teo ren jie · land transport authority (lta) singapore, active mobility unit technical assistant,...
TRANSCRIPT
-
EDUCATIONApr 2016 - Mar 2019
WORK EXPERIENCEMar 2018 - Jun 2018
KEY ACHIEVEMENTS2018
2017
Excellence Awards - Outstanding Contributions Award (Individual) Department of Student and Alumni Relations, Singapore PolytechnicAwarded for outstanding achievements, talents and contributions as well as demonstration of SP CORE Values
SOFTWAREMicrosoft WordMicrosoft ExcelMicrosoft PowerpointAdobe Photoshop CCAdobe InDesign CCAdobe Lightroom CCAdobe Illustrator CCAutodesk AutoCADAutodesk RevitBentley MicrostationSketchup ProVray for SketchupEnscape for Sketchup
TEO REN JIEARCHITECTURE STUDENT
LANGUAGEWritten (Proficient):EnglishChinese
Verbal (Proficient): EnglishChinese
International BIM Competition 2017Building and Construction Authority (Singapore)Shortlisted for project submission
Intern (Project Management and Research)Land Transport Authority (LTA) Singapore, Active Mobility UnitTechnical Assistant, Graphic Designer and Event Coordinator for Active Mobility Unit (Design & Infrastructure)
Singapore PolytechnicDiploma in Architecture
ACHIEVEMENTS2018
2017
2016
Edusave Certificate of Academic AchievementMinistry of EducationAwarded to students in the top 25% of cohort in academic performance (AY17/18)
Edusave Certificate of Academic AchievementMinistry of EducationAwarded to students in the top 25% of cohort in academic performance (AY16/17)
School of Architecture and Built Environment ScholarshipSchool of Architecture and Built Environment, Singapore PolytechnicAwarded for being Top in Diploma in Architecture enrolment
CO-CURRICULAR ACTIVITIESOct 2018 -Mar 2019
Jan 2018 -Mar 2019
Apr 2017 -Mar 2018
Diploma in Architecture End of Year and Graduation Show 2019Design and Fabrication TeamEnsured on-time production of modules, resource allocation and communication with lecturers
Singapore Polytechnic Stage Management ClubStudent AdvisorAdvised AY17/18 Committee with the daily operations of the club
Singapore Polytechnic Stage Management ClubVice President (Admin and Welfare)Improved operations of club through various initiatives and promoted use of technology
PERSONAL PROFILEI have graduated with a Diploma in Architecture from Singapore Polytechnic in 2019. I am an excellent team player, self-discplined and self-motivated, ensuring tasks are delivered on time and on target.
Having a previous internship with Land Transport Authority’s Active Mobility Unit, I pay close attention to detail, evaluate and ensure issues resolved effectively and efficiently.
INFORMATIONDate of Birth:21 June 1999
Contact:+65 9355 [email protected]
Address:#07-64 Blk 707Woodlands Drive 40Singapore 730707
Portfolio:renjieteo.com
LinkedIn:linkedin.com/in/renjieteo
SKILLS2D Laser CutterConceptual StudiesDetailingFeasibility StudiesGraphic DesignProject ManagementModel MakingRendering
-
PROJECTS
Exterior Render of High Rise Residential ProjectExterior Render of Residential Project
Interior Render of Office VR LabInterior Render of Bicycle Parking Facility in High Rise Residential
Exterior Render of Office Workspace
-
DN
UP
UPUP
UP
UP
UP
UPUP
UP
06
1
A B C D E F G
H
1
2
3
4
5
6
7
3650 8400 8400 8400 8400 8200 8°
J
1700
6900
8400
8400
8400
8400
8400
UP
UP
FIR
E F
IGH
TIN
GL
OB
BY
H.
TIL
ES
FF
L 1
02
.10
0M
/ V
SERVICE LIFT LOBBY
H. TILES
FFL 98.650 M / V
ELECTRICALSUBSTATION
C. SCREED
FFL 102.100 M / V
CONSUMERSWITCH ROOM
C. SCREED
FFL 102.100 M / V
BIN
CE
NT
RE
C.
SC
RE
ED
FF
L 1
02
.10
0M
/ V
VR SCANNERH. TILES
FFL 102.100 A / C
MEETING RM 1AH. TILES
FFL 102.100 A / C
FIR
E C
OM
MA
ND
CE
NT
RE
H.
TIL
ES
FF
L 1
02
.10
0M
/ V
COVERED PUBLIC WALKWAY
POLISHED CONCRETE
FFL 102.100 M / V
TYRWHITT RD (NCAT)
JALAN BESAR (NCAT)
COVERED PUBLIC WALKWAY
POLISHED CONCRETE
FFL 102.100 M / V
OFFICE RECEPTIONH. TILES
FFL 102.100 N / V
RECEPTIONH. TILES
FFL 102.100 N / V
EQUIPMENT LIBRARYH. TILES
FFL 102.100 A / C
EVENTS SPACEPOLISHED CONCRETE
FFL 102.100 A / C
EVENTS STAGEPOLISHED CONCRETE
FFL 102.100 A / C
CAFEH. TILES
FFL 102.100 N / V
EXHIBITIONSPACE
POLISHED CONCRETE
FFL 102.100 N / V
MH
MH
TL:102.100IL:100.600
TL:102.100IL:100.100
TL:102.100IL:100.100
BUS STOP
FH
102.100
100.211
101.900
95.618
1885165
148624
1969688
1969691
MH
STAIR B-1(L1 THRU L6)
STAIR A(L1 THRU
BLK A ROOF)
HRDR LAN WAT NEW
MVELECTEL
SERVICE LIFT
FL2 / EVAC /
PL 2
FL1 / EVAC /
PL 1
MV
MV
STAIR A(B1 THRU L1)
FA
D
EAD
STAIR B-2(L1 THRU L6)
STAIR B(B1 THRU L1)
ST
AIR
C(L
1 T
HR
U B
LK
B
L5
RO
OF
)
CARPARK RAMP
C. SCREED
PROPOSED NEW ROAD SIDETABLE
PROPOSED FLATTENING OF KERB
PROPOSED LOWERING OF DRAIN COVER TO NEW PROPOSED ROAD LEVEL
PROPOSED FLATTENING OF KERB
LOADING / UNLOADING BAY
C. SCREED
FFL 102.100 N / V
MAKEUP RMH. TILES
FFL 103.000 A / C
WCH. TILES
FFL 102.050 N / V
HRDRMV
50
6100
INGRESS/EGRESS
RAMP GRADIENT AT 1:83 LENGTH AT 30.45m LONG
FH
PROVISION OF NEW FIRE HYDRANT
2300
2300
2300
2600
2200
4100
6100
8350
FIRE ENGINE ACCESSWAY LENGTH = 32.2m
BUILDING PURPOSE GROUP: VIIGFA OF LARGEST FLOOR PLATE (FLOOR 02): 1551.67 sqmBUILDING PERIMETER: 193.12m
FIRE ENGINE ACCESSWAY LENGTH = 193.12m / 6 = 32.2m
6M WIDE FIRE ENGINE ACCESSWAY
MAX LOADING CAPACITY : 30 TONNES
2600
3950
DIS
TA
NC
E B
ET
WE
EN
FIR
E E
NG
INE
A
CC
ES
SW
AY
AN
D B
RE
EC
HIN
G I
NL
ET :
95
79
4.7
m E
SC
AP
E T
O
OP
EN
AR
EA
4.7
m E
SC
AP
E T
O
OP
EN
AR
EA
0m ESCAPE TO OPEN AREA
0m ESCAPE TO OPEN AREA
0m ESCAPE TO OPEN AREA
4000
3000
EXTG ROAD SIDETABLE TO BE RETAINED
VSDS
VSDS
VSDS
VSDS
VS
VS
UT
FT
FT
FT
IC3
IC4
IC5
IC8
IC9
IC6IC7
(LAST IC)
21.7m 150dia DUCTILE IRO
N PIPE
MDL G
RADIENT AT 1:200
EJECTOR FROM B1
T: 250R: 150
T: 250R: 150
T: 250R: 150
T: 250R: 150
S1TL: 102.100IL: 101.750
S2TL: 102.100IL: 101.720
S3TL: 102.100IL: 101.690
S4TL: 102.100IL: 101.660
S5TL: 102.100IL: 101.630
ROADISDETL: 102.100IL: 101.600
SUMMITTL: 102.100IL: 101.770
SUMMITTL: 102.100IL: 101.770
S10TL: 102.100IL: 101.750
S11TL: 102.100IL: 101.720
S12TL: 102.100IL: 101.690
S13TL: 102.100IL: 101.660
S14TL: 102.100IL: 101.630
S13TL: 102.100IL: 101.600
S14TL: 102.100IL: 101.570
S15TL: 102.100IL: 101.560
S16TL: 102.100IL: 101.530
S17TL: 102.100IL: 101.500
SUMMITTL: 102.100IL: 101.710
S18TL: 102.100IL: 101.470
ROADSIDETL: 102.100IL: 100.100
S26TL: 102.100IL: 101.500
S25TL: 102.100IL: 101.530
S24TL: 102.100IL: 101.560
S23TL: 102.100IL: 101.590
S22TL: 102.100IL: 101.620
S21TL: 102.100IL: 101.650
S20TL: 102.100IL: 101.680
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
FD1H
THERMOPLASTIC ROAD MARKINGS TO LTA'S STANDARD DETAIL FOR ROAD ELEMENTS
PIPE FROM EJECTOR ROOM BELOW
300mm THK 1H FIRE-RATED LOAD BEARING WALL
150mm THK 1H FIRE-RATED WALL
100mm THK 1H FIRE-RATED WALL
300mm WIDE CONDUIT UPVC DRAIN AT 1:200
300mm THK 1H FIRE-RATED LOAD BEARING WALL
150mm THK 1H FIRE-RATED WALL
PIPE FROM SUMP PUMP ROOM BELOW
100mm THK 1H FIRE-RATED WALL
450 x 450 CONCRETE COLUMN
12.67mm LAMINATED TEMPERED GLASS
12.67mm LAMINATED TEMPERED GLASS SLIDING DOOR
300mm THK 1H FIRE-RATED LOAD BEARING WALL
50mm dia. 1000mm HIGH MILD STEEL RAILING
150 RISER 250 TREAD PRECAST STAIRCASE
150mm THK 1H FIRE-RATED WALL
600 x 600 H. TILES WITH ANTI-SLIP
2400
5150
8250
7900
8450
11700
6600
1000
2000
2100
6100
3500
5900
8800
2650
5250
1650
1550
900 750
3600
3150
3150
3600
1500
1650
2250
1850
8400
16850
16750
1250 1250
GT
IC1IC2
A
B
B
B
1
08
FIRST STOREY TOILET CALLOUT
________sheet of ________
BUILDING AND
CONSTRUCTION AUTHORITY
APPROVED UNDER SECTION 5/ SECTION 5A OF THE BUILDING
CONTROL ACT (CAP29)
Project Ref No:
Scale: Checked:Drawn:Date:
Project Description:
Owner:
Drawing Title:
Drawing No.:
Author: Architect
Project No.:
Rev.: -Project Code:
The standard certification is submitted in the form of an electronic record which is signed with a digital signature.
DECLARATIONI, TEO REN JIE, hereby certify, subject to any waiver/modification granted under Section 14 of the Building Control Act (CAP29) that the preparation of these building plans are in accordance with the Building Control Regulations, and the buildings/building works shown on these plans are in accordance with the provision of the Building Control Regulations and the acceptable solutions in the Approved Document.
OWNER ENDORSEMENTI/We, TEO REN JIE, hereby declare that -
(A) I/We am/are not the owner(s) of the land within the meaning of the term 'owner' as defined in Section 2 of the Planning Act ( Cap 232, 1998Ed ); and
(B) I/We have shown this plan to the owner(s) of the land, and have obtained the consent of the said owner(s) to submit this plan to the Competent Authority under Planning Act (Cap 232, 1998Ed).
SCDFI, TEO REN JIE, S9918967C, being a qualified person under the Fire Safety Act, hereby certify that the fire safety works as shown on these plans have been in accordance with the provisions of the Fire Code, the Fire Safety Act and any regulation made thereunder, subject to modifications or waivers granted under Section 27 of the Fire Safety Act.
LTAI, TEO REN JIE, confirm that the road reserve lines, the category of the proposed and existing roads and other related road information as shown in the layout plan is in accordance with the current information provided by the LTA.
NEAI, TEO REN JIE, confirm that the drainage details as shown in the layout plan are in accordance with the current information provided by the Chief Engineer, Central Building Plan Unit, NEA.
I, TEO REN JIE, confirm that the sewerage details as shown in the layout plan are in accordance with the current information provided by the Chief Engineer, Central Building Plan Unit, NEA.
PROPOSED ERECTION OF A BLOCK OF 6-STOREY COMMERCIAL WITH A BASEMENT CARPARK AND ANCILLARY FACILITIES ON LOT TS17-02734T AT 270 JALAN BESAR SINGAPORE 208953 (KALLANG PLANNING AREA)
A 8 2 8 5 - 0 0 7
MAJOR PROJECT
_______________________________
COMMISIONER OF BUILDING CONTROL
frame.architects
Frame Architects Pte Ltd500 Dover RdSingapore 139651
Two House Concepts Pte Ltd24 Cavan RdSingapore 209853
CHOO THIAN SIONG
TEO REN JIE
14 DEC 2018
7
A8285-007-2018-BP01
02A8285-007-2018-BP01
1st Storey Plan and Surface Drainage Calculations
N
0m
SCALE 1:
10m 20m2.0m
FIRST STOREY PLAN
200
OCCUPANCY LOAD
THIS STOREY IS PROTECTED BY FIRE EXTINGUISHERS, DRY RISERS, SPRINKLER SYSTEMS AND AUTOMATIC CALL POINTS
FIRST STOREY PLAN
OCCUPANCY LOAD: - NA - (GROUND ESCAPE)
MEANS OF ESCAPE PROVIDED FOR: - NA -
PROVISION OF SANITARY FACILITIES
CATEGORY OF PLACE : SHOPPING PLACE
REQUIRED
PROVISIONS
GFA / CAPACITY
1500 - 3000 sqm
FEMALE
6 WC 4 WHB
6 WC 4 WHB
MALE
2 WC 3 UR 2 WHB
3 WC 3 UR 2 WHB
ALL FLOORS INCLUDE AT LEAST ONE HANDICAP WC AND COMPLIES WITH NEEDS OF THE AMBULANT DISABLED.
SURFACE DRAINAGE CALCULATIONS
A/C = AIR-CONDITIONED
C.SCREED = CEMENT SCREED
DS = DISCHARGE STACK
ELEC = ELECTRICAL
FD = FIRE-RATED DOOR
FT = FLOOR TRAP
FW = FLOOR WASTE
FES = FIRE ESCAPE STAIRS
FFL = FINISH FLOOR LEVEL
GT = GULLY TRAP.
HR/DR = HOSEREEL WITH DRY RISER
H.TILES = HOMOGENEOUS TILES
ALL DIMENSIONS ARE IN mm
ALL STRUCTURAL COLUMNS ARE 450mm x 450mm*
ALL STAIRCASE/LIFT CORE WALLS ARE 300mm THK*
ALL OTHER WALLS ARE 100mm THK*
ALL SCUPPER DRAINS ARE 150mm*
ALL SCUPPER DRAINS ARE OF GRADIENT 1:100*
ALL RWO ARE OF UPVC Ø150mm*
ALL RWDP ARE OF UPVC Ø150mm*
ALL STRUCTURAL COLUMNS ABOVE GROUND ARE OF 1HR FIRE RESISTANCE
ALL STRUCTURAL COLUMNS BELOW GROUND ARE OF 2HR FIRE RESISTANCE
ALL FLOORS ABOVE GROUND ARE OF 1HR FIRE RESISTANCE
ALL FLOORS BELOW GROUND ARE OF 2HR FIRE RESISTANCE
*UNLESS OTHERWISE STATED
IC = INSPECTION CHAMBER
LAN = LOCAL ACCESS NETWORK
M/V = MECHANICAL VENTILATION
N/V = NATURAL VENTILATION
PL = PLATFORM LEVEL
RWDP = RAINWATER DOWNPIPE
RWO = RAINWATER OUTLET
TEL = TELECOMMUNICATIONS
W = WATER DISTRIBUTION
W = WASTE SUMP
VS = VENT STACK
LEGEND
GROSS FLOOR AREA
FIRST STOREY PLAN
GROSS FLOOR AREA: 1343.7 sqm
1:200
0802
Rev. Date Description
PROJECTS
LVL/UNIT #01 / A #02 / B #03 /C #04 / D #05 /E #06 / J #07 / K #08 / M #09 / N #10 / O #11 / P #12 / S #13 / T HT/FLR
ROOF 6
24 2 3.4
23 2 3.4
22 2 3.4
21 2 3.4
20 2 3.4
19 2 3.4
18 6
17 1 2 1 1 2 3.4
16 1 2 1 1 2 3.4
15 1 2 2 1 1 2 3.4
14 1 2 1 1 2 3.4
13 1 2 1 1 2 3.4
12 6
11 1 2 1 1 2 3.4
10 1 2 1 1 2 3.4
9 1 2 2A 1 2 2 1 1 2 3.4
8 1 2 2A 1 2 1 1 2 3.4
7 1 2 2A 1 2 1 1 2 3.4
6 EX. COR 6
5 1 2 2A 1 2 2 1 2 R. TER 3.4
4 1 2 2A 1 2 2 1 2 2B 3.4
3 2A 1 2 2 1 COM COM 2 3.4
2 1 2 2 1 3.4
1 5
TTL BLDG HT 97
% OF DVT LEGEND
1 RM 43 43 1 4 4 ROOM GREEN SPACES
2 RM 51 51 2 COM COMMUNAL SPACE
4 RM 6 6 2A EX. COR EXERCISE CORNER
TTL 100 100 2B MULTIPURPOSE TER MULTIPURPOSE TER
1 ROOM
2 ROOM STANDARD
2 ROOM VARIANT A
2 ROOM VARIANT B
THE COALESCENECE
TOTAL UNIT
ROOF TERRACE
COMMUNAL GARDEN / PLAYGROUND / EXERCISE CORNER / BIKE PARK
MULTIPURPOSE TERMULTIPURPOSE TEREX. COR
4
4
4
4
4
A. GREEN ROOF
MULTIPURPOSE TER
ROOF TERRACE
ROOF TERRACE
4
MULTIPURPOSE TER
COM
COM
MULTIPURPOSE TER
MULTIPURPOSE TER
MULTIPURPOSE TER
COM
COM
Case Study of Aluminium Fin Assembly
Unit Mix of Residential Development in ExcelSectional Axonometric 1:10 Detailing
Conceptual Diagrams
Authority Submission
Massing Studies
-
PROJECTSLAND TRANSPORT AUTHORITY, ACTIVE MOBILITY UNIT (DESIGN AND INFRASTRUCTURE)
Cycling Path DescriptionsActive Mobility Act 2018Prepared Cycling Path Descriptions for 11 towns/shortlinks within a short timelineChecked against internal drawings and maps
End of Path MarkingsActive Mobility Act 2018Drafted Path Markings for 7 towns / shortlinksPerformed site checks to ensure existing drawings match on site conditions
Drafting SchemesFeedbackDrafted Path Markings for 12 feedbacks and 1 new proposed shortlinkPerformed site checks to ascertain if further safety improvements could be made on sitePrepared site analysis, feedback matrix, visuallisations and proposed solutions to team for acceptance
SafeguardingFinal Planning ApprovalDrafted documents to help safeguard part of a town’s cycling path network with existing as-built drawings
Bicycle CrossingsConsultation with Consultant / ContractorChecked drawings for 19 bicycle crossings for ongoing projectLiased with consultant regarding comments and feedbacksDrafted proposed comments for consultant’s amendments for their approval
Tender PreparationTenderPrepared tender drawings for cycling-related facilities
DRAFTING
CONSULTATION
MISCELLENOUS
Cycling PathInternal and External ConsultationsDrafted drawings and comments for consultationsProvided input to assist various stakeholders
IMAGES