testing and commisioning of cb and trans. line
TRANSCRIPT
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
1/27
Testing and Commissioningof Circuit Breaker and
Transmission LinePrepared by:
Hafz Syed Faizan Hamid (Grid System Maintenance Engr.)
Muhammad Faizan Faroo (Po!er System "perations Engr.)
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
2/27
#esting and $ommisioning%euirements o& $ircuit 'reaer
• ataco**ection
• Genera* $hecs and inspection
• $ontact resistance
• +u,i*ary s!itch checs
• #rip and c*ose timing test
• "$' specifc tests
• "$' oi* test• +'$' specifc tests
• +'$' air dryness test
• +'$' air *eaage
• +'$' pressure s!itches
• +'$' pressure drop !ith operations
• G$'(SF-) specifc test
• G$'(SF-) *eaage detection
• G$'(SF-) de! point
• G$'(SF-) o,ygen content
• G$'(SF-) acidity
• "perationa* test
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
3/27
Data Collection:
#his !ou*d consist o& type re&erence and seria*
Checks/inspections :
#his is *arge*y a isua* chec and !ou*d typica**y consist "& the &o**o!ing:
/ circuit identifcation and phase *abe*s
/ earth Strap connections
/ tightness o& &astenings
/ arcing horns and rings
/ contro* and operation "& heaters
/ insu*ators c*ean and undamaged
/ inspection "& breathers
/ oi* *ee*s0&or "$'s
/ correct position o& any a*es
/ acceptab*e readings on any gauges
Contact Resistance:
#his is a measure o& resistance across each set o& contacts !ith the circuitbreaer c*osed. + digita* micrometer shou*d be used. Manu&acturers !i** uote ma,imuma*ues "& resistance1 !hich !i** typica**y be in the range o& a &e! tens o& micro2ohms. +**resu*ts shou*d be
recorded as a source &or comparison during maintenance.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
4/27
Contact Resistance:
• #his is a measure o& resistance across
each set o& contacts !ith the circuitbreaer c*osed.
• + digita* micrometer shou*d be used.
•
Manu&acturers !i** uote ma,imuma*ues "& resistance1 !hich !i**typica**y be in the range o& a &e! tens oµ2ohms.
• +** resu*ts shou*d be recorded as asource &or comparison duringmaintenance.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
5/27
Auxiliary switches
+u,i*iary s!itches are typica**y o& the &o**o!ingtypes:
/ mae coincident !ith the main contactsc*osing (norma**y open)3
/ brea coincident !ith the main contacts
c*osing (norma**y c*osed)3/ mae (or brea) in adance "& the maincontacts c*osing3
/ mae (or brea) a&ter the main contacts c*ose3
/ momentari*y mae during the open or c*osingseuence (4eeting con2
tact).
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
6/27
Timing Tests
/ trip test0initiation to contacts part
/ c*ose test0initiation to contactstouch
/ trip on c*ose test0c*ose onto an
a*ready operated trip re*ay/ au,i*iary s!itch test0comparison o&au,i*iary s!itch !ith main contacts.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
7/27
Air dryness:• %e*atie*y dry air is obious*y important &or the
satis&actory
•
per&ormance o& a pressurized head +'$'• +ir under pressure has a more concentrated moisture
content than at atmospheric pressure1 and there&ore thede!point temperature increases !ith air pressure.
• #hus un*ess the receier air is reasonab*y dry1 a !inter
co*d spe** cou*d cause moisture in the air !ithin thebreaer to condense onto insu*ation sur&aces resu*ting ininsu*ation breado!n.
• +t a receier operating pressure o&1 say1 567 *b8in91 thereuired de!point temperature shou*d be 097$ or *o!er3
• this !ou*d correspond to a de!point "& 0 67$ atatmospheric pressure.
• e!point can be obtained by passing the compressed airthrough a de!point meter.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
8/27
Air Leakage:
#his is a chec to eri&y that the sea*s and seats are reasonab*y
airtight. #his can be done by c*osing the +'$' in*et a*e. and obsering the
pressure gauge drop oer a number "& hours.
ressure switch:
;n genera* three pressure s!itches are ftted:
/ *o!2air2pressure a*arm
/ c*ose *ocout
/ trip *ocout #he operation and resetting o& these s!itches shou*d be checed against a
ca*ibrated pressure gauge. #his is usua**y accomp*ished by iso*ating a section
o& pipe!or to !hich the s!itch is connected1 and s*o!*y draining (and then
ref**ing) the section.
ressure drop with operations: #he air receier usua**y contains su
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
9/27
!"# Leakage detection:
• #his shou*d commence !ith the SF-
compartments f**ed to &u** pressureand an obseration made o& !hetherthe pressure is then stab*e or &a**s
oer a period o& time.• =eas can be detected by use o& an
SF-2*eaage detector. #his genera**y
consists o& a hand2he*d probe !hichshou*d be s*o!*y moed oer thesur&ace o& the SF- containmentesse*.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
10/27
!"# Dewpoint:
• #he de!point can be obtained by use o& a de!point ce**.
• #his consists o& a c*osed ce** in !hich there is an e,posedmeta**ic mirror.
• #hrough !hich SF- is passed at a contro**ed rate !hi*e themirror temperature is s*o!*y *o!ered.
•
#emperature contro* is achieed by e,posing the reerse sideo& the mirror to a mi, o& acetone and so*id carbon dio,ide.
• #he *atter being added s*o!*y to reduce temperature. +s themirror temperature &a**s1 a point is reached !here !atercondenses on the sur&ace &orming a de! or a &rost.
•
#he temperature #1 at !hich this taes p*ace is recorded. #hetemperature is then a**o!ed to rise and point at !hich thede! c*ears is recorded. #he de!point is then taen as >89( #*?#9).
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
11/27
!"# $xygen content:
#his can be determined by use o& ano,ygen2measuring
instrument1 !hich may &unction on the
princip*e o& magnetic susceptibi*ity(o,ygen is paramagnetic1 !hich isunusua* &or a gas) or gas chromatography.
SF- is passed through the measuring
deice at a contro**ed rate. #he ma,imumpermitted o,ygen concentration is 7.7> @by mass.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
12/27
!"# acidity:
#he acidity is measured by passing SFS through a di*ute a*a*io& no!n strength and o*ume unti* the a*a*i is neutra*isedby the acid. #he
a*a*i chosen is usua**y sodium hydro,ide1 to !hich anindicator (such as
bromocreso* purp*e) is added. Aeutra*isation is indicated by achange in the
co*our o& the so*ution. #he acidity content is "btained byca*cu*ation1 !hich
is !e** described in 'S 697B. #he acidity is e,pressed in termso& hydro4uoric
acid (HF) content1 in mg "& acid8g "& SF-. #he ma,imumpermitted concentration 07.C mg8g.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
13/27
$perational tests
#he &o**o!ing operationa* tests shou*d be carried out during
commissioning:
(a) Manua* c*osure o& the circuit breaer ia the c*ose hand*e8s!itch!hi*e a trip re*ay is operated. #he manua* c*osure shou*d be e,ecuted&or about >7 s.
#he circuit shou*d commence to c*ose1 trip and remain open. "nce
the circuit breaer is in the open position1 the trip signa* shou*d beautomatica**y remoed &rom the trip coi*1 ia the breaer au,i*iarycontacts and thus it may seem1 at frst sight1 that the circuit breaershou*d commence to c*ose again. (b) Functioning o& the circuitbreaer &rom the *oca*1 standby and superisory (main) positions3
(c) "pening and c*osing under reduced battery o*tage3
(d) Proing o& inter*ocs. Most circuit breaers hae inter*ocs3 someare euipped !ith Dcaster type eys such that they cannot beoperated i& the ey is remoed.
(e) $hec on8o2position indicator.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
14/27
#esting and $ommissioning o& "8H
#ransmission =ine
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
15/27
a% "or !teel>. $hemica* +na*ysis
9. #ensi*e #ests
C. 'end #ests
&% "or ole>. isua* E,amination
9. erifcation o& imensions and eightsC. Prototype #est
c% "or 'uts Bolts and (ashers>. erifcation o& imensions
9. isua* ;nspection
C. Proo& =oad #est
5. *timate #ensi*e Strength #est
6. Ga*anizing #est
-. 'end #est
#ensi*e Stress #esting
'end #est
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
16/27
d% Rolled !teel Angles and Bolts• #ensi*e strength test and Mi** #est $ertifcate
• $hemica* ana*ysis1 Stee* mi** +S#M
• Iinc coating test certifcates
• Fu** sca*e to!er *oad test ;E$ -69
e% )nsulators #ype tests1 samp*e tests and %outine tests.
• %adio ;nter&erence tests on
;ndiidua* insu*ator1 ;E$ 6B68E 9>9
;nsu*ator strings1 ;E$ CJC (>KB-)
• +rtifcia* Po**ution #est ;E$ 5CB8E 755-
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
17/27
f% )nsulator "ittings• %outine and samp*e mechanica* tests ;A1 E
•
Ga*anizing tests E 9>7
g% Conductor and $*( "ittings #ype1 %outine and samp*e test and routine test1;E$6B68E9>9
• %adio inter&erence test on indiidua* insu*ator ;E$CJC
• ;nsu*ator strings artifcia* po**ution test;E$5CB8E755-
h% Clamps and +oints• Mechanica* and e*ectrica* E
• #ype tests1 ga*anizing and
•
Mechanica* routine tests
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
18/27
i% Dampers and !pacers• Fatigue resistant test1 %e*eant Standards
• #est o& c*amp s*ippage resistance• =ongitudina* de&ormation test
• amping per&ormance test
• Ga*anizing tests
,% Line Conductors• Mechanica* test
•
Grease test• %esistiity test
• *timate tensi*e stress o& comp*ete ;E$ 97K ;A25J975 conductor
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
19/27
)nsulator !trings
#!o important tests o& the insu*atorstrings sha** be carried out in a reputab*e*aboratory.
>. E*ectro2Mechanica* test !ithcorresponding short2circuit current at >C98997 L strings
(;E$26B6).9. +rtifcia* po**ution test o& an insu*atorstring &or both >C9 8997 L *ines.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
20/27
Conductors andAccessories
• Mechanica* and e*ectrica* tests on conductors andaccessories *ie dampers1 c*amps1 oints etc sha** be
carried out according to standards indicated.
• For conductors tensi*e destruction tests on the stranded
conductor sha** be carried out.• $opper conductors sha** be subect to grease test1 i&
reuired by the "!ner1 !hich sha** be per&ormed as
&o**o!s:
• + samp*e o& the specifed conductor1 not *ess than >677
mm *ong sha** be he*d at an ang*e o& 96 eg. to thehorizonta* and heated automatica**y contro**ed to atemperature o& >77 $ &or a period o&95 hours. uring the
test there sha** be no migration or *oss o& grease.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
21/27
Testing Concrete
• #he $ontractor sha**1 at his o!n e,pense1prepare concrete test cubes as directed bythe "!ner and hae them tested in a
concrete *aboratory approed by the"!ner in accordance !ith
• Standard ;A >756 (>KBJ). + su
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
22/27
#esting and $ommissioning o&ndeground #ransmission $ab*es
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
23/27
Type tests for ca&le outer co-ering:• $onstruction and dimensions (;E$ -7J>>)
•
Mechanica* properties (;E$ -7J>>)• $arbon b*ac content
• ater and sa*ine absorption test (;E$ -799K)
• Shrinage test
•
+$ !ithstand o*tage test (;E$ -799K)• +$ o*tage test (>7 8C7 min and then increase in >7
steps o& >7 min duration each up to min B6 )
• ;mpu*se !ithstand o*tage test (67 N>7 ;mp.) (;E$-79C7)
• ;mpu*se o*tage test to breado!n (57 8OC ;mp.step)
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
24/27
Type test for ca&les and theiraccessories:
Genera**y1 the standards o& SS 595>5>B1 ;E$ -97-Band ;EEE 5J sha** be app*ied.
• ater and sa*ine absorption test o& the insu*ation
shrinage test o& the insu*ation.• Specia* cab*e tests according to: SS 595>5>B1 E
79-C1 ;E$ -97-B and ;E$ -7J>>.
• ;mpu*se test >.65 , ';= at ? 97 E$1 each C negatie
and positie impu*ses.• ie*ectric test C , o &or 5 hours.
• Measurements o& meta* sheath thicness (;E$ -7>5>1>C.9)1 !eights o& copper1 *ead and stee* per meter &oradustment o& meta* prices &or fna* $ontract Price.
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
25/27
Routine ca&le tests according to).C #0#1%
;n addition1 the &o**o!ing sha** beper&ormed:
• $onductor resistance test (;E$
-799J)
• $apacitance test
• ie*ectric *oss ang*e test
• #est on corrosion O resistant coering(;E$ -799K)
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
26/27
Test after installation including allaccessories:
+ccording to ;E$ -97-B. ;n addition1 the&o**o!ing sha** be per&ormed:
• $ conductor resistance test (;E$
-799J)• $apacitance test
• $ sheath test (>7 8> minute)
bet!een meta**ic sheath8screen8armouring inc*uding cross bondingsystem1 etc. and ground
-
8/16/2019 Testing and Commisioning of CB and Trans. Line
27/27
.arthing measurements
• isua* and &unction test o& cross
bonding system and cab*e sheathtemperature measurement system.
• Positie8negatie and zero seuence
impedance measurements.• $ sheath test (6 8> minute)
bet!een meta**ic
sheath8screen8armouring inc*udingcross bonding system1 etc. andground.