Page 1: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Technology Centre Mongstad

Technology Manager Olav Falk-Pedersen

Page 2: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

TCM – Highlights

Page 3: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

International Co-operation

Other potential partners to be invited

75.12% 20% 2.44% 2.44%

Page 4: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Ambitions• Test, verify and demonstrate CO2 capture technology

owned and marketed by vendors• Reduce cost, technical, environmental and financial risks• Encourage the development of market for CO2 capture

technology• Aim at international deployment

Page 5: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

How does CO2 capture work?

Page 6: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Total capacity 100 ktonnes CO2 per year

Combined Heat & Power plant

(CHP)*

CO2 12.9%

CO2 3.5%

Chilled Ammonia

Treated exhaust

Treated exhaust

Cracker (RFCC)

AmineCO2

CO2

Mobile Test Unit

Test Strategy – Overall Concept

CO2Treated exh.

* CHP design capacity of 280MW electricity and 360MW heat.

Page 7: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Combined Heat & Power plant

(CHP)*

Two flue gas sources

Max 5% of total flowFrom one stack

28 – 56 000 Sm3/hr3.5 – 9 mole% CO2

14.4 % O25 ppmv NOx

≈ 0 ppmv SOx

Pre-treatment

Capture processes(amine or chilled ammonia)

Cracker (RFCC) Max 11% of total flow

22 – 50 000 Sm3/hr12.9 mole% CO2

4.2 % O2183 ppmv NOx≈ 30 ppmv SOx

Pre-treatment

Capture processes(amine or chilled ammonia)

Relevant for a number of industrial processes including gas and coal fired power plants.

22 – 25 000 tonnes CO2 /yr3,1- 7,4 tonnes CO2/h

74 – 82 000 tonnes CO2 /yr9,7 tonnes CO2 /h

Recycle

* CHP design capacity of 280MW electricity and 360MW heat.

Page 8: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Amine plant

Chilled Ammonia plant

Admin complex

Electricalsubstation

Utilities

Area for future development

Seawater

Piperacks

RFCC

CHP

Page 9: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

CHPRFCC

TCM

Project office rig

Aerial photo 29.11.2010

Page 10: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

TCM project

Start-up:• First Technology Q4 2011• Second Technology 2012

• End of May 2011:• 77 % completed• 3 495 000 manhours worked• 3,9 BNOK spent (465 M€ / 690 M$)• 900 people directly involved

0

100

200

300

400

500

600

700

Personnel on site - Mongstad

Aker

AF-gruppen

TCM project org.

Alstom

PERSONNEL

Figures from week 23/2011

Total: 589

Reinertsen

Page 11: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Key figures for TCM

Structural steel tons 2 917Piping tons 1 087

Electrical cables m 234 400Instrument cables m 208 000

Instruments no's 3 904

Equipment tons 958

Total TCM

Page 12: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Construction philosophyArea Philosophy

Amine plant Prefabricate modulesSite-build of foundationsSlip-form concrete structure

Chilled Ammonia plant Stick-build at siteSite-build of foundationsSlip-form concrete structure

Utilities and infrastructure Prefabricate modulesPrefabricate concrete elements

Page 13: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Prefabrication

PAU assembly at Aker Stord

Page 14: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Fabrication of equipment

Page 15: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

56” flue gas piping

Page 16: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Piperacks installed

Page 17: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Seawater intake

Page 18: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Mechanical installations

Page 19: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent
Page 20: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

TCM organisation build upCompany Meeting (4+4)

Managing Director (73)

Technology Manager (8) Operations Manager (57)

Financial Manager (2)

Technology Committee(4+4 Partners reps.)

QR/HMS Manager (3)

Communication Manager (1) Admin. Co-ordinator (1)

Page 21: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Schedule

Page 22: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Knowledge sharing• Co-operate with research organisations and other CCS projects • Participate in CCS conferences and give papers• Keep outside world updated on status through website• Good communication with media and NGO’s• Subject to vendor confidentiality agreements

Page 23: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

www.tcmda.com

Page 24: Technology Centre Mongstad - SINTEF€¦ · •First Technology Q4 2011 •Second Technology 2012 •End of May 2011: •77 % completed •3 495 000 manhours worked •3,9 BNOK spent

Improve and verify CO2 capture

technology for large scale

Become a globally recognized centre of competence on

CO2 capture

Our Objectives