to provide analysis of samples provided by the Client using the testing methodology referenced in this report. Interpretation anduse of test results are the sole responsibility of the Client and are not within the scope of services provided by BV Labs, unless otherwise agreed in writing.BV Labs is not responsible for the accuracy or any data impacts, that result from the information provided by the customer or their agent.

Solid sample results, except biota, are based on dry weight unless otherwise indicated. Organic analyses are not recovery corrected except for isotopedilution methods.Results relate to samples tested. When sampling is not conducted by BV Labs, results relate to the supplied samples tested.This Certificate shall not be reproduced except in full, without the written approval of the laboratory.

Reference Method suffix “m” indicates test methods incorporate validated modifications from specific reference methods to improve performance.

* RPDs calculated using raw data. The rounding of final results may result in the apparent difference.

Encryption Key

Please direct all questions regarding this Certificate of Analysis to your Project Manager.Nahed Amer, Project ManagerEmail: [email protected]# (604) 734 7276==================================================================== This report has been generated and distributed using a secure automated process.BV Labs has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.10.2 of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page.

Total Cover Pages : 1Page 1 of 5

Bureau Veritas Laboratories Burnaby: 4606 Canada Way V5G 1K5 Telephone(604) 734-7276 Fax(604) 731-2386

Page 19: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

BV Labs Job #: B944009Report Date: 2019/06/10

Sure Hazmat & TestingClient Project #: CITY OF VANCOUVER

Site Location: 814 RICHARDS ST

Sampler Initials: RV

ELEMENTS BY ATOMIC SPECTROSCOPY (SOLID)

BV Labs ID VV3347

Sampling Date 2019/06/05

COC Number 578202-155-01

UNITSL05-INT WOODTRIM VARNISH

RDL QC Batch

Total Metals by ICP

Total Lead (Pb) mg/kg 179 2.0 9454974

RDL = Reportable Detection Limit

BV Labs ID VV3343 VV3344 VV3345 VV3346

Sampling Date 2019/06/05 2019/06/05 2019/06/05 2019/06/05

COC Number 578202-155-01 578202-155-01 578202-155-01 578202-155-01

UNITSL01-INT GREY

DRYWALL PAINTL02-INT BLUE

DRYWALL PAINTL03-INT GREEN

DRYWALL PAINTL04-STAFF

ROOM-CT GLAZINGRDL QC Batch

Total Metals by ICP

Total Lead (Pb) mg/kg <2.0 3.2 7.1 <2.0 2.0 9454974

RDL = Reportable Detection Limit

Page 2 of 5

Bureau Veritas Laboratories Burnaby: 4606 Canada Way V5G 1K5 Telephone(604) 734-7276 Fax(604) 731-2386

Page 20: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

BV Labs Job #: B944009Report Date: 2019/06/10

Sure Hazmat & TestingClient Project #: CITY OF VANCOUVER

Site Location: 814 RICHARDS ST

Sampler Initials: RV

GENERAL COMMENTS

Results relate only to the items tested.

Page 3 of 5

Bureau Veritas Laboratories Burnaby: 4606 Canada Way V5G 1K5 Telephone(604) 734-7276 Fax(604) 731-2386

Page 21: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Sure Hazmat & TestingClient Project #: CITY OF VANCOUVER

Sampler Initials: RVSite Location: 814 RICHARDS ST

QUALITY ASSURANCE REPORTBV Labs Job #: B944009Report Date: 2019/06/10

QC Batch Parameter Date Value UNITS Value (%) QC Limits % Recovery QC Limits

Method Blank RPD QC Standard

9454974 Total Lead (Pb) 2019/06/07 <2.0 mg/kg NC 40 73 70 - 130

Duplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement.

QC Standard: A sample of known concentration prepared by an external agency under stringent conditions. Used as an independent check of method accuracy.

Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination.

NC (Duplicate RPD): The duplicate RPD was not calculated. The concentration in the sample and/or duplicate was too low to permit a reliable RPD calculation (absolute difference <= 2x RDL).

Page 4 of 5

Bureau Veritas Laboratories Burnaby: 4606 Canada Way V5G 1K5 Telephone(604) 734-7276 Fax(604) 731-2386

Page 22: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

Page 5 of 5

Page 23: SURE Hazmat and Testing - bids.vancouver.ca · City of Vancouver Pre-Renovation Building Materials Investigation 4th Floor – 814 Richards Street, Vancouver, BC 4 SURE Hazmat Three

4th Floor

Legend

X

LX

Asbestos Sample

Lead Sample

Main Area

L1

W. Staff Room

SW Office

Central Network Room

03 05

04

02

01

07

06

0908

17

16

13-15

18

22

19-21

23

24

25

26

27

28

29

30

31

3533 34

32

36

37

38

39

40

41

42

43

44

45

L2

L4

L5

L3

#7 VFT

#7 VFT

#7 VFT

Merc. Thermostat

10-12

X Non-Asbestos Sample