DESCRIPTION
Texas Regional Entity Presentation to UFLS SDT. Delegation Agreements Between NERC and REs. Delegated functions: Compliance enforcement Development of Regional standards / Regional Variance - PowerPoint PPT PresentationTRANSCRIPT
July 2008 UFLS
Texas Regional Entity
Presentation to UFLS SDT
UFLSJuly 2008
2
Delegation Agreements Between NERC and REs
Delegated functions:
Compliance enforcement
Development of Regional standards / Regional Variance
• FERC approved the Texas RE Standards Development Process as part of the delegation agreement on April 19, 2007
UFLSJuly 2008
3
Key Role Players
● Requester/Originator of a Standard or Variance● Reliability Standards Committee (RSC)● Reliability Standards Manager (RSM)● Reliability and Operations Subcommittee (ROS)● Standards Drafting Team (SDT)● Registered Ballot Body (RBB)
Ballot Pool (BP)● Texas RE Board of Directors (BOD)● NERC Board of Trustees (BOT)● FERC
UFLSJuly 2008
4
Reliability Standards Committee (Cont.)
Reliability Standards Committee (RSC)
Review and consider SARs to be assigned for development
Prioritize the development of SARs
Request ROS to assemble the Standard Drafting Team (SDT)
Declare an expected date for the SDT work to be completed and available for consideration by the NERC Registered Entity in ERCOT region
Evaluate a draft standard for completion and readiness for posting for comments and/or voting by RBB
Recommend to forward the Draft standard package to the TRE BOD for approval
UFLSJuly 2008
5
Reliability and Operations Subcommittee (ROS)
Reliability and Operations Subcommittee (ROS)
Appoints the SDT interim chair
*The SDT will elect the permanent Chair and Vice-Chair at its first meeting
Assemble a qualified balanced slate for the SDT
UFLSJuly 2008
6
Standard Drafting Team
Typically includes a member of the Texas RE staff and the originator in addition to the field Subject Matter Experts (SME) assigned by ROS
Standard Drafting Team
A team of technical experts assigned by ROS
Collectively have the necessary technical expertise and work process skills pertaining to the particular SAR subject
Review stakeholders comments and consider modification to the draft standard
Work on the technical aspect of the standard
Report to RSC on the work progress and make appropriate recommendations as needed
UFLSJuly 2008
7
Regional Standards Process Overview
SAR Submitted
RSC Evaluation and disposition of
SAR
ROSforms SDT
SDT
UFLSJuly 2008
8
Regional Standards Process Overview ( Cont.)
SDT RSC Evaluation
Posting for Comments
More work needed
SDT responds to comments and considers modification to the draft standard
UFLSJuly 2008
9
Regional Standards Process Overview ( Cont.)
RSC recommends posting for vote
RBB/BP
Forward the package for TRE BOD approval
Evaluation by NERC and approval by NERC BOT
NERC filing to seek FERC approval
Reject
Remand
UFLSJuly 2008
10
Regional Standards Process Overview ( Cont.)
● Proposed regional reliability standard is subject to review by NERC, and approval by NERC Board of Trustees
● Upon approval by FERC, Regional reliability standards, shall be made part of the body of NERC reliability standards and shall be enforced upon all applicable bulk-power system owners, operators, and users within the ERCOT region, regardless of membership in the region.
UFLSJuly 2008
11
Standard Drafting Team
● Team of Subject Matter Experts● Use their specific expertise to lead the
development and refinement of the technical and detailed standards
● Encourage and coordinate inter-industry examination and consensus
● Ensure that Regional Standards are technically accurate, clear, enforceable, and provide an adequate level of reliability for the ERCOT Bulk Power System
UFLSJuly 2008
12
General Documents for SDT
● Approved SAR ● Standard Drafting Team Roster ● Reliability Standards Process● Regional Reliability Standards numbering
convention ● Any other relevant material ● Texas Regional Entity Standards Drafting Team
Procedure
UFLSJuly 2008
13
Actions for the First SDT Meeting
● Elect a permanent Chair and a Vice-chair
● Review the following items:
Standards Development Process Responsibilities and tasks of the SDT members
● Propose Proposed timetable with target dates and key milestones (Project Schedule and Plan)
UFLSJuly 2008
14
SDT Work Products
● A draft Regional Standard consistent with the SAR on which it was based
● An assessment of the impact of the SAR on neighboring regions and appropriate input from the neighboring regions if the SAR is determined to impact any neighboring region
UFLSJuly 2008
15
SDT Work Products (Cont.)
● Identification of any existing Regional Standard that will be deleted, in part or whole, or otherwise impacted by the implementation of the draft Standard
● Technical reports and/or work papers that provide technical support for the draft Regional Standard under consideration
● Document the perceived reliability impact should the Regional Standard be approved
UFLSJuly 2008
16
SDT Work Products (Cont.)
● SDT is also responsible for developing all required compliance and performance elements and associated questions for a Comment Form.
● An implementation plan, including the nature, extent and duration of field-testing, if any.
UFLSJuly 2008
17
General Administrative for SDT
● Voting
Voting may take place during formal meetings or may take place through electronic means as the SDT Chair deems necessary.
Approval of any action of a SDT requires two-thirds of the SDT member votes cast.
Only those team members who are appointed by the ROS have the right to vote.
UFLSJuly 2008
18
General Administrative for SDT (Cont.)
● Quorum A quorum requires two-thirds of the voting
members of the SDT. The voting members are those members appointed by the ROS.
● Proxies Proxies for SDT voting are not allowed.
UFLSJuly 2008
19
General Administrative for SDT (Cont.)
● Open Meetings Meetings of SDTs shall be open to all
interested parties. The SDT Chair is responsible for conducting
the meetings in a responsible, timely and efficient manner.
To accomplish its assigned tasks there may be times when the Chair has to limit the participation of guests to ensure that the SDT accomplishes its assigned tasks in a timely and efficient manner.
UFLSJuly 2008
20
Project 2007-01 Underfrequency Load Shedding
PRC-006 — Development and Documentation of Regional Reliability Organizations Underfrequency Load Shedding Programs
PRC-007 — Assuring Consistency with Regional UFLS Programs
PRC-009 — UFLS Performance Following an Underfrequency Event
http://www.nerc.com/~filez/standards/Underfrequency_Load_Shedding.html
UFLSJuly 2008
21
Project 2007-01: UFLS ( Cont.)
Current Working View
First draft is posted for comments (July 2 to Aug 15)
ftp://www.nerc.com/pub/sys/all_updl/standards/announcements/Standards_Announcements_CIP_and_UFLS_Comment_Periods_Open_2008July02.pdf
UFLSJuly 2008
22
Regional UFLS
● SAR-002-TRE-01: Development and Documentation of Regional UFLS Program
Accepted by RSC on May 27 SDT slate was accepted by ROS on June 12,
2008
● RSC directed the Regional UFLS SDT to review and comment on the NERC UFLS Draft.