th st. tampa, fl 33 unit ed states field...

10
FIELD NOTE: Report By: Report Da Project: Present at Distributio WORK IN 1 2 3 4 5 6 OBSERVAT 1 REPORT Other Tom Be te: 19 Sep Site: n: PROGRESS . South e . Center . Shoring and 15 . Terrace . One u . SW Ca TIONS: . Photos Lookin work was in p elcher ptember 2012 USF Po Lakela Tom B Joey O Skansk Liberty Borrell Q & Q Chasta John W Chuck entry wall foun r 2 nd floor slab g and formwo 5 and between e (east and we pper portal po auseway pond below provide g SE at buildin rogress on this olytechnic, Bld nd, Florida elcher AAI Ottman - AAI ka Team /Baker Electric Q Plumbing ain Skillman White USFP k Jablon - Skan ndations forme poured betwe rk in progress n B lines. est) reinforcing ortion poured. wall sheet pile e construction ng. s date that wa dg 555 nska ed. een pour brea for 2 nd Floor s g in progress b Form work st es in progress. status. L A A R 170 5 UNI T s not observed Field Repo Time Wea AAI ks. slab approxim between CL -8 tarted on anot . Looking east a L F O R C H I 5 N.16 TH ST. T ED STATES d by Alfonso A d Report #: 17 ort Date: 1 e: 9 ather: 8 Project #: 0 mately between and 8. ther frame in N across north b O N S T E C T TAMPA, FL 33 813.247.3 Architects. 7 19 September 9:30 PM 4:0 88° Cloudy/ra 08135.00 column lines NW quad. ridge/common O T S 605 333 2012 00 PM in PM 8 ns.

Upload: others

Post on 24-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other

FIELD

NOTE: Report By:Report Da

Project:

Present at

Distributio

WORK IN

123

456

OBSERVAT

1

REPORT

Other Tom Bete: 19 Sep

Site:

n:

PROGRESS . South e. Center. Shoring

and 15. Terrace. One u. SW Ca

TIONS: . Photos

Lookin

work was in pelcher ptember 2012

USF PoLakela Tom BJoey OSkanskLibertyBorrellQ & QChasta John WChuck

entry wall founr 2nd floor slab g and formwo5 and betweene (east and wepper portal po

auseway pond

below provide

g SE at buildin

rogress on this

olytechnic, Bldnd, Florida

elcher – AAI Ottman - AAI ka Team /Baker Electric

Q Plumbing ain Skillman

White – USFP k Jablon - Skan

ndations forme poured betwerk in progress

n B lines. est) reinforcingortion poured. wall sheet pile

e construction

ng.

s date that wa

dg 555

nska

ed. een pour brea for 2nd Floor s

g in progress b Form work stes in progress.

status.

L

A A R

1705U N I T

s not observed

Field

RepoTime

Wea AAI

ks. slab approxim

between CL -8 tarted on anot.

Looking east a

L F OR C H I

5 N.16T H ST. T E D S T A T E S

d by Alfonso A

d Report #: 17

ort Date: 1e: 9

ather: 8

Project #: 0

mately between

and 8. ther frame in N

across north b

O N S T E C T

TAMPA, FL 33 8 1 3 . 2 4 7 . 3

Architects.

7

19 September 9:30 PM – 4:0

88° Cloudy/ra

08135.00

column lines

NW quad.

ridge/common

O T S

605 3 3 3

2012 00 PM

in PM

8

ns.

Page 2: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other

NOTE: Report By:Report Da

2

Other Tom Bete: 19 Sep

Lookin

Lookin

West c

. 2nd floolevel coelimina

First po

work was in pelcher ptember 2012

g south across

g across west

orridor portal

or level portal olumns. Subsate bleeding.

ortal pour sout

rogress on this

s 2nd common

terrace.

formwork.

poured one Cequent formwo

th of NW bridg

s date that wa

s. L

L

E

CL south of NWork will have a

ge. R

A A R

s not observed

Looking south

Looking NNW

East corridor p

W bridge. Conadditional form

Radius to strai

L F OR C H I

d by Alfonso A

down west 1s

W.

portal reinforci

ncrete finish qm ties on eithe

ght slightly mi

O N S T E C T

Page 2

Architects.

t floor corridor

ing in NE qua

uality similar tr side of beam

ssed aligned.

O T S

2 of 5

r.

d.

o first ms to

Page 3: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other

NOTE: Report By:Report Da

3

4

Other Tom Bete: 19 Sep

Radius

D

Base o

. Terrace

Lookin

. Southw

Lookin

work was in pelcher ptember 2012

to straight slig

of portal at 2nd

e formwork/re

g NW at west

west causeway

g west from so

rogress on this

ghtly missed a

floor.

inforcing in pr

terrace.

pondwall she

outh bldg. entr

s date that wa

ligned. S

P

rogress.

L

et piles in prog

ry.

A A R

s not observed

Some bleed-o

Portal column

Looking NE at

gress.

L F OR C H I

d by Alfonso A

out at chamfer

at clerestory.

t east terrace.

O N S T E C T

Page 3

Architects.

requiring repa

O T S

3 of 5

air.

Page 4: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other

NOTE: Report By:Report Da

ITEMS TO INFORMA

1

Other Tom Bete: 19 Sep

VERIFY: Non

ATION OR AC. Concre

followitop of wparalleeach cshall suwall, co

Both wFinish.

StraighParalle

Deficiea. Th

therem

b. A cwacolocjoi

c. Loim

d. Cothe

work was in pelcher ptember 2012

ne.

TION REQUIRete pour at nong photos arewall shall be c

el to stringer (1olumn. Concubmit revised solumn/beam r

walls have been

ht edge illustrael to wall

encies (9/5/12ere is a horizoe same stair camediated awachamfer has balls. This is OKorner which wilcation where tnt between thewer portion ofplemented in

onfirm the porte curved wall h

rogress on this

RED: rth stair does n of corrective w

consistent. Eac/2 inch deviarete sub did nshop drawingsremediation.

n repaired to a

tes column fac

2): ontal joint on oannot be formy.

been added aloK, but there arl need remedihe horizontal e vertical and f form joint wathe upper porttion of the colhas been impl

s date that wa

not reflect notawork executedch CM-29 coltion). Lower eot resubmit shs picking up pr

a polished E

ce not V

f

one side of theed differently.

ong the exposre two issues: al work; and (beam below thhorizontal me

as not poured. tion of the waumn at the coemented as in

A A R

s not observed

ations provided in the past wlumn face adjaedge of exposehop drawings frevious review

Each wall will

View of exposeformed.

e stair but not The horizonta

sed vertical co(i) there is sign(ii) the chamfehe stair is to b

embers. Consequentlyll.

orner that is to ndicated on the

L F OR C H I

d by Alfonso A

ed on shop draweek. Finish onacent to stair aed chevron befor this area pr

w comments an

need to match

ed CM-29 col

the other. Twoal joint in the e

rner at the intenificant bleediner must not pasbe poured later

y, the joint sho

be expressed e revised docu

O N S T E C T

Page 4

Architects.

awings. The n wall from staangles and is neam missing orior to pour annd illustrate low

h formwork ab

lumn incorrect

o exposed sideeast wall must

ersection of thng at the west ss through ther. We do want

ould not be

on the facadeuments.

O T S

4 of 5

air to not n nd wer

bove.

tly

es of be

e

e t a

e of

Page 5: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other

A L F O N S O A R C H I T E C T S

Page 5 of 5

NOTE: Other work was in progress on this date that was not observed by Alfonso Architects. Report By: Tom Belcher Report Date: 19 September 2012

e. “L-shaped” beam did not appear to be cast at top of stair as documented. Not shown in these photos.

9/19/12: TB and JDO reviewed deficiencies with Pete Karamitsanis and John White. Pete reiterated AAI’s request that Skanska provide plan for remediation. JDO and Mark Manning met and developed three potential remediation options (see attached). Skanska to meet with Liberty/Baker to develop remediation plan and provide AAI and Owner a mockup for review.

2. Columns B-29 (east and west) require remediation to meet design intent as noted in Item 3 in field report above.

9/19/12: Ongoing.

ATTACHMENTS: Sketches of North Stair referenced in “Information or Action Required”.

Page 6: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other
Page 7: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other
Page 8: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other
Page 9: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other
Page 10: TH ST. TAMPA, FL 33 UNIT ED STATES FIELD REPORTusfweb2.usf.edu/LakelandBOT/content/docs/facilities... · d chevron be or this area pr comments an need to match d CM-29 col the other