    Testing and Commissioningof Circuit Breaker and

    Transmission LinePrepared by:

    Hafz Syed Faizan Hamid (Grid System Maintenance Engr.)

    Muhammad Faizan Faroo (Po!er System "perations Engr.)

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    2/27

     #esting and $ommisioning%euirements o& $ircuit 'reaer

    • ataco**ection

    • Genera* $hecs and inspection

    • $ontact resistance

    • +u,i*ary s!itch checs

    •  #rip and c*ose timing test

    • "$' specifc tests

    • "$' oi* test• +'$' specifc tests

    • +'$' air dryness test

    • +'$' air *eaage

    • +'$' pressure s!itches

    • +'$' pressure drop !ith operations

    • G$'(SF-) specifc test

    • G$'(SF-) *eaage detection

    •  G$'(SF-) de! point

    • G$'(SF-) o,ygen content

    • G$'(SF-) acidity

    • "perationa* test

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    3/27

    Data Collection:

     #his !ou*d consist o& type re&erence and seria*

    Checks/inspections :

     #his is *arge*y a isua* chec and !ou*d typica**y consist "& the &o**o!ing:

    / circuit identifcation and phase *abe*s

    / earth Strap connections

    / tightness o& &astenings

    / arcing horns and rings

    / contro* and operation "& heaters

    / insu*ators c*ean and undamaged

    / inspection "& breathers

    / oi* *ee*s0&or "$'s

    / correct position o& any a*es

    / acceptab*e readings on any gauges

    Contact Resistance:

     #his is a measure o& resistance across each set o& contacts !ith the circuitbreaer c*osed. + digita* micrometer shou*d be used. Manu&acturers !i** uote ma,imuma*ues "& resistance1 !hich !i** typica**y be in the range o& a &e! tens o& micro2ohms. +**resu*ts shou*d be

    recorded as a source &or comparison during maintenance.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    4/27

    Contact Resistance:

    •  #his is a measure o& resistance across

    each set o& contacts !ith the circuitbreaer c*osed.

    • + digita* micrometer shou*d be used.

    Manu&acturers !i** uote ma,imuma*ues "& resistance1 !hich !i**typica**y be in the range o& a &e! tens o&micro2ohms.

    • +** resu*ts shou*d be recorded as asource &or comparison duringmaintenance.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    5/27

    Auxiliary switches

    +u,i*iary s!itches are typica**y o& the &o**o!ingtypes:

    / mae coincident !ith the main contactsc*osing (norma**y open)3

    / brea coincident !ith the main contacts

    c*osing (norma**y c*osed)3/ mae (or brea) in adance "& the maincontacts c*osing3

    / mae (or brea) a&ter the main contacts c*ose3

    / momentari*y mae during the open or c*osingseuence (4eeting con2

    tact).

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    6/27

    Timing Tests

    / trip test0initiation to contacts part

    / c*ose test0initiation to contactstouch

    / trip on c*ose test0c*ose onto an

    a*ready operated trip re*ay/ au,i*iary s!itch test0comparison o&au,i*iary s!itch !ith main contacts.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    7/27

     Air dryness:• %e*atie*y dry air is obious*y important &or the

    satis&actory

    per&ormance o& a pressurized head +'$'• +ir under pressure has a more concentrated moisture

    content than at atmospheric pressure1 and there&ore thede!point temperature increases !ith air pressure.

    •  #hus un*ess the receier air is reasonab*y dry1 a !inter

    co*d spe** cou*d cause moisture in the air !ithin thebreaer to condense onto insu*ation sur&aces resu*ting ininsu*ation breado!n.

    • +t a receier operating pressure o&1 say1 567 *b8in91 thereuired de!point temperature shou*d be 097$ or *o!er3

    • this !ou*d correspond to a de!point "& 0 67$ atatmospheric pressure.

    •  e!point can be obtained by passing the compressed airthrough a de!point meter.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    8/27

     Air Leakage:

     #his is a chec to eri&y that the sea*s and seats are reasonab*y

    airtight. #his can be done by c*osing the +'$' in*et a*e. and obsering the

    pressure gauge drop oer a number "& hours.

    ressure switch:

    ;n genera* three pressure s!itches are ftted:

    / *o!2air2pressure a*arm

    / c*ose *ocout

    / trip *ocout #he operation and resetting o& these s!itches shou*d be checed against a

    ca*ibrated pressure gauge. #his is usua**y accomp*ished by iso*ating a section

    o& pipe!or to !hich the s!itch is connected1 and s*o!*y draining (and then

    ref**ing) the section.

    ressure drop with operations: #he air receier usua**y contains su

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    9/27

    !"# Leakage detection:

    •  #his shou*d commence !ith the SF-

    compartments f**ed to &u** pressureand an obseration made o& !hetherthe pressure is then stab*e or &a**s

    oer a period o& time.• =eas can be detected by use o& an

    SF-2*eaage detector. #his genera**y

    consists o& a hand2he*d probe !hichshou*d be s*o!*y moed oer thesur&ace o& the SF- containmentesse*.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    10/27

     !"# Dewpoint:

    •  #he de!point can be obtained by use o& a de!point ce**.

    •  #his consists o& a c*osed ce** in !hich there is an e,posedmeta**ic mirror.

    •  #hrough !hich SF- is passed at a contro**ed rate !hi*e themirror temperature is s*o!*y *o!ered.

     #emperature contro* is achieed by e,posing the reerse sideo& the mirror to a mi, o& acetone and so*id carbon dio,ide.

    •  #he *atter being added s*o!*y to reduce temperature. +s themirror temperature &a**s1 a point is reached !here !atercondenses on the sur&ace &orming a de! or a &rost.

     #he temperature #1 at !hich this taes p*ace is recorded. #hetemperature is then a**o!ed to rise and point at !hich thede! c*ears is recorded. #he de!point is then taen as >89( #*?#9).

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    11/27

    !"# $xygen content:

     #his can be determined by use o& ano,ygen2measuring

    instrument1 !hich may &unction on the

    princip*e o& magnetic susceptibi*ity(o,ygen is paramagnetic1 !hich isunusua* &or a gas) or gas chromatography.

    SF- is passed through the measuring

    deice at a contro**ed rate. #he ma,imumpermitted o,ygen concentration is 7.7> @by mass.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    12/27

    !"# acidity:

     #he acidity is measured by passing SFS through a di*ute a*a*io& no!n strength and o*ume unti* the a*a*i is neutra*isedby the acid. #he

    a*a*i chosen is usua**y sodium hydro,ide1 to !hich anindicator (such as

    bromocreso* purp*e) is added. Aeutra*isation is indicated by achange in the

    co*our o& the so*ution. #he acidity content is "btained byca*cu*ation1 !hich

    is !e** described in 'S 697B. #he acidity is e,pressed in termso& hydro4uoric

    acid (HF) content1 in mg "& acid8g "& SF-. #he ma,imumpermitted concentration 07.C mg8g.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    13/27

    $perational tests

     #he &o**o!ing operationa* tests shou*d be carried out during

    commissioning:

    (a) Manua* c*osure o& the circuit breaer ia the c*ose hand*e8s!itch!hi*e a trip re*ay is operated. #he manua* c*osure shou*d be e,ecuted&or about >7 s.

     #he circuit shou*d commence to c*ose1 trip and remain open. "nce

    the circuit breaer is in the open position1 the trip signa* shou*d beautomatica**y remoed &rom the trip coi*1 ia the breaer au,i*iarycontacts and thus it may seem1 at frst sight1 that the circuit breaershou*d commence to c*ose again. (b) Functioning o& the circuitbreaer &rom the *oca*1 standby and superisory (main) positions3

    (c) "pening and c*osing under reduced battery o*tage3

    (d) Proing o& inter*ocs. Most circuit breaers hae inter*ocs3 someare euipped !ith Dcaster type eys such that they cannot beoperated i& the ey is remoed.

    (e) $hec on8o2position indicator.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    14/27

     #esting and $ommissioning o& "8H

     #ransmission =ine

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    15/27

    a% "or !teel>. $hemica* +na*ysis

    9. #ensi*e #ests

    C. 'end #ests

    &% "or ole>. isua* E,amination

    9. erifcation o& imensions and eightsC. Prototype #est

    c% "or 'uts Bolts and (ashers>. erifcation o& imensions

    9. isua* ;nspection

    C. Proo& =oad #est

    5. *timate #ensi*e Strength #est

    6. Ga*anizing #est

    -. 'end #est

     #ensi*e Stress #esting

    'end #est

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    16/27

    d% Rolled !teel Angles and Bolts•  #ensi*e strength test and Mi** #est $ertifcate

    • $hemica* ana*ysis1 Stee* mi** +S#M

    • Iinc coating test certifcates

    • Fu** sca*e to!er *oad test ;E$ -69

    e% )nsulators #ype tests1 samp*e tests and %outine tests.

    • %adio ;nter&erence tests on

      ;ndiidua* insu*ator1 ;E$ 6B68E 9>9

      ;nsu*ator strings1 ;E$ CJC (>KB-)

    • +rtifcia* Po**ution #est ;E$ 5CB8E 755-

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    17/27

    f% )nsulator "ittings• %outine and samp*e mechanica* tests ;A1 E

    Ga*anizing tests E 9>7

    g% Conductor and $*( "ittings #ype1 %outine and samp*e test and routine test1;E$6B68E9>9

    • %adio inter&erence test on indiidua* insu*ator ;E$CJC

    • ;nsu*ator strings artifcia* po**ution test;E$5CB8E755-

    h% Clamps and +oints• Mechanica* and e*ectrica* E

    •  #ype tests1 ga*anizing and

    Mechanica* routine tests

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    18/27

    i% Dampers and !pacers• Fatigue resistant test1 %e*eant Standards

    •  #est o& c*amp s*ippage resistance• =ongitudina* de&ormation test

    • amping per&ormance test

    • Ga*anizing tests

     ,% Line Conductors• Mechanica* test

    Grease test• %esistiity test

    • *timate tensi*e stress o& comp*ete ;E$ 97K ;A25J975 conductor

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    19/27

    )nsulator !trings

     #!o important tests o& the insu*atorstrings sha** be carried out in a reputab*e*aboratory.

    >. E*ectro2Mechanica* test !ithcorresponding short2circuit current at >C98997 L strings

    (;E$26B6).9. +rtifcia* po**ution test o& an insu*atorstring &or both >C9 8997 L *ines.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    20/27

    Conductors andAccessories

    • Mechanica* and e*ectrica* tests on conductors andaccessories *ie dampers1 c*amps1 oints etc sha** be

    carried out according to standards indicated.

    • For conductors tensi*e destruction tests on the stranded

    conductor sha** be carried out.• $opper conductors sha** be subect to grease test1 i&

    reuired by the "!ner1 !hich sha** be per&ormed as

    &o**o!s:

    • + samp*e o& the specifed conductor1 not *ess than >677

    mm *ong sha** be he*d at an ang*e o& 96 eg. to thehorizonta* and heated automatica**y contro**ed to atemperature o& >77 $ &or a period o&95 hours. uring the

    test there sha** be no migration or *oss o& grease.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    21/27

    Testing Concrete

    •  #he $ontractor sha**1 at his o!n e,pense1prepare concrete test cubes as directed bythe "!ner and hae them tested in a

    concrete *aboratory approed by the"!ner in accordance !ith

    • Standard ;A >756 (>KBJ). + su

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    22/27

     #esting and $ommissioning o&ndeground #ransmission $ab*es

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    23/27

    Type tests for ca&le outer co-ering:• $onstruction and dimensions (;E$ -7J>>)

    Mechanica* properties (;E$ -7J>>)• $arbon b*ac content

    • ater and sa*ine absorption test (;E$ -799K)

    • Shrinage test

    +$ !ithstand o*tage test (;E$ -799K)• +$ o*tage test (>7 8C7 min and then increase in >7

    steps o& >7 min duration each up to min B6 )

    • ;mpu*se !ithstand o*tage test (67 N>7 ;mp.) (;E$-79C7)

    • ;mpu*se o*tage test to breado!n (57 8OC ;mp.step)

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    24/27

    Type test for ca&les and theiraccessories:

    Genera**y1 the standards o& SS 595>5>B1 ;E$ -97-Band ;EEE 5J sha** be app*ied.

    • ater and sa*ine absorption test o& the insu*ation

    shrinage test o& the insu*ation.• Specia* cab*e tests according to: SS 595>5>B1 E

    79-C1 ;E$ -97-B and ;E$ -7J>>.

    • ;mpu*se test >.65 , ';= at ? 97 E$1 each C negatie

    and positie impu*ses.• ie*ectric test C , o &or 5 hours.

    • Measurements o& meta* sheath thicness (;E$ -7>5>1>C.9)1 !eights o& copper1 *ead and stee* per meter &oradustment o& meta* prices &or fna* $ontract Price.

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    25/27

    Routine ca&le tests according to).C #0#1%

    ;n addition1 the &o**o!ing sha** beper&ormed:

    • $onductor resistance test (;E$

    -799J)

    • $apacitance test

    • ie*ectric *oss ang*e test

    •  #est on corrosion O resistant coering(;E$ -799K)

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    26/27

    Test after installation including allaccessories:

    +ccording to ;E$ -97-B. ;n addition1 the&o**o!ing sha** be per&ormed:

    • $ conductor resistance test (;E$

    -799J)• $apacitance test

    • $ sheath test (>7 8> minute)

    bet!een meta**ic sheath8screen8armouring inc*uding cross bondingsystem1 etc. and ground

  • 8/16/2019 Testing and Commisioning of CB and Trans. Line

    27/27

    .arthing measurements

    • isua* and &unction test o& cross

    bonding system and cab*e sheathtemperature measurement system.

    • Positie8negatie and zero seuence

    impedance measurements.• $ sheath test (6 8> minute)

    bet!een meta**ic

    sheath8screen8armouring inc*udingcross bonding system1 etc. andground.