DATE: TO: FROM COPIE SUBJE This mem proposed previousl location o 1.0 P Our unde and our data. A study wa sheet pile for the an : M: ES: ECT: morandum r d sheet pile r ly provided of the specif PROJECT I erstanding o review of p detail sectio as to review e retaining w nalysis and d 30 Mi Ra An Ste Joh Pre Sh US Bu La KC report provi retaining wa a location d fic design ele NFORMAT f the project roject inform on of the pro w available p wall detail pl design of the MEMO November 2 ike Gedig, S ansford Adde nu Saxena, P eve McConn hn C. White, eliminary M eetpile Reta SF Polytechn uilding 555 C keland, Polk CI Project No ides a summ all located o drawing as w ement is sho TION t is based on mation whic oposed sheet project infor lans and prov e proposed sh ORANDU 2011 antiago Cala ei, P.E. P.E. n, P.E., Chas , AIA, USF Memorandum ining Wall A nic Causeway Se k County, Fl o. 61110267 mary of our on the campu well as detai own on the a n e-mail corr ch included t pile retaini rmation inclu vide geotech heet pile reta UM atrava New Y stain Skillma Polytechnic m Report Analysis and ection orida 7 geotechnic us at the Bu ils for the pr attached figu respondence conceptual ing wall is a uding soil b hnical assum aining wall. York,/Festin an, Inc. d Design al analyses uilding 555 roposed shee ures. e and conver design plan attached. Th boring profil mptions and r na Lente LLP and design Causeway. et pile wall. rsations with ns and subsu he purpose o les and prop recommenda P of a You The h you urface of this posed ations

Upload: others

Post on 16-Dec-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus

DATE:

TO:

FROM

COPIE

SUBJE

This memproposedpreviousllocation o 1.0 P Our undeand our data. A study washeet pilefor the an

:

M:

ES:

ECT:

morandum rd sheet pile rly provided of the specif

PROJECT I

erstanding oreview of pdetail sectio

as to reviewe retaining wnalysis and d

30

Mi RaAn SteJoh PreShUSBuLaKC

report proviretaining waa location d

fic design ele

NFORMAT

f the projectroject inform

on of the prow available pwall detail pldesign of the

MEMO

November 2

ike Gedig, S

ansford Addenu Saxena, P

eve McConnhn C. White,

eliminary Meetpile Reta

SF Polytechnuilding 555 Ckeland, Polk

CI Project No

ides a summall located odrawing as wement is sho

TION

t is based onmation whicoposed sheetproject inforlans and prove proposed sh

ORANDU

2011

antiago Cala

ei, P.E. P.E.

n, P.E., Chas, AIA, USF

Memorandumining Wall Anic Causeway Sek County, Flo. 61110267

mary of our on the campuwell as detaiown on the a

n e-mail corrch included t pile retainirmation incluvide geotechheet pile reta

UM

atrava New Y

stain SkillmaPolytechnic

m Report Analysis and

ection orida

7

geotechnicus at the Bu

ils for the prattached figu

respondenceconceptual

ing wall is auding soil b

hnical assumaining wall.

York,/Festin

an, Inc.

d Design

al analyses uilding 555 roposed shee

ures.

e and converdesign plan

attached. Thboring profil

mptions and r

na Lente LLP

and design Causeway. et pile wall.

rsations withns and subsuhe purpose oles and proprecommenda

P

of a You The

h you urface of this posed ations

Page 2: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus

MEMORANDUM Preliminary Memorandum Report Sheetpile Retaining Wall Analysis and Design USF Polytechnic Building 555 Causeway Section Lakeland, Polk County, Florida KCI Project No. 61110267 30 November 2011 Page 2 of 4 2.0 GEOTECHNICAL EVALUATIONS AND RECOMMENDATIONS Design Assumptions: We have performed sheet pile analysis and design based on the following assumptions:

The exposed height of the sheet pile should be a maximum 7 feet cantilever The top of the sheet pile is at EL 150 feet Model for Differential Hydrostatic Conditions as follows:

- Model A – Natural water level at the top of the sheet pile - Model B – Natural water level at the dredge line with full hydrostatic pressure behind the exposed height of the sheet pile - Model C – Natural water level at 2.5 feet below top of the sheet pile

Surcharge loading shall not exceed 250 pounds per square foot (psf) Minimum steel grade shall be ASTM A328 with yield strength of 39 kips per square inch

(ksi) Design Recommendations: Based on our analysis, we have provided the following recommendations for the sheet pile retaining wall design:

We recommend a minimum factor of safety (FS) of 1.3 for embedment We recommend a total minimum sheet pile length of 30 ft with a minimum of 23 ft of the

sheet pile below the dredge line The minimum section modulus of the sheet pile required per unit length of the wall shall

be 13 cubic inches per linear foot of the wall (in3/ft.). However, for corrosion considerations we recommend the following sheet pile sections: - AZ12 with section modulus of 22.3 in3/ft., or - PZ22 with section modulus of 18.1 in3/ft., or - PZ27 with section modulus of 30.2 in3/ft., or - AZ17 with section modulus of 31.0 in3/ft

KCI recommends the use of PZ27 or higher steel sheet piles for a highly corrosive project environment for this causeway. Steel sheet pile should conform to ASTM A572 Grade 50.

We recommend sealing the steel sheets joints to provide water tight seal and prevent fines from migrating through the sheet pile joints

Page 3: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus

MEMORANDUM Preliminary Memorandum Report Sheetpile Retaining Wall Analysis and Design USF Polytechnic Building 555 Causeway Section Lakeland, Polk County, Florida KCI Project No. 61110267 30 November 2011 Page 3 of 4 3.0 GEOTECHNICAL LIMITATIONS General 1. This report has been prepared to aid in the design of the proposed construction described in this report. Adequate recommendations have been provided to serve as a basis for design and preparation of plans and specifications. The opinions, conclusions, and recommendations contained in this report are based upon our professional judgment and generally accepted principles of geotechnical engineering. Inherent to these are the assumptions that the earthwork construction should be monitored and tested under the guidance of a geotechnical engineer licensed in the State of Florida or his representative. Review 2. This report has been prepared based on plans and description of the proposed construction cited herein. In the event that any changes in the nature, design or location of the proposed sheet pile retaining wall are planned, the conclusions and recommendations contained in this report should not be considered valid unless the changes are reviewed and conclusions of this report modified or verified in writing by KCI. This preliminary report is valid for a dredge depth of 7 ft below the final design grade of the causeway. If for any reason this dredge depth increases more than 7 ft, then this sheet pile wall design will not be valid. In this regard, the dredge depth should be maintained for the service life of this structure. Uses of Report 3. This report has been prepared for the exclusive use of USF Polytechnic and other members of the design team for specific application to the proposed Cantilever Sheet Pile Retaining Wall, located at the proposed Building 555 Causeway, USF Polytechnic Campus, Lakeland, Polk County, Florida. Our professional services have been performed in accordance with generally accepted geotechnical engineering principles and practices; no other warranty, expressed or implied, is made. KCI assumes no responsibility for interpretations made by others on the work performed by KCI. 4. This report is for design purposes only and is not sufficient to prepare an accurate bid. Contractors wishing a copy of the report may secure it with the understanding that its scope is

Page 4: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus

MEMORANDUM Preliminary Memorandum Report Sheetpile Retaining Wall Analysis and Design USF Polytechnic Building 555 Causeway Section Lakeland, Polk County, Florida KCI Project No. 61110267 30 November 2011 Page 4 of 4 limited to design considerations only. We recommend that this report be made available in its entirety including attachments and appendices to Contractors for informational purposes only. The project plans or specifications should include the following note: A geotechnical memorandum report has been prepared for this project by KCI Technologies, Inc. This report is for informational purposes only and should not be considered as part of the contract documents. The opinions and conclusions of KCI represent our interpretation of the subsurface conditions and the planned construction at the time of the report preparation. The data in this report may not be adequate for contractors estimating purposes.

* * *

Page 5: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus
mgedig
Line
mgedig
Line
mgedig
Line
mgedig
Polygon
mgedig
Polygon
mgedig
Text Box
BUILDING 555 CAUSEWAY SECTION
Page 6: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus

L-3.21

BU

ILD

ING

555

CA

US

EW

AY

SE

CTI

ON

S

CA

MPU

S PL

AN

NIN

G A

ND

FA

CIL

ITIE

S O

PERA

TIO

NS

POLY

TEC

HN

IC

2750 N McMULLEN BOOTH ROADSUITE 104

CLEARWATER, FL 33761P: (727) 797-5050

FLORIDA LICENSE #28392

I N N O V A T I V E S I T E D E S I G N

FESTINA LENTE SERVICES

713 PARK AVENUENEW YORK, NY 10021, USA

TEL: 212-452-1046

©2011 FESTINA LENTE SERVICESALL RIGHTS RESERVED

CA

MPU

S PL

AN

NIN

G A

ND

FA

CIL

ITIE

S O

PERA

TIO

NS

POLY

TEC

HN

IC

US

F P

OLY

TEC

HN

ICIN

FRA

STR

UC

TUR

E P

AC

KA

GE

LAK

ELA

ND

, FLO

RID

A

KEY MAP

Page 7: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus
Page 8: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus
Page 9: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus
Page 10: DesignMemorandum Sheetpile 5December2011usfweb2.usf.edu/LakelandBOT/content/docs/facilities...considerations we recommend the following sheet pile sections: - AZ12 with section modulus