123
456
OBSERVAT
1
REPORT
Other Tom Bete: 19 Sep
Site:
n:
PROGRESS . South e. Center. Shoring
and 15. Terrace. One u. SW Ca
TIONS: . Photos
Lookin
work was in pelcher ptember 2012
USF PoLakela Tom BJoey OSkanskLibertyBorrellQ & QChasta John WChuck
entry wall founr 2nd floor slab g and formwo5 and betweene (east and wepper portal po
auseway pond
below provide
g SE at buildin
rogress on this
olytechnic, Bldnd, Florida
elcher – AAI Ottman - AAI ka Team /Baker Electric
Q Plumbing ain Skillman
White – USFP k Jablon - Skan
ndations forme poured betwerk in progress
n B lines. est) reinforcingortion poured. wall sheet pile
e construction
ng.
s date that wa
dg 555
nska
ed. een pour brea for 2nd Floor s
g in progress b Form work stes in progress.
status.
L
A A R
1705U N I T
s not observed
Field
RepoTime
Wea AAI
ks. slab approxim
between CL -8 tarted on anot.
Looking east a
L F OR C H I
5 N.16T H ST. T E D S T A T E S
d by Alfonso A
d Report #: 17
ort Date: 1e: 9
ather: 8
Project #: 0
mately between
and 8. ther frame in N
across north b
O N S T E C T
TAMPA, FL 33 8 1 3 . 2 4 7 . 3
Architects.
7
19 September 9:30 PM – 4:0
88° Cloudy/ra
08135.00
column lines
NW quad.
ridge/common
O T S
605 3 3 3
2012 00 PM
in PM
8
ns.
NOTE: Report By:Report Da
2
Other Tom Bete: 19 Sep
Lookin
Lookin
West c
. 2nd floolevel coelimina
First po
work was in pelcher ptember 2012
g south across
g across west
orridor portal
or level portal olumns. Subsate bleeding.
ortal pour sout
rogress on this
s 2nd common
terrace.
formwork.
poured one Cequent formwo
th of NW bridg
s date that wa
s. L
L
E
CL south of NWork will have a
ge. R
A A R
s not observed
Looking south
Looking NNW
East corridor p
W bridge. Conadditional form
Radius to strai
L F OR C H I
d by Alfonso A
down west 1s
W.
portal reinforci
ncrete finish qm ties on eithe
ght slightly mi
O N S T E C T
Page 2
Architects.
t floor corridor
ing in NE qua
uality similar tr side of beam
ssed aligned.
O T S
2 of 5
r.
d.
o first ms to
NOTE: Report By:Report Da
3
4
Other Tom Bete: 19 Sep
Radius
D
Base o
. Terrace
Lookin
. Southw
Lookin
work was in pelcher ptember 2012
to straight slig
of portal at 2nd
e formwork/re
g NW at west
west causeway
g west from so
rogress on this
ghtly missed a
floor.
inforcing in pr
terrace.
pondwall she
outh bldg. entr
s date that wa
ligned. S
P
rogress.
L
et piles in prog
ry.
A A R
s not observed
Some bleed-o
Portal column
Looking NE at
gress.
L F OR C H I
d by Alfonso A
out at chamfer
at clerestory.
t east terrace.
O N S T E C T
Page 3
Architects.
requiring repa
O T S
3 of 5
air.
NOTE: Report By:Report Da
ITEMS TO INFORMA
1
Other Tom Bete: 19 Sep
VERIFY: Non
ATION OR AC. Concre
followitop of wparalleeach cshall suwall, co
Both wFinish.
StraighParalle
Deficiea. Th
therem
b. A cwacolocjoi
c. Loim
d. Cothe
work was in pelcher ptember 2012
ne.
TION REQUIRete pour at nong photos arewall shall be c
el to stringer (1olumn. Concubmit revised solumn/beam r
walls have been
ht edge illustrael to wall
encies (9/5/12ere is a horizoe same stair camediated awachamfer has balls. This is OKorner which wilcation where tnt between thewer portion ofplemented in
onfirm the porte curved wall h
rogress on this
RED: rth stair does n of corrective w
consistent. Eac/2 inch deviarete sub did nshop drawingsremediation.
n repaired to a
tes column fac
2): ontal joint on oannot be formy.
been added aloK, but there arl need remedihe horizontal e vertical and f form joint wathe upper porttion of the colhas been impl
s date that wa
not reflect notawork executedch CM-29 coltion). Lower eot resubmit shs picking up pr
a polished E
ce not V
f
one side of theed differently.
ong the exposre two issues: al work; and (beam below thhorizontal me
as not poured. tion of the waumn at the coemented as in
A A R
s not observed
ations provided in the past wlumn face adjaedge of exposehop drawings frevious review
Each wall will
View of exposeformed.
e stair but not The horizonta
sed vertical co(i) there is sign(ii) the chamfehe stair is to b
embers. Consequentlyll.
orner that is to ndicated on the
L F OR C H I
d by Alfonso A
ed on shop draweek. Finish onacent to stair aed chevron befor this area pr
w comments an
need to match
ed CM-29 col
the other. Twoal joint in the e
rner at the intenificant bleediner must not pasbe poured later
y, the joint sho
be expressed e revised docu
O N S T E C T
Page 4
Architects.
awings. The n wall from staangles and is neam missing orior to pour annd illustrate low
h formwork ab
lumn incorrect
o exposed sideeast wall must
ersection of thng at the west ss through ther. We do want
ould not be
on the facadeuments.
O T S
4 of 5
air to not n nd wer
bove.
tly
es of be
e
e t a
e of
A L F O N S O A R C H I T E C T S
Page 5 of 5
NOTE: Other work was in progress on this date that was not observed by Alfonso Architects. Report By: Tom Belcher Report Date: 19 September 2012
e. “L-shaped” beam did not appear to be cast at top of stair as documented. Not shown in these photos.
9/19/12: TB and JDO reviewed deficiencies with Pete Karamitsanis and John White. Pete reiterated AAI’s request that Skanska provide plan for remediation. JDO and Mark Manning met and developed three potential remediation options (see attached). Skanska to meet with Liberty/Baker to develop remediation plan and provide AAI and Owner a mockup for review.
2. Columns B-29 (east and west) require remediation to meet design intent as noted in Item 3 in field report above.
9/19/12: Ongoing.