the municipality of central elgin water and wastewater ... · watson & associates economists...

140
The Municipality of Central Elgin Water and Wastewater Rate Study May 24, 2018

Upload: others

Post on 07-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

The Municipality of Central Elgin

Water and Wastewater Rate Study

May 24, 2018

Page 2: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Contents

Page

Executive Summary ......................................................................................................... i

1. Introduction ........................................................................................................ 1-1 1.1 Background ............................................................................................. 1-1 1.2 Study Process ......................................................................................... 1-2

1.3 Regulatory Changes in Ontario ............................................................... 1-2 1.4 Sustainable Water and Sewage Systems Act ......................................... 1-3 1.5 Financial Plans Regulation ..................................................................... 1-5 1.6 Water Opportunities Act, 2010 ................................................................ 1-6

1.7 Infrastructure for Jobs and Prosperity Act (I.J.P.A.), 2015 ...................... 1-8 1.8 Forecast Growth and Servicing Requirements ....................................... 1-9

2. Capital Infrastructure Needs .............................................................................. 2-1

2.1 Capital Forecast ...................................................................................... 2-1

3. Lifecycle Costing ............................................................................................... 3-1

3.1 Overview of Lifecycle Costing ................................................................. 3-1 3.1.1 Definition ...................................................................................... 3-1 3.1.2 Financing Costs ........................................................................... 3-1

3.1.3 Costing Methods .......................................................................... 3-5 3.2 Impact on Budgets .................................................................................. 3-6

4. Capital Cost Financing Options ......................................................................... 4-1 4.1 Summary of Capital Cost Financing Alternatives .................................... 4-1

4.2 Development Charges Act, 1997 ............................................................ 4-2 4.3 Municipal Act .......................................................................................... 4-3 4.4 Grant Funding Availability ....................................................................... 4-4

4.5 Existing Reserves/Reserve Funds .......................................................... 4-6 4.6 Debenture Financing............................................................................... 4-6

4.7 Infrastructure Ontario .............................................................................. 4-6 4.8 Recommended Capital Financing Approach ........................................... 4-8

5. Overview of Expenditures and Revenues .......................................................... 5-1

5.1 Water Operating Expenditures ................................................................ 5-1 5.2 Water Operating Revenues .................................................................... 5-1 5.3 Wastewater Operating Expenditures ...................................................... 5-6 5.4 Wastewater Operating Revenues ........................................................... 5-6

6. Pricing Structures .............................................................................................. 6-1 6.1 Introduction ............................................................................................. 6-1 6.2 Alternative Pricing Structures .................................................................. 6-2 6.3 Assessment of Alternative Pricing Structures ......................................... 6-4 6.4 Rate Structures in Ontario ...................................................................... 6-9 6.5 Recommended Rate Structures .............................................................. 6-9

7. Analysis of Water and Wastewater Rates and Policy Matters ........................... 7-1

7.1 Introduction ............................................................................................. 7-1 7.2 Water Rates ............................................................................................ 7-1

Page 3: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

7.3 Wastewater Rates .................................................................................. 7-2

8. Recommendations ............................................................................................. 8-1

Appendix A – Water System Inventory Data ................................................................A-1

Appendix B – Wastewater System Inventory Data .......................................................B-1

Appendix C – Central Elgin System Detailed Water Rate Calculations ....................... C-1

Appendix D – Central Elgin System Detailed Wastewater Rate Calculations ............. D-1

Appendix E – Alternate Calculation for the Water System – Water Base Charge ........E-1

Page 4: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

List of Acronyms and Abbreviations

C.O.M.R.I.F. Canada-Ontario Municipal Rural Infrastructure Fund

D.C.A. Development Charges Act

F.I.R. Financial Information Return

I.O. Infrastructure Ontario

L.P.A.T. Land Planning Appeal Tribunal

M.O.E. Ministry of Environment

O.M.B. Ontario Municipal Board

O.Reg. Ontario Regulation

O.S.I.F.A. Ontario Strategic Infrastructure Financing Authority

O.S.T.A.R. Ontario Small Town and Rural

P.S.A.B. Public Sector Accounting Board

S.W.S.S.A. Sustainable Water and Sewage Systems Act, 2002

Page 5: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page (i)

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Executive Summary

The Municipality of Central Elgin retained Watson & Associates Economists Ltd.

(Watson) to undertake a water and wastewater rate study. Watson provided a water

and wastewater rate study and a Water Financial Plan in 2012. This study extends off

those studies, updating the analysis for current capital and operating forecasts, costing

for lifecycle cost requirements, current consumption and customer profiles. The results

of this analysis provide updated water and wastewater base charges and volume rates

for customers within the Municipality of Central Elgin. The rate analysis contained

herein continues to provide fiscally responsible practices that are in line with current

provincial legislation.

The monthly base charge rates and volume rates for water and wastewater are

anticipated to increase annually by 5% each year from 2018 to 2021, and then 2%

annually thereafter, for the Central Elgin system.

Tables ES-1 and ES-2 summarize the recommended water and wastewater rates and

average annual bill (assuming an annual volume of 140 m3) based on the analysis

provided herein over the forecast period to 2027:

Table ES-1 Summary of Forecasted Water Rates

Table ES-2 Summary of Forecasted Wastewater Rates

Description 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Monthly Base Rate $16.78 $17.62 $18.50 $19.42 $20.40 $20.80 $21.22 $21.64 $22.08 $22.52 $22.97

Constant Rate $2.81 $3.09 $3.40 $3.74 $4.11 $4.52 $4.79 $5.08 $5.18 $5.28 $5.39

Annual Base Rate Bill $201.36 $211.43 $222.00 $233.10 $244.75 $249.65 $254.64 $259.74 $264.93 $270.23 $275.63

Volume 140 140 140 140 140 140 140 140 140 140 140

Annual Volume Bill $393.40 $432.60 $476.00 $523.60 $575.40 $632.80 $670.60 $711.20 $725.20 $739.20 $754.60

Total Annual Bill $594.76 $644.03 $698.00 $756.70 $820.15 $882.45 $925.24 $970.94 $990.13 $1,009.43 $1,030.23

% Increase - Base Rate 5% 5% 5% 5% 2% 2% 2% 2% 2% 2%

% Increase - Volume Rate 10% 10% 10% 10% 10% 6% 6% 2% 2% 2%

% Increase - Total Annual Bill 8% 8% 8% 8% 8% 5% 5% 2% 2% 2%

Description 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Monthly Base Rate $20.01 $21.01 $22.06 $23.16 $24.32 $24.81 $25.30 $25.81 $26.33 $26.85 $27.39

Constant Rate $2.44 $2.64 $2.85 $3.08 $3.23 $3.39 $3.46 $3.53 $3.60 $3.67 $3.74

Annual Base Rate Bill $240.12 $252.13 $264.73 $277.97 $291.87 $297.70 $303.66 $309.73 $315.93 $322.25 $328.69

Volume 140 140 140 140 140 140 140 140 140 140 140

Annual Volume Bill $341.60 $369.60 $399.00 $431.20 $452.20 $474.60 $484.40 $494.20 $504.00 $513.80 $523.60

Total Annual Bill $581.72 $621.73 $663.73 $709.17 $744.07 $772.30 $788.06 $803.93 $819.93 $836.05 $852.29

% Increase - Base Rate 5% 5% 5% 5% 2% 2% 2% 2% 2% 2%

% Increase - Volume Rate 8% 8% 8% 5% 5% 2% 2% 2% 2% 2%

% Increase - Total Annual Bill 7% 7% 7% 5% 4% 2% 2% 2% 2% 2%

Page 6: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

1. Introduction

1.1 Background

The Municipality of Central Elgin provides water service to the Port Stanley, Belmont,

Lynhurst, Oakview, and St. Thomas suburban areas. Other customers receiving water

services include those along the Port Burwell, Port Stanley, St. Thomas, London and

Aylmer Secondary water systems and customers along the Elgin primary water system.

Currently, there are approximately 3,770 metered water customers within the

Municipality. These users are billed a fixed monthly charge as well as volume rate

based on their consumption. Revenues received from the charges directly fund the

capital and operating budgets for water.

Note that all users within Central Elgin presently pay a uniform rate. For 871 customers

within the St. Thomas suburban area, they are presently billed directly by St. Thomas

for service provided and pay an additional capital charge which is forwarded to Central

Elgin. In total these customers pay the exact same amounts as all other users in

Central Elgin.

Wastewater collection and treatment is provided by the Municipality to the urban areas

of Port Stanley, Belmont, Lynhurst and Eastwood. The communities of Port Stanley

and Belmont have been serviced since the early 1970’s, while Lynhurst has been

serviced since the mid 1980’s and Eastwood began receiving services in 2009.

The Municipality currently imposes a monthly base charge along with a volume

consumption charge for both water and wastewater. The 2017 rates, to recover capital

and operating costs related to the systems, are provided in Table 1-1.

Table 1-1 2017 Water and Wastewater Rates

With the legislative changes being made across Ontario as a result of the Walkerton

crisis, Municipalities will be required to conform to new statutes governing the

Monthly 16.78 Monthly 20.01

2.810$ per m3 2.440$ per m3

3.232$ per m3

*15% higher than cost charged to Municipality Customers

Volume Charge Volume Charge

Bulk Water Volume Charge*

Municipality of Central Elgin Municipality of Central Elgin

2017 - Water Billing Rates 2017 - Wastewater Billing Rates

Base Charge Base Charge

Page 7: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

management of water and wastewater systems. Watson & Associates Economists Ltd.

was retained by the Municipality of Central Elgin to assist in addressing these changes

in a proactive manner as they relate to the water and wastewater systems. The

assessment provided herein addresses changes recommended to the water and

wastewater rates based on the most current information and forecasts the implications

over the next ten-year period.

1.2 Study Process

The objectives of the study and the steps involved in carrying out this assignment are

summarized below:

• Identify all current and future water and wastewater system capital needs to

assess the immediate and longer-term implications;

• Identify potential methods of cost recovery from the capital needs listing. These

recovery methods may include other statutory authorities (e.g. Development

Charges, Municipal Act, etc.) as an offset to recovery through the water and

wastewater rates;

• Identify existing operating costs by component and estimate future operating

costs over the next ten years. This assessment identifies fixed and variable

costs in order to project those costs sensitive to changes to the existing

infrastructure inventory, as well as costs which may increase commensurate with

growth; and

• Provide staff and Committee/Council the findings to assist in gaining approval of

the rates for 2018 and future years.

1.3 Regulatory Changes in Ontario

Resulting from the water crisis in Walkerton, significant regulatory changes have been

made in Ontario over the past decade. These changes arise as a result of the

Walkerton Commission and the 93 recommendations made by the Walkerton Inquiry

Part II report. Areas of recommendation include:

• watershed management and source protection;

• quality management;

• preventative maintenance;

• research and development;

• new performance standards;

• sustainable asset management; and

• lifecycle costing.

Page 8: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

The legislation which would have most impacted municipal water and wastewater rates

was the Sustainable Water and Sewage Systems Act (S.W.S.S.A.) which would have

required municipalities to implement full cost pricing. The Act was enacted in 2002,

however, had not been implemented pending the approval of its regulations. The Act

was repealed as of January 1, 2013. It is expected that the provisions of the Water

Opportunities Act will implement the fundamental requirements of S.W.S.S.A.

Furthermore, on December 27, 2017, O.Reg. 588/17 was released under the

Infrastructure for Jobs and Prosperity Act (I.J.P.A.), 2015 which outlines the

requirements for asset management for municipalities. The results of the Asset

Management review under this Act will need to be considered in light of the recent

investments undertaken by the Municipality and the capital spending plan provided

herein. The following sections describe these various resulting changes.

1.4 Sustainable Water and Sewage Systems Act

As noted earlier, S.W.S.S.A. was passed on December 13, 2002. The intent of the Act

was to introduce the requirement for municipalities to undertake an assessment of the

“full cost” of providing their water and wastewater services. It is noted that this Act has

been repealed, however, to provide broader context and understanding to other

legislation discussed herein, a description of the Act is provided below.

Full costs for water service was defined in subsection 3(7) of the Act and included

“source protection costs, operating costs, financing costs, renewal and replacement

costs and improvement costs associated with extracting, treating or distributing water to

the public and such other costs which may be specified by regulation.” Similar

provisions were made for wastewater services in subsection 4(7) respecting the

“collecting, treating or discharging waste water.”

The Act would have required the preparation of two reports for submission to the

Ministry of the Environment (or such other member of the Executive Council as may be

assigned the administration of this Act under the Executive Council Act). The first report

was on the “full cost of services” and the second was the “cost recovery plan.” Once

these reports were reviewed and approved by the Ministry, the municipality would have

been required to implement the plans within a specified time period.

In regard to the “Full Cost of Services” report, the municipality (deemed a regulated

entity under the Act) would prepare and approve a report concerning the provision of

water and sewage services. This report was to include an inventory of the infrastructure,

a management plan providing for the long-term integrity of the systems and address the

full cost of providing the services (other matters may be specified by the regulations)

Page 9: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

along with the revenue obtained to provide them. A professional engineer would certify

the inventory and management plan portion of the report. The municipality’s auditor

would be required to provide a written opinion on the report. The report was to be

approved by the municipality and then be forwarded to the Ministry along with the

engineer’s certification and the auditor’s opinion. The regulations would stipulate the

timing for this report.

The second report was referred to as a “Cost Recovery Plan” and would address how

the municipality intended to pay for the full costs of providing the service. The

regulations were to specify limitations on what sources of revenue the municipality may

use. The regulations may have also provided limits as to the level of increases any

customer or class of customer may experience over any period of time. Provision was

made for the municipality to implement increases above these limits however ministerial

approval would be required first. Similar to the first report, the municipal auditor would

provide a written opinion on the report prior to Council’s adoption, and this opinion must

accompany the report when submitted to the Province.

The Act provided the Minister the power to approve or not approve the plans. If the

Minister was not satisfied with the report or if a municipality did not submit a plan, the

Minister may have a plan prepared. The cost to the Crown for preparing the plan would

be recovered from the municipality. As well, the Minister may direct two or more

regulated municipalities to prepare a joint plan. This joint plan may be directed at the

onset or be directed by the Minister after receiving the individual plans from the

municipalities.

The Minister also had the power to order a municipality to generate revenue from a

specific revenue source or in a specified manner. The Minister may have also ordered a

regulated entity to do or refrain from doing such things as the Minister considered

advisable to ensure that the entity pays the full cost of providing the services to the

public.

Once the plans were approved and in place, the municipality would be required to

submit progress reports. The timing of these reports and the information to be contained

therein would be established by the regulations. A municipal auditor’s opinion must be

provided with the progress report. Municipalities would also revise the plans if they

deem the estimate does not reflect the full cost of providing the services, as a result of a

change in circumstances, regulatory or other changes that affect their plan, etc. The

municipality would then revise its prior plan, provide an auditor’s opinion, and submit the

plan to the Minister.

Page 10: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

1.5 Financial Plans Regulation

On August 16, 2007, the M.O.E. passed O.Reg. 453/07 which requires the preparation

of financial plans for water (and wastewater) systems. The M.O.E. has also provided a

Financial Plan Guidance Document to assist in preparing the plans. A brief summary of

the key elements of the regulation is provided below:

• The financial plan will represent one of the key elements for the Municipality to

obtain its Drinking Water License;

• The financial plans shall be for a period of at least six years but longer planning

horizons are encouraged;

• As the regulation is under the Drinking Water Act, the preparation of the plan is

mandatory for water and encouraged for wastewater;

• The plan is considered a living document (i.e. will be updated as annual budgets

are prepared) but will need to be undertaken at a minimum every five years;

• The plans generally require the forecasting of capital, operating and reserve fund

positions, providing detailed inventories, forecasting future users and volume

usage and corresponding calculation of rates. In addition, P.S.A.B. information

on the system must be provided for each year of the forecast (i.e. total non-

financial assets, tangible capital asset acquisitions, tangible capital asset

construction, betterments, write-downs, disposals, total liabilities and net debt);

• The financial plans must be made available to the public (at no charge) upon

request and be available on the Municipality’s website. The availability of this

information must also be advertised; and

• The financial plans are to be approved by Resolution of the Council or governing

body indicating that the drinking water system is financially viable.

In general, the financial principles of the draft regulations follow the intent of S.W.S.S.A.

to move municipalities towards financial sustainability. However, many of the

prescriptive requirements have been removed (e.g. preparation of two separate

documents for provincial approval, auditor opinions, engineer certifications, etc.).

A Guideline (“Towards Financially Sustainable Drinking - Water and Wastewater

Systems”) has been developed to assist municipalities in understanding the Province’s

direction and provides a detailed discussion on possible approaches to sustainability.

The Province’s Principles of Financially Sustainable Water and Wastewater Services

are provided below:

Page 11: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Principle #1: Ongoing public engagement and transparency can build support for,

and confidence in, financial plans and the system(s) to which they

relate.

Principle #2: An integrated approach to planning among water, wastewater, and

stormwater systems is desirable given the inherent relationship among

these services.

Principle #3: Revenues collected for the provision of water and wastewater services

should ultimately be used to meet the needs of those services.

Principle #4: Lifecycle planning with mid-course corrections is preferable to planning

over the short-term, or not planning at all.

Principle #5: An asset management plan is a key input to the development of a

financial plan.

Principle #6: A sustainable level of revenue allows for reliable service that meets or

exceeds environmental protection standards, while providing sufficient

resources for future rehabilitation and replacement needs.

Principle #7: Ensuring users pay for the services they are provided leads to

equitable outcomes and can improve conservation. In general,

metering and the use of rates can help ensure users pay for services

received.

Principle #8: Financial Plans are “living” documents that require continuous

improvement. Comparing the accuracy of financial projections with

actual results can lead to improved planning in the future.

Principle #9: Financial plans benefit from the close collaboration of various groups,

including engineers, accountants, auditors, utility staff, and municipal

council.

1.6 Water Opportunities Act, 2010

As noted earlier, since the passage of the Safe Drinking Water Act, continuing changes

and refinements to the legislation have been introduced. Some of these Bills have

found their way into law while others have not been approved. Bill 72 was introduced

into the legislation on May 18, 2010 and received Royal Assent on November 29, 2010.

Page 12: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

On November 29, 2010, Bill 72, the Water Opportunities Act, 2010 received Royal

Assent.

The Act provides for the following elements:

• Foster innovative water, wastewater and stormwater technologies, services and

practices in the private and public sectors;

• Prepare water conservation plans to achieve water conservation targets

established by the regulations; and

• Prepare sustainability plans for municipal water services, municipal wastewater

services and municipal stormwater services.

With regard to the sustainability plans:

• The Act extends from the water financial plans and requires a more detailed

review of the water financial plan and requires a full plan for wastewater and

stormwater services; and

• Regulations will provide performance targets for each service – these targets

may vary based on the jurisdiction of the regulated entity or the class of entity.

The Financial Plan shall include:

• An asset management plan for the physical infrastructure;

• A financial Plan;

• For water, a water conservation plan;

• An assessment of risks that may interfere with the future delivery of the municipal

service, including, if required by the regulations, the risks posed by climate

change and a plan to deal with those risks; and

• Strategies for maintaining and improving the municipal service, including

strategies to ensure the municipal service can satisfy future demand, consider

technologies, services and practices that promote the efficient use of water and

reduce negative impacts on Ontario’s water resources, and increase co-

operation with other municipal service providers.

Performance indicators will be established by service:

• May relate to the financing, operation or maintenance of a municipal service or to

any other matter in respect of which information may be required to be included

in a plan;

• May be different for different municipal service providers or for municipal services

in different areas of the Province.

Page 13: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Regulations will prescribe:

• Timing;

• Contents of the plans;

• Identifying what portions of the plan will require certification;

• Public consultation process; and

• Limitations, updates, refinements, etc.

As noted earlier, it is expected that this Act will implement the principles of the

Sustainable Water and Sewage Systems Act once all regulations are put in place.

1.7 Infrastructure for Jobs and Prosperity Act (I.J.P.A.), 2015

On June 4, 2015, the province passed the Infrastructure for Jobs and Prosperity Act

(I.J.P.A.) which, over time, will require municipalities to undertake and implement asset

management plans for all infrastructure they own. On December 27, 2017, the Province

of Ontario released Ontario Regulation 588/17 under I.J.P.A. which has 3 phases that

municipalities must meet:

Every municipality in Ontario will have to prepare a strategic asset management policy

by July 1, 2019. Municipalities will be required to review their strategic asset

management policies at least every five years and make updates as necessary. The

subsequent phases are as follows:

• Phase 1 – Asset Management Plan (by July 1, 2021):

o For core assets – Municipalities must have the following:

▪ Inventory of assets;

▪ Current levels of service measured by standard metrics; and

▪ Costs to maintain levels of service.

Page 14: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-9

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

• Phase 2 – Asset Management Plan (by July 1, 2023):

o Same steps as Phase 1 but for all assets.

• Phase 3 – Asset Management Plan (by July 1, 2024):

o Builds on Phase 1 and 2 by adding:

▪ Proposed levels of service; and

▪ Lifecycle management and Financial strategy.

In relation to water and wastewater (which is considered a core asset), municipalities

will need to have an asset management plan that addresses the related infrastructure

by July 1, 2021 (Phase 1). O.Reg 588/17 specifies that the municipality’s asset

management plan must include the following for each asset category:

• the current levels of service being provided;

o determined in accordance with the following qualitative descriptions and

technical metrics and based on data from at most the two calendar years

prior to the year in which all information required under this section is

included in the asset management plan.

• the current performance of each asset category;

• a summary of the assets in the category,

• the replacement cost of the assets in the category,

• the average age of the assets in the category, determined by assessing the

average age of the components of the assets,

• the information available on the condition of the assets in the category, and

• a description of the municipality’s approach to assessing the condition of the

assets in the category, based on recognized and generally accepted good

engineering practices where appropriate; and

• the lifecycle activities that would need to be undertaken to maintain the current

levels of service.

Upon completion of the asset management plan for water and wastewater services, the

Municipality will need to consider the impacts on the capital plan provided herein

1.8 Forecast Growth and Servicing Requirements

The Municipality, as of December, 2017, services approximately 3,770 water customers

(871 of which are serviced through St. Thomas). There are also approximately 3,150

customers receiving wastewater services. Information on the existing number of

customers and existing billable volumes was obtained from the Municipality.

Page 15: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-10

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

For forecasting future water and wastewater/billable volumes, a historic four-year

average annual water volume per residential customer of 140 m³, has been used. The

average volume has been steadily declining over the past decade (from 175 m³ per

year).

For future water and wastewater customers to be added to the systems, consideration

has been given to development potential within the various serviced areas of the

municipality over the forecast period 2018-2027.

Table 1-2 provides for the forecast of water users and volumes within Central Elgin.

Table 1-3 provides the forecast of wastewater users and volumes.

Page 16: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-11

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 1-2 System User and Volume Forecast

Water Services

Water Users Forecast

Year Total Users 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

2018 30 15 30 30 30 30 30 30 30 30 30

2019 29 15 29 29 29 29 29 29 29 29

2020 30 15 30 30 30 30 30 30 30

2021 30 15 30 30 30 30 30 30

2022 30 15 30 30 30 30 30

2023 29 15 29 29 29 29

2024 30 15 30 30 30

2025 29 15 29 29

2026 30 15 30

2027 29 15

Total 296 15 45 74 104 134 164 193 223 252 282

m3/user 140 140 140 140 140 140 140 140 140 140 140

Annual Flow 2,100 6,300 10,360 14,560 18,760 22,960 27,020 31,220 35,280 39,480

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 3,773 3,773 3,773 3,773 3,773 3,773 3,773 3,773 3,773 3,773

New - Growth 15 45 74 104 134 164 193 223 252 282

Total 3,788 3,818 3,847 3,877 3,907 3,937 3,966 3,996 4,025 4,055

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 528,287 528,287 528,287 528,287 528,287 528,287 528,287 528,287 528,287 528,287

New 2,100 6,300 10,360 14,560 18,760 22,960 27,020 31,220 35,280 39,480

Total 530,387 534,587 538,647 542,847 547,047 551,247 555,307 559,507 563,567 567,767

Water Customer Forecast

Water Volume Forecast (m³)

Page 17: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 1-12

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 1-3 System User and Volume Forecast

Wastewater Services

Wastewater Users Forecast

Year Total Users 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

2018 30 15 30 30 30 30 30 30 30 30 30

2019 29 15 29 29 29 29 29 29 29 29

2020 30 15 30 30 30 30 30 30 30

2021 30 15 30 30 30 30 30 30

2022 30 15 30 30 30 30 30

2023 29 15 29 29 29 29

2024 55 28 55 55 55

2025 54 27 54 54

2026 55 28 55

2027 54 27

Total 396 15 45 74 104 134 164 206 260 315 369

m3/user 140 140 140 140 140 140 140 140 140 140 140

Annual Flow 2,100 6,300 10,360 14,560 18,760 22,960 28,770 36,400 44,030 51,660

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing* 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493

New - Growth 15 45 74 104 134 164 206 260 315 369

Total 2,508 2,538 2,567 2,597 2,627 2,657 2,699 2,753 2,808 2,862

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing* 352,150 352,150 352,150 352,150 352,150 352,150 352,150 352,150 352,150 352,150

St. Thomas Energy Customers 121,030 121,030 121,030 121,030 121,030 121,030 121,030 121,030 121,030 121,030

New 2,100 6,300 10,360 14,560 18,760 22,960 28,770 36,400 44,030 51,660

Total 475,280 479,480 483,540 487,740 491,940 496,140 501,950 509,580 517,210 524,840

Note: Above flows are water flows on which the wastewater billing will be calculated

* Excludes Customers serviced by St. Thomas Energy

Wastewater Customer Forecast

Wastewater Flows Forecast (m³)

Page 18: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 2-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

2. Capital Infrastructure Needs

2.1 Capital Forecast

Capital forecasts have been provided for the water and wastewater systems and are

presented on Tables 2-1 and 2-2 (Note: the costs are in inflated dollars). The basis for

these forecasts is the Municipality’s Capital Forecasts, Development Charges

Background Study, and works identified as asset replacement needs based on the

inventory data provided for the water & wastewater systems.

A summary of the capital works related to Central Elgin water services is provided

below in Figure 2-1:

Figure 2-1 Summary of Water Capital Expenditures

(inflated $)

Total

Description 2018-2027

Kettle Creek Watermain Crossing - St. George Street Watermain Replacement 115,500

Dalewood Campground Water Servicing - Watermain Replacement 190,000

Annual Capital Equipment Purchases 41,200

Rate Study 31,600

Lifecycle:

Water Meters Replacement Program 606,000

Non-Spatial Equipment - Eastwood 23,900

Pump House - Belmont 35,000

Watermains:

Belmont 286,400

Port Stanley 768,400

Lynhurst 450,900

Eastwood 122,800

Rural Area -

Growth Related:

Port Stanley:

Water Supply - PS 657,300

Southblock:

W1 - 400 dia New Development Main East of Fairview from Elm to Raven (oversizing) 12,100

W2 - 300 dia Bill Martyn from Sauve to Southdale 24,300

W3 - 400 dia Southdale from Fairview to existing 200 dia at Lake Margaret Tr. 101,600

W5 - 400 dia Southdale from Lake Margaret Tr. To Sunset Drive 103,800

W6 - 400 dia Southdale from Fairview east to City Limit 48,600

W7 - 300 dia Southdale from Sunset Drive west to Shaw Valley Drive 36,700

Total Capital Expenditures $3,656,100

Page 19: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 2-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

A summary of the capital works related to Central Elgin wastewater services is provided

below in Figure 2-2:

Figure 2-2 Summary of Wastewater Capital Expenditures

(inflated $)

Total

Description 2018-2027

Union Sanitary E. A. 150,000

Sewer Rate Study 15,000

Lifecycle:

Non-Spatial Equipment 275,500

Manholes -

Sanitary Sewers: -

Belmont -

Port Stanley -

Lynhurst -

Eastwood -

Water Meters Replacement Program 404,000

Growth Related:

Belmont:

Sewage Forcemain (Belmont) 503,900

Port Stanley:

Sunset Road Sanitary Sewer Extension - Port Stanley 500,000

Southblock:

S4 - Trunk sewer from P.S. to Southdale Road 177,000

Total Capital Expenditures $2,025,400

Page 20: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 2-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 2-1 Water Service

Capital Budget Forecast Inflated $

Actual Actual

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures:

Water Main Replacement - Catherine St, Warren St to Stanley St 160,655 - - - - - - - - - - - -

Port Stanley Watermain Replacement 41,536 - - - - - - - - - - - -

Edith Cavell Watermain 557,943 734,020 - - - - - - - - - - -

Catherine Street Watermain - 97,401 - - - - - - - - - - -

Seventh Ave Watermain 26,969 - - - - - - - - - - - -

Harrison/McClary Ave Watermain - 6,115 - - - - - - - - - - -

Transfer to UFCO from prior years (2005-2015) - 3,768,673 - - - - - - - - - - -

SCADA Server Virtualization - - - - - - - - - - - - -

SCADA Report Upgrades - - - - - - - - - - - - -

Kettle Creek Watermain Crossing - St. George Street Watermain Replacement - - 115,500 115,500 - - - - - - - - -

Dalewood Campground Water Servicing - Watermain Replacement - - 190,000 190,000 - - - - - - - - -

Annual Capital Equipment Purchases - - 41,200 - 20,400 20,800 - - - - - - -

Rate Study - - 31,600 15,000 - - - - 16,600 - - - -

Lifecycle: - - - - - - - - - - - - -

Water Towers: - - - - - - - - - - - - -

Belmont - - - - - - - - - - - - -

Port Stanley - - - - - - - - - - - - -

Water Towers - Non-spatial - - - - - - - - - - - - -

Water Meters Replacement Program - - 606,000 300,000 306,000 - - - - - - - -

Water Chambers - - - - - - - - - - - - -

Non-Spatial Equipment - Eastwood - - 23,900 - - - - - - - - - 23,900

Pump House - Belmont - - 35,000 35,000 - - - - - - - - -

SCADA - - - - - - - - - - - - -

Watermains: - - - - - - - - - - - - -

Belmont - - 284,100 - - - - - - - 284,100 - -

Port Stanley - - 753,300 - - - - 98,700 - - 654,600 - -

Lynhurst - - 442,100 - - 442,100 - - - - - - -

Eastwood - - 120,400 - - 120,400 - - - - - - -

Rural Area - - - - - - - - - - - - -

Growth Related: - - - - - - - - - - - - -

Port Stanley: - - - - - - - - - - - - -

Water Supply - PS - - 657,300 - - - - - - - - - 657,300

Southblock: - - - - - - - - - - - - -

W1 - 400 dia New Development Main East of Fairview from Elm to Raven (oversizing) - - 12,100 - - - - - 12,100 - - - -

W2 - 300 dia Bill Martyn from Sauve to Southdale - - 24,300 - - - - - 24,300 - - - -

W3 - 400 dia Southdale from Fairview to existing 200 dia at Lake Margaret Tr. - - 101,600 - - - - - 101,600 - - - -

W5 - 400 dia Southdale from Lake Margaret Tr. To Sunset Drive - - 103,800 - - - - - 103,800 - - - -

W6 - 400 dia Southdale from Fairview east to City Limit - - 48,600 - - - - - 48,600 - - - -

W7 - 300 dia Southdale from Sunset Drive west to Shaw Valley Drive - - 36,700 - 36,700 - - - - - - - -

Total Capital Expenditures 787,104 4,606,208 3,627,500 655,500 363,100 583,300 - 98,700 307,000 - 938,700 - 681,200

Description TotalForecast

Page 21: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 2-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 2-2 Wastewater Service

Capital Budget Forecast Inflated $

Actual Actual

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures:

Pumping Station 73 Upgrades-Belmont (partly funded by ERTH 609 - - - - - - - - - - - -

Talbot Line Sanitary Pump Station - - - - - - - - - - - - -

St. George Street 55,287 - - - - - - - - - - - -

SCADA Virtualization - 119,760 - - - - - - - - - - -

Transfer to UFCO Prior Years (2005-2015) - 850,506 - - - - - - - - - - -

Union Sanitary E. A. - - 150,000 150,000 - - - - - - - - -

Sewer Rate Study - - 15,000 15,000 - - - - - - - - -

Lifecycle: - - - - - - - - - - -

Wastewater Facilities (Port Stanley) - - - - - - - - - - - - -

Non-Spatial Equipment - - 270,100 - - - - 78,400 - - 191,700 - -

Manholes - - - - - - - - - - - - -

Sanitary Sewers: - - - - - - - - - - - - -

Belmont - - - - - - - - - - - - -

Port Stanley - - - - - - - - - - - - -

Lynhurst - - - - - - - - - - - - -

Eastwood - - - - - - - - - - - - -

Water Meters Replacement Program - - 404,000 200,000 204,000 - - - - - - - -

Growth Related: - - - - - - - - - - - - -

Belmont: - - - - - - - - - - - -

Sewage Forcemain (Belmont) - - 503,900 - - - 503,900 - - - - - -

Port Stanley: - - - - - - - - - - - -

Sunset Road Sanitary Sewer Extension - Port Stanley 789,344 38,772 500,000 500,000 - - - - - - - - -

Downtown Pumping Station Upgrade - Pump Station 52 10,060 10,539 - - - - - - - - - - -

Wastewater Treatment for Lagoon 2,223,729 16,122,855 - - - - - - - - - - -

Replace and Expand Trunk Sanitary Sewers - Pump Station 51 - 930 - - - - - - - - - - -

Southblock: - - - - - - - - - - - - -

S4 - Trunk sewer from P.S. to Southdale Road - - 177,000 - 177,000 - - - - - - - -

Total Capital Expenditures 3,079,030 17,143,361 2,020,000 865,000 381,000 - 503,900 78,400 - - 191,700 - -

Description TotalForecast

Page 22: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

3. Lifecycle Costing

3.1 Overview of Lifecycle Costing

3.1.1 Definition

For many years, lifecycle costing has been used in the field of maintenance engineering

and to evaluate the advantages of using alternative materials in construction or

production design. The method has gained wider acceptance and use in the areas of

industrial decision-making and the management of physical assets.

By definition, lifecycle costs are all the costs which are incurred during the lifecycle of a

physical asset, from the time its acquisition is first considered to the time it is taken out

of service for disposal or redeployment. The stages which the asset goes through in its

lifecycle are specification, design, manufacture (or build), install, commission, operate,

maintain and disposal. Figure 3-1 depicts these stages in a schematic form.

3.1.2 Financing Costs

This section will focus on financing mechanisms in place to fund the costs incurred

throughout the asset's life.

In a municipal context, services are provided to benefit tax/rate payers. Acquisition of

assets is normally timed in relation to direct needs within the community. At times,

economies of scale or technical efficiencies will lead to oversizing an asset to

accommodate future growth within the Municipality. Over the past few decades, new

financing techniques such as development charges have been employed based on the

underlying principle of having tax/rate payers who benefit directly from the service

paying for that service. Operating costs which reflect the cost of the service for that

year are charged directly to all existing tax/rate payers who have received the benefit.

Operating costs are normally charged through the tax base or user rates.

Capital expenditures are recouped through several methods; operating budget

contributions, development charges, reserves, developer contributions and debentures,

being the most common.

New construction related to growth could produce development charges and developer

contributions (e.g. works internal to a subdivision which are the responsibility of the

developer to construct) to fund a significant portion of projects, where new assets are

being acquired to allow growth within the Municipality to continue. As well, debentures

Page 23: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

could be used to fund such works, with the debt charge carrying costs recouped from

taxpayers in the future.

Figure 3-1 Lifecycle Costing

Figure 3-1

Life Cycle Costing

Select

or Specify

Purchase

Install

Commission

Operate

Maintain

Monitor

(Throughout Life

of Assets)

(To End of

Useful Life)

Remove

Dispose

User Cost to User

Investment

Costs

Operating Costs

Maintenance Costs

Monitoring Costs

Disposal

Costs

Life Cycle

Costs

Page 24: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

However, capital construction to replace existing infrastructure is largely not growth-

related and will therefore not yield development charges or developer contributions to

assist in financing these works. Hence, a Municipality will be dependent upon

debentures, reserves and contributions from the operating budget to fund these works.

Figure 3-2 depicts the costs of an asset from its initial conception through to

replacement and then continues to follow the associated costs through to the next

replacement.

As referred to earlier, growth-related financing methods such as development charges

and developer contributions could be utilized to finance the growth-related component

of the new asset. These revenues are collected (indirectly) from the new homeowner

who benefits directly from the installation of this asset. Other financing methods may be

used as well to finance the non-growth related component of this project; reserves

which have been collected from past tax/rate payers, operating budget contributions

which are collected from existing tax/rate payers and debenturing which will be carried

by future tax/rate payers. Ongoing costs for monitoring, operating and maintaining the

asset will be charged annually to the existing tax/rate payer.

When the asset requires replacement, the sources of financing will be limited to

reserves, debentures and contributions from the operating budget. At this point, the

question is raised; "If the cost of replacement is to be assessed against the tax/rate

payer who benefits from the replacement of the asset, should the past tax/rate payer

pay for this cost or should future rate payers assume this cost?" If the position is taken

that the past user has used up the asset, hence he should pay for the cost of

replacement, then a charge should be assessed annually, through the life of the asset

to have funds available to replace it when the time comes. If the position is taken that

the future tax/rate payer should assume this cost, then debenturing and, possibly, a

contribution from the operating budget should be used to fund this work.

Charging for the cost of using up of an asset is the fundamental concept behind

depreciation methods utilized by the private sector. This concept allows for expending

the asset as it is used up in the production process. The tracking of these costs forms

part of the product's selling price and hence end users are charged for the asset's

depreciation. The same concept can be applied in a municipal setting to charge

existing users for the asset's use and set those funds aside in a reserve to finance the

cost of replacing the asset in the future.

Page 25: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Figure 3-2 Financing Lifecycle Costs

Figure 3-2

Financing Life Cycle Costs

Select

or Specify

Purchase

Install

Commission

Operate

Maintain

Monitor

(Throughout Life

of Assets)

(To End of

Useful Life)

Remove

DisposeSelect

or Specify

Purchase

Install

Commission

Operate

Maintain

Monitor

(Throughout Life

of Assets)

(To End of

Useful Life)

Remove

Dispose

"NEW ASSET"

User

"REPLACEMENT ASSET"

User

Development Charges

Operating Budget Contributions

Debentures

Reserves

Operating Budget

Debentures

Reserves

Operating Budget Contributions

Operating Budget

Debentures

Reserves

Operating Budget Contributions

Financing Methods

Available

Page 26: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

3.1.3 Costing Methods

There are two fundamental methods of calculating the cost of the usage of an asset and

for the provision of the revenue required when the time comes to retire and replace it.

The first method is the Depreciation Method. This method recognizes the reduction in

the value of the asset through wear and tear and aging. There are two commonly used

forms of depreciation: the straight-line method and the reducing balance method

(shown graphically in Figure 3-3).

The straight line method is calculated by taking the original cost of the asset, subtracting

its estimated salvage value (estimated value of the asset at the time it is disposed of)

and dividing this by the estimated number of years of useful life. The reducing balance

method is calculated by utilizing a fixed percentage rate and this rate is applied annually

to the undepreciated balance of the asset value.

The second method of lifecycle costing is the sinking fund method. This method first

estimates the future value of the asset at the time of replacement. This is done by

inflating the original cost of the asset at an assumed annual inflation rate. A calculation

is then performed to determine annual contributions (equal or otherwise) which, when

invested, will grow with interest to equal the future replacement cost.

The preferred method used herein for forecasting purposes is the sinking fund method

of lifecycle costing.

Page 27: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Figure 3-3

Process

FIGURE 3-3

STRAIGHT LINE DEPRECIATION

Original Cost

$x $x $x $x $x $x $x $x $x $x

Formula:

Original Cost - Salvage Cost

Number of Years of Useful Life

SINKING FUND METHOD

$x $x $x $x $x $x $x $x $x $x

1. "Estimate Future Replacement Cost"

Original Cost

Future

Replacement

Cost

Future

Replacement

Cost

2. "Estimate Annual Contribution which will Grow with Interest to Equal Future Replacement Cost"

Total Annual Contributions Equal Original Cost

"Annual Inflation"

"Annual Interest Earnings"

3.2 Impact on Budgets

Detailed water and wastewater systems inventory information was obtained from the

Municipality. The age of the water and wastewater systems date back to the early 1950’s

and 1970’s, respectfully. The total value of existing water infrastructure is $47.46 million,

and the value of existing wastewater infrastructure is $40.40 million.

Page 28: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

The detailed water inventory and wastewater inventory are provided in Appendices A and

B, respectively. As well, the lifecycle “sinking fund” contribution amounts for each piece

of infrastructure have also been included. These calculations determine the level of

investment the Municipality may wish to consider as part of its budgeting practices. This

information is summarized in Table 3-1.

Table 3-1 Municipality of Central Elgin

Summary of Central Elgin Water and Central Elgin Wastewater Infrastructure

It is noted that the inventory of the complete water and wastewater systems may be

required to be assessed and reported on by a professional engineer as part of the

documentation required under the Water Opportunities Act. The detailed specifics of

the reporting will not be known until the Province has set these standards by regulation.

Area Total Replacement Value

Suggested amount to be

included in 10 year

forecast based on

estimated life.

Net Replacement for

Future Lifecycle

Annual Lifecycle

Replacement

Water

Water Towers:

Belmont 1,047,180 - 1,047,180 29,382

Port Stanley 1,293,580 - 1,293,580 39,392

Water Towers - Non-

spatial1,897,620 - 1,897,620 85,786

Water Meters 1,160,510 1,145,250 15,260 1,443

Water Chambers 1,379,580 - 1,379,580 39,909

Non-Spatial Equipment -

Eastwood791,360 20,000 771,360 52,855

Pump House - Belmont 789,190 - 789,190 21,802

SCADA 150,000 - 150,000 9,174

Watermains: -

Belmont 7,924,584 249,310 7,675,274 199,766

Port Stanley 20,399,040 674,290 19,724,750 502,879

Lynhurst 4,502,500 433,410 4,069,090 99,464

Eastwood 2,034,250 118,000 1,916,250 44,948

Rural Area 5,004,210 - 5,004,210 123,567

Total Water 48,373,604 2,640,260 45,733,344 1,250,367

Wastewater

Wastewater Facilities* 17,172,992 10,212,015 6,960,977 235,377

Non-Spatial Equipment 5,758,020 254,000 5,504,020 460,228

Manholes 4,325,896 - 4,325,896 152,227

Sanitary Sewers: -

Belmont 3,264,946 - - 112,651

Port Stanley 7,160,030 - 7,160,030 301,941

Lynhurst 2,883,043 - 2,883,043 76,330

Eastwood 393,520 - 393,520 9,389

Total Wastewater 40,958,447 10,466,015 27,227,486 1,348,143

Total 89,332,051 13,106,275 72,960,830 2,598,510

Investment per customer is $12,821 for water and $13,011 for wastewater

* Wastewater Facilities Replacement Cost of $10.2 million identified for the 10 yeare forecast is part of ongoing plant project

that is currently underway

Page 29: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 3-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

With respect to lifecycle costing contained in the Appendices the following information

was taken under consideration:

• approximate age;

• material type;

• main lengths;

• diameter of the mains;

• number of meters;

• number of items;

• facilities and their components;

• estimated useful life; and

• estimated replacement costs.

It is also noted that the suggested amount to be included in the 10-year forecast related

to wastewater facilities, has already been accounted for through the recent work at the

wastewater treatment facility. Therefore, this amount has not been added to the capital

forecast.

Page 30: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

4. Capital Cost Financing Options

4.1 Summary of Capital Cost Financing Alternatives

Historically, the powers that municipalities had to raise alternative revenues to taxation

to fund capital services have been restrictive. Over the past decade, legislative reforms

have been introduced. Some of these have expanded municipal powers (e.g. Bill 26

introduced in 1996 to provide for expanded powers for imposing fees and charges),

while others appear to restrict them (Bill 98 in 1997 providing amendments to the

Development Charges Act).

The Province passed a new Municipal Act which came into force on January 1, 2003.

Part XII of the Act and O.Reg. 584/06 govern a Municipality’s ability to impose fees and

charges. In contrast to the previous Municipal Act, this Act provides municipalities with

broadly defined powers and does not differentiate between fees for operating and

capital purposes. It is anticipated that the powers to recover capital costs under the

previous Municipal Act will continue within the new Statutes and Regulations, as

indicated by s.9(2) and s.452 of the new Municipal Act.

Under s.484 of Municipal Act, 2001, the Local Improvement Act was repealed with the

in force date of the Municipal Act (January 1, 2003). The municipal powers granted

under the Local Improvement Act now fall under the jurisdiction of the Municipal Act. To

this end, on December 20, 2002, O.Reg. 390/02 was filed, which allowed for the Local

Improvement Act to be deemed to remain in force until April 1, 2003. However, O.Reg.

119/03 was enacted on April 19, 2003 which restores many of the previous Local

Improvement Act provisions; however, the authority is now provided under the Municipal

Act.

The methods of capital cost recovery available to municipalities are provided as follows:

Recovery Methods Section

Reference

• Development Charges Act, 1997 4.2

• Municipal Act o Fees and Charges o Sewer and Water Area Charges o Connection Fees o Local Improvements

4.3

Page 31: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

4.2 Development Charges Act, 1997

In November, 1996, the Ontario Government introduced Bill 98, a new Development

Charges Act. The Province’s stated intentions were to “create new construction jobs

and make home ownership more affordable” by reducing the charges and to “make

municipal Council decisions more accountable and more cost effective.” The basis for

this Act is to allow municipalities to recover the growth-related capital cost of

infrastructure necessary to accommodate new growth within the Municipality. Generally

the new Act provided the following changes to the former Act:

• Replace those sections of the 1989 D.C.A. which govern municipal development

charges. (Education development charges are not to be significantly altered at

this time);

• Limit services which can be financed from development charges, specifically

excluding parkland acquisition, administration buildings, and cultural,

entertainment, tourism, solid waste management and hospital facilities;

• Ensure that the level of service used in the calculation of capital costs will not

exceed the average level of service over the previous decade. Level of service is

to be measured from both a quality and quantity perspective;

• Provide that uncommitted excess capacity available in existing municipal facilities

and benefits to existing residents are removed from the calculation of the charge;

• Ensure that the development charge revenues collected by municipalities are

spent only on those capital costs identified in the calculation of the development

charge;

• Require municipalities to contribute funds (e.g. taxes, user charges or other non-

development charge revenues) to the financing of certain projects primarily

funded from development charges. The municipal contribution is 10 percent for

services such as recreation, parkland development, libraries, etc.;

• Permit (but apparently not require) municipalities to grant developers credits for

the direct provision of services identified in the development charge calculation

and, when credits are granted, require the Municipality to reimburse the

developer for the costs the Municipality would have incurred if the project had

been financed from the development charge reserve fund;

• Set out provisions for front-end financing capital projects (limited to essential

services) required to service new development; and

• Set out provisions for appeals and complaints, and transitional rules, including

that municipalities will have up to 18 months from the date of proclamation of the

new Act to establish new development charge by-laws, otherwise the old by-laws

will expire.

Page 32: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

4.3 Municipal Act

4.3.1 Part XII of the Municipal Act provides municipalities with broad powers to impose

fees and charges via passage of a by-law. These powers, as presented in s.391(1),

include imposing fees or charges:

• “for services or activities provided or done by or on behalf of it;

• for costs payable by it for services or activities provided or done by or on behalf

of any other municipality or local board; and

• for the use of its property including property under its control.”

Restrictions are provided to ensure that the form of the charge is not akin to a poll tax.

Any charges not paid under this authority may be added to the tax roll and collected in a

like manner. The fees and charges imposed under this part are not appealable to the

Land Planning Appeal Tribunal (L.P.A.T. formerly known as the O.M.B.).

4.3.2 s.221 of the previous Municipal Act, permitted municipalities to impose charges,

by by-law, on owners or occupants of land who would or might derive benefit from the

construction of sewage (storm and sanitary) or water works being authorized (in a

Specific Benefit Area). For a by-law imposed under this section of the previous Act:

• A variety of different means could be used to establish the rate and recovery of

the costs could be imposed by a number of methods at the discretion of Council

(i.e. lot size, frontage, number of benefiting properties, etc.);

• Rates could be imposed in respect to costs of major capital works, even though

an immediate benefit was not enjoyed;

• Non-abutting owners could be charged;

• Recovery was authorized against existing works, where a new water or sewer

main was added to such works, "notwithstanding that the capital costs of existing

works has in whole or in part been paid."

• Charges on individual parcels could be deferred;

• Exemptions could be established;

• Repayment was secured; and

• L.P.A.T. approval was not required.

While under the new Municipal Act no provisions are provided specific to the previous

s.221, the intent to allow capital cost recovery through fees and charges is embraced

within s.391. The new Municipal Act also maintains the ability of municipalities to

impose capital charges for water and sewer services on landowners not receiving an

immediate benefit from the works. Under s.391(2) of the Act, “a fee or charge imposed

Page 33: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

under subsection (1) for capital costs related to sewage or water services or activities

may be imposed on persons not receiving an immediate benefit from the services or

activities but who will receive a benefit at some later point in time.” Also, capital

charges imposed under s.391 are not appealable to the L.P.A.T. on the grounds that the

charges are “unfair or unjust”.

4.3.3 s.222 of the previous Municipal Act permitted municipalities to pass a by-law

requiring buildings to connect to the Municipality's sewer and water systems, charging

the owner for the cost of constructing services from the mains to the property line.

Under the new Municipal Act, this power still exists under Part II, General Municipal

Powers (s.9 (3) b of the Municipal Act). Enforcement and penalties for this use of power

are contained in s.427 (1) of the Municipal Act.

4.3.4 Under the previous Local Improvement Act:

• A variety of different types of works could be undertaken, such as watermain,

storm and sanitary sewer projects, supply of electrical light or power, bridge

construction, sidewalks, road widening and paving;

• Council could pass a by-law for undertaking such work on petition of a majority of

benefiting taxpayers, on a 2/3 vote of Council and on sanitary grounds, based on

the recommendation of the Minister of Health. The by-law was required to go to

the L.P.A.T., which might hold hearings and alter the by-law, particularly if there

were objections;

• The entire cost of a work was assessed only upon the lots abutting directly on the

work, according to the extent of their respective frontages, using an equal special

rate per metre of frontage; and

• As noted, this Act was repealed as of April 1, 2003; however, O.Reg. 119/03 was

enacted on April 19, 2003 which restores many of the previous Local

Improvement Act provisions; however, the authority is now provided under the

Municipal Act.

4.4 Grant Funding Availability

Federal Infrastructure Funding

Phase 1 (April 1, 2016 – March 31, 2018)

Funding was provided by the Government of Canada to expressly help municipalities

with repair and rehabilitation projects. Funding was mainly provided through the Clean

Water and Wastewater Fund (C.W.W.F.) and Public Transit Infrastructure Fund

(P.T.I.F.) in Federal Phase 1 projects. The C.W.W.F. was announced in Ontario on

Page 34: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

September 15, 2016. The Fund is $1.1 billion for water, wastewater, and storm water

systems in Ontario. The federal government provided $569 million and Ontario and

municipal governments provided $275 million each.

Over 1,300 water, wastewater, and storm water projects have been approved in Ontario

through the C.W.W.F. In Ontario, P.T.I.F. accounted for nearly $1.5 billion of the

national total of $3.4 billion. The program was allocated by ridership numbers from the

Canadian Urban Transit Association. A.M.O. understands that $1 billion of Ontario’s

share has been approved.

Phase 2: Next Steps

The federal government announced Phase 2 of its infrastructure funding plan with a

total of $180 billion spent over 11 years. In addition to the balance of funding for

previous Green, Social, and Public Transit Infrastructure Funds ($20 billion each,

including Phase 1), the government has added $10.1 billion for Trade and

Transportation Infrastructure and $2 billion for Rural and Northern. This funding must be

implemented by agreements with each province and territory. Negotiations are ongoing,

and funding is designed to start flowing after the 2018 Budget, ramping up in the out

years.

In Phase 2, Ontario will be eligible for $11.8 billion including $8.3 billion for transit, $2.8

billion for green infrastructure, $407 million for community, culture and recreation and

$250 million for rural and northern communities.

Federal Gas Tax

The Federal Gas Tax is a permanent source of funding provided up front, twice-a-year,

to provinces and territories, who in turn flow this funding to their municipalities to

support local infrastructure priorities. Municipalities can pool, bank and borrow against

this funding, providing significant financial flexibility. Every year, the Federal Gas Tax

provides over $2 billion and supports approximately 2,500 projects in communities

across Canada. Each municipality selects how best to direct the funds with the flexibility

provided to make strategic investments across 18 different project categories, which

include other water and wastewater servicing.

Ontario Government

The Province has taken steps to increase municipal infrastructure funding. The Ontario

Community Infrastructure Fund (O.C.I.F.) was increased in 2016 with formula-based

support growing to $200 million, and application funding growing to $100 million

Page 35: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

annually by 2018-19. As well, $15 million annually will go to the new Connecting Links

program to help pay for the construction and repair costs of municipal roads that

connect communities to provincial highways. This is on top of the Building Ontario Up

investment of $130 billion in public infrastructure over 10 years starting in 2015.

4.5 Existing Reserves/Reserve Funds

The Municipality has established reserves and reserve funds for water and wastewater

costs. The following table summarizes the water and wastewater reserves utilized in

this analysis and their respective balances at December 31, 2017:

4.6 Debenture Financing

Although it is not a direct method of minimizing the overall cost to the ratepayer,

debentures are used by municipalities to assist in cash flowing large capital

expenditures.

The Ministry of Municipal Affairs regulates the level of debt incurred by Ontario

municipalities, through its powers established under the Municipal Act. Ontario

Regulations 403/02 provides the current rules respecting municipal debt and financial

obligations. Through the rules established under these regulations, a Municipality’s

debt capacity is capped at a level where no more than 25% of the Municipality’s own

purpose revenue may be allotted for servicing the debt (i.e. debt charges). The

Municipality of Central Elgin’s 2014 calculation on Debt Capacity, as shown on

Schedule 81 of the Municipality’s 2016 Financial Information Return (F.I.R.). This

calculates to the Municipality’s estimated annual repayment limit of approximately $2.6

million.

4.7 Infrastructure Ontario

Infrastructure Ontario (I.O.) is an arms-length crown corporation, which has been set up

as a tool to offer low-cost and longer-term financing to assist municipalities in renewing

Reserve

Balance at

Dec. 31, 2017

Water:

General Reserves (404,054)

Development Charges Reserve Fund 9,136

Wastewater:

General Reserves 498,899

Connection Reserve Fund 450,693

Development Charges Reserve Fund 663,487

Page 36: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

their infrastructure (this corporation has merged the former O.S.I.F.A. into its

operations) I.O. combines the infrastructure renewal needs of municipalities into an

infrastructure investment “pool”. I.O. will raise investment capital to finance loans to the

public sector by selling a new investment product called Infrastructure Renewal Bonds

to individual and institutional investors.

I.O. provides access to infrastructure capital that would not otherwise be available to

smaller borrowers. Larger borrowers receive a longer term on their loans than they

could obtain in the financial markets, and can also benefit from significant savings on

transaction costs such as legal costs and underwriting commissions. Under the I.O.

approach, all borrowers receive the same low interest rate. I.O. will enter into financial

agreement with each Municipality subject to technical and credit reviews, for a loan up

to the maximum amount of the loan request.

The first round of the former O.S.I.F.A.’s 2004-05 infrastructure renewal program was

focused on municipal priorities of clean water infrastructure, sewage treatment facilities,

municipal roads and bridges, public transit and waste management infrastructure. The

focus of the program was expanded in 2005/2006 somewhat to include:

• clean water infrastructure;

• sewage infrastructure;

• waste management infrastructure;

• municipal roads and bridges;

• public transit;

• municipal long-term care homes;

• renewal of municipal social housing and culture; and

• tourism and recreation infrastructure.

With the merging of O.S.I.F.A. and I.O., the program was broadened in late 2006 to also

include municipal administrative buildings, local police and fire stations, emergency

vehicles and equipment, ferries, docks and municipal airports.

To be eligible to receive these loans, municipalities must submit a formal application

along with pertinent financial information. Allotments are prioritized and distributed

based upon the Province’s assessment of need.

The analysis provided herein assumes that the Municipality will borrow approximately

$2.48 million for water services over the forecast, for a ten-year term at 4.0%. Appendix

C, Tables C-3 and C-4 provide the estimated repayment schedule for these loans. For

Page 37: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

wastewater services it is assumed that the Municipality will borrow approximately $1.75

million over the forecast, at the same term and rate as assumed for water.

4.8 Recommended Capital Financing Approach

Of the various funding alternatives provided in this section, the following are

recommended for further consideration by the Municipality of Central Elgin for the

capital expenditures provided in Chapter 2:

Tables 4-1 and 4-2 provide for the full capital expenditure and funding program by year

for water and wastewater respectively.

2018-2027

Description Water Wastewater

Capital Financing

Provincial/Federal Grants - -

Development Charges Reserve Fund 36,700 -

Non-Growth Related Debenture Requirements 1,663,900 569,000

Growth Related Debenture Requirements 817,219 569,000

Operating Contributions - -

Lifecycle Reserve Fund - -

Water Reserve 1,109,681

Connection Reserve Fund 78,400

Wastewater Reserve 191,700

Total Capital Financing $3,627,500 $1,408,100

Page 38: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-9

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 4-1 Water Service

Capital Budget Forecast Inflated $

Actual Actual

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures:

Water Main Replacement - Catherine St, Warren St to Stanley St 160,655 - - - - - - - - - - - -

Port Stanley Watermain Replacement 41,536 - - - - - - - - - - - -

Edith Cavell Watermain 557,943 734,020 - - - - - - - - - - -

Catherine Street Watermain - 97,401 - - - - - - - - - - -

Seventh Ave Watermain 26,969 - - - - - - - - - - - -

Harrison/McClary Ave Watermain - 6,115 - - - - - - - - - - -

Transfer to UFCO from prior years (2005-2015) - 3,768,673 - - - - - - - - - - -

SCADA Server Virtualization - - - - - - - - - - - - -

SCADA Report Upgrades - - - - - - - - - - - - -

Kettle Creek Watermain Crossing - St. George Street Watermain Replacement - - 115,500 115,500 - - - - - - - - -

Dalewood Campground Water Servicing - Watermain Replacement - - 190,000 190,000 - - - - - - - - -

Annual Capital Equipment Purchases - - 41,200 - 20,400 20,800 - - - - - - -

Rate Study - - 31,600 15,000 - - - - 16,600 - - - -

Lifecycle: - - - - - - - - - - - - -

Water Towers: - - - - - - - - - - - - -

Belmont - - - - - - - - - - - - -

Port Stanley - - - - - - - - - - - - -

Water Towers - Non-spatial - - - - - - - - - - - - -

Water Meters - - 606,000 300,000 306,000 - - - - - - - -

Water Chambers - - - - - - - - - - - - -

Non-Spatial Equipment - Eastwood - - 23,900 - - - - - - - - - 23,900

Pump House - Belmont - - 35,000 35,000 - - - - - - - - -

SCADA - - - - - - - - - - - - -

Watermains: - - - - - - - - - - - - -

Belmont - - 284,100 - - - - - - - 284,100 - -

Port Stanley - - 753,300 - - - - 98,700 - - 654,600 - -

Lynhurst - - 442,100 - - 442,100 - - - - - - -

Eastwood - - 120,400 - - 120,400 - - - - - - -

Rural Area - - - - - - - - - - - - -

Growth Related: - - - - - - - - - - - - -

Port Stanley: - - - - - - - - - - - - -

Water Supply - PS - - 657,300 - - - - - - - - - 657,300

Southblock: - - - - - - - - - - - - -

W1 - 400 dia New Development Main East of Fairview from Elm to Raven (oversizing) - - 12,100 - - - - - 12,100 - - - -

W2 - 300 dia Bill Martyn from Sauve to Southdale - - 24,300 - - - - - 24,300 - - - -

W3 - 400 dia Southdale from Fairview to existing 200 dia at Lake Margaret Tr. - - 101,600 - - - - - 101,600 - - - -

W5 - 400 dia Southdale from Lake Margaret Tr. To Sunset Drive - - 103,800 - - - - - 103,800 - - - -

W6 - 400 dia Southdale from Fairview east to City Limit - - 48,600 - - - - - 48,600 - - - -

W7 - 300 dia Southdale from Sunset Drive west to Shaw Valley Drive - - 36,700 - 36,700 - - - - - - - -

Total Capital Expenditures 787,104 4,606,208 3,627,500 655,500 363,100 583,300 - 98,700 307,000 - 938,700 - 681,200

Capital Financing

Provincial/Federal Grants 144,752 - - - - - - - - - - - -

Development Charges Reserve Fund - - 36,700 - 36,700 - - - - - - - -

Non-Growth Related Debenture Requirements 542,061 4,582,208 1,663,900 655,500 326,400 583,300 - 98,700 - - - - -

Growth Related Debenture Requirements - - 817,219 - - - - - 290,400 - - - 526,819

Operating Contributions 30,000 24,000 - - - - - - - - - - -

Lifecycle Reserve Fund - - - - - - - - - - - - -

Water Reserve 70,291 - 1,109,681 - - - - - 16,600 - 938,700 - 154,381

Total Capital Financing 787,104 4,606,208 3,627,500 655,500 363,100 583,300 - 98,700 307,000 - 938,700 - 681,200

Description TotalForecast

Page 39: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 4-10

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 4-2 Wastewater Service

Capital Budget Forecast Inflated $

Actual Actual

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures:

Pumping Station 73 Upgrades-Belmont (partly funded by ERTH 609 - - - - - - - - - - - -

Talbot Line Sanitary Pump Station - - - - - - - - - - - - -

St. George Street 55,287 - - - - - - - - - - - -

SCADA Virtualization - 119,760 - - - - - - - - - - -

Transfer to UFCO Prior Years (2005-2015) - 850,506 - - - - - - - - - - -

Union Sanitary E. A. - - 150,000 150,000 - - - - - - - - -

Sewer Rate Study - - 15,000 15,000 - - - - - - - - -

Lifecycle: - - - - - - - - - - -

Wastewater Facilities (Port Stanley) - - - - - - - - - - - - -

Non-Spatial Equipment - - 270,100 - - - - 78,400 - - 191,700 - -

Manholes - - - - - - - - - - - - -

Sanitary Sewers: - - - - - - - - - - - - -

Belmont - - - - - - - - - - - - -

Port Stanley - - - - - - - - - - - - -

Lynhurst - - - - - - - - - - - - -

Eastwood - - - - - - - - - - - - -

Water Meters - - 404,000 200,000 204,000 - - - - - - - -

Growth Related: - - - - - - - - - - - - -

Belmont: - - - - - - - - - - - -

Sewage Forcemain (Belmont) - - 503,900 - - - 503,900 - - - - - -

Port Stanley: - - - - - - - - - - - -

Sunset Road Sanitary Sewer Extension - Port Stanley 789,344 38,772 500,000 500,000 - - - - - - - - -

Downtown Pumping Station Upgrade - Pump Station 52 10,060 10,539 - - - - - - - - - - -

Wastewater Treatment for Lagoon 2,223,729 16,122,855 - - - - - - - - - - -

Replace and Expand Trunk Sanitary Sewers - Pump Station 51 - 930 - - - - - - - - - - -

Southblock: - - - - - - - - - - - - -

S4 - Trunk sewer from P.S. to Southdale Road - - 177,000 - 177,000 - - - - - - - -

Total Capital Expenditures 3,079,030 17,143,361 2,020,000 865,000 381,000 - 503,900 78,400 - - 191,700 - -

Capital Financing

Provincial/Federal Grants 1,100,000 400,000 -

Development Charges Reserve Fund - - - - - - - - - - - - -

Growth Related Debenture Requirements - 2016/17 Debt Issue 976,009 8,102,632 - - - - - - - - - - -

Non-Growth Related Debenture Requirements - 2016/17 Debt Issue 75,809 8,640,729 - - - - - - - - - - -

Non-Growth Related Debenture Requirements - - 569,000 365,000 204,000 - - - - - - - -

Growth Related Debenture Requirements 927,212 - 1,180,900 500,000 177,000 - 503,900 - - - - - -

Operating Contributions - - - - - - - - - - - - -

Lifecycle Reserve Fund - - - - - - - - - - - - -

Connection Reserve Fund - - 78,400 - - - - 78,400 - - - - -

Wastewater Reserve - - 191,700 - - - - - - - 191,700 - -

Total Capital Financing 3,079,030 17,143,361 2,020,000 865,000 381,000 - 503,900 78,400 - - 191,700 - -

Description TotalForecast

Page 40: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

5. Overview of Expenditures and Revenues

5.1 Water Operating Expenditures

In this report, the forecasted water budget figures (2018-2027) are based on the 2018

Operating Budget. Note that these operating costs include the costs associated with the

rate that the City of St. Thomas imposes on the Central Elgin customers in the St. Thomas

suburban area. The costs for each component of the operating budget have been

reviewed with staff to establish forecast inflationary adjustments (2% annual inflation has

been applied) to all expenses except the purchase of water from the Elgin Area Primary

System which includes inflationary factors equal to the rate study undertaken. These

inflationary rates include an estimated annual increase of 4.75% for 2018 and 2019,

3.75% for 2020-2022, and 3.25% thereafter. It is noted that operating budget funding

shortfalls over the past couple of years have been experienced in water system and is

expected to continue for the 2018 through to the 2021. These shortfalls may be required

to be cash flowed by the financial reserves and reserve funds for water and the property

tax base for these years. If property tax funding is required, the analysis herein

anticipates that the water rates would be able to provide a full payback to the property tax

over the forecast period. It is also noted that there will be a need to cash flow a portion

of the growth-related debt payments from the water reserves, until such time as

development charges are collected for the full growth component of capital infrastructure.

5.2 Water Operating Revenues

The Municipality has miscellaneous revenue sources to contribute towards operating

expenditures. A number of these have been inflated over the period (by 2%), while

others have been held constant. A summary of the miscellaneous revenues sources

which have and have not had inflation applied to them over the forecast is presented

below. The Base Charge Revenue is discussed further in Chapter 6. Table 5-1

provides for the operating budget for the water system.

Page 41: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Miscellaneous Revenues

Annual

Inflation

Factor

Hydrant Maintenance Revenue 2%

Water Meter Revenue 2%

Water Rent Revenue 2%

New Connection Charge 0%

New Water Service Hook Up 2%

Bulk Water Fill Station Revenue 2%

Bulk Fill Station Keys 0%

Water Sundry Revenue 2%

Water Recovery 0%

Water Reconnect Charge 2%

Water Penalty 2%

Federal - Water Distribution Grant 0%

Source Water Protection Grant 0%

Local Improvement Collections 0%

Contributions from Development Charges Reserve Fund 0%

Contributions from Reserves / Reserve Funds 0%

Page 42: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 5-1 (page 1) Water Service

Operating Budget Forecast Inflated $

Actual Actual

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Expenditures:

Operating Costs:

Supervision 103,802 134,383 138,845 141,622 144,454 147,300 150,200 153,200 156,300 159,400 162,600 165,900

Union (including Overtime) 129,976 73,434 56,898 58,036 59,197 60,400 61,600 62,800 64,100 65,400 66,700 68,000

Casual (including Overtime) 3,186 2,260 411 420 428 400 400 400 400 400 400 400

On-Call - - - - - - - - - - - -

CPP 8,327 7,565 6,885 7,023 7,164 7,300 7,400 7,500 7,700 7,900 8,100 8,300

EI 4,454 3,491 3,412 3,480 3,550 3,600 3,700 3,800 3,900 4,000 4,100 4,200

WSIB 2,854 2,305 6,041 6,162 6,285 6,400 6,500 6,600 6,700 6,800 6,900 7,000

OMERS 24,171 22,909 18,506 18,876 19,253 19,600 20,000 20,400 20,800 21,200 21,600 22,000

EHT 4,677 4,397 3,825 3,902 3,980 4,100 4,200 4,300 4,400 4,500 4,600 4,700

LTD/ADD/LIFE 25,693 23,536 19,173 19,556 19,947 20,300 20,700 21,100 21,500 21,900 22,300 22,700

Employee Assistance 289 271 191 195 198 200 200 200 200 200 200 200

Employee Records 200 - - - - - - - - - - -

Mileage - - - - - - - - - - - -

Travel and Conventions 2,178 66 3,000 3,060 3,121 3,200 3,300 3,400 3,500 3,600 3,700 3,800

Safety Apparel 163 - - - - - - - - - - -

Clothing Allowance 3,134 3,276 3,600 3,672 3,745 3,800 3,900 4,000 4,100 4,200 4,300 4,400

Dues/Memberships 1,088 403 959 978 997 1,000 1,000 1,000 1,000 1,000 1,000 1,000

Employee Recognition 772 125 449 458 467 500 500 500 500 500 500 500

Meetings - - 33 33 34 - - - - - - -

Flowers/Memorials - - 17 17 17 - - - - - - -

Employee Recruitment 36 722 253 258 263 300 300 300 300 300 300 300

Advertising 203 199 134 137 139 100 100 100 100 100 100 100

Insurance 19,469 20,483 23,323 23,789 24,265 24,800 25,300 25,800 26,300 26,800 27,300 27,800

Radio Licensing 614 1,229 1,500 1,530 1,561 1,600 1,600 1,600 1,600 1,600 1,600 1,600

Licenses/Permits 1,316 1,591 2,271 2,316 2,363 2,400 2,400 2,400 2,400 2,400 2,400 2,400

Office Supplies 359 896 651 664 677 700 700 700 700 700 700 700

Office Equipment 637 - 694 708 722 700 700 700 700 700 700 700

Equipment Charges 15,736 18,448 15,271 15,576 15,887 16,200 16,500 16,800 17,100 17,400 17,700 18,100

Small Tools/Equipment 7,834 869 8,000 8,160 8,323 8,500 8,700 8,900 9,100 9,300 9,500 9,700

Truck Maintenance - - - - - - - - - - - -

Parts & Supplies 2,917 15,601 6,325 6,452 6,581 6,700 6,800 6,900 7,000 7,100 7,200 7,300

Water - 12,351 - - - - - - - - - -

Telephone 3,491 3,960 4,401 4,489 4,579 4,700 4,800 4,900 5,000 5,100 5,200 5,300

IT Supplies 254 - 85 86 88 100 100 100 100 100 100 100

IT Equipment 414 729 381 389 396 400 400 400 400 400 400 400

Courier 8 - - - - - - - - - - -

Legal Service 13 - - - - - - - - - - -

Consulting - 638 - - - - - - - - - -

Answering Service 575 627 610 622 634 600 600 600 600 600 600 600

IT Service 7,941 22,388 20,920 21,338 21,765 22,200 22,600 23,100 23,600 24,100 24,600 25,100

Contracted Services 479 1,276 585 597 609 600 600 600 600 600 600 600

SCADA Service 23,489 20,911 23,000 23,460 23,929 24,400 24,900 25,400 25,900 26,400 26,900 27,400

Rate Study Consulting 265 13,103 3,000 3,060 3,121 - - 11,600 - - - -

Bank Charges 136 87 - - - - - - - - - -

Payments in Lieu 13,396 16,841 11,107 11,329 11,556 11,800 12,000 12,200 12,400 12,600 12,900 13,200

White Station Lease - - - - - - - - - - - -

Copier Lease 586 932 900 918 936 1,000 1,000 1,000 1,000 1,000 1,000 1,000

Training 14,433 12,232 13,342 13,609 13,881 14,200 14,500 14,800 15,100 15,400 15,700 16,000

Health & Safety:

Training 3,360 1,476 1,612 1,644 1,677 1,700 1,700 1,700 1,700 1,700 1,700 1,700

Health and Safety Supplies 1,657 981 4,000 4,080 4,162 4,200 4,300 4,400 4,500 4,600 4,700 4,800

Health and Safety Services 376 309 342 349 356 400 400 400 400 400 400 400

Forecast

Page 43: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 5-1 (page 2) Water Service

Operating Budget Forecast Inflated $

Actual Actual

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

DWQMS

Audit Services 3,843 2,162 3,268 3,334 3,401 3,500 3,600 3,700 3,800 3,900 4,000 4,100

Billing and Collection

Supervision 47,777 9,316 10,399 10,607 10,819 11,000 11,200 11,400 11,600 11,800 12,000 12,200

Union (including Overtime) 15,087 20,170 18,357 18,724 19,099 19,500 19,900 20,300 20,700 21,100 21,500 21,900

Casual (including Overtime) 4,623 38,399 6,991 7,131 7,274 7,400 7,500 7,700 7,900 8,100 8,300 8,500

CPP 2,893 2,852 1,354 1,381 1,408 1,400 1,400 1,400 1,400 1,400 1,400 1,400

EI 1,538 1,367 695 709 723 700 700 700 700 700 700 700

WSIB 751 964 1,126 1,149 1,172 1,200 1,200 1,200 1,200 1,200 1,200 1,200

OMERS 5,421 5,962 2,667 2,720 2,775 2,800 2,900 3,000 3,100 3,200 3,300 3,400

EHT 1,308 1,317 697 711 725 700 700 700 700 700 700 700

LTD/ADD/LIFE 8,199 1,938 3,101 3,163 3,226 3,300 3,400 3,500 3,600 3,700 3,800 3,900

Office Supplies - - - - - - - - - - - -

Postage - - - - - - - - - - - -

Billing and Collection Services 9 1,486 1,684 1,718 1,752 1,800 1,800 1,800 1,800 1,800 1,800 1,800

Equipment Charges 3,814 5,932 3,864 3,941 4,020 4,100 4,200 4,300 4,400 4,500 4,600 4,700

Small Tools and Equipment - - 500 510 520 500 500 500 500 500 500 500

Meter Reading Services 509 - - - - - - - - - - -

Purchase of Water - - - - - - -

Elgin Primary Area Water Supply System 216,735 224,107 234,842 246,068 255,369 264,900 274,800 283,700 292,900 302,400 312,200 322,300

Malahide Secondary Water Supply System 23,240 21,704 22,246 22,691 23,145 24,300 25,600 26,900 28,300 29,800 31,300 32,900

Alymer Secondary Water Supply System 31,982 35,815 36,710 37,444 38,193 40,000 41,900 43,900 46,000 48,200 50,500 52,900

St. Thomas Secondary Water Supply System 59,500 60,707 62,224 63,469 64,738 71,600 79,200 87,600 96,800 107,000 118,300 130,800

Belmont Pumphouse 74,433 84,586 84,597 86,289 88,015 89,800 91,600 93,400 95,300 97,200 99,100 101,100

Port Stanley Rechlorination 22,560 10,680 8,583 8,754 8,929 9,100 9,300 9,500 9,700 9,900 10,100 10,300

Water Distribution & Transmission - - - - - - -

Belmont Water Tower 44,944 14,687 29,949 30,548 31,159 31,800 32,400 33,000 33,700 34,400 35,100 35,800

Port Stanley Water Tower 25,845 12,350 12,403 12,651 12,904 13,200 13,500 13,800 14,100 14,400 14,700 15,000

Bulk Water Fill Station 488 182 270 275 280 300 300 300 300 300 300 300

Fruit Ridge Booster 2,170 2,206 13,436 13,705 13,979 14,300 14,600 14,900 15,200 15,500 15,800 16,100

Water Chambers 10,008 4,461 3,932 4,010 4,091 4,200 4,300 4,400 4,500 4,600 4,700 4,800

Water Mains 128,255 135,474 112,224 114,469 116,758 119,100 121,500 123,900 126,400 128,900 131,500 134,100

Water Mains - Sampling 23,145 24,383 20,226 20,631 21,043 21,500 21,900 22,300 22,700 23,200 23,700 24,200

Water Mains - Locates - 1,865 14,000 14,280 14,566 14,900 15,200 15,500 15,800 16,100 16,400 16,700

Water Services 77,078 112,843 82,083 83,725 85,399 87,100 88,800 90,600 92,400 94,200 96,100 98,000

Water Services - Water Meters - - - - - - - - - - - -

Fire Hydrants 48,418 48,933 36,683 37,417 38,165 38,900 39,700 40,500 41,300 42,100 42,900 43,800

Sub Total Operating 1,319,529 1,334,144 1,234,061 1,265,271 1,294,956 1,329,300 1,368,200 1,419,000 1,448,500 1,491,200 1,535,800 1,582,500

Capital-Related:

Existing Debt (Principal) - Growth Related 23,619 24,781 26,000 27,279 28,621 30,028 31,506 33,055 34,681 36,387 - -

Existing Debt (Interest) - Growth Related 14,100 12,938 11,719 10,440 9,098 7,691 6,213 4,664 3,038 884 - -

New Growth Related Debt (Principal) - - - - - - 24,188 25,155 26,161 27,208

New Growth Related Debt (Interest) - - - - - - 11,616 10,648 9,642 8,596

Existing Debt (Principal) - Non-Growth Related 614,374 768,102 948,233 974,065 991,002 1,018,079 1,046,069 982,030 1,011,953 1,042,897 615,852 -

Existing Debt (Interest) - Non-Growth Related 348,536 372,907 391,451 361,415 330,667 299,288 267,088 215,968 186,045 154,296 126,277 -

New Non-Growth Related Debt (Principal) - 54,597 83,967 135,910 141,346 155,221 161,429 167,887 174,602 181,586

New Non-Growth Related Debt (Interest) - 26,220 37,092 57,065 51,629 49,923 43,714 37,257 30,542 23,558

Transfer to Capital 30,000 24,000 - - - - - - - - - -

Transfer to Water Discretionary Reserve Fund 80,060 234,311 465,516 710,505 586,868 648,555 63,132 270,856

Transfer to Water Development Charge Reserve Fund - - - - - - - - - - - -

Transfer to Lifecycle Reserve Fund - - - - - - - - - - - -

Sub Total Capital Related 1,030,629 1,202,728 1,377,403 1,454,016 1,560,508 1,782,372 2,009,367 2,151,366 2,063,533 2,123,968 1,046,208 511,804

Total Expenditures 2,350,157 2,536,872 2,611,464 2,719,287 2,855,464 3,111,672 3,377,567 3,570,366 3,512,033 3,615,168 2,582,008 2,094,304

Forecast

Page 44: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 5-1 (page 3) Water Service

Operating Budget Forecast Inflated $

Actual Actual

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Revenues

Base Charge 605,366 624,023 616,735 654,232 693,704 735,732 757,936 780,734 803,881 827,906 852,301 877,616

Revenue Other Municipality - - - - - - - - - - - -

Hydrant Maintenance Revenue - 44,040 45,000 45,900 46,818 47,750 48,710 49,680 50,670 51,680 52,710 53,760

Water Meter Revenue 14,825 20,336 13,748 14,023 14,303 14,590 14,880 15,180 15,480 15,790 16,110 16,430

Water Rent Revenue 2,968 3,000 3,000 3,060 3,121 3,180 3,240 3,300 3,370 3,440 3,510 3,580

New Connection Charge - 3,883 1,294 1,320 1,347

New Water Service Hook Up 8,300 15,200 10,733 10,948 11,167 11,390 11,620 11,850 12,090 12,330 12,580 12,830

Bulk Water Fill Station Revenue 2,498 2,411 1,636 1,669 1,702 1,740 1,770 1,810 1,850 1,890 1,930 1,970

Bulk Fill Station Keys 5,098 3,085 4,301 4,387 4,474

Water Sundry Revenue 2,511 2,730 1,000 1,020 1,040 1,060 1,080 1,100 1,120 1,140 1,160 1,180

Water Recovery (1,417) (1,488) (1,291) (1,317) (1,343)

Water Reconnect Charge 8,700 12,600 10,767 10,982 11,202 11,430 11,660 11,890 12,130 12,370 12,620 12,870

Water Penalty 14,552 14,467 15,062 15,363 15,670 15,980 16,300 16,630 16,960 17,300 17,650 18,000

Federal - Water Distribution Grant 1,968 - - - -

Source Water Protection Grant - - - - -

Local Improvement Collections 10,990 10,990 10,990 10,990

Contributions from Development Charges Reserve Fund 123,763 37,719 37,719 37,719 37,719 37,719 37,719 37,719 73,523 73,075 35,804 35,804

Contributions from Reserves / Reserve Funds 134,227 259,389 201,874 91,396 - - - - - - - -

Total Operating Revenue 934,348 1,052,386 972,568 901,691 840,924 880,571 904,915 929,893 991,073 1,016,921 1,006,375 1,034,040

Water Billing Recovery - Operating 1,415,809 1,484,486 1,638,896 1,817,596 2,014,540 2,231,101 2,472,652 2,640,473 2,520,960 2,598,246 1,575,634 1,060,264

Lifecycle Reserve Contribution ($) 300,000 300,000 1,400,000 2,000,000

Water Billing Recovery - Total 1,415,809 1,484,486 1,638,896 1,817,596 2,014,540 2,231,101 2,472,652 2,640,473 2,820,960 2,898,246 2,975,634 3,060,264

Forecast

Page 45: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

5.3 Wastewater Operating Expenditures

Similar to the budget forecasting approach presented above for water services, the costs

for wastewater operating expenditures have been adjusted over the forecast by an annual

inflationary factor of 2%. It is noted that operating budget is anticipated to result in minor

funding shortfalls between 2021 and 2025 forecast years. These shortfalls have been

cash flowed by the financial reserves and reserve funds (see Appendix D-5) for

wastewater and may require minor cash flow assistance from the property tax base.

Actual revenues and expenditures should be monitored closely to determine what level

of assistance from property taxes may be required. If property tax funding is required,

the analysis herein anticipates that the wastewater rates would be able to provide a full

payback to the property tax base by 2026. It is also noted that, due to the recent

debenture for the wastewater plant, there will be a need to cash flow a portion of the

growth-related debt payments from property taxes, until development charges are

collected for the full growth component of capital infrastructure. The payback of this

assistance will be based on the rate of growth and should be monitored on an annual

basis.

5.4 Wastewater Operating Revenues

The revenue for the wastewater program has been forecasted based on growth, in the

case of base charges (discussed further in Chapter 6) and volume charges (Chapter 7).

As well, the miscellaneous revenues have been inflated annually by 2% annually. There

are several local improvement charges and connection charges outstanding that will be

received over the 2018 to 2024 forecast. These revenues have been included based on

repayment schedules agreed upon with the individual property owners.

Tables 5-2 provides the operating budget for the wastewater system.

Page 46: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 5-2 (page 1) Wastewater Service

Operating Budget Forecast Inflated $

Actuals Actuals

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Expenditures:

Operating Costs:

Wastewater Administration and Office

Supervision 25,305 46,570 49,027 50,008 51,008 52,000 53,000 54,100 55,200 56,300 57,400 58,500

Union (including Overtime) 30,442 17,305 29,186 29,769 30,365 31,000 31,600 32,200 32,800 33,500 34,200 34,900

Casual (including Overtime) 826 595 501 511 521 500 500 500 500 500 500 500

On-Call Pay - - - - - - - - - - - -

CPP 1,881 2,327 2,767 2,823 2,879 2,900 3,000 3,100 3,200 3,300 3,400 3,500

EI 1,003 1,092 1,324 1,351 1,378 1,400 1,400 1,400 1,400 1,400 1,400 1,400

WSIB 667 795 2,422 2,470 2,520 2,600 2,700 2,800 2,900 3,000 3,100 3,200

OMERS 5,892 6,832 7,899 8,057 8,218 8,400 8,600 8,800 9,000 9,200 9,400 9,600

EHT 1,109 1,269 1,535 1,566 1,597 1,600 1,600 1,600 1,600 1,600 1,600 1,600

LTD/ADD/LIFE 5,977 6,922 8,453 8,622 8,794 9,000 9,200 9,400 9,600 9,800 10,000 10,200

Employee Records Checks 200 - - - - - - - - - - -

Travel & Conventions 3,613 4,286 4,000 4,080 4,162 4,200 4,300 4,400 4,500 4,600 4,700 4,800

Clothing Allowance 2,936 2,800 3,400 3,468 3,537 3,600 3,700 3,800 3,900 4,000 4,100 4,200

Dues/Memberships - - - - - - - - - - - -

Employee Recruitment 36 390 - - - - - - - - - -

Advertising - - - - - - - - - - - -

Insurances 13,218 12,408 14,830 15,127 15,429 15,700 16,000 16,300 16,600 16,900 17,200 17,500

Radio Licenses 614 614 615 627 640 700 700 700 700 700 700 700

Licenses/Permits 261 2,709 1,446 1,475 1,505 1,500 1,500 1,500 1,500 1,500 1,500 1,500

Office Supplies 194 894 761 776 792 800 800 800 800 800 800 800

Postage 14,613 15,404 16,000 16,320 16,646 17,000 17,300 17,600 18,000 18,400 18,800 19,200

Office Equipment 295 - - - - - - - - - - -

Equipment Charges 6,145 6,782 5,738 5,853 5,970 6,100 6,200 6,300 6,400 6,500 6,600 6,700

Maintenance 1,375 717 1,500 1,530 1,561 1,600 1,600 1,600 1,600 1,600 1,600 1,600

Sampling Services - - - - - - - - - - - -

Truck Maintenance - - - - - - - - - - - -

Treatment Plant Operations - - - - - - - - - - - -

Pump Station Operations - - - - - - - - - - - -

Systems Operations Maintenance - - - - - - - - - - - -

Hydro - - - - - - - - - - - -

Water 108 - - - - - - - - - - -

Telephone 1,403 1,380 1,450 1,479 1,509 1,500 1,500 1,500 1,500 1,500 1,500 1,500

IT Supplies 102 - - - - - - - - - - -

IT Equipment 414 729 2,000 2,040 2,081 2,100 2,100 2,100 2,100 2,100 2,100 2,100

St. Thomas Sewer Operations 233,895 251,104 230,000 234,600 239,292 244,100 249,000 254,000 259,100 264,300 269,600 275,000

Legal Services - 52 - - - - - - - - - -

Audit Services 1,680 - - - - - - - - - - -

Answering Service 519 1,453 846 863 880 900 900 900 900 900 900 900

IT Services 7,795 22,388 21,004 21,424 21,852 22,300 22,700 23,200 23,700 24,200 24,700 25,200

Contracted Services - 715 - - - - - - - - - -

SCADA Services 23,489 27,078 28,500 29,070 29,651 30,200 30,800 31,400 32,000 32,600 33,300 34,000

Locates - 535 14,000 14,280 14,566 14,900 15,200 15,500 15,800 16,100 16,400 16,700

Wastewater Rate Study 265 5,032 2,000 - - - - 11,600 - - - -

Bank Charges - 4 - - - - - - - - - -

Payments-in-Lieu - 47,517 28,424 28,993 29,573 30,200 30,800 31,400 32,000 32,600 33,300 34,000

White Station Lease - - - - - - - - - - - -

Copier Lease 586 933 900 900 900 900 900 900 900 900 900 900

Training - Operator 6,881 11,280 12,000 12,240 12,485 12,700 13,000 13,300 13,600 13,900 14,200 14,500

Health & Safety - - - - - - - - - - - -

Health & Safety Training 3,249 941 1,397 1,425 1,453 1,500 1,500 1,500 1,500 1,500 1,500 1,500

Health & Safety Supplies 437 1,048 512 523 533 500 500 500 500 500 500 500

Health & Safety Services 372 89 267 273 278 300 300 300 300 300 300 300

Wastewater Treatment

Belmont WWTP 164,024 193,602 161,179 164,402 167,690 171,000 174,400 177,900 181,500 185,100 188,800 192,600

Port Stanley WWTP 108,782 68,869 289,513 290,203 296,007 301,900 307,900 314,100 320,400 326,800 333,300 340,000

Wastewater Collection

Pumping Stations 154,875 102,951 96,340 98,266 100,232 102,200 104,200 106,300 108,400 110,600 112,800 115,100

Collection System Total 68,289 34,442 64,414 65,702 67,016 68,400 69,800 71,200 72,600 74,100 75,600 77,100

Sub Total Operating 893,766 902,854 1,106,150 1,121,115 1,143,519 1,166,200 1,189,200 1,224,500 1,237,000 1,261,600 1,286,700 1,312,300

Forecast

Page 47: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 5-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 5-2 (page 2) Wastewater Service

Operating Budget Forecast Inflated $

Actuals Actuals

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital-Related:

Existing Debt (Principal) - Growth Related 135,592 142,262 149,260 156,602 164,305 172,387 180,867 189,764 199,099 208,892 - -

Existing Debt (Interest) - Growth Related 80,945 74,275 67,277 59,935 52,232 44,150 35,670 26,773 17,438 5,076 - -

New Growth Related Debt (Principal) - 41,645 58,054 60,376 104,761 108,952 113,310 117,842 122,556 127,458

New Growth Related Debt (Interest) - 20,000 25,414 23,092 40,833 36,643 32,284 27,752 23,038 18,136

New WWTP, PS51, and PS52 Debt (Principal) - Growth-related - 108,448 222,343 229,809 237,525 245,501 253,744 262,264 271,070 280,172 289,579 299,303

New WWTP, PS51, and PS52 Debt (Interest) - Growth-related - 139,177 272,908 265,442 257,726 249,750 241,507 232,987 224,181 215,079 205,672 195,948

Existing Debt (Principal) - Non-Growth Related 517,436 530,769 572,124 590,482 596,964 615,990 635,699 656,117 677,274 699,200 93,523 47,622

Existing Debt (Interest) - Non-Growth Related 173,868 166,972 160,016 141,658 122,635 103,609 83,901 63,482 42,325 17,610 2,889 583

New Non-Growth Related Debt (Principal) - 30,401 48,609 50,553 52,575 54,678 56,865 59,140 61,505 63,966

New Non-Growth Related Debt (Interest) - 14,600 21,544 19,600 17,577 15,474 13,287 11,013 8,647 6,187

New WWTP, PS51, and PS52 Debt (Principal) - Non growth-related - 139,757 286,533 296,154 306,098 316,376 326,999 337,979 349,327 361,057 373,180 385,710

New WWTP, PS51, and PS52 Debt (Interest) - Non growth-related - 179,357 351,695 342,074 332,130 321,852 311,229 300,250 288,901 277,172 265,048 252,518

Transfer to Capital - - - - - - - - - - - -

Transfer to Wastewater Discretionary Reserve Fund 221,488 381,666 - 38,757 111,186 57,143 751,871 376,026

Transfer to Wastewater Development Charge Reserve Fund - - - - - - - - - - - -

Sub Total Capital Related 1,129,329 1,862,684 2,082,156 2,188,803 2,223,237 2,223,237 2,285,363 2,324,120 2,396,549 2,337,148 2,197,509 1,773,458

Total Expenditures 2,023,095 2,765,538 3,188,306 3,309,918 3,366,756 3,389,437 3,474,563 3,548,620 3,633,549 3,598,748 3,484,209 3,085,758

Revenues

Base Charge 554,748 612,087 632,332 671,891 713,546 757,980 782,070 806,821 835,812 869,746 904,703 940,711

Wastewater Penalty 9,294 10,197 9,843 10,040 10,240 10,400 10,600 10,800 11,000 11,200 11,400 11,600

Wastewater Revenue From St. Thomas Energy 322,132 523,472

Port Stanley Plant Land Rent 24,900 24,900 24,900 25,398 25,906 26,400 26,900 27,400 27,900 28,500 29,100 29,700

Frontage/Connection Wastewater System 900 13,825 18,900 18,900 18,900 900 - - - - - -

Local Improvement Charges - 150,616 129,572 129,572 129,572 129,572 129,572 129,572 129,572 - - -

Other Revenue 392 813 - - -

Contributions from Development Charges Reserve Fund 275,070 275,070 711,788 773,433 795,256 795,256 857,382 857,382 857,382 854,814 640,845 640,845

Contribution from Connection Reserve Fund - - - 106,745 184,032 93,529 362 - - - - -

Contributions from Reserves / Reserve Funds - - 406,232 207,421 - - - - - - - -

Total Operating Revenue 1,187,435 1,610,979 1,933,567 1,943,400 1,877,453 1,814,036 1,806,886 1,831,975 1,861,666 1,764,260 1,586,049 1,622,856

Wastewater Billing Recovery - Operating 835,659 1,154,559 1,254,739 1,366,518 1,489,303 1,575,400 1,667,677 1,716,644 1,771,884 1,834,488 1,898,161 1,462,902

Lifecycle Reserve Contribution ($) 500,000

Wastewater Billing Recovery - Total 835,659 1,154,559 1,254,739 1,366,518 1,489,303 1,575,400 1,667,677 1,716,644 1,771,884 1,834,488 1,898,161 1,962,902

Forecast

Page 48: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

6. Pricing Structures

6.1 Introduction

Rates, in their simplest form, can be defined as total costs to maintain the utility function

divided by the total expected volume to be generated for the period. Total costs are

usually a combination of operating costs (e.g. staff costs, distribution costs,

maintenance, administration, etc.) and capital-related costs (e.g. past debt to finance

capital projects, transfers to reserves to finance future expenditures, etc.). The

schematic below provides a simplified illustration of the rate calculation for water.

“Annual Costs”

Operations

- Staff costs

- Distribution costs

- Maintenance

- Meter reading and billing, etc.

Capital Related

- Past debt

- Contributions to reserves

- Contribution to capital

Total Costs

VolumeRate

These operating and capital expenditures will vary over time. Examples of factors

which will affect the expenditures over time are provided below.

Operations

• Inflation;

• Increased maintenance as system ages; and

• Changes to provincial legislation.

Page 49: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Capital Related

• New capital will be built as areas expand;

• Replacement capital needed as system ages; and

• Financing of capital costs are a function of policy regarding reserves and direct

financing from rates (pay as you go), debt and user pay methods (development

charges, Municipal Act).

6.2 Alternative Pricing Structures

Throughout Ontario, and as well, Canada, the use of pricing mechanisms varies

between municipalities. The use of a particular form of pricing depends upon numerous

factors, including Council preference, administrative structure, surplus/deficit system

capacities, economic/ demographic conditions, to name a few.

Municipalities within Ontario have two basic forms of collecting revenues for water

purposes, those being through incorporation of the costs within the tax rate charged on

property assessment and/or through the establishment of a specific water rate billed to

the customer. Within the rate methods, there are five basic rate structures employed

along with other variations:

• Flat Rate (non-metered customers);

• Constant Rate;

• Declining Block Rate;

• Increasing (or Inverted) Block Rate;

• Hump Back Block Rate; and

• Base Charges.

The definitions and general application of the various methods are as follows:

Property Assessment: This method incorporates the total costs of providing water into

the general requisition or the assessment base of the Municipality. This form of

collection is a "wealth tax", as payment increases directly with the value of property

owned and bears no necessary relationship to actual consumption. This form is easy to

administer as the costs to be recovered are incorporated in the calculation for all

general services, normally collected through property taxes.

Flat Rate: This rate is a constant charge applicable to all customers served. The

charge is calculated by dividing the total number of user households and other entities

(e.g. businesses) into the costs to be recovered. This method does not recognize

differences in actual consumption but provides for a uniform spreading of costs across

Page 50: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

all users. Some municipalities define users into different classes of similar consumption

patterns, that is, a commercial user, residential user and industrial user, and charge a

flat rate by class. Each user is then billed on a periodic basis. No meters are required

to facilitate this method, but an accurate estimate of the number of users is required.

This method ensures set revenue for the collection period but is not sensitive to

consumption, hence may cause a shortfall or surplus of revenues collected.

Constant Rate: This rate is a volume-based rate, in which the consumer pays the

same price per unit consumed, regardless of the volume. The price per unit is

calculated by dividing the total cost of the service by the total volume used by total

consumers. The bill to the consumer climbs uniformly as the consumption increases.

This form of rate requires the use of meters to record the volume consumed by each

user. This method closely aligns the revenue recovery with consumption. Revenue

collected varies directly with the consumption volume.

Declining Block Rates: This rate structure charges a successively lower price for set

volumes, as consumption increases through a series of "blocks". That is to say that

within set volume ranges, or blocks, the charge per unit is set at one rate. Within the

next volume range the charge per unit decreases to lower rate, and so on. Typically,

the first, or first and second blocks cover residential and light commercial uses.

Subsequent blocks normally are used for heavier commercial and industrial uses. This

rate structure requires the use of meters to record the volume consumed by each type

of user. This method requires the collection and analysis of consumption patterns by

user classification to establish rates at a level which does not over or under collect

revenue from rate payers.

Increasing or Inverted Block Rates: The increasing block rate works essentially the

same way as the declining block rate, except that the price of water in successive

blocks increases rather than declines. Under this method the consumer's bill rises

faster with higher volumes used. This rate structure also requires the use of meters to

record the volume consumed by each user. This method requires, as with the declining

block structure, the collection and analysis of consumption patterns by user

classification to establish rates at a level which does not over or under collect from rate

payers.

The Hump Back Rate: The hump back rate is a combination of an increasing block

rate and the declining block rate. Under this method the consumer’s bill rises with

higher volumes used up to a certain level and then begins to fall for volumes in excess

of levels set for the increasing black rate.

Page 51: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

6.3 Assessment of Alternative Pricing Structures

The adoption by a Municipality or utility of any one particular pricing structure is

normally a function of a variety of administrative, social, demographic and financial

factors. The number of factors and the weighting each particular factor receives can

vary between municipalities. The following is a review of some of the more prevalent

factors:

Cost Recovery

Cost recovery is a prime factor in establishing a particular pricing structure. Costs can

be loosely defined into different categories: operations, maintenance, capital, financing

and administration. These costs often vary between municipalities and even within a

municipality, based on consumption patterns, infrastructure age, economic growth, etc.

The pricing alternatives defined earlier can all achieve the cost recovery goal, but some

do so more precisely than others. Fixed pricing structures, such as Property

Assessment and Flat Rate, are established on the value of property or on the number of

units present in the municipality, but do not adjust in accordance with consumption.

Thus, if actual consumption for the year is greater than projected, the municipality incurs

a higher cost of production, but the revenue base remains static (since it was

determined at the beginning of the year), thus potentially providing a funding shortfall.

Conversely, if the consumption level declines below projections, fixed pricing structures

will produce more revenue than actual costs incurred.

The other pricing methods (declining block, constant rate, increasing block) are

consumption based and generally will generate revenues in proportion to actual

consumption.

Administration

Administration is defined herein as the staffing, equipment and supplies required to

support the undertaking of a particular pricing strategy. This factor not only addresses

the physical tangible requirements to support the collection of the revenues, but also the

intangible requirements, such as policy development.

The easiest pricing structure to support is the Property Assessment structure. As

municipalities undertake the process of calculating property tax bills and the collection

process for their general services, the incorporation of the water costs into this

calculation would have virtually no impact on the administrative process and structure.

Page 52: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

The Flat Rate pricing structure is relatively easy to administer as well. It is normally

calculated to collect a set amount, either on a monthly, quarterly, semi-annual or annual

basis and is billed directly to the customer. The impact on administration centres mostly

on the accounts receivable or billing area of the municipality, but normally requires

minor additional staff or operating costs to undertake.

The three remaining methods, those being Increasing Block Rate, Constant Rate and

Declining Block Rate, have a more dramatic effect on administration. These methods

are dependent upon actual consumption and hence involve a major structure in place to

administer. First, meters must be installed in all existing units in the municipality and

units to be subsequently built must be required to include these meters. Second, meter

readings must be undertaken periodically. Hence staff must be available for this

purpose or a service contract must be negotiated. Third, the billings process must be

expanded to accommodate this process. Billing must be done per a defined period,

requiring staff to produce the bills. Lastly, either through increased staffing or by service

contract, an annual maintenance program must be set up to ensure meters are working

effectively in recording consumed volumes.

The benefit derived from the installation of meters is that information on consumption

patterns becomes available. This information provides benefit to administration in

calculating rates which will ensure revenue recovery. Additionally, when planning what

services are to be constructed in future years, the municipality or utility has documented

consumption patterns distinctive to its own situation, which can be used to project sizing

of growth-related works.

Equity

Equity is always a consideration in the establishment of pricing structures but its

definition can vary depending on a municipality's circumstances and based on the

subjective interpretation of those involved. For example: is the price charged to a

particular class of rate payer consistent with those of a similar class in surrounding

municipalities; through the pricing structure does one class of rate payer pay more than

another class; should one pay based on ability to pay, or on the basis that a unit of

water costs the same to supply no matter who consumes it; etc. There are many

interpretations. Equity therefore must be viewed broadly in light of many factors as part

of achieving what is best for the municipality as a whole.

Conservation

Page 53: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

In today's society, conservation of natural resources is increasingly being more highly

valued. Controversy continuously focuses on the preservation of non-renewable

resources and on the proper management of renewable resources. Conservation is

also a concept which applies to a municipality facing physical limitations in the amount

of water which can be supplied to an area. As well, financial constraints can encourage

conservation in a municipality where the cost of providing each additional unit is

increasing.

Pricing structures such as property assessment and flat rate do not, in themselves,

encourage conservation. In fact, depending on the price which is charged, they may

even encourage resource "squandering," either because consumers, without the price

discipline, consume water at will, or the customer wants to get his money's worth and

hence adopts more liberal consumption patterns. The fundamental reason for this is

that the price paid for the service bears no direct relationship to the volume consumed

and hence is viewed as a "tax," instead of being viewed as the price of a purchased

commodity.

The Declining Block Rate provides a decreasing incentive towards conservation. By

creating awareness of volumes consumed, the consumer can reduce his total costs by

restricting consumption; however the incentive lessens as more water is consumed,

because the marginal cost per unit declines as the consumer enters the next block

pricing range. Similarly, those whose consumption level is at the top end of a block

have reduced incentive to reduce consumption.

The Constant Rate structure presents the customer with a linear relationship between

consumption and the cost thereof. As the consumer pays a fixed cost per unit, his bill

will vary directly with the amount consumed. This method presents tangible incentive

for consumers to conserve water. As metering provides direct feedback as to usage

patterns and the consumer has direct control over the total amount paid for the

commodity, the consumer is encouraged to use only those volumes that are reasonably

required.

The Inverted Block method presents the most effective pricing method for encouraging

conservation. Through this method, the price per unit consumed increases as total

volumes consumed grow. The consumer becomes aware of consumption through

metering with the charges increasing dramatically with usage. Hence, there normally is

awareness that exercising control over usage can produce significant savings. This

method not only encourages conservation methods, but may also penalize legitimate

high volume users if not properly structured.

Page 54: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Figure 6-1 provides a schematic representation of the various rate structures (note

property tax as a basis for revenue recovery has not been presented for comparison, as

the proportion of taxes paid varies in direct proportion to the market value of the

property). The graphs on the left-hand side of the figure present the cost per unit for

each additional amount of water consumed. The right-hand side of the figure presents

the impact on the customer's bill as the volume of water increases. The schematic is

summarized below for each rate structure.

Page 55: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Figure 6-1

"Rate Structure" "Impact on Individual Customer"

Flat Rate:

Co

st P

er

Un

it

To

tal B

ill C

ha

rge

d

Volume Volume

Constant Rate:

Co

st P

er

Un

it

To

tal B

ill C

ha

rge

dVolume Volume

Declining Block Rate:

Co

st P

er

Un

it

To

tal B

ill C

ha

rge

d

Volume Volume

Increasing Block Rate:

Co

st P

er

Un

it

To

tal B

ill C

ha

rge

d

Volume Volume

Hump Back Rate:

Co

st P

er

Un

it

To

tal B

ill C

ha

rge

d

Volume Volume

FIGURE 6-1

WATER RATE PRICING CONCEPTS

Page 56: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-9

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

6.4 Rate Structures in Ontario

In a past survey of over 170 municipalities (approximately half of the municipalities who

provide water and/or sewer), all forms of rate structures are in use by Ontario

municipalities. The most common rate structure is the constant rate (for metered

municipalities). Most municipalities (approximately 92%) who have volume rate

structures also impose a base monthly charge.

Historically, the development of a base charge often reflected either the recovery of

meter reading/billing/collection costs, plus administration or those costs plus certain

fixed costs (such as capital contributions or reserve contributions). More recently, many

municipalities have started to establish base charges based on ensuring a secure

portion of the revenue stream which does not vary with volume consumption. Selection

of the quantum of the base charge is a matter of policy selected by individual

municipalities.

6.5 Recommended Rate Structures

The Municipality presently uses a monthly base charge along with a volume charge for

both water and wastewater customers. Note that customers serviced by the City of St.

Thomas in the suburban area are billed directly by St. Thomas.

RATE

STRUCTURE

COST PER UNIT AS

VOLUME CONSUMPTION

INCREASES

IMPACT ON CUSTOMER

BILL AS VOLUME

CONSUMPTION

INCREASES

Flat Rate Cost per unit decreases as

more volume consumed

Bill remains the same no

matter how much volume is

consumed

Constant Rate Cost per unit remains the

same

Bill increases in direct

proportion to consumption

Declining Block Cost per unit decreases as

threshold targets are achieved

Bill increases at a slower

rate as volumes increases

Increasing Block Cost per unit increases as

threshold targets are achieved

Bill increases at a faster rate

as volumes increase

Hump Back Rate Combination of an increasing

block at the lower consumption

volumes and then converts to a

declining block for the high

consumption

Bill increases at a faster rate

at the lower consumption

amounts and then slows as

volumes increase

Page 57: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-10

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

The present rate structure is provided below:

The use of the base charge and a volume charge for water and a flat rate for

wastewater is recommended to be continued for the water system. The water rates

encourage conservation and provide incentive to maintain water use at reasonable

levels.

As noted in Chapter 5 and for use in Chapter 7, Tables 6-1 and 6-2 provide for the

calculation of the base charge revenues for water and wastewater, respectfully. The base

charges have been adjusted by 5% annually for inflation in each year of the forecast 2018

to 2021 and then 2% annually thereafter. The number of customers serviced annually

are provided in Tables 1-1 and 1-2.

Staff requested that an alternative base charge rate be calculated for the water system

which varies the rates by meter size. This analysis has been provided in Appendix E.

Monthly 16.78 Monthly 20.01

2.810$ per m3 2.440$ per m3

3.232$ per m3

*15% higher than cost charged to Municipality Customers

Volume Charge Volume Charge

Bulk Water Volume Charge*

Municipality of Central Elgin Municipality of Central Elgin

2017 - Water Billing Rates 2017 - Wastewater Billing Rates

Base Charge Base Charge

Page 58: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 6-11

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Tables 6-1 Base Charge - Water

Tables 6-2 Base Charge - Wastewater

Water 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902

New - 15 45 74 104 134 164 193 223 252 282

Total Customers 2,902 2,917 2,947 2,976 3,006 3,036 3,066 3,095 3,125 3,154 3,184

Total Annual Revenue $584,347 $616,735 $654,232 $693,704 $735,732 $757,936 $780,734 $803,881 $827,906 $852,301 $877,616

Customers 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902

New 0 15 45 74 104 134 164 193 223 252 282

Subtotal Customers 2,902 2,917 2,947 2,976 3,006 3,036 3,066 3,095 3,125 3,154 3,184

Monthly Base Charge $16.78 $17.62 $18.50 $19.42 $20.40 $20.80 $21.22 $21.64 $22.08 $22.52 $22.97

Annual Base Charge $201.36 $211.43 $222.00 $233.10 $244.75 $249.65 $254.64 $259.74 $264.93 $270.23 $275.63

Total Annual Revenue $584,347 $616,735 $654,232 $693,704 $735,732 $757,936 $780,734 $803,881 $827,906 $852,301 $877,616

Rate Increase 5% 5% 5% 5% 2% 2% 2% 2% 2% 2%

Wastewater 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493

New - 15 45 74 104 134 164 206 260 315 369

Total Customers 2,493 2,508 2,538 2,567 2,597 2,627 2,657 2,699 2,753 2,808 2,862

Total Annual Revenue $598,619 $632,332 $671,891 $713,546 $757,980 $782,070 $806,821 $835,812 $869,746 $904,703 $940,711

Monthly Meter Size 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493 2,493

New 0 15 45 74 104 134 164 206 260 315 369

Subtotal Customers 2,493 2,508 2,538 2,567 2,597 2,627 2,657 2,699 2,753 2,808 2,862

Monthly Base Charge $20.01 $21.01 $22.06 $23.16 $24.32 $24.81 $25.30 $25.81 $26.33 $26.85 $27.39

Annual Base Charge $240.12 $252.13 $264.73 $277.97 $291.87 $297.70 $303.66 $309.73 $315.93 $322.25 $328.69

Total Annual Revenue $598,619 $632,332 $671,891 $713,546 $757,980 $782,070 $806,821 $835,812 $869,746 $904,703 $940,711

Annual Increase 5% 5% 5% 5% 2% 2% 2% 2% 2% 2%

Page 59: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 7-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

7. Analysis of Water and Wastewater Rates and Policy Matters

7.1 Introduction

To summarize the analysis undertaken thus far, Chapter 2 reviewed capital-related

issues and responds to the provincial directives to maintain and upgrade infrastructure

to required levels. Chapter 4 provided a review of capital financing options to which

lifecycle reserve contributions will be the predominant basis for financing future capital

replacement. Chapter 5 established the 10-year operating forecast of expenditures

including an annual lifecycle capital replacement reserve contribution. Non-rate

revenues (including base charge revenues) to assist in offsetting the charges for

volumetric rates were also identified in Chapter 5. The base charge revenues are to

ensure that fixed costs are recovered regardless of the amount of volume used by

customers. This chapter will provide for the calculation of the volume rates over the

forecast period. These calculations will be based on the net operating expenditures (the

variable costs) provided in Chapter 5, divided by the water consumption forecast and

wastewater volumes provided in Section 1.7.

7.2 Water Rates

Based on the discussion of rate structures provided in section 6.5 and the

recommendation to continue with the present structures, the rates are calculated by

taking the net recoverable amounts from Table 5-1 and 5-2 (the product of total

expenditures plus lifecycle costs less non-rate revenues and, for the Central Elgin’s

water system, deduct the base charge amounts provided in section 6.5) and completes

the calculation by dividing them by the volumes resulting in the forested rates. The

volume rates are presented in Table 7-1.

To be sustainable, the water volume rates are forecasted to increase at 10% annually

for 2018 to 2022, 6% annually for 2023 to 2024, and then 2% annually thereafter.

Table 7-1 Water Volume Rates

Description 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Total Wastewater Billing Recovery 1,484,486 1,638,896 1,817,596 2,014,540 2,231,101 2,472,652 2,640,473 2,820,960 2,898,246 2,975,634 3,060,264

Total Volume (m3) 528,287 530,387 534,587 538,647 542,847 547,047 551,247 555,307 559,507 563,567 567,767

Constant Rate 2.81 3.09 3.40 3.74 4.11 4.52 4.79 5.08 5.18 5.28 5.39

Annual Percentage Change 10% 10% 10% 10% 10% 6% 6% 2% 2% 2%

Page 60: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 7-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Detailed calculations of the volume rates are provided in Appendix C. An example of

the recommended base charge and volume rates are presented in Table 7-2 along with

an average annual residential water bill for a customer with annual volumes of 140m3:

Table 7-2 Calculated Water Rates and Average Annual Residential Water Bill

7.3 Wastewater Rates

The recommendation to continue with the present structure for wastewater results in the

volume rates as calculated below in Table 7-3. The calculation of the rates takes the

net recoverable amounts from Table 5-3 (the product of total expenditures plus lifecycle

transfers to reserves) and completes the calculation by dividing them by the volumes,

resulting in a calculated volume rate per cubic meter. Detailed calculations are provided

in Appendix D.

To be sustainable, the wastewater volumes rates are forecasted to increase at 8%

annually for 2018 to 2020, 5% annually for 2021 to 2022, and then 2% annually

thereafter.

Table 7-3 Wastewater Volume Rates

An example of the recommended base charge and volume rates are presented in Table

7-4 along with an average annual residential wastewater bill for a customer with annual

volumes of 140m3:

Description 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Monthly Base Rate $16.78 $17.62 $18.50 $19.42 $20.40 $20.80 $21.22 $21.64 $22.08 $22.52 $22.97

Constant Rate $2.81 $3.09 $3.40 $3.74 $4.11 $4.52 $4.79 $5.08 $5.18 $5.28 $5.39

Annual Base Rate Bill $201.36 $211.43 $222.00 $233.10 $244.75 $249.65 $254.64 $259.74 $264.93 $270.23 $275.63

Volume 140 140 140 140 140 140 140 140 140 140 140

Annual Volume Bill $393.40 $432.60 $476.00 $523.60 $575.40 $632.80 $670.60 $711.20 $725.20 $739.20 $754.60

Total Annual Bill $594.76 $644.03 $698.00 $756.70 $820.15 $882.45 $925.24 $970.94 $990.13 $1,009.43 $1,030.23

% Increase - Base Rate 5% 5% 5% 5% 2% 2% 2% 2% 2% 2%

% Increase - Volume Rate 10% 10% 10% 10% 10% 6% 6% 2% 2% 2%

% Increase - Total Annual Bill 8% 8% 8% 8% 8% 5% 5% 2% 2% 2%

Description 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Total Wastewater Billing Recovery 1,154,559 1,254,739 1,366,518 1,489,303 1,575,400 1,667,677 1,716,644 1,771,884 1,834,488 1,898,161 1,962,902

Total Volume (m3) 473,180 475,280 479,480 483,540 487,740 491,940 496,140 501,950 509,580 517,210 524,840

Constant Rate 2.44 2.64 2.85 3.08 3.23 3.39 3.46 3.53 3.60 3.67 3.74

Annual Percentage Change 8% 8% 8% 5% 5% 2% 2% 2% 2% 2%

Page 61: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 7-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table 7-4 Calculated Wastewater Rates and Average Annual Residential Wastewater Bill

Description 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Monthly Base Rate $20.01 $21.01 $22.06 $23.16 $24.32 $24.81 $25.30 $25.81 $26.33 $26.85 $27.39

Constant Rate $2.44 $2.64 $2.85 $3.08 $3.23 $3.39 $3.46 $3.53 $3.60 $3.67 $3.74

Annual Base Rate Bill $240.12 $252.13 $264.73 $277.97 $291.87 $297.70 $303.66 $309.73 $315.93 $322.25 $328.69

Volume 140 140 140 140 140 140 140 140 140 140 140

Annual Volume Bill $341.60 $369.60 $399.00 $431.20 $452.20 $474.60 $484.40 $494.20 $504.00 $513.80 $523.60

Total Annual Bill $581.72 $621.73 $663.73 $709.17 $744.07 $772.30 $788.06 $803.93 $819.93 $836.05 $852.29

% Increase - Base Rate 5% 5% 5% 5% 2% 2% 2% 2% 2% 2%

% Increase - Volume Rate 8% 8% 8% 5% 5% 2% 2% 2% 2% 2%

% Increase - Total Annual Bill 7% 7% 7% 5% 4% 2% 2% 2% 2% 2%

Page 62: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page 8-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

8. Recommendations

As presented within this report, capital and operating expenditures have been identified

and forecasted over a ten-year period for water and wastewater services. In addition, a

long-term lifecycle plan has been provided consistent with the principles provided in

S.W.S.S.A. and the Water Opportunities Act.

Based upon the foregoing, the following recommendations are identified for

consideration by Municipal Council:

1. That Council provide for the recovery of all water and wastewater costs through

full cost recovery rates.

2. That Council consider the Capital Plan for water and wastewater as provided in

Tables 2-1 and 2-2 and the associated Capital Financing Plan as set out in

Tables 4-1 and 4-2.

3. That Council consider the base charges for water and wastewater as provided in

Tables 6-1 and 6-2, respectively.

4. That Council consider the volume rates for water and wastewater as provided in

Tables 7-1 and 7-3 respectively.

Page 63: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix A – Water System Inventory Data

Page 64: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Item LocationYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to be

included in 10

year Forecast

WTST0001 BELMONT WATER TOWER 2005 75 2080 1,047,180 63 29,382 -

WTST0002 PORT STANLEY WATER TOWER 1996 75 2071 1,293,580 54 39,392 -

Total 2,340,760 68,775 0

Appendix A-1

Municipality of Central Elgin

Water Towers

Page 65: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Item Location DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to be

included in 10

year Forecast

WTST0002_MECH EAST RD Mechanical 1996 50 2046 517,430 29 23,687 -

WTST0002_ELEC EAST RD Electrical 1996 50 2046 258,720 29 11,844 -

WTST0002_HVAC EAST RD HVAC 2010 20 2030 25,000 13 2,203 -

WTST0002_YRDP EAST RD Yard Piping 1996 75 2071 258,720 54 7,879 -

WTST0001_MECH BELMONT RD Mechanical 2005 50 2055 418,870 38 15,842 -

WTST0001_ELEC BELMONT RD Electrical 2005 25 2030 209,440 13 18,456 -

WTST0001_YRDP BELMONT RD Yard Piping 2005 75 2080 209,440 63 5,877 -

Total 1,897,620 85,786 0

Appendix A-2

Municipality of Central Elgin

Water Towers

Page 66: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID LocationYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

ESWMB 0001_D Oakview Watermeters (46) 2004 25 2029 15,260 12 1,443 -

ESWMB 1001 Belmont Watermeters (23) 1998 25 2023 7,630 6

suggested for 10

year capital

forecast

7,630

ESWMO 0001 Belmont Watermeters (663) 1998 25 2023 393,760 6

suggested for 10

year capital

forecast

393,760

ESWMP 0001 Port Stanley Watermeters (1,410) 1996 25 2021 467,830 4

suggested for 10

year capital

forecast

467,830

ESWMR 0001 Rural Watermeters (324) 1996 25 2021 192,420 4

suggested for 10

year capital

forecast

192,420

ESWMT 0001 Tridon Watermeters (252) 2000 25 2025 83,610 8

suggested for 10

year capital

forecast

83,610

Total 1,160,510 1,443 1,145,250

Appendix A-3

Municipality of Central Elgin

Water Meters

Page 67: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID LocationYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

MECHO F0001 Mechanical Joint Offset 2006 75 2081 16,710 64 465 -

PRVC00 01 Pressure Relief Chamber 2007 75 2082 118,620 65 3,277 -

WMCH0 001 Water Meter Chamber 2007 75 2082 138,250 65 3,819 -

WMCH0 002 Water Meter Chamber 2007 75 2082 138,250 65 3,819 -

WMCH0 003 Water Meter Chamber 2007 75 2082 138,250 65 3,819 -

WMCH0 004 Water Meter Chamber 2007 75 2082 138,250 65 3,819 -

WMCH0 005 Water Meter Chamber 1996 75 2071 138,250 54 4,210 -

WMCH0 006 Water Meter Chamber 1996 75 2071 138,250 54 4,210 -

WMCH0 007 Water Meter Chamber 1996 75 2071 138,250 54 4,210 -

WMCH0 008 Water Meter Chamber 1996 75 2071 138,250 54 4,210 -

WMCH0 009 Water Meter Chamber 2000 75 2075 138,250 58 4,049 -

Total 1,379,580 39,909 0

Appendix A-4

Municipality of Central Elgin

Network Structure - Water Chambers

Page 68: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

ESWBS0 001_ME CH CAESAR RD Mechanical 2007 25 2032 295,680 15 23,011 -

ESWBS0 001_ELE C C CAESAR RD Electrical 2007 25 2032 147,840 15 11,506 -

ESWBS0 001_HV AC CAESAR RD HVAC 2007 20 2027 20,000 10

suggested for 10

year capital

forecast

20,000

ESWBS0 001_YR DP CAESAR RD Yard Piping 2007 50 2057 147,840 40 5,404 -

Fruit Ridge Line Mechanical 2007 25 2032 110,000 15 8,561 -

Fruit Ridge Line Electrical 2007 25 2032 50,000 15 3,891 -

Fruit Ridge Line Yard Piping 2007 100 2107 20,000 90 481 -

Total 791,360 52,855 20,000

Appendix A-5

Municipality of Central Elgin

Non-Spatial Equipment

Page 69: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

ESWBS0001 CAESAR RD Belmont Pump House 2007 75 2082 739,190 65 20,421 -

Fruit Ridge Line Fruit Ridge Boost Station 2007 75 2082 50,000 65 1,381 -

Total 789,190 21,802 0

Appendix A-6

Municipality of Central Elgin

Water Facilities

Page 70: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

SCADA0 001 SCADA 2017 20 2037 150,000 20 9,174 -

Total 150,000 9,174 0

Appendix A-7

Municipality of Central Elgin

Water Facilities

Page 71: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-9

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

Belmont:

BELWT M0008 BELMONT ROAD Water Distribution Main 2003 100 2103 21,120 86 516 - -

BELWT M0009 BELMONT ROAD Water Distribution Main 2003 100 2103 90,600 86 2,216 - -

BELWT M0010 BELMONT ROAD Water Distribution Main 2003 100 2103 69,140 86 1,691 - -

BELWT M0011 BELMONT ROAD Water Distribution Main 2003 100 2103 104,220 86 2,549 - -

BELWT M0012 BELMONT ROAD Water Distribution Main 2003 100 2103 84,810 86 2,074 - -

BELWT M0013 LORNE STREET Water Distribution Main 1990 100 2090 89,880 73 2,352 - -

BELWT M0014 LORNE STREET Water Distribution Main 1990 100 2090 38,150 73 998 - -

BELWT M0015 LORNE STREET Water Distribution Main 1990 75 2065 9,870 48 322 - -

BELWT M0016 HAZELWOOD CRESCENT Water Distribution Main 1977 75 2052 100,850 35 4,034 - -

BELWT M0017 HAZELWOOD CRESCENT Water Distribution Main 1977 75 2052 61,680 35 2,467 - -

BELWT M0018 HAZELWOOD CRESCENT Water Distribution Main 1977 75 2052 75,870 35 3,035 - -

BELWT M0019 LOUISE STREET Water Distribution Main 1988 100 2088 83,270 71 2,206 - -

BELWT M0020 LOUISE STREET Water Distribution Main 1988 100 2088 52,120 71 1,381 - -

BELWT M0021 LOUISE STREET Water Distribution Main 1988 100 2088 55,510 71 1,471 - -

BELWT M0022 ROUEN STREET Water Distribution Main 1996 100 2096 99,310 79 2,512 - -

BELWT M0023 ROUEN STREET Water Distribution Main 1996 100 2096 90,980 79 2,301 - -

BELWT M0025 DYER STREET Water Distribution Main 1994 100 2094 12,340 77 315 - -

BELWT M0026 DYER STREET Water Distribution Main 1994 100 2094 66,930 77 1,711 - -

BELWT M0027 BARONS COURT Water Distribution Main 1988 100 2088 114,110 71 3,023 - -

BELWT M0028 EASEMENT Water Distribution Main 1990 100 2090 59,220 73 1,549 - -

BELWT M0029 CANTERBURY PLACE Water Distribution Main 1990 100 2090 50,270 73 1,315 - -

BELWT M0030 CANTERBURY PLACE Water Distribution Main 1990 100 2090 56,130 73 1,469 - -

BELWT M0031 CANTERBURY PLACE Water Distribution Main 1990 100 2090 91,910 73 2,405 - -

BELWT M0032 CANTERBURY PLACE Water Distribution Main 1990 100 2090 74,020 73 1,937 - -

BELWT M0033 SCARLETT PLACE Water Distribution Main 1990 100 2090 94,990 73 2,485 - -

BELWT M0034 SHERWOOD AVENUE Water Distribution Main 1990 100 2090 58,600 73 1,533 - -

BELWT M0035 CAESAR ROAD Water Distribution Main 2003 100 2103 60,380 86 1,477 - -

BELWT M0036 CAESAR ROAD Water Distribution Main 2003 100 2103 158,530 86 3,877 - -

BELWT M0037 CAESAR ROAD Water Distribution Main 2003 100 2103 200,780 86 4,910 - -

BELWT M0038 EASMENT Water Distribution Main 1997 100 2097 1,700 80 43 - -

BELWT M0039 KETTLE CREEK DRIVE Water Distribution Main 1997 100 2097 32,360 80 814 - -

BELWT M0040 KETTLE CREEK DRIVE Water Distribution Main 1997 100 2097 74,590 80 1,877 - -

BELWT M0041 KETTLE CREEK DRIVE Water Distribution Main 1997 100 2097 64,030 80 1,611 - -

BELWT M0042 KETTLE CREEK DRIVE Water Distribution Main 1997 100 2097 125,000 80 3,145 - -

BELWT M0043 KETTLE CREEK DRIVE Water Distribution Main 1997 100 2097 51,770 80 1,303 - -

BELWT M0044 KETTLE CREEK DRIVE Water Distribution Main 1997 100 2097 65,390 80 1,645 - -

BELWT M0045 RAMONA LANE Water Distribution Main 1997 100 2097 97,640 80 2,457 - -

BELWT M0046 RAMONA LANE Water Distribution Main 1997 100 2097 62,080 80 1,562 - -

BELWT M0047 ANDREA CRESCENT Water Distribution Main 1997 100 2097 65,800 80 1,656 - -

BELWT M0048 SNYDERS AVENUE Water Distribution Main 1997 100 2097 63,370 80 1,594 - -

Appendix A-8

Municipality of Central Elgin

Watermains

Page 72: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-10

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

BELWT M0049 SNYDERS AVENUE Water Distribution Main 1997 100 2097 62,080 80 1,562 - -

BELWT M0050 SNYDERS AVENUE Water Distribution Main 1997 100 2097 10,990 80 277 - -

BELWT M0051 SNYDERS AVENUE Water Distribution Main 1997 100 2097 45,270 80 1,139 - -

BELWT M0052 ANITA COURT Water Distribution Main 1997 100 2097 14,190 80 357 - -

BELWT M0053 PLYMOUTH COURT Water Distribution Main 1997 100 2097 13,880 80 349 - -

BELWT M0054 LANDON LANE Water Distribution Main 1997 100 2097 99,580 80 2,506 - -

BELWT M0055 LANDON LANE Water Distribution Main 1997 100 2097 61,430 80 1,546 - -

BELWT M0056 LANDON LANE Water Distribution Main 1997 100 2097 176,860 80 4,450 - -

BELWT M0057 JONATHAN WAY Water Distribution Main 1997 100 2097 12,340 80 310 - -

BELWT M0058 SEVENTH AVENUE Water Distribution Main 1997 100 2097 88,550 80 2,228 - -

BELWT M0059 SEVENTH AVENUE Water Distribution Main 1997 100 2097 68,800 80 1,731 - -

BELWT M0061 WEST STREET Water Distribution Main 1991 100 2091 84,200 74 2,190 - -

BELWT M0062 WEST STREET Water Distribution Main 1991 100 2091 61,680 74 1,604 - -

BELWT M0063 ODELL STREET Water Distribution Main 1991 100 2091 61,370 74 1,596 - -

BELWT M0064 WASHBURN STREET Water Distribution Main 1991 100 2091 62,920 74 1,636 - -

BELWT M0065 UNION STREET Water Distribution Main 1991 100 2091 57,980 74 1,508 - -

BELWT M0066 UNION STREET Water Distribution Main 1979 75 2054 162,840 37 6,270 - -

BELWT M0067 UNION STREET Water Distribution Main 1979 75 2054 39,480 37 1,520 - -

BELWT M0068 UNION STREET Water Distribution Main 1979 75 2054 83,270 37 3,206 - -

BELWT M0069 COLLEGE STREET Water Distribution Main 1991 100 2091 101,780 74 2,647 - -

BELWT M0070 COLLEGE STREET Water Distribution Main 1991 100 2091 86,970 74 2,262 - -

BELWT M0071 VICTORIA STREET Water Distribution Main 1996 100 2096 98,380 79 2,488 - -

BELWT M0072 VICTORIA STREET Water Distribution Main 1996 100 2096 148,040 79 3,744 - -

BELWT M0073 CHURCH STREET Water Distribution Main 2006 100 2106 101,470 89 2,450 - -

BELWT M0074 DUFFERIN STREET Water Distribution Main 2002 100 2102 159,760 85 3,924 - -

BELWT M0075 WASHBURN STREET Water Distribution Main 2006 100 2106 57,370 89 1,385 - -

BELWT M0076 WASHBURN STREET Water Distribution Main 2000 100 2100 32,080 83 795 - -

BELWT M0077 WASHBURN STREET Water Distribution Main 2000 100 2100 65,200 83 1,616 - -

BELWT M0078 DUFFERIN STREET Water Distribution Main 1980 75 2055 34,670 38 1,311 - -

BELWT M0079 DUFFERIN STREET Water Distribution Main 1980 75 2055 31,710 38 1,199 - -

BELWT M0080 OAKDALE COURT Water Distribution Main 1980 75 2055 108,690 38 4,111 - -

BELWT M0081 BRENTWOOD CRESCENT Water Distribution Main 1980 75 2055 45,210 38 1,710 - -

BELWT M0082 BRENTWOOD CRESCENT Water Distribution Main 1980 75 2055 7,710 38 292 - -

BELWT M0083 LANDON LANE Water Distribution Main 1997 100 2097 60,140 80 1,513 - -

BELWT M0084 KETTLE CREEK DRIVE Water Distribution Main 1997 100 2097 8,510 80 214 - -

BELWT M0085 RIGHT OF WAY Water Distribution Main 1997 100 2097 117,160 80 2,948 - -

BELWT M0001 BELMONT ROAD Water Distribution Main 2003 100 2103 55,710 86 1,362 - -

BELWT M0002 BELMONT ROAD Water Distribution Main 2003 100 2103 51,400 86 1,257 - -

BELWT M0003 BELMONT ROAD Water Distribution Main 2003 100 2103 79,070 86 1,934 - -

BELWT M0004 BELMONT ROAD Water Distribution Main 2003 100 2103 131,910 86 3,226 - -

BELWT M0005 BELMONT ROAD Water Distribution Main 1975 50 2025

99,310

8

suggested for 10

year capital

forecast 99,310 99,310

BELWT M0006 BELMONT ROAD Water Distribution Main 2003 100 2103 20,090 86 491 - -

BELWT M0007 BELMONT ROAD Water Distribution Main 2003 100 2103 92,300 86 2,257 - -

Page 73: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-11

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

BELWT M0100 EASEMENT Water Distribution Main 2003 100 2103 122,610 86 2,998 - -

BELWT M0099 WASHBURN STREET Water Distribution Main 2003 100 2103 64,340 86 1,573 - -

BELWT M0097 DUFFERIN STREET Water Distribution Main 1980 75 2055 36,020 38 1,362 - -

BELWT M0098 DUFFERIN STREET Water Distribution Main 2002 100 2102 30,840 85 758 - -

BELWT M0096 EASEMENT Water Distribution Main 1980 75 2055 83,270 38 3,149 - -

BELWT M0095 EASEMENT Water Distribution Main 2003 100 2103 129,420 86 3,165 - -

BELWT M0094 CAESAR ROAD Water Distribution Main 1990 100 2090 99,930 73 2,615 - -

BELWT M0093 CAESAR ROAD Water Distribution Main 2004 100 2104 119,210 87 2,902 - -

BELWT M0092 EASEMENT Water Distribution Main 2007 100 2107 18,500 90 445 - -

BELWT M0088 BORDEN AVE Water Distribution Main 2000 100 2100 341,720 83 8,472 - -

BELWT M0087 BORDEN AVE Water Distribution Main 1986 100 2086 194,300 69 5,216 - -

BELWT M0089 BORDEN AVE Water Distribution Main 1960 65 2025 150,000 8

suggested for 10

year capital

forecast 150,000 150,000

BELWT M0906 SEVENTH AVE Water Distribution Main 2009 100 2109 45,460 92 1,085 - -

BELWT M0905 SEVENTH AVE Water Distribution Main 2009 100 2109 66,160 92 1,578 - -

BELWT M0903 DYER ST Water Distribution Main 2009 100 2109 194,250 92 4,635 - -

BELWT M0901 COPELAND/WEST ST Water Distribution Main 2009 100 2109 8,940 92 213 - -

SEVENTH AVE Water Distribution Main 2016 100 2116 27,509 99 640 - -

ROBIN RIDGE ESTATES Water Distribution Main 2013 100 2113 200,436 96 - - -

Total Belmont 7,924,584 199,766 249,310 249,310

Port Stanley:

PSWTM 0001 GEORGE STREET Water Distribution Main 1998 100 2098 37,390 81 936 - -

PSWTM 0002 GEORGE STREET Water Distribution Main 1992 100 2092 39,790 75 1,029 - -

PSWTM 0003 GEORGE STREET Water Distribution Main 1992 100 2092 37,690 75 974 - -

PSWTM 0004 GEORGE STREET Water Distribution Main 1992 100 2092 43,980 75 1,137 - -

PSWTM 0005 GEORGE STREET Water Distribution Main 1992 100 2092 51,750 75 1,338 - -

PSWTM 0006 GEORGE STREET Water Distribution Main 1992 100 2092 103,210 75 2,669 - -

PSWTM 0007 GEORGE STREET Water Distribution Main 1992 100 2092 305,440 75 7,897 - -

PSWTM 0008 GEORGE STREET Water Distribution Main 1992 100 2092 144,490 75 3,736 - -

PSWTM 0009 GEORGE STREET Water Distribution Main 1992 100 2092 46,670 75 1,207 - -

PSWTM 0010 GEORGE STREET Water Distribution Main 1992 100 2092 19,450 75 503 - -

PSWTM 0123 HILL STREET Water Distribution Main 1996 100 2096 96,120 79 2,431 - -

PSWTM 0124 HILL STREET Water Distribution Main 1996 100 2096 147,480 79 3,730 - -

PSWTM 0125 BEAMISH STREET Water Distribution Main 1968 100 2068 106,150 51 3,339 - -

PSWTM 0126 HIGH STREET Water Distribution Main 1999 100 2099 105,870 82 2,637 - -

PSWTM 0127 LARRY STREET Water Distribution Main 1997 100 2097 31,680 80 797 - -

PSWTM 0128 LARRY STREET Water Distribution Main 1997 100 2097 61,640 80 1,551 - -

PSWTM 0129 EMERY STREET Water Distribution Main 1997 100 2097 121,850 80 3,066 - -

PSWTM 0130 EAST ROAD Water Distribution Main 1996 100 2096 145,660 79 3,684 - -

PSWTM 0131 EAST ROAD Water Distribution Main 1996 100 2096 114,070 79 2,885 - -

PSWTM 0132 EAST ROAD Water Distribution Main 1996 100 2096 627,870 79 15,880 - -

PSWTM 0011 GEORGE STREET Water Distribution Main 1992 100 2092 61,930 75 1,601 - -

Page 74: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-12

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

PSWTM 0012 GEORGE STREET Water Distribution Main 1992 100 2092 72,700 75 1,880 - -

PSWTM 0013 GEORGE STREET Water Distribution Main 1968 57 2025 65,550 8

suggested for 10

year capital

forecast 65,550 65,550

PSWTM 0014 EDITH STREET Water Distribution Main 2003 100 2103 70,600 86 1,726 - -

PSWTM 0015 WALTER STREET Water Distribution Main 1992 100 2092 73,620 75 1,903 - -

PSWTM 0016 FREDERICK STREET Water Distribution Main 1970 100 2070 82,750 53 2,547 - -

PSWTM 0017 MEEK STREET Water Distribution Main 1980 100 2080 94,170 63 2,642 - -

PSWTM 0018 CHARLES STREET Water Distribution Main 2003 100 2103 19,400 86 474 - -

PSWTM 0019 RIVER ROAD Water Distribution Main 1992 100 2092 22,140 75 572 - -

PSWTM 0020 RIVER ROAD Water Distribution Main 1992 100 2092 30,510 75 789 - -

PSWTM 0023 VALLEY STREET Water Distribution Main 1992 100 2092 38,290 75 990 - -

PSWTM 0024 VALLEY STREET Water Distribution Main 1992 100 2092 31,710 75 820 - -

PSWTM 0025 UPPER SPRING STREET Water Distribution Main 1994 100 2094 21,120 77 540 - -

PSWTM 0026 UPPER SPRING STREET Water Distribution Main 2003 100 2103 17,650 86 432 - -

PSWTM 0027 UPPER SPRING STREET Water Distribution Main 2003 100 2103 30,250 86 740 - -

PSWTM 0028 UPPER SPRING STREET Water Distribution Main 2003 100 2103 37,380 86 914 - -

PSWTM 0029 UPPER SPRING STREET Water Distribution Main 2003 100 2103 47,940 86 1,172 - -

PSWTM 0030 LOWER SPRING STREET Water Distribution Main 2003 100 2103 21,970 86 537 - -

PSWTM 0031 LOWER SPRING STREET Water Distribution Main 2003 100 2103 29,960 86 733 - -

PSWTM 0032 LOWER SPRING STREET Water Distribution Main 1992 100 2092 102,010 75 2,637 - -

PSWTM 0034 FRONT STREET Water Distribution Main 1992 100 2092 98,720 75 2,552 - -

PSWTM 0035 FRONT STREET Water Distribution Main 1992 100 2092 53,250 75 1,377 - -

PSWTM 0036 FRONT STREET Water Distribution Main 1992 100 2092 254,580 75 6,582 - -

PSWTM 0037 FRONT STREET Water Distribution Main 1992 100 2092 40,690 75 1,052 - -

PSWTM 0038 IOLA STREET Water Distribution Main 2003 100 2103 159,150 86 3,892 - -

PSWTM 0039 WEST EDITH CAVELL BLVD Water Distribution Main 1998 100 2098 55,340 81 1,385 - -

PSWTM 0040 BARTHOLOMEW STREET Water Distribution Main 1978 100 2078 131,270 61 3,744 - -

PSWTM 0041 WEST EDITH CAVELL BLVD Water Distribution Main 1998 100 2098 117,270 81 2,936 - -

PSWTM 0076 COLONEL BOSTWICK STREET Water Distribution Main 1965 60 2025 63,720 8

suggested for 10

year capital

forecast 63,720 63,720

PSWTM 0077 HETTY STREET Water Distribution Main 1960 65 2025 102,910 8

suggested for 10

year capital

forecast 102,910 102,910

PSWTM 0078 EASEMENT Water Distribution Main 1979 100 2079 70,170 62 1,985 - -

PSWTM 0079 BRIDGE STREET Water Distribution Main 1968 75 2043 99,100 26 4,925 - -

PSWTM 0081 CORNELL DRIVE Water Distribution Main 1996 100 2096 66,510 79 1,682 - -

PSWTM 0086 ORCHARD STREET Water Distribution Main 1980 100 2080 179,210 63 5,028 - -

PSWTM 0087 MAIN STREET Water Distribution Main 1988 100 2088 34,400 71 911 - -

PSWTM 0088 MAIN STREET Water Distribution Main 2006 100 2106 82,270 89 1,986 - -

PSWTM 0089 COLBORNE STREET Water Distribution Main 2006 100 2106 31,350 89 757 - -

PSWTM 0090 COLBORNE STREET Water Distribution Main 2006 100 2106 188,290 89 4,546 - -

PSWTM 0091 COLBORNE STREET Water Distribution Main 2006 100 2106 230,110 89 5,556 - -

PSWTM 0042 WEST EDITH CAVELL BLVD Water Distribution Main 1996 100 2096 64,020 79 1,619 - - -

Page 75: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-13

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

PSWTM 0043 WEST EDITH CAVELL BLVD Water Distribution Main 2006 100 2106 49,660 89 1,199 - - -

PSWTM 0049 TOWER HEIGHTS DRIVE Water Distribution Main 1980 100 2080 33,670 63 945 - -

PSWTM 0050 INVERERIE HEIGHTS LANE Water Distribution Main 1994 100 2094 118,140 77 3,020 - -

PSWTM 0051 BOLTVILLE PLACE Water Distribution Main 1992 100 2092 72,700 75 1,880 - -

PSWTM 0052 STANLEY PARK DRIVE Water Distribution Main 1994 100 2094 55,360 77 1,415 - - -

PSWTM 0057 WILLIAM STREET Water Distribution Main 1968 57 2025 61,140 8

suggested for 10

year capital

forecast 61,140 61,140

PSWTM 0058 WILLIAM STREET Water Distribution Main 1968 57 2025 63,030 8

suggested for 10

year capital

forecast 63,030 63,030

PSWTM 0059 WILLIAM STREET Water Distribution Main 1968 57 2025 35,290 8

suggested for 10

year capital

forecast 35,290 35,290

PSWTM 0060 ERIE STREET Water Distribution Main 1980 100 2080 66,770 63 1,873 - -

PSWTM 0061 ERIE ST Water Distribution Main 2008 100 2108 172,560 91 4,133 - -

PSWTM 0062 ERIE STREET Water Distribution Main 1968 100 2068 25,110 51 790 - -

PSWTM 0063 ERIE STREET Water Distribution Main 1986 100 2086 25,970 69 697 - -

PSWTM 0064 ERIE STREET Water Distribution Main 1986 100 2086 171,790 69 4,612 - -

PSWTM 0065 BESSIE STREET Water Distribution Main 1986 100 2086 25,110 69 674 - -

PSWTM 0066 LOTUS LANE Water Distribution Main 1986 100 2086 172,070 69 4,620 - -

PSWTM 0067 MAUD STREET Water Distribution Main 1986 100 2086 53,080 69 1,425 - -

PSWTM 0068 SYDENHAM STREET Water Distribution Main 1980 100 2080 60,500 63 1,698 - -

PSWTM 0069 SYDENHAM STREET Water Distribution Main 1980 100 2080 87,890 63 2,466 - -

PSWTM 0070 WEBSTER LANE Water Distribution Main 2004 100 2104 66,490 87 1,619 - -

PSWTM 0071 SMITH STREET Water Distribution Main 1960 62 2022 66,770 5

suggested for 10

year capital

forecast 66,770 66,770

PSWTM 0072 SMITH STREET Water Distribution Main 1960 62 2022 26,250 5

suggested for 10

year capital

forecast 26,250 26,250

PSWTM 0073 BRIDGE STREET Water Distribution Main 2017 100 2117 54,450 100 1,263 - -

PSWTM 0074 BRIDGE STREET Water Distribution Main 2012 100 2112 44,290 95 1,045 - -

PSWTM 0075 COLONEL BOSTWICK STREET Water Distribution Main 1965 60 2025 40,980 8

suggested for 10

year capital

forecast 40,980 40,980

PSWTM 0092 COLBORNE STREET Water Distribution Main 2006 100 2106 132,350 89 3,195 - -

PSWTM 0093 COLBORNE STREET Water Distribution Main 2006 100 2106 51,160 89 1,235 - -

PSWTM 0094 COLBORNE STREET Water Distribution Main 1996 100 2096 60,060 79 1,519 - -

PSWTM 0095 CHARLOTTE STREET Water Distribution Main 1980 100 2080 36,410 63 1,022 - -

PSWTM 0096 FRANCES STREET Water Distribution Main 2015 100 2115 68,490 98 1,600 - - -

PSWTM 0097 FRANCES STREET Water Distribution Main 2015 100 2115 48,280 98 1,128 - - -

PSWTM 0098 FRANCES STREET Water Distribution Main 1992 100 2092 59,470 75 1,538 - -

PSWTM 0099 FRANCES STREET Water Distribution Main 1992 100 2092 16,390 75 424 - -

Page 76: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-14

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

PSWTM 0100 FRANCES STREET Water Distribution Main 1992 100 2092 63,600 75 1,644 - -

PSWTM 0101 FRANCES STREET Water Distribution Main 1992 100 2092 43,080 75 1,114 - -

PSWTM 0102 FRANCES STREET Water Distribution Main 1992 100 2092 56,060 75 1,449 - -

PSWTM 0103 MATILDA STREET Water Distribution Main 1976 100 2076 95,880 59 2,783 - -

PSWTM 0104 SELBOURNE DRIVE Water Distribution Main 1992 100 2092 55,650 75 1,439 - -

PSWTM 0105 SELBOURNE DRIVE Water Distribution Main 1992 100 2092 98,450 75 2,545 - -

PSWTM 0106 SELBOURNE DRIVE Water Distribution Main 1992 100 2092 58,040 75 1,501 - -

PSWTM 0107 SELBOURNE COURT Water Distribution Main 1992 100 2092 71,740 75 1,855 - -

PSWTM 0108 FRANCES COURT Water Distribution Main 1992 100 2092 57,070 75 1,476 - -

PSWTM 0109 STANLEY STREET Water Distribution Main 1979 100 2079 12,270 62 347 - -

PSWTM 0110 STANLEY STREET Water Distribution Main 1992 100 2092 53,250 75 1,377 - -

PSWTM 0111 WARREN STREET Water Distribution Main 1996 100 2096 75,630 79 1,913 - -

PSWTM 0112 WARREN STREET Water Distribution Main 1996 100 2096 74,690 79 1,889 - -

PSWTM 0113 WAREN STREET Water Distribution Main 1996 100 2096 22,060 79 558 - -

PSWTM 0114 WARREN STREET Water Distribution Main 1996 100 2096 29,620 79 749 - -

PSWTM 0115 WARREN STREET Water Distribution Main 1996 100 2096 183,720 79 4,647 - -

PSWTM 0116 CATHARINE STREET Water Distribution Main 2017 100 2117 693,430 100 16,089 - -

PSWTM 0117 CARLOW ROAD Water Distribution Main 2011 100 2111 20,020 94 474 - -

PSWTM 0121 HILL STREET Water Distribution Main 1996 100 2096 14,810 79 375 - -

PSWTM 0122 HILL STREET Water Distribution Main 1996 100 2096 48,530 79 1,227 - -

PSWTM 0133 EAST ROAD Water Distribution Main 1996 100 2096 37,380 79 945 - -

PSWTM 0134 PROSPECT STREET Water Distribution Main 1996 100 2096 17,290 79 437 - -

PSWTM 0135 PROSPECT STREET Water Distribution Main 1996 100 2096 12,560 79 318 - -

PSWTM 0136 PROSPECT STREET Water Distribution Main 2010 100 2110 17,120 93 407 - -

PSWTM 0137 PROSPECT STREET Water Distribution Main 1980 100 2080 84,470 63 2,370 - -

PSWTM 0138 GENTRY LANE Water Distribution Main 2004 100 2104 34,240 87 834 - -

PSWTM 0141 HARRISON PLACE Water Distribution Main 2004 100 2104 102,730 87 2,501 - -

PSWTM 0142 HARRISON PLACE Water Distribution Main 1988 100 2088 27,390 71 726 - -

PSWTM 0143 HARRISON PLACE Water Distribution Main 1988 100 2088 43,660 71 1,157 - -

PSWTM 0144 HARRISON PLACE Water Distribution Main 1988 100 2088 43,090 71 1,142 - -

PSWTM 0145 HARRISON PLACE Water Distribution Main 1988 100 2088 37,670 71 998 - -

PSWTM 0146 HARRISON PLACE Water Distribution Main 1988 100 2088 169,500 71 4,491 - -

PSWTM 0147 CURRIE BLVD Water Distribution Main 2003 100 2103 12,270 86 300 - -

PSWTM 0148 VIMY RIDGE (2ND MAIN) Water Distribution Main 1990 50 2040 25,110 23 1,373 - -

PSWTM 0149 VIMY RIDGE Water Distribution Main 1990 50 2040 57,070 23 3,120 - -

PSWTM 0150 KITCHENER STREET Water Distribution Main 1990 50 2040 25,110 23 1,373 - -

PSWTM 0151 OAK STREET Water Distribution Main 1984 100 2084 52,220 67 1,422 - -

PSWTM 0152 WILLOW DRIVE Water Distribution Main 1980 100 2080 63,060 63 1,769 - -

PSWTM 0154 BRAYSIDE STREET Water Distribution Main 1971 75 2046 49,200 29 2,252 - -

PSWTM 0155 QUEEN STREET Water Distribution Main 1994 100 2094 41,090 77 1,050 - -

PSWTM 0156 ADELAIDE STREET Water Distribution Main 1994 100 2094 446,880 77 11,424 - -

PSWTM 0157 EAST ROAD Water Distribution Main 2003 100 2103 1,189,090 86 29,078 - -

PSWTM 0161 SUNSET ROAD Water Distribution Main 2003 100 2103 81,140 86 1,984 - -

Page 77: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-15

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

PSWTM 0160 SUNSET ROAD Water Distribution Main 2003 100 2103 1,018,960 86 24,917 - -

PSWTM 0159 SUNSET ROAD Water Distribution Main 2003 100 2103 208,180 86 5,091 - -

PSWTM 0162 SUNSET ROAD Water Distribution Main 2003 100 2103 111,740 86 2,732 - -

PSWTM 0163 SUNSET ROAD Water Distribution Main 2003 100 2103 170,270 86 4,164 - -

PSWTM 0164 SUNSET ROAD Water Distribution Main 2003 100 2103 63,190 86 1,545 - -

PSWTM 0165 SUNSET ROAD Water Distribution Main 2003 100 2103 40,570 86 992 - -

PSWTM 0166 SUNSET ROAD Water Distribution Main 2003 100 2103 126,370 86 3,090 - -

PSWTM 0167 SUNSET ROAD Water Distribution Main 2003 100 2103 114,730 86 2,806 - -

PSWTM 0168 BOSTWICK ROAD Water Distribution Main 2003 100 2103 104,620 86 2,558 - -

PSWTM 0169 BOSTWICK ROAD Water Distribution Main 2003 100 2103 25,530 86 624 - -

PSWTM 0170 BOSTWICK ROAD Water Distribution Main 2003 100 2103 415,970 86 10,172 - -

PSWTM 0171 OAKVIEW CRESCENT Water Distribution Main 2003 100 2103 76,400 86 1,868 - -

PSWTM 0172 SUNSET ROAD Water Distribution Main 2003 100 2103 335,950 86 8,215 - -

PSWTM 0173 SUNSET ROAD Water Distribution Main 2003 100 2103 23,610 86 577 - -

PSWTM 0174 KAREN STREET Water Distribution Main 2003 100 2103 71,800 86 1,756 - -

PSWTM 0176 DOVER PLACE Water Distribution Main 1992 100 2092 22,830 75 590 - -

PSWTM 0178 WEST EDITH CAVELL BLVD Water Distribution Main 1998 100 2098 42,480 81 1,063 - -

PSWTM 0182 BRIDGE STREET Water Distribution Main 1968 57 2025 28,990 8

suggested for 10

year capital

forecast 28,990 28,990

PSWTM 0183 BRIDGE STREET Water Distribution Main 1968 57 2025 119,660 8

suggested for 10

year capital

forecast 119,660 119,660

PSWTM 0184 FRANCES STREET Water Distribution Main 1980 100 2080 79,900 63 2,242 - -

PSWTM 0185 ELIZABETH STREET Water Distribution Main 1992 100 2092 1,672,210 75 43,235 - -

PSWTM 0200 STANLEY ST Water Distribution Main 2011 100 2111 57,600 94 1,364 - -

PSWTM 0186 DEXTER LINE Water Distribution Main 1996 100 2096 411,700 79 10,412 - -

PSWTM 0187 DEXTER LINE Water Distribution Main 1996 100 2096 106,740 79 2,700 - -

PSWTM 0188 HILL STREET Water Distribution Main 1996 100 2096 28,540 79 722 - -

PSWTM 0190 VIMY RIDGE Water Distribution Main 2003 100 2103 12,270 86 300 - -

PSWTM 0191 VIMY RIDGE Water Distribution Main 1980 100 2080 154,090 63 4,324 - -

PSWTM 0189 PROSPECT STREET Water Distribution Main 1996 100 2096 13,130 79 332 - -

PSWTM 0194 SPARTA LINE Water Distribution Main 2006 100 2106 83,170 89 2,008 - -

PSWTM 0195 SPARTA LINE Water Distribution Main 2006 100 2106 24,530 89 592 - -

PSWTM 0196 SPARTA LINE Water Distribution Main 2006 100 2106 27,520 89 664 - -

PSWTM 0197 SPARTA LINE Water Distribution Main 2006 100 2106 63,780 89 1,540 - -

PSWTM 0198 BELL STREET Water Distribution Main 2006 100 2106 542,190 89 13,090 - -

PSWTR M0209 FOURTH ST Water Distribution Main 2008 100 2108 48,700 91 1,166 - -

PSWTR M0208 THIRD ST Water Distribution Main 2008 100 2108 35,900 91 860 - -

PSWTR M0207 SECOND STREET Water Distribution Main 2008 100 2108 44,900 91 1,075 - -

PSWTR M0206 EXTENSION IN N EDITH Water Distribution Main 2008 100 2108 40,700 91 975 - -

PSWTR M0205 EXTENSION IN N EDITH Water Distribution Main 2008 100 2108 21,710 91 520 - -

PSWTR M0204 FIRST STREET Water Distribution Main 2008 100 2108 61,030 91 1,462 - -

Page 78: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-16

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

PSWTR M0203 FIRST STREET Water Distribution Main 2008 100 2108 44,760 91 1,072 - -

PSWTR M0202 FIRST STREET Water Distribution Main 2008 100 2108 56,960 91 1,364 - -

PSWTR M0201 ERIE STREET Water Distribution Main 2008 100 2108 9,060 91 217 - -

PSWTM 10139 FRANKLIN DR Water Distribution Main 2010 100 2110 35,550 93 845 - -

PSWTM 10140 MAPLE ST Water Distribution Main 2010 100 2110 13,930 93 331 - -

PSWTM 10151 OAK ST Water Distribution Main 2010 100 2110 24,220 93 576 - -

PSWTM 10153 EDWARD ST Water DistributioN Main 2010 100 2110 116,070 93 2,759 - -

PSWTM 10080 JOSEPH ST Water Distribution Main 2010 100 2110 144,700 93 3,439 - -

PSWTM 10082 CORNELL ST Water Distribution Main 2010 100 2110 133,130 93 3,164 - -

PSWTM 10085 JAMIESON ST Water Distribution Main 2010 100 2110 55,250 93 1,313 - -

PSWTM 10210 JAMIESON ST Water Distribution Main 2010 100 2110 11,620 93 276 - -

PSWTM 10211 MAPLE ST Water Distribution Main 2010 100 2110 116,300 93 2,764 - -

PSWTM 10212 FRANKLIN DR Water Distribution Main 2010 100 2110 27,510 93 654 - -

PSWTM 10215 CARLOW RD Water Distribution Main 2010 100 2110 76,000 93 1,806 - -

PSWTM 10214 CARLOW RD Water Distribution Main 2010 100 2110 24,560 93 584 - -

PSWTM 10213 CARLOW RD Water Distribution Main 2010 100 2110 137,630 93 3,271 - -

PSWTM12117 Carlow Road (Kanagio to William) Water Distribution Main 2013 100 2113 143,080 96 3,364 - -

PSWTM12119 Carlow Road (William to Bridge) Water Distribution Main 2013 100 2113 91,660 96 2,155 - -

PSWTM12227 William Street (Carlow to Briar Hill) Water Distribution Main 2013 100 2113 53,690 96 1,262 - -

PSWTM12120 William Street (Briar Hill to South) Water Distribution Main 2013 100 2113 42,520 96 1,000 - -

PSWTM12056 William Street Water Distribution Main 2013 100 2113 106,580 96 2,506 - -

PSWTM12228 William Street Water Distribution Main 2013 100 2113 106,580 96 2,506 - -

PSWTM12229 Lotus Lane Water Distribution Main 2013 100 2113 25,780 96 606 - -

PSWTM12066 Lotus Lane Water Distribution Main 2013 100 2113 25,780 96 606 - -

PSWTM13217 Smith, Edith Cavell, Tower Heights Water Distribution Main 2013 100 2113 23,110 96 543 - -

Total Port Stanley 20,399,040 502,879 674,290 674,290

Lynhurst:

LYNWT M0023 TIMBERLANE CRESCENT Water Distribution Main 1990 100 2090 73,110 73 1,913 - -

LYNWT M0001 ST GEORGE STREET Water Distribution Main 2007 100 2107 65,810 90 1,582 - -

LYNWT M0036 NATHAN STREET Water Distribution Main 1955 65 2020 116,370 3

suggested for 10

year capital

forecast 116,370 116,370

LYNWT M0034 VINEDEN DRIVE Water Distribution Main 1955 65 2020 38,520 3

suggested for 10

year capital

forecast 38,520 38,520

LYNWT M0033 VINEDEN DRIVE Water Distribution Main 1955 65 2020 46,060 3

suggested for 10

year capital

forecast 46,060 46,060

LYNWT M0032 VINEDEN DRIVE Water Distribution Main 1955 65 2020 180,410 3

suggested for 10

year capital

forecast 180,410 180,410

LYNWT M0031 HYDRO ROAD Water Distribution Main 2004 100 2104 11,400 87 278 - -

LYNWT M0037 WOODLAND AVENUE Water Distribution Main 2007 100 2107 87,380 90 2,101 - -

Page 79: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-17

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

LYNWT M0025 HILLCREST AVENUE Water Distribution Main 1991 100 2091 10,220 74 266 - -

LYNWT M0022 CRESTVIEW COURT Water Distribution Main 1995 100 2095 229,140 78 5,826 - -

LYNWT M0021 SYMPHONY COURT Water Distribution Main 1997 100 2097 28,590 80 719 - -

LYNWT M0020 SYMPHONY COURT Water Distribution Main 1997 100 2097 122,590 80 3,084 - -

LYNWT M0019 SYMPHONY COURT Water Distribution Main 1997 100 2097 48,630 80 1,224 - -

LYNWT M0018 COWAN LANE Water Distribution Main 1997 100 2097 139,660 80 3,514 - -

LYNWT M0007 ST GEORGE STREET Water Distribution Main 2007 100 2107 209,410 90 5,035 - -

LYNWT M0024 HILLCREST AVENUE Water Distribution Main 1991 100 2091 130,120 74 3,384 - -

LYNWT M0070 MCBAIN LN Water Distribution Main 1997 100 2097 59,410 80 1,495 - -

LYNWT M0035 RYAN STREET Water Distribution Main 1955 65 2020 52,050 3

suggested for 10

year capital

forecast 52,050 52,050

LYNWT M0017 LYNHURST AVENUE Water Distribution Main 2007 100 2107 143,370 90 3,447 - -

LYNWT M0072 JAMES TURVEY PL Water Distribution Main 1997 100 2097 13,400 80 337 - -

LYNWT M0008 ST GEORGE STREET Water Distribution Main 2007 100 2107 127,440 90 3,064 - -

LYNWT M0006 ST GEORGE STREET Water Distribution Main 2007 100 2107 35,900 90 863 - -

LYNWT M0014 CRESCENT AVENUE Water Distribution Main 2007 100 2107 132,830 90 3,194 - -

LYNWT M0013 CRESCENT AVENUE Water Distribution Main 2007 100 2107 80,770 90 1,942 - -

LYNWT M0012 CRESCENT AVENUE Water Distribution Main 2007 100 2107 80,770 90 1,942 - -

LYNWT M0011 CRESCENT AVENUE Water Distribution Main 2007 100 2107 208,210 90 5,007 - -

LYNWT M0010 CRESCENT AVENUE Water Distribution Main 2007 100 2107 323,090 90 7,769 - -

LYNWT M0009 WELLINGTON ROAD Water Distribution Main 2007 100 2107 153,170 90 3,683 - -

LYNWT M0002 ST GEORGE STREET Water Distribution Main 2007 100 2107 197,440 90 4,748 - -

LYNWT M0005 ST GEORGE STREET Water Distribution Main 2007 100 2107 86,760 90 2,086 - -

LYNWT M0027 ST GEORGE STREET Water Distribution Main 2006 100 2106 100,680 89 2,431 - -

LYNWT M0003 ST GEORGE STREET Water Distribution Main 2007 100 2107 107,700 90 2,590 - -

LYNWT M0004 ST GEORGE STREET Water Distribution Main 2007 100 2107 62,820 90 1,511 - -

LYNWT M0016 BATTRAM AVENUE Water Distribution Main 2007 100 2107 100,520 90 2,417 - -

LYNWT M0015 WOODLAND AVENUE Water Distribution Main 2007 100 2107 98,720 90 2,374 - -

LYNWT M0071 JAMES TURVEY PL Water Distribution Main 1997 100 2097 115,500 80 2,906 - -

LYNWT M0075 TURNER RD Water Distribution Main 1996 100 2096 224,960 79 5,690 - -

LYNWT M0029 DAVIS STREET Water Distribution Main 2006 100 2106 81,040 89 1,957 - -

LYNWT M0026 ST GEORGE STREET Water Distribution Main 2006 100 2106 41,780 89 1,009 - -

LYNWT M0028 PARKINS STREET Water Distribution Main 2006 100 2106 37,040 89 894 - -

LYNWT M0076 WOODLAND AV Water Distribution Main 2007 100 2107 127,220 90 3,059 - -

LYNWT M0030 INDEPENDENT STREET Water Distribution Main 2006 100 2106 61,010 89 1,473 - -

LYNWT M1001 WELLINGTON ROAD Water Distribution Main 2010 100 2110 103,570 93 2,462 - -

LYNWT M1002 WELLINGTON ROAD Water Distribution Main 2010 100 2110 5,410 93 129 - -

LYNWT M1003 WELLINGTON ROAD Water Distribution Main 2010 100 2110 2,500 93 59 - -

Total Lynhurst 4,502,500 99,464 433,410 433,410

Eastwood

EWWTM 0001 ELM LINE Water Distribution Main 1950 70 2020 118,000 3

suggested for 10

year capital

forecast 118,000 118,000

Page 80: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-18

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

EWWTM 0002 BODKIN ST Water Distribution Main PVC 2015 100 2115 116,710 98 2,726 - - -

EWWTM 0003 LAWTON ST Water Distribution Main PVC 2015 100 2115 93,540 98 2,185 - - -

EWWTM 0004 LAWTON ST Water Distribution Main PVC 2015 100 2115 72,770 98 1,699 - - -

EWWTM 0005 LAWTON ST Water Distribution Main PVC 2015 100 2115 114,700 98 2,679 - - -

EWWTM 0006* ELM LINE Water Distribution Main 1993 100 2093 - 76 - - -

EWWTM 0007* ELM LINE Water Distribution Main 1950 100 2050 - 33 - - -

EWWTM 0008* ELM LINE Water Distribution Main 1950 100 2050 - 33 - - -

EWWTM 0009 TRACEY ST Water Distribution Main PVC 2015 100 2115 86,040 98 2,009 - -

EWWTM 0010 TRACEY ST Water Distribution Main PVC 2015 100 2115 35,600 98 831 - -

EWWTM 0011 NORA PL Water Distribution Main PVC 2015 100 2115 48,840 98 1,141 - -

EWWTM 0012 PETER ST Water Distribution Main PVC 2015 100 2115 79,750 98 1,862 - -

EWWTM 0015 COULTER AVE Water Distribution Main PVC 2015 100 2115 70,300 98 1,642 - -

EWWTM 0016 COULTER AVE Water Distribution Main PVC 2015 100 2115 68,650 98 1,603 - -

EWWTM 0017 COULTER AVE Water Distribution Main PVC 2015 100 2115 63,290 98 1,478 - -

EWWTM 0018 COULTER AVE Water Distribution Main PVC 2015 100 2115 327,630 98 7,651 - -

EWWTM 0019 COULTER AVE Water Distribution Main PVC 2015 100 2115 96,920 98 2,263 - -

EWWTM 0022 LOIS AVE Water Distribution Main PVC 2015 100 2115 207,190 98 4,839 - -

EWWTM 0021 LOIS AVE Water Distribution Main PVC 2015 100 2115 45,490 98 1,062 - -

EWWT M09010 BAILEY AV Water Distribution Main 2009 100 2109 119,220 92 2,844 - -

EWWT M09013 ELM LN Water Distribution Main 2009 100 2109 24,490 92 584 - -

EWWT M09008 ELMWOOD AV Water Distribution Main 2009 100 2109 119,550 92 2,852 - -

EWWT M09009 BAILEY AV Water Distribution Main 2009 100 2109 35,540 92 848 - -

EWWT M09012 PAUL ST Water Distribution Main 2009 100 2109 42,970 92 1,025 - -

EWWT M09011 PAUL ST Water Distribution Main 2009 100 2109 37,160 92 887 - -

EWWT M09007 ELMWOOD AV Water Distribution Main 2009 100 2109 9,900 92 236 - -

Total Eastwood 2,034,250 44,948 118,000 118,000

Rural Area:

RWT M0001 BARNUMS GULLY LINE Water Distribution Main 2000 100 2100 1,018,010 83 25,238 - -

RWT M0005 CENTENNIAL ROAD Water Distribution Main 2007 100 2107 688,060 90 16,545 - -

RWT M0002 FRUIT RIDGE LINE Water Distribution Main 2007 100 2107 329,070 90 7,913 - -

RWT M0003 FRUIT RIDGE LINE Water Distribution Main 2007 100 2107 182,490 90 4,388 - -

RWT M0004 FRUIT RIDGE LINE Water Distribution Main 2007 100 2107 173,510 90 4,172 - -

RWT M0007 YARMOUTH CENTRE ROAD Water Distribution Main 2001 100 2101 100,520 84 2,480 - -

RWT M0008 YARMOUTH CENTRE ROAD Water Distribution Main 2004 100 2104 353,850 87 8,615 - -

RWT M0010 BLOSSOM RIDGE Water Distribution Main 2006 100 2106 68,810 89 1,661 - -

RWT M0009 BELMONT ROAD Water Distribution Main 2006 100 2106 155,560 89 3,756 - -

RWT M0011 PRIOR ST Water Distribution Main 1996 100 2096 91,320 79 2,310 - -

RWT M0012 SPRING WATER ROAD Water Distribution Main 1996 100 2096 208,310 79 5,268 - -

RWT M0013 TURNER ROAD Water Distribution Main 1990 100 2090 89,750 73 2,348 - -

RWT M0014 WATER TOWER LINE Water Distribution Main 2004 100 2104 194,050 87 4,725 - -

RWT M0015 FERGUSON LINE Water Distribution Main 1996 100 2096 179,490 79 4,540 - -

RWT M0016 CENTENNIAL ROAD Water Distribution Main 1990 100 2090 346,260 73 9,060 - -

Page 81: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page A-19

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street Description MaterialYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Funded in

Work in

Progress

Amount to be

included in 10

year Forecast

net of Work in

Progress

RWT M0021 STONE CHURCH ROAD Water Distribution Main 2006 100 2106 3,200 89 77 - -

RWT M0022 HINDLEY COURT Water Distribution Main 2006 100 2106 9,130 89 220 - -

RWT M0023 TOWER ROAD Water Distribution Main 1996 100 2096 639,930 79 16,185 - -

RWTM13025 Sunset Road - OPP Servicing Water Distribution Main 2013 100 2113 43,220 96 1,016 - -

RWTM13026 John Wise Line - OPP Servicing Water Distribution Main 2013 100 2113 86,450 96 2,033 - -

RWTM13027 Easement from OPP Servicing Water Distribution Main 2013 100 2113 43,220 96 1,016 - -

Total Rural Area 5,004,210 123,567 - -

Grand Total 39,864,584 970,624 1,475,010 1,475,010

* As part of agreement the responsibility for replacement rests with City of St. Thomas as a combined works

Page 82: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix B – Wastewater System Inventory

Data

Page 83: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual

Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

ESSBS0011 TAYLOR LINE Belmont Water Pollution Control Plant 2005 75 2080 3,611,810 63 101,342 -

ESSBS0001 SCOTCH LN PORT STANLEY SEWAGE PLANT: 1937 75

ESSBS0001 SCOTCH LN Port Stanley Building 1937 75 2018 1,035,000 1

suggested for 10

year capital

forecast

1,035,000

ESSBS0001 SCOTCH LN Port Stanley Mechanical 1993 25 2018 2,557,000 1

suggested for 10

year capital

forecast

2,557,000

ESSBS0001 SCOTCH LN Port Stanley Electrical 1998 20 2018 900,000 1

suggested for 10

year capital

forecast

900,000

ESSBS0001 SCOTCH LN Port Stanley Yard Piping 1968 50 2018 835,000 1

suggested for 10

year capital

forecast

835,000

ESSBS0001 SCOTCH LN Port Stanley Land Improvements 1998 20 2018 2,000,000 1

suggested for 10

year capital

forecast

2,000,000

ESSBS0001 SCOTCH LN Port Stanley exterior structural 1937 75 2018 2,885,015 1

suggested for 10

year capital

forecast

2,885,015

ESSBS0008 BELMONT RD Belmont Main Street Pumping Station (P.S. 71) 1997 75 2072 123,200 55 3,714 -

ESSBS0047 BRENTWOOD CRES Brentwood Pumping Station (P.S. 73) 1980 75 2055 49,280 38 1,864 -

ESSBS0047 BRENTWOOD CRES - Electrical 2015 20 2035 53,950 18 3,599 -

ESSBS0047 BRENTWOOD CRES - Mechanical 2015 25 2040 34,554 23 1,889 -

ESSBS0072 WASHBURN STREET Washburn Street Pumping Station (P.S. 72) 2011 75 2086 49,280 69 1,323 -

ESSBS0048 EDGEWELL CR Edgewell/James Turvey Pumping Station 2000 75 2075 123,200 58 3,608 -

ESSBS0049 CRESCENT AVE Crescent Avenue Pumping Station 1987 75 2062 49,280 45 1,671 -

ESSBS0050 WOODLAND AVE Woodland Road Pumping Station 1987 75 2062 49,280 45 1,671 -

ESSBS0056 GEORGE ST Pumping Station 56 2000 75 2075 49,280 58 1,443 -

ESSBS0055 HARRISON PL Pumping Station 55 1972 75 2047 49,280 30 2,200 -

ESSBS0054 WEST EDITH CAVELL BLVD Pumping Station 54 1975 75 2050 49,280 33 2,054 -

ESSBS0052 BRIDGE ST Pumping Station 52 2017 75 2092 116,250 75 3,006 -

ESSBS0052 BRIDGE ST Pumping Station 52 - electrical 2017 20 2037 24,390 20 1,492 -

ESSBS0052 BRIDGE ST Pumping Station 52 - electrical 2017 20 2037 14,720 20 900 -

ESSBS0052 BRIDGE ST Pumping Station 52 - mechanical 2017 25 2042 14,720 25 754 -

ESSBS0052 BRIDGE ST Pumping Station 52 - structural 2017 75 2092 14,720 75 381 -

ESSBS0051 CARLOW RD Pumping Station 51 2017 75 2092 138,510 75 3,581 -

Appendix B-1

Municipality of Central Elgin

Wastewater Facilities

Page 84: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual

Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

ESSBS0051 CARLOW RDPumping Station 51 - Upgrade - third pump, wet

well-refurbish2017 25 2042 560,840 25 28,726 -

ESSBS0051 CARLOW RD Pumping Station 51 - Upgrade - generator 2017 25 2042 70,640 25 3,618 -

ESSBS0051 CARLOW RD Pumping Station 51 - Upgrade - Mechanical 2017 25 2042 24,390 25 1,249 -

ESSBS13060 TALBOT LINE Talbot Line PS -Electrical 2008 25 2033 195,000 16 14,362 -

ESSBS13060 TALBOT LINE Talbot Line PS -Yard Piping 2008 75 2083 124,587 66 3,416 -

ESSBS13060 TALBOT LINE Talbot Line PS -Mechanical 2008 25 2033 179,554 16 13,224 -

ESSBS13060 TALBOT LINE Talbot Line PS -Structural 2008 75 2083 380,695 66 10,439 -

24306 SUNSET RD Pumping Station Sunset - structural 2013 75 2088 185,000 71 4,901 -

24306 SUNSET RD Pumping Station Sunset - mechanical 2013 25 2038 34,256 21 2,014 -

24306 SUNSET RD Pumping Station Sunset - Electrical 2013 25 2038 30,190 21 1,775 -

ESSBS1053 BRIDGE ST Pump Station 53 - PS TOWN HALL 2010 75 2085 560,840 68 15,160 -

Total 17,172,992 235,377 10,212,015

Page 85: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

ESSBS0 051_ME CH CARLOW RD Mechanical 2017 25 2042 67,300 25 3,447 -

ESSBS0 051_ELE C CARLOW RD Electrical 2017 25 2042 560,840 25 28,726 -

ESSBS0 051_HV AC CARLOW RD HVAC 2017 20 2037 560,840 20 34,299 -

ESSBS0 051_YR DP CARLOW RD Yard Piping 1972 75 2047 154,000 30 6,876 -

ESSBS0 052_ME CH BRIDGE ST Mechanical 2017 25 2042 73,920 25 3,786 -

ESSBS0 052_ELE C BRIDGE ST Electrical 2017 25 2042 36,960 25 1,893 -

ESSBS0 052_YR DP BRIDGE ST Yard Piping 2017 75 2092 36,960 75 956 -

ESSBS0 053_ELE C BRIDGE ST Electrical 2017 25 2042 12,320 25 631 -

ESSBS0 054_ME CH WEST EDITH CAVELL BLVD Mechanical 2008 25 2033 19,710 16 1,452 -

ESSBS0 054_ELE C WEST EDITH CAVELL BLVD Electrical 2008 25 2033 9,860 16 726 -

ESSBS0 054_YR DP WEST EDITH CAVELL BLVD Yard Piping 1975 75 2050 9,860 33 411 -

ESSBS0 055_ME CH HARRISON PL Mechanical 1972 53 2025 19,710 8

suggested for 10

year capital

forecast

19,710

ESSBS0 055_ME CH HARRISON PLMechanical - New control panel, gen set plug,

wet well covers2012 53 2065 4,000 48 130 -

ESSBS0 055_ELE C HARRISON PL Electrical 1972 25 2017 9,860 0

suggested for 10

year capital

forecast

9,860

ESSBS0 055_YR DP HARRISON PL Yard Piping 1972 75 2047 9,860 30 440 -

ESSBS0 056_ME CH GEORGE ST Mechanical 2000 25 2025 7,590 8

suggested for 10

year capital

forecast

7,590

ESSBS0 056_ME CH GEORGE ST Mechanical - new gen set plug 2012 25 2037 12,120 20 741 -

ESSBS0 056_ELE C GEORGE ST Electrical 2000 25 2025 9,860 8

suggested for 10

year capital

forecast

9,860

ESSBS0 056_TR DP GEORGE ST Yard Piping 2000 75 2075 9,860 58 289 -

ESSBS0 050_ME CH WOODLAND AVE Mechanical 1987 38 2025 19,710 8

suggested for 10

year capital

forecast

19,710

ESSBS0 050_ELE C WOODLAND AVE Electrical 1987 38 2025 9,860 8

suggested for 10

year capital

forecast

9,860

ESSBS0 050_YR DP WOODLAND AVE Yard Piping 1987 50 2037 9,860 20 603 -

ESSBS0 049_ME CH CRESCENT AVE Mechanical 1987 38 2025 19,710 8

suggested for 10

year capital

forecast

19,710

Appendix B-2

Municipality of Central Elgin

Wastewater Non-Spatial Equipment

Page 86: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Replacement

Cost

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

ESSBS0 049_ELE C CRESCENT AVE Electrical 1987 38 2025 9,860 8

suggested for 10

year capital

forecast

9,860

ESSBS0 049_YR DP CRESCENT AVE Yard Piping 1987 75 2062 9,860 45 334 -

ESSBS0 048_ME CH EDGEWELL CR Mechanical 2000 25 2025 49,280 8

suggested for 10

year capital

forecast

49,280

ESSBS0 048_ELE C WDGEWELL CR Electrical 2000 25 2025 24,640 8

suggested for 10

year capital

forecast

24,640

ESSBS0 048_YR DP EDGEWELL CR Yard Piping 2000 75 2075 24,640 58 722 -

ESSBS0 072_ME CH WASHBURN ST Mechanical 2011 25 2036 19,710 19 1,257 -

ESSBS0 072_ELE C WASHBURN ST Electrical 2011 25 2036 9,860 19 629 -

ESSBS0 072_YR DP WASHBURN ST Yard Piping 2011 75 2086 9,860 69 265 -

ESSBS0 047_ELE C BRENTWOOD CRESElectrical - refurbish - new building, move gen

set, new pumps, force main connection2012 25 2037 50,760 20 3,104 -

ESSBS0 047_YR DP BRENTWOOD CRES Yard Piping 1980 75 2055 9,860 38 373 -

ESSB00 11_MEC H TAYLOR LN Mechanical 2005 25 2030 1,478,380 13 130,272 -

ESSB00 11_ELE C TAYLOR LN Electrical 2005 25 2030 739,190 13 65,136 -

ESSB00 11_HVA C TAYLOR LN HVAC 2005 25 2030 739,190 13 150,000 -

ESSB00 11_YRD P TAYLOR LN Yard Piping 2005 100 2105 739,190 88 17,921 -

ESSBS0 088_ME CH BELMONT RD Mechanical 1997 25 2022 49,280 5

suggested for 10

year capital

forecast

49,280

ESSBS0 088_ME CH BELMONT RD - install 3rd pump Mechanical 2012 25 2037 60,610 20 3,707 -

ESSBS0 008_ELE C BELMONT RD Electrical 1997 25 2022 24,640 5

suggested for 10

year capital

forecast

24,640

ESSBS0 008_YR DP BELMONT RD Yard Piping 1997 50 2047 24,640 30 1,100 -

Total 5,758,020 460,228 254,000

Page 87: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

LYNSAM H2071 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2070 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2072 St George St Sanitary Sewer Manhole 1987 75 2062 673,010 45 22,822 -

LYNSAM H2068 Crescent Av Sanitary Sewer Manhole 1987 75 2062 28,040 45 951 -

LYNSAM H2067 Crescent Av Sanitary Sewer Manhole 1987 75 2062 67,300 45 2,282 -

LYNSAM H2069 St George St Sanitary Sewer Manhole 1987 75 2062 560,840 45 19,018 -

LYNSAM H2064 Crescent Av Sanitary Sewer Manhole 1987 75 2062 560,840 45 19,018 -

LYNSAM H2066 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2065 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2063 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2059 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2061 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2062 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2058 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2056 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2060 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2057 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2055 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2073 Crescent Av Sanitary Sewer Manhole 1996 75 2071 3,460 54 105 -

LYNSAM H2082 Crescent Ct Sanitary Sewer Manhole 1996 75 2071 3,460 54 105 -

LYNSAM H2074 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2075 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2076 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2080 Crescent Av Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H2077 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2078 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2079 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2083 Symphony Ct Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H2084 Symphony Ct Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H2085 Symphony Ct Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H2086 Symphony Ct Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H2088 Symphony Ct Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H2089 Symphony Ct Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H2087 Symphony Ct Sanitary Sewer Manhole 1998 75 2073 3,460 56 103 -

LYNSAM H1037 Symphony Ct Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1036 Symphony Ct Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

Appendix B-3

Municipality of Central Elgin

Wastewater Manholes

Page 88: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

LYNSAM H1035 Symphony Ct Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1047 Vineden St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1048 Vineden St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1017 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1016 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1015 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1014 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1013 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1012 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1011 Hydro Rd Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1038 Hydro Rd Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1039 Hydro Rd Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1040 Timberlane Cr Sanitary Sewer Manhole 1990 75 2065 3,460 48 113 -

LYNSAM H1041 Timberlane Cr Sanitary Sewer Manhole 1990 75 2065 3,460 48 113 -

LYNSAM H1042 Timberlane Cr Sanitary Sewer Manhole 1990 75 2065 3,460 48 113 -

LYNSAM H1043 Timberlane Cr Sanitary Sewer Manhole 1990 75 2065 3,460 48 113 -

LYNSAM H1044 Timberlane Cr Sanitary Sewer Manhole 1990 75 2065 3,460 48 113 -

LYNSAM H1045 Timberlane Cr Sanitary Sewer Manhole 1990 75 2065 3,460 48 113 -

LYNSAM H1046 Timberlane Cr Sanitary Sewer Manhole 1990 75 2065 3,460 48 113 -

LYNSAM H1049 Vineden St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1050 Vineden St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1051 Vineden St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1052 Vineden St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1053 Nathan St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1010 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1009 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1008 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1007 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1032 Cowan Lane Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1034 Cowan Lane Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1033 Cowan Lane Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1006 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1005 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1029 Independent St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1030 Independent St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1031 Independent St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1028 Parkins St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1026 Parkins St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

Page 89: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

LYNSAM H1025 Parkins St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1024 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1004 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1003 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1002 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1001 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2081 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3102 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3101 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3100 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3099 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3111 Lynhurst Av Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

LYNSAM H3106 Hillcrest Av Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

LYNSAM H3107 Hillcrest Av Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

LYNSAM H3108 Hillcrest Av Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

LYNSAM H3109 Hillcrest Av Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

LYNSAM H3110 Hillcrest Av Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

LYNSAM H3105 Hillcrest Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3104 Battram St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3103 Battram St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3098 Cresent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3097 Cresent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3096 Woodland Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3095 Woodland Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3094 Woodland Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3093 Woodland Ave Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3092 Woodland Ave Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3091 Woodland Ave Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H3090 Woodland Ave Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1018 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1019 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1020 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1021 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1022 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1023 St George St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H2054 Crescent Av Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

LYNSAM H1027 Parkins St Sanitary Sewer Manhole 1987 75 2062 3,460 45 117 -

PSSAMH 1001 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

Page 90: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-9

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 1002 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1003 Carlow Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1004 Carlow Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1005 Carlow Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1006 Carlow Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1007 CARLOW RD Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1008 Carlow Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1009 Carlow Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1010 Warren St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1011 Catherine St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1012 Catherine St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1013 Catherine St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1014 Warren St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1015 Warren St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1016 Warren St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1017 Catherine St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1018 Catherine St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1019 Elizabeth St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1020 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1021 Stanley St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1022 Elizabeth St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1023 Elizabeth St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1024 Elizabeth St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1025 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1026 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1027 Sunset Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1028 Warren St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1029 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1030 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1031 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1032 Colborne St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1033 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1034 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1035 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1036 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1037 Colborne St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 1038 Matilda St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1039 Frances St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1040 Frances St Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

Page 91: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-10

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 1041 Frances St Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1042 Frances St Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1043 Frances St Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1044 Frances St Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1045 Frances St Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1046 Frances Crt Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1047 Selbourne Dr Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1048 Selbourne Dr Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1049 Selbourne Dr Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1050 Selbourne Dr Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1051 Selbourne Dr Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1052 Selbourne Crt Sanitary Sewer Manhole 1992 75 2067 3,460 50 110 -

PSSAMH 1053 Frances St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1054 Frances St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1055 Frances St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1056 Frances St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 1057 Frances St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2058 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2059 Main St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2060 Main St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2061 Main St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2062 Main St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2063 Main St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2064 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2065 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2066 Colonel Bostwick Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2067 Colonel Bostwick Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 2068 Colonel Bostwick Rd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 2069 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2070 Joseph St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 2071 Joseph St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3072 Main St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3073 Jamieson St Orchard St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3074 Jamieson St Orchard St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3075 Jamieson St Orchard St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3076 Jamieson St Orchard St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3077 Prospect St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

Page 92: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-11

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 3078 Edward St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3079 Edward St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3080 Prospect St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3081 Prospect St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3082 Prospect St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3083 Prospect St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3084 Oak St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 3085 Oak St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 3086 Oak St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3087 Kitchener St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3088 Kitchener St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3089 Kitchener St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3090 Kitchener St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3091 Vimy Ridge Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3092 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3093 Currie Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3094 Currie Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3095 Currie Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3096 Currie Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3097 Currie Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3098 East Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3099 East Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3100 East Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3101 East Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3102 East Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3103 East Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3104 Currie Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3105 Cornell St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3106 Prospect St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3107 Franklin Dr Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3108 Franklin Dr Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3109 Cornell St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3110 Cornell St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 3111 Cornell St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 3112 Cornell St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3113 Cornell St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3114 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3115 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

Page 93: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-12

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 3116 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3117 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3118 Brayside St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3119 Brayside St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3120 Brayside St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3121 Brayside St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3122 Brayside St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3123 Brayside St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4124 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4125 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4126 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4127 Queen St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4128 Adelaide St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4129 Lakeview St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4130 Mcclary St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4131 Harrison Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4132 Queen St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 4133 Adelaide St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5134 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 3135 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5136 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5137 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5138 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5139 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5140 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5141 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5142 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5143 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5144 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5145 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5146 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5147 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5148 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5149 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5150 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5151 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5152 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5153 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

Page 94: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-13

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 5154 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5155 George St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5156 Boltville Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5157 Boltville Pl Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5158 Webster Lane Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5159 Webster Lane Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5160 Webster Lane Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5161 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5162 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5163 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5164 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5165 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5166 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5167 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5168 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5169 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5170 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5171 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5172 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5173 Front St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5174 Invererie Heights Tower Heights Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5175 Invererie Heights Tower Heights Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5176 Invererie Heights Tower Heights Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5177 Bridge St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5178 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5179 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5180 Carlow Rd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5181 Maud St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5182 Bessie St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5183 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5184 First St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5185 Sydenham St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5186 Sydenham St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5187 Sydenham St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5188 Smith St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5189 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5190 Sydenham St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

Page 95: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-14

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 5191 Smith St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5192 Sydenham St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5193 Sydenham St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5194 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5195 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5196 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5197 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5198 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5199 William St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5200 Bessie St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5201 Bessie St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5202 Bessie St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5203 Maud St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5204 Maud St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5205 Maud St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5206 Second St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5207 Second St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5208 Third St Fourth St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5209 First St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5210 Third St Fourth St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5211 Third St Fourth St Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5212 Edith Cavell Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5213 Edith Cavell Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5214 Edith Cavell Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5215 Edith Cavell Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5216 Edith Cavell Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5217 Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5218 Edith Cavell Blvd Sanitary Sewer Manhole 1972 75 2047 3,460 30 154 -

PSSAMH 5219 Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5220 Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5221 Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5222 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5223 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6224 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6225 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6226 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6227 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

Page 96: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-15

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 6228 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6229 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6230 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6231 Bartholomew St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6232 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6233 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6234 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6235 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5236 Stanley Park Dr Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5237 Stanley Park Dr Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 5238 Stanley Park Dr Sanitary Sewer Manhole 1994 75 2069 3,460 52 108 -

PSSAMH 5239 Stanley Park Dr Sanitary Sewer Manhole 1994 75 2069 3,460 52 108 -

PSSAMH 6240 Lower Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6241 Lower Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6242 Lower Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6243 Lower Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6244 Lower Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6245 Lower Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6246 Valley St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6247 Valley St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6248 Valley St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6249 River Road Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6250 George St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6251 Mitchell St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6252 George St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6253 Mitchell St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6254 Charles St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6255 Meek St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6256 Frederick St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6257 Walter St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6258 Edith St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6259 George St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6260 Mitchell St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6261 Charles St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6262 Frederick St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6263 Walter St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6264 Edith St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6265 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

Page 97: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-16

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSAMH 6266 West Edith Cavell Blvd Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6267 Upper Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6268 Upper Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6269 Upper Spring St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6270 Meek St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 6271 Meek St Sanitary Sewer Manhole 1975 75 2050 3,460 33 144 -

PSSAMH 7272 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7273 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7274 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7275 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7276 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7277 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7278 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7279 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7280 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7281 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

PSSAMH 7282 George St Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH1 001 Kettle Creek Dr Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 002 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 003 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 004 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 005 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 006 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 007 Copeland/west St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 008 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 009 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 010 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 011 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 012 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 013 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 014 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 016 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 017 Copeland/west St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 018 Copeland/west St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 019 Copeland/west St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 020 Copeland/west St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 021 West St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 022 West St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

Page 98: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-17

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

BSAMH1 023 West St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 024 West St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 025 Odell St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 026 Union St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 027 Union St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH1 028 Union St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH1 029 Union St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH1 030 Union St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH1 031 Union St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 032 College St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 033 College St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 034 College St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 035 College St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 036 Church St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 037 Victoria St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 038 Victoria St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 039 Victoria St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 040 Washburn St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 041 Washburn St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 042 Washburn St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 043 Seventh Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 044 Seventh Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH1 045 Seventh Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH2 047 Washburn St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH2 048 Dufferin St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH2 049 Church St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH2 050 Dufferin St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH2 051 Church St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH2 052 Church St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH2 053 Church St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH2 054 Washburn St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH2 055 Washburn St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH2 056 Washburn St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 046 Washburn St Sanitary Sewer Manhole 2001 75 2076 3,460 59 100 -

BSAMH3 057 Hazelwood Cres Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 058 Hazelwood Cres Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 059 Hazelwood Cres Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 060 Louise St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 061 Louise St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

Page 99: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-18

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

BSAMH3 062 Louise St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 063 Dyer St Sanitary Sewer Manhole 1988 75 2063 3,460 46 116 -

BSAMH3 064 Louise St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 065 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 066 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 067 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 068 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 069 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 070 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 071 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 072 Borden Ave Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 073 Rouen St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 074 Rouen St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 075 Rouen St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 076 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 077 Belmont Rd Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 078 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 079 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 080 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 081 Belmont Rd Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 082 Dyer St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 083 Lorne St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 084 Dyer St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 085 Lorne St Sanitary Sewer Manhole 1974 75 2049 3,460 32 147 -

BSAMH3 086 Dyer St Sanitary Sewer Manhole 1988 75 2063 3,460 46 116 -

BSAMH3 087 Barons Crt Sanitary Sewer Manhole 1988 75 2063 3,460 46 116 -

BSAMH3 088 Canterbury Pl Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 089 Canterbury Pl Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 090 Sherwood Ave Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 091 Sherwood Ave Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 092 Canterbury Pl Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 093 Scarlett Pl Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 094 Canterbury Pl Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 095 Canterbury Pl Sanitary Sewer Manhole 1989 75 2064 3,460 47 114 -

BSAMH3 096 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH3 097 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH3 098 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH3 099 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

Page 100: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-19

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

BSAMH3 100 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH3 101 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH3 102 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH3 103 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH3 104 Hazelwood Cres Sanitary Sewer Manhole 1978 75 2053 3,460 36 136 -

BSAMH4 134 Dufferin St Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 135 Brentwood Cres Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 136 Brentwood Cres Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 137 Brentwood Cres Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 138 Brentwood Cres Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 139 Brentwood Cres Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 140 Dufferin St Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 141 Dufferin St Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH4 142 Oakdale Cres Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

BSAMH5 105 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 106 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 107 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 108 Kettle Creek Dr Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 109 Ramona Ln Sndyers Ave Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 110 Andrea Cres Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 111 Andrea Cres Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 112 Andrea Cres Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 113 Ramona Ln Sndyers Ave Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 114 Ramona Ln Sndyers Ave Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 115 Snyders Ave Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 116 Anita Crt Sanitary Sewer Manhole 1997 75 2072 3,460 55 104 -

BSAMH5 117 Snyders Ave Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 118 Plymouth Court Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 119 Snyders Ave Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 120 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 121 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 122 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 123 Landon Lane Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 124 Landon Lane Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 125 Jonathan Way Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 126 Jonathan Way Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 127 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 128 Jonathan Way Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

Page 101: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-20

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

BSAMH5 129 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 130 Jonathan Way Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 131 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH5 132 Landon Lane Sanitary Sewer Manhole 2000 75 2075 3,460 58 101 -

BSAMH5 133 Kettle Creek Dr Sanitary Sewer Manhole 1991 75 2066 3,460 49 111 -

BSAMH1 143 Brentwood Cres Sanitary Sewer Manhole 1980 75 2055 3,460 38 131 -

EWSAM H09012 Elm Ln Sanitary Sewer Manhole 2009 75 2084 6,560 67 179 -

EWSAM H09011 Bailey Ave Sanitary Sewer Manhole 2009 75 2084 7,720 67 210 -

EWSAM H09010 Bailey Ave Sanitary Sewer Manhole 2009 75 2084 8,160 67 222 -

EWSAM H09008 Paul St Sanitary Sewer Manhole 2009 75 2084 5,570 67 152 -

EWSAM H09009 Paul St Sanitary Sewer Manhole 2009 75 2084 6,400 67 174 -

EWSAM H09003 Paul St Sanitary Sewer Manhole 2009 75 2084 6,090 67 166 -

EWSAM H09007 Bailey Ave Sanitary Sewer Manhole 2009 75 2084 8,650 67 235 -

EWSAM H09006 Bailey Ave Sanitary Sewer Manhole 2009 75 2084 5,930 67 161 -

EWSAM H09005 Elmwood Ave Sanitary Sewer Manhole 2009 75 2084 10,510 67 286 -

EWSAM H09004 Elmwood Ave Sanitary Sewer Manhole 2009 75 2084 6,990 67 190 -

EWSAM H09002 Elmwood Ave Sanitary Sewer Manhole 2009 75 2084 6,990 67 190 -

EWSAM H09001 Elmwood Ave Sanitary Sewer Manhole 2009 75 2084 5,780 67 157 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Page 102: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-21

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Street DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

Centennial Ave Sanitary Sewer Manhole 2016 75 2091 17,725 74 461 -

BSAMH13010 Belmont Splash Pad Sanitary Sewer Manhole 2013 100 2113 2,700 96 63 -

Total 4,325,896 152,227 -

Page 103: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-22

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

LYNSA1 012 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 62,420 70 1,665 -

LYNSA1 013 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 58,340 70 1,556 -

LYNSA1 052 VINEDEN ST Sanitary Sewer Collector 1987 100 2087 25,840 70 689 -

LYNSA1 034 COWAN LANE Sanitary Sewer Collector 1987 100 2087 28,490 70 760 -

LYNSA1 033 COWAN LANE Sanitary Sewer Collector 1987 100 2087 38,420 70 1,025 -

LYNSA1 032 COWAN LANE Sanitary Sewer Collector 1987 100 2087 12,920 70 345 -

LYNSA1 008 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 36,720 70 979 -

LYNSA1 009 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 42,970 70 1,146 -

LYNSA1 007 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 19,620 70 523 -

LYNSA1 036 SYMPHONY CT Sanitary Sewer Collector 1987 100 2087 7,890 70 210 -

LYNSA1 037 SYMPHONY CT Sanitary Sewer Collector 1987 100 2087 37,470 70 999 -

LYNSA1 010 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 57,890 70 1,544 -

LYNSA2 086 SYMPHONY CT Sanitary Sewer Collector 1998 100 2098 27,780 81 695 -

LYNSA2 088 SYMPHONY CT Sanitary Sewer Collector 1998 100 2098 10,850 81 272 -

LYNSA2 089 SYMPHONY CT Sanitary Sewer Collector 1998 100 2098 33,590 81 841 -

LYNSA1 005 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 49,180 70 1,312 -

LYNSA1 031 INDEPENDENT ST Sanitary Sewer Collector 1987 100 2087 41,310 70 1,102 -

LYNSA1 029 INDEPENDENT ST Sanitary Sewer Collector 1987 100 2087 24,310 70 648 -

LYNSA1 006 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 10,540 70 281 -

LYNSA1 027 PARKINS ST Sanitary Sewer Collector 1987 100 2087 39,580 70 1,056 -

LYNSA1 030 INDEPENDENT ST Sanitary Sewer Collector 1987 100 2087 20,610 70 550 -

LYNSA1 028 PARKINS ST Sanitary Sewer Collector 1987 100 2087 25,260 70 674 -

LYNSA1 039 HYDRO RD Sanitary Sewer Collector 1987 100 2087 8,700 70 232 -

LYNSA1 011 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 56,740 70 1,513 -

LYNSA1 038 HYDRO RD Sanitary Sewer Collector 1987 100 2087 24,820 70 662 -

LYNSA2 087 SYMPHONY CT Sanitary Sewer Collector 1998 100 2098 22,140 81 554 -

LYNSA1 044 TIMBERLANE CR Sanitary Sewer Collector 1990 100 2090 30,940 73 810 -

LYNSA1 014 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 60,890 70 1,624 -

LYNSA1 015 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 52,410 70 1,398 -

LYNSA1 016 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 51,960 70 1,386 -

LYNSA1 041 TIMBERLANE CR Sanitary Sewer Collector 1990 100 2090 30,940 73 810 -

LYNSA1 042 TIMBERLANE CR Sanitary Sewer Collector 1990 100 2090 19,380 73 507 -

LYNSA1 043 TIMBERLANE CR Sanitary Sewer Collector 1990 100 2090 12,920 73 338 -

LYNSA1 045 TIMBERLANE CR Sanitary Sewer Collector 1990 100 2090 6,120 73 160 -

LYNSA1 051 VINEDEN ST Sanitary Sewer Collector 1987 100 2087 35,230 70 940 -

LYNSA1 053 NATHAN ST Sanitary Sewer Collector 1987 100 2087 19,310 70 515 -

Appendix B-4

Municipality of Central Elgin

Sanitary Sewers

Page 104: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-23

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

LYNSA2 084 SYMPHONY CT Sanitary Sewer Collector 1998 100 2098 12,240 81 306 -

LYNSA2 076 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 9,720 70 259 -

LYNSA2 077 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 20,060 70 535 -

LYNSA2 078 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 34,000 70 907 -

LYNSA2 079 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 34,340 70 916 -

LYNSA2 080 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 30,260 70 807 -

LYNSA2 083 SYMPHONY CT Sanitary Sewer Collector 1998 100 2098 15,030 81 376 -

LYNSA2 085 SYMPHONY CT Sanitary Sewer Collector 1998 100 2098 16,220 81 406 -

LYNSA2 081 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 37,200 70 992 -

LYNSA1 050 VINEDEN ST Sanitary Sewer Collector 1987 100 2087 34,550 70 921 -

LYNSA1 017 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 31,240 70 833 -

LYNSA1 046 TIMBERLANE CR Sanitary Sewer Collector 1990 100 2090 11,220 73 294 -

LYNSA1 047 RYAN ST Sanitary Sewer Collector 1987 100 2087 27,540 70 734 -

LYNSA1 048 VINEDEN ST Sanitary Sewer Collector 1987 100 2087 16,700 70 445 -

LYNSA1 049 VINEDEN ST Sanitary Sewer Collector 1987 100 2087 37,400 70 997 -

LYNSA1 018 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 57,380 70 1,530 -

LYNSA2 075 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 27,780 70 741 -

LYNSA2 057 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 16,150 70 431 -

LYNSA1 019 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 45,600 70 1,216 -

LYNSA1 020 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 35,700 70 952 -

LYNSA1 021 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 26,270 70 701 -

LYNSA2 058 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 10,000 70 267 -

LYNSA2 056 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 28,970 70 773 -

LYNSA2 073 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 28,430 70 758 -

LYNSA2 082 CRESCENT CT Sanitary Sewer Collector 1996 100 2096 16,050 79 406 -

LYNSA2 074 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 26,690 70 712 -

LYNSA3 102 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 22,990 70 613 -

LYNSA3 101 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 17,270 70 461 -

LYNSA3 100 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 20,840 70 556 -

LYNSA3 105 HILLCREST AV Sanitary Sewer Collector 1987 100 2087 6,320 70 169 -

LYNSA3 106 HILLCREST AV Sanitary Sewer Collector 1987 100 2087 34,170 70 911 -

LYNSA3 111 LYNHURST AV Sanitary Sewer Collector 1987 100 2087 44,030 70 1,174 -

LYNSA3 107 HILLCREST AV Sanitary Sewer Collector 1991 100 2091 13,400 74 348 -

LYNSA3 108 HILLCREST AV Sanitary Sewer Collector 1991 100 2091 24,690 74 642 -

LYNSA3 109 HILLCREST AV Sanitary Sewer Collector 1991 100 2091 23,630 74 615 -

LYNSA3 110 HILLCREST AV Sanitary Sewer Collector 1991 100 2091 14,450 74 376 -

LYNSA3 104 BATTRAM ST Sanitary Sewer Collector 1987 100 2087 29,240 70 780 -

LYNSA3 098 CRESENT AV Sanitary Sewer Collector 1987 100 2087 33,490 70 893 -

LYNSA3 099 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 44,030 70 1,174 -

LYNSA3 097 WOODLAND AV Sanitary Sewer Collector 1987 100 2087 7,040 70 188 -

Page 105: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-24

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

LYNSA3 096 WOODLAND AV Sanitary Sewer Collector 1987 100 2087 29,990 70 800 -

LYNSA3 095 WOODLAND AV Sanitary Sewer Collector 1987 100 2087 10,340 70 276 -

LYNSA3 094 WOODLAND AV Sanitary Sewer Collector 1987 100 2087 39,210 70 1,046 -

LYNSA3 092 WOODLAND AVE Sanitary Sewer Collector 1987 100 2087 17,040 70 454 -

LYNSA3 091 WOODLAND AVE Sanitary Sewer Collector 1987 100 2087 10,340 70 276 -

LYNSA3 090 WOODLAND AVE Sanitary Sewer Collector 1987 100 2087 30,260 70 807 -

LYNSA3 103 BATTRAM ST Sanitary Sewer Collector 1987 100 2087 30,430 70 811 -

LYNSA1 022 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 10,710 70 286 -

LYNSA1 023 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 24,630 70 657 -

LYNSA2 059 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 35,910 70 958 -

LYNSA2 060 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 43,860 70 1,170 -

LYNSA2 061 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 11,560 70 308 -

LYNSA2 062 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 10,120 70 270 -

LYNSA2 063 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 23,790 70 634 -

LYNSA2 064 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 22,160 70 591 -

LYNSA2 067 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 23,770 70 634 -

LYNSA2 071 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 3,210 70 86 -

LYNSA2 068 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 13,480 70 359 -

LYNSA2 069 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 31,530 70 841 -

LYNSA2 070 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 25,980 70 693 -

LYNSA2 072 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 18,140 70 484 -

LYNSA2 066 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 14,890 70 397 -

LYNSA2 065 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 14,970 70 399 -

LYNSA1 002 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 4,460 70 119 -

LYNSA1 003 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 48,960 70 1,306 -

LYNSA1 004 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 9,900 70 264 -

LYNSA1 025 PARKINS ST Sanitary Sewer Collector 1987 100 2087 21,930 70 585 -

LYNSA1 024 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 12,100 70 323 -

LYNSA1 026 PARKINS ST Sanitary Sewer Collector 1987 100 2087 15,810 70 422 -

LYNSA1 035 SYMPHONY CT Sanitary Sewer Collector 1987 100 2087 12,340 70 329 -

LYNSA2 055 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 2,210 70 59 -

LYNSA1 001 ST GEORGE ST Sanitary Sewer Collector 1987 100 2087 8,420 70 225 -

LYNSA3 093 WOODLAND AV Sanitary Sewer Collector 1987 100 2087 8,670 70 231 -

LYNSA1 040 TIMBERLANE CR Sanitary Sewer Collector 1990 100 2090 18,700 73 489 -

LYNSA2 054 CRESCENT AV Sanitary Sewer Collector 1987 100 2087 - 70 0 -

ST GEORGE ST Sanitary Sewer Collector 2016 100 2116 56,393 99 1,313 -

Total Lynhurst 2,883,043 76,330 -

PSSA72 79 GEORGE ST Sanitary Sewer Collector 2000 100 2100 2,280 83 57 -

PSSA10 47 SELBOURNE DR Sanitary Sewer Collector 1992 100 2092 2,800 75 72 -

Page 106: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-25

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA41 29 HARRISON PL Sanitary Sewer Collector 1972 75 2047 1,870 30 83 -

PSSA41 28 HARRISON PL Sanitary Sewer Collector 1972 75 2047 8,290 30 370 -

PSSA10 01 CARLOW RD Sanitary Sewer Collector 1972 75 2047 13,770 30 615 -

PSSA20 61 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 14,410 30 643 -

PSSA41 30 HARRISON PL Sanitary Sewer Collector 1972 75 2047 6,630 30 296 -

PSSA41 31 HARRISON PL Sanitary Sewer Collector 1972 75 2047 25,910 30 1,157 -

PSSA41 36 QUEEN ST Sanitary Sewer Collector 1972 75 2047 27,460 30 1,226 -

PSSA30 95 VIMY RIDGE Sanitary Sewer Collector 1972 75 2047 9,130 30 408 -

PSSA30 84 WILLOW ST Sanitary Sewer Collector 1972 75 2047 18,330 30 818 -

PSSA30 89 OAK ST Sanitary Sewer Collector 1975 75 2050 18,660 33 778 -

PSSA52 26 EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 11,400 33 475 -

PSSA51 55 GEORGE ST Sanitary Sewer Collector 1972 75 2047 24,250 30 1,083 -

PSSA51 56 GEORGE ST Sanitary Sewer Collector 1972 75 2047 11,090 30 495 -

PSSA51 57 GEORGE ST Sanitary Sewer Collector 1972 75 2047 13,990 30 625 -

PSSA51 58 GEORGE ST Sanitary Sewer Collector 1972 75 2047 29,950 30 1,337 -

PSSA51 59 GEORGE ST Sanitary Sewer Collector 1972 75 2047 30,420 30 1,358 -

PSSA51 60 BOLTVILLE PL Sanitary Sewer Collector 1972 75 2047 3,060 30 137 -

PSSA51 61 BOLTVILLE PL Sanitary Sewer Collector 1972 75 2047 18,860 30 842 -

PSSA51 69 FRONT ST Sanitary Sewer Collector 1972 75 2047 26,010 30 1,161 -

PSSA51 70 FRONT ST Sanitary Sewer Collector 1972 75 2047 41,040 30 1,832 -

PSSA51 78 INVERERIE HEIGHTS TOWER Sanitary Sewer Collector 1972 75 2047 20,310 30 907 -

PSSA51 79 INVERERIE HEIGHTS TOWER Sanitary Sewer Collector 1972 75 2047 33,370 30 1,490 -

PSSA62 37 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 10,570 33 441 -

PSSA62 46 BARTHOLOMEW ST Sanitary Sewer Collector 1975 75 2050 27,460 33 1,145 -

PSSA62 71 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 7,880 33 328 -

PSSA62 72 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 6,940 33 289 -

PSSA62 47 LOWER SPRING ST Sanitary Sewer Collector 1975 75 2050 14,720 33 614 -

PSSA62 48 LOWER SPRING ST Sanitary Sewer Collector 1975 75 2050 11,810 33 492 -

PSSA62 49 LOWER SPRING ST Sanitary Sewer Collector 1975 75 2050 17,930 33 747 -

PSSA62 50 LOWER SPRING ST Sanitary Sewer Collector 1975 75 2050 13,780 33 574 -

PSSA62 52 VALLEY ST Sanitary Sewer Collector 1975 75 2050 21,040 33 877 -

PSSA62 53 VALLEY ST Sanitary Sewer Collector 1975 75 2050 30,160 33 1,257 -

PSSA62 54 VALLEY ST Sanitary Sewer Collector 1975 75 2050 29,230 33 1,218 -

PSSA62 55 VALLEY ST Sanitary Sewer Collector 1975 75 2050 17,930 33 747 -

PSSA62 56 DOVER PL Sanitary Sewer Collector 1975 75 2050 10,360 33 432 -

PSSA62 58 GEORGE ST Sanitary Sewer Collector 1975 75 2050 28,290 33 1,179 -

PSSA62 59 GEORGE ST Sanitary Sewer Collector 1975 75 2050 29,740 33 1,240 -

PSSA62 57 DOVER PL Sanitary Sewer Collector 1975 75 2050 28,600 33 1,192 -

PSSA62 66 MITCHELL ST Sanitary Sewer Collector 1975 75 2050 12,750 33 532 -

Page 107: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-26

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA62 60 GEORGE ST Sanitary Sewer Collector 1975 75 2050 30,260 33 1,261 -

PSSA10 59 FRANCES ST Sanitary Sewer Collector 1972 75 2047 23,420 30 1,046 -

PSSA10 34 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 81,150 30 3,623 -

PSSA10 35 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 81,730 30 3,649 -

PSSA10 36 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 41,250 30 1,842 -

PSSA20 72 HETTY ST Sanitary Sewer Collector 1972 75 2047 33,890 30 1,513 -

PSSA20 75 JOSEPH ST Sanitary Sewer Collector 1972 75 2047 8,550 30 382 -

PSSA62 78 MEEK ST Sanitary Sewer Collector 1975 75 2050 24,770 33 1,033 -

PSSA62 68 FREDERICK ST Sanitary Sewer Collector 1975 75 2050 32,230 33 1,344 -

PSSA62 69 WALTER ST Sanitary Sewer Collector 1975 75 2050 19,170 33 799 -

PSSA62 70 EDITH ST Sanitary Sewer Collector 1975 75 2050 20,830 33 868 -

PSSA72 80 GEORGE ST Sanitary Sewer Collector 2000 100 2100 19,250 83 477 -

PSSA72 81 GEORGE ST Sanitary Sewer Collector 2000 100 2100 11,900 83 295 -

PSSA72 82 GEORGE ST Sanitary Sewer Collector 2000 100 2100 27,200 83 674 -

PSSA72 83 GEORGE ST Sanitary Sewer Collector 2000 100 2100 31,080 83 771 -

PSSA72 84 GEORGE ST Sanitary Sewer Collector 2000 100 2100 30,600 83 759 -

PSSA72 85 GEORGE ST Sanitary Sewer Collector 2000 100 2100 10,540 83 261 -

PSSA72 86 GEORGE ST Sanitary Sewer Collector 2000 100 2100 30,600 83 759 -

PSSA72 87 GEORGE ST Sanitary Sewer Collector 2000 100 2100 30,600 83 759 -

PSSA10 41 FRANCES ST Sanitary Sewer Collector 1975 75 2050 36,170 33 1,508 -

PSSA10 42 FRANCES ST Sanitary Sewer Collector 1992 100 2092 3,290 75 85 -

PSSA10 49 SELBOURNE DR Sanitary Sewer Collector 1992 100 2092 24,040 75 622 -

PSSA10 50 SELBOURNE DR Sanitary Sewer Collector 1992 100 2092 5,040 75 130 -

PSSA10 55 FRANCES ST Sanitary Sewer Collector 1975 75 2050 38,870 33 1,620 -

PSSA10 56 FRANCES ST Sanitary Sewer Collector 1975 75 2050 36,170 33 1,508 -

PSSA62 74 UPPER SPRING ST Sanitary Sewer Collector 1975 75 2050 26,120 33 1,089 -

PSSA10 09 CARLOW RD Sanitary Sewer Collector 1975 75 2050 14,610 33 609 -

PSSA10 38 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 47,880 30 2,138 -

PSSA20 73 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 24,670 30 1,102 -

PSSA52 00 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 32,960 30 1,472 -

PSSA62 32 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 32,340 33 1,348 -

PSSA20 62 MAIN ST Sanitary Sewer Collector 1972 75 2047 19,070 30 851 -

PSSA20 67 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 14,820 30 662 -

PSSA10 11 CATHERINE ST Sanitary Sewer Collector 1972 75 2047 55,620 30 2,483 -

PSSA10 12 CATHERINE ST Sanitary Sewer Collector 1972 75 2047 37,430 30 1,671 -

PSSA10 02 CARLOW RD Sanitary Sewer Collector 1972 75 2047 7,140 30 319 -

PSSA10 03 CARLOW RD Sanitary Sewer Collector 1972 75 2047 30,890 30 1,379 -

PSSA10 04 CARLOW RD Sanitary Sewer Collector 1975 75 2050 56,280 33 2,346 -

PSSA10 07 CARLOW RD Sanitary Sewer Collector 1975 75 2050 26,220 33 1,093 -

Page 108: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-27

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA10 08 CARLOW RD Sanitary Sewer Collector 1975 75 2050 26,640 33 1,111 -

PSSA10 05 CARLOW RD Sanitary Sewer Collector 1975 75 2050 37,930 33 1,581 -

PSSA10 06 CARLOW RD Sanitary Sewer Collector 1975 75 2050 33,270 33 1,387 -

PSSA51 40 CARLOW RD Sanitary Sewer Collector 1972 75 2047 27,980 30 1,249 -

PSSA41 33 HARRISON PL Sanitary Sewer Collector 1972 75 2047 25,600 30 1,143 -

PSSA31 24 BRAYSIDE ST Sanitary Sewer Collector 1972 75 2047 35,340 30 1,578 -

PSSA31 25 BRAYSIDE ST Sanitary Sewer Collector 1972 75 2047 22,280 30 995 -

PSSA31 26 BRAYSIDE ST Sanitary Sewer Collector 1972 75 2047 12,540 30 560 -

PSSA31 27 BRAYSIDE ST Sanitary Sewer Collector 1972 75 2047 19,040 30 850 -

PSSA41 32 HARRISON PL Sanitary Sewer Collector 1972 75 2047 25,910 30 1,157 -

PSSA41 34 HARRISON PL Sanitary Sewer Collector 1972 75 2047 31,660 30 1,414 -

PSSA41 35 HARRISON PL Sanitary Sewer Collector 1972 75 2047 15,440 30 689 -

PSSA41 37 ADELAIDE ST Sanitary Sewer Collector 1972 75 2047 18,760 30 838 -

PSSA31 20 HARRISON PL Sanitary Sewer Collector 1972 75 2047 26,530 30 1,185 -

PSSA30 94 KITCHENER ST Sanitary Sewer Collector 1972 75 2047 18,860 30 842 -

PSSA31 19 HARRISON PL Sanitary Sewer Collector 1972 75 2047 26,120 30 1,166 -

PSSA31 21 HARRISON PL Sanitary Sewer Collector 1972 75 2047 15,650 30 699 -

PSSA31 22 BRAYSIDE ST Sanitary Sewer Collector 1972 75 2047 14,350 30 641 -

PSSA31 23 BRAYSIDE ST Sanitary Sewer Collector 1972 75 2047 17,720 30 791 -

PSSA30 90 OAK ST Sanitary Sewer Collector 1972 75 2047 21,630 30 966 -

PSSA30 91 KITCHENER ST Sanitary Sewer Collector 1972 75 2047 1,870 30 83 -

PSSA30 92 KITCHENER ST Sanitary Sewer Collector 1972 75 2047 12,640 30 564 -

PSSA30 93 KITCHENER ST Sanitary Sewer Collector 1972 75 2047 26,840 30 1,198 -

PSSA30 96 VIMY RIDGE Sanitary Sewer Collector 1972 75 2047 7,900 30 353 -

PSSA30 97 CURRIE BLVD Sanitary Sewer Collector 1972 75 2047 10,160 30 454 -

PSSA30 98 CURRIE BLVD Sanitary Sewer Collector 1972 75 2047 38,090 30 1,701 -

PSSA30 99 CURRIE BLVD Sanitary Sewer Collector 1972 75 2047 22,390 30 1,000 -

PSSA31 18 HARRISON PL Sanitary Sewer Collector 1972 75 2047 26,480 30 1,182 -

PSSA31 03 EAST RD Sanitary Sewer Collector 1972 75 2047 27,360 30 1,222 -

PSSA31 14 CORNELL ST Sanitary Sewer Collector 1972 75 2047 9,330 30 417 -

PSSA31 13 CORNELL ST Sanitary Sewer Collector 1972 75 2047 11,870 30 530 -

PSSA31 09 PROSPECT ST Sanitary Sewer Collector 1972 75 2047 18,810 30 840 -

PSSA31 00 CURRIE BLVD Sanitary Sewer Collector 1972 75 2047 8,390 30 375 -

PSSA31 01 CURRIE BLVD Sanitary Sewer Collector 1972 75 2047 30,570 30 1,365 -

PSSA31 02 EAST RD Sanitary Sewer Collector 1972 75 2047 5,700 30 255 -

PSSA31 08 CURRIE BLVD Sanitary Sewer Collector 1972 75 2047 2,440 30 109 -

PSSA31 04 EAST RD Sanitary Sewer Collector 1972 75 2047 37,410 30 1,670 -

PSSA31 05 EAST RD Sanitary Sewer Collector 1972 75 2047 28,760 30 1,284 -

PSSA31 06 EAST RD Sanitary Sewer Collector 1972 75 2047 31,090 30 1,388 -

PSSA31 07 EAST RD Sanitary Sewer Collector 1972 75 2047 32,390 30 1,446 -

Page 109: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-28

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA30 88 PROSPECT ST Sanitary Sewer Collector 1972 75 2047 6,300 30 281 -

PSSA30 81 PROSPECT ST Sanitary Sewer Collector 1972 75 2047 21,760 30 972 -

PSSA30 82 EDWARD ST Sanitary Sewer Collector 1972 75 2047 15,430 30 689 -

PSSA30 83 EDWARD ST Sanitary Sewer Collector 1972 75 2047 15,430 30 689 -

PSSA30 85 PROSPECT ST Sanitary Sewer Collector 1972 75 2047 5,950 30 266 -

PSSA30 86 PROSPECT ST Sanitary Sewer Collector 1972 75 2047 5,610 30 250 -

PSSA30 87 PROSPECT ST Sanitary Sewer Collector 1972 75 2047 5,800 30 259 -

PSSA31 11 FRANKLIN DR Sanitary Sewer Collector 1972 75 2047 23,010 30 1,027 -

PSSA30 78 JAMIESON ST ORCHARD ST Sanitary Sewer Collector 1972 75 2047 18,870 30 843 -

PSSA31 15 CORNELL ST Sanitary Sewer Collector 1975 75 2050 11,920 33 497 -

PSSA31 16 CORNELL ST Sanitary Sewer Collector 1972 75 2047 25,240 30 1,127 -

PSSA31 17 CORNELL ST Sanitary Sewer Collector 1972 75 2047 25,500 30 1,139 -

PSSA31 10 PROSPECT ST Sanitary Sewer Collector 1972 75 2047 27,050 30 1,208 -

PSSA31 12 FRANKLIN DR Sanitary Sewer Collector 1972 75 2047 10,160 30 454 -

PSSA20 66 MAIN ST Sanitary Sewer Collector 1972 75 2047 30,520 30 1,363 -

PSSA30 79 JAMIESON ST ORCHARD ST Sanitary Sewer Collector 1972 75 2047 3,380 30 151 -

PSSA30 80 JAMIESON ST ORCHARD ST Sanitary Sewer Collector 1972 75 2047 3,910 30 175 -

PSSA20 64 MAIN ST Sanitary Sewer Collector 1972 75 2047 33,160 30 1,481 -

PSSA20 65 MAIN ST Sanitary Sewer Collector 1972 75 2047 30,470 30 1,360 -

PSSA30 76 MAIN ST Sanitary Sewer Collector 1972 75 2047 19,110 30 853 -

PSSA30 77 JAMIESON ST ORCHARD ST Sanitary Sewer Collector 1972 75 2047 14,480 30 647 -

PSSA20 63 MAIN ST Sanitary Sewer Collector 1972 75 2047 4,660 30 208 -

PSSA20 68 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 9,120 30 407 -

PSSA20 69 COLONEL BOSTWICK RD Sanitary Sewer Collector 1972 75 2047 24,670 30 1,102 -

PSSA10 60 CHARLOTTE ST Sanitary Sewer Collector 1972 75 2047 40,770 30 1,820 -

PSSA10 57 FRANCES ST Sanitary Sewer Collector 1975 75 2050 19,800 33 825 -

PSSA10 58 FRANCES ST Sanitary Sewer Collector 1975 75 2050 15,860 33 661 -

PSSA20 74 JOSEPH ST Sanitary Sewer Collector 1972 75 2047 6,530 30 292 -

PSSA10 37 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 46,850 30 2,092 -

PSSA20 70 COLONEL BOSTWICK RD Sanitary Sewer Collector 1972 75 2047 22,280 30 995 -

PSSA20 71 COLONEL BOSTWICK RD Sanitary Sewer Collector 1975 75 2050 19,480 33 812 -

PSSA10 52 SELBOURNE DR Sanitary Sewer Collector 1992 100 2092 32,440 75 839 -

PSSA10 44 FRANCES ST Sanitary Sewer Collector 1992 100 2092 18,540 75 479 -

PSSA10 45 FRANCES ST Sanitary Sewer Collector 1992 100 2092 32,090 75 830 -

PSSA10 46 FRANCES ST Sanitary Sewer Collector 1992 100 2092 34,680 75 897 -

PSSA10 48 FRANCES CRT Sanitary Sewer Collector 1992 100 2092 11,400 75 295 -

PSSA10 51 SELBOURNE DR Sanitary Sewer Collector 1992 100 2092 31,140 75 805 -

PSSA10 53 SELBOURNE DR Sanitary Sewer Collector 1992 100 2092 10,600 75 274 -

PSSA10 54 SELBOURNE CRT Sanitary Sewer Collector 1992 100 2092 13,380 75 346 -

PSSA10 43 FRANCES ST Sanitary Sewer Collector 1992 100 2092 17,770 75 459 -

Page 110: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-29

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA10 31 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 81,380 30 3,634 -

PSSA10 32 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 49,200 30 2,197 -

PSSA10 39 MATILDA ST Sanitary Sewer Collector 1975 75 2050 29,230 33 1,218 -

PSSA10 40 FRANCES ST Sanitary Sewer Collector 1975 75 2050 38,870 33 1,620 -

PSSA10 33 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 80,920 30 3,613 -

PSSA10 25 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 36,790 30 1,643 -

PSSA10 20 STANLEY ST Sanitary Sewer Collector 1972 75 2047 69,860 30 3,119 -

PSSA10 21 STANLEY ST Sanitary Sewer Collector 1972 75 2047 16,170 30 722 -

PSSA10 22 ELIZABETH ST Sanitary Sewer Collector 1975 75 2050 24,610 33 1,026 -

PSSA10 23 ELIZABETH ST Sanitary Sewer Collector 1975 75 2050 19,860 33 828 -

PSSA10 24 ELIZABETH ST Sanitary Sewer Collector 1975 75 2050 19,860 33 828 -

PSSA10 29 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 84,420 30 3,769 -

PSSA10 30 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 74,740 30 3,337 -

PSSA10 17 CATHERINE ST Sanitary Sewer Collector 1972 75 2047 61,860 30 2,762 -

PSSA10 13 CATHERINE ST Sanitary Sewer Collector 1972 75 2047 27,760 30 1,239 -

PSSA10 14 CATHERINE ST Sanitary Sewer Collector 1972 75 2047 3,440 30 154 -

PSSA10 15 WARREN ST Sanitary Sewer Collector 1972 75 2047 32,130 30 1,435 -

PSSA10 16 WARREN ST Sanitary Sewer Collector 1972 75 2047 40,730 30 1,819 -

PSSA10 18 CATHERINE ST Sanitary Sewer Collector 1972 75 2047 34,930 30 1,560 -

PSSA10 19 ELIZABETH ST Sanitary Sewer Collector 1972 75 2047 51,730 30 2,310 -

PSSA10 26 COLBORNE ST Sanitary Sewer Collector 1972 75 2047 36,480 30 1,629 -

PSSA10 27 SUNSET RD Sanitary Sewer Collector 1972 75 2047 38,870 30 1,736 -

PSSA10 28 WARREN ST Sanitary Sewer Collector 1972 75 2047 21,090 30 942 -

PSSA51 41 CARLOW RD Sanitary Sewer Collector 1972 75 2047 17,000 30 759 -

PSSA51 42 CARLOW RD Sanitary Sewer Collector 1972 75 2047 30,880 30 1,379 -

PSSA51 46 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 31,250 30 1,395 -

PSSA51 81 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 3,060 30 137 -

PSSA51 47 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 5,180 30 231 -

PSSA51 48 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 13,580 30 606 -

PSSA51 82 CARLOW RD Sanitary Sewer Collector 1972 75 2047 29,300 30 1,308 -

PSSA51 83 CARLOW RD Sanitary Sewer Collector 1972 75 2047 48,270 30 2,155 -

PSSA51 92 SMITH ST Sanitary Sewer Collector 1972 75 2047 6,060 30 271 -

PSSA51 93 SMITH ST Sanitary Sewer Collector 1972 75 2047 34,510 30 1,541 -

PSSA51 84 CARLOW RD Sanitary Sewer Collector 1972 75 2047 48,660 30 2,173 -

PSSA52 09 MAUD ST Sanitary Sewer Collector 1972 75 2047 34,620 30 1,546 -

PSSA51 85 ERIE ST Sanitary Sewer Collector 1972 75 2047 10,800 30 482 -

PSSA51 86 ERIE ST Sanitary Sewer Collector 1972 75 2047 15,040 30 672 -

PSSA51 87 ERIE ST Sanitary Sewer Collector 1972 75 2047 22,540 30 1,006 -

PSSA52 01 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 46,020 30 2,055 -

Page 111: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-30

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA52 02 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 23,320 30 1,041 -

PSSA52 06 BESSIE ST Sanitary Sewer Collector 1972 75 2047 34,410 30 1,536 -

PSSA52 03 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 21,920 30 979 -

PSSA52 04 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 25,180 30 1,124 -

PSSA52 05 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 26,120 30 1,166 -

PSSA52 07 BESSIE ST Sanitary Sewer Collector 1972 75 2047 34,200 30 1,527 -

PSSA52 08 BESSIE ST Sanitary Sewer Collector 1972 75 2047 33,790 30 1,509 -

PSSA52 10 MAUD ST Sanitary Sewer Collector 1972 75 2047 33,530 30 1,497 -

PSSA52 11 MAUD ST Sanitary Sewer Collector 1972 75 2047 35,190 30 1,571 -

PSSA51 43 CARLOW RD Sanitary Sewer Collector 1972 75 2047 15,290 30 683 -

PSSA51 44 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 13,270 30 593 -

PSSA51 45 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 12,700 30 567 -

PSSA51 63 WEBSTER LANE Sanitary Sewer Collector 1972 75 2047 37,100 30 1,657 -

PSSA51 64 WEBSTER LANE Sanitary Sewer Collector 1972 75 2047 11,090 30 495 -

PSSA51 62 WEBSTER LANE Sanitary Sewer Collector 1972 75 2047 2,440 30 109 -

PSSA51 98 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 17,830 30 796 -

PSSA51 49 GEORGE ST Sanitary Sewer Collector 1972 75 2047 33,010 30 1,474 -

PSSA51 94 SMITH ST Sanitary Sewer Collector 1972 75 2047 39,590 30 1,768 -

PSSA51 95 SMITH ST Sanitary Sewer Collector 1975 75 2050 13,470 33 562 -

PSSA51 96 SYDENHAM ST Sanitary Sewer Collector 1972 75 2047 24,200 30 1,081 -

PSSA51 99 WILLIAM ST Sanitary Sewer Collector 1972 75 2047 32,540 30 1,453 -

PSSA51 97 SYDENHAM ST Sanitary Sewer Collector 1975 75 2050 16,790 33 700 -

PSSA51 50 GEORGE ST Sanitary Sewer Collector 1972 75 2047 20,940 30 935 -

PSSA51 91 SYDENHAM ST Sanitary Sewer Collector 1972 75 2047 4,230 30 189 -

PSSA51 88 ERIE ST Sanitary Sewer Collector 1972 75 2047 22,600 30 1,009 -

PSSA51 89 SYDENHAM ST Sanitary Sewer Collector 1972 75 2047 5,100 30 228 -

PSSA51 90 SYDENHAM ST Sanitary Sewer Collector 1972 75 2047 9,600 30 429 -

PSSA52 13 SECOND ST Sanitary Sewer Collector 1972 75 2047 17,150 30 766 -

PSSA52 14 FIRST ST Sanitary Sewer Collector 1972 75 2047 7,250 30 324 -

PSSA52 16 THIRD ST FOURTH ST Sanitary Sewer Collector 1972 75 2047 8,140 30 363 -

PSSA52 17 THIRD ST FOURTH ST Sanitary Sewer Collector 1972 75 2047 15,130 30 676 -

PSSA52 15 FIRST ST Sanitary Sewer Collector 1972 75 2047 15,290 30 683 -

PSSA52 18 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 37,890 30 1,692 -

PSSA52 19 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 30,190 30 1,348 -

PSSA51 66 FRONT ST Sanitary Sewer Collector 1972 75 2047 34,200 30 1,527 -

PSSA51 51 GEORGE ST Sanitary Sewer Collector 1972 75 2047 20,830 30 930 -

PSSA51 52 GEORGE ST Sanitary Sewer Collector 1972 75 2047 40,730 30 1,819 -

PSSA51 53 GEORGE ST Sanitary Sewer Collector 1972 75 2047 29,230 30 1,305 -

PSSA51 54 GEORGE ST Sanitary Sewer Collector 1972 75 2047 11,350 30 507 -

PSSA51 65 FRONT ST Sanitary Sewer Collector 1972 75 2047 25,130 30 1,122 -

Page 112: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-31

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA51 67 FRONT ST Sanitary Sewer Collector 1972 75 2047 22,700 30 1,014 -

PSSA51 68 FRONT ST Sanitary Sewer Collector 1972 75 2047 21,090 30 942 -

PSSA52 22 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 50,140 30 2,239 -

PSSA52 20 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 29,080 30 1,298 -

PSSA52 21 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 35,240 30 1,573 -

PSSA52 23 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 37,180 30 1,660 -

PSSA62 42 STANLEY PARK DR Sanitary Sewer Collector 1975 75 2050 18,910 33 788 -

PSSA62 43 STANLEY PARK DR Sanitary Sewer Collector 1975 75 2050 5,910 33 246 -

PSSA62 44 STANLEY PARK DR Sanitary Sewer Collector 1975 75 2050 25,910 33 1,080 -

PSSA62 45 STANLEY PARK DR Sanitary Sewer Collector 1994 100 2094 9,350 77 239 -

PSSA52 24 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 43,010 30 1,920 -

PSSA52 25 EDITH CAVELL BLVD Sanitary Sewer Collector 1972 75 2047 41,840 30 1,868 -

PSSA51 80 INVERERIE HEIGHTS TOWER Sanitary Sewer Collector 1972 75 2047 29,170 30 1,302 -

PSSA51 71 FRONT ST Sanitary Sewer Collector 1972 75 2047 24,870 30 1,110 -

PSSA51 72 FRONT ST Sanitary Sewer Collector 1972 75 2047 19,120 30 854 -

PSSA51 73 FRONT ST Sanitary Sewer Collector 1972 75 2047 18,450 30 824 -

PSSA51 74 FRONT ST Sanitary Sewer Collector 1972 75 2047 23,680 30 1,057 -

PSSA51 75 FRONT ST Sanitary Sewer Collector 1972 75 2047 25,340 30 1,131 -

PSSA51 76 FRONT ST Sanitary Sewer Collector 1972 75 2047 4,970 30 222 -

PSSA51 77 FRONT ST Sanitary Sewer Collector 1972 75 2047 16,890 30 754 -

PSSA52 27 EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 14,250 33 594 -

PSSA52 28 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 13,340 33 556 -

PSSA52 29 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 39,380 33 1,642 -

PSSA62 33 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 34,820 33 1,452 -

PSSA62 30 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 4,150 33 173 -

PSSA62 31 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 8,600 33 359 -

PSSA62 34 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 22,180 33 925 -

PSSA62 35 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 24,870 33 1,037 -

PSSA62 36 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 24,360 33 1,015 -

PSSA62 61 GEORGE ST Sanitary Sewer Collector 1975 75 2050 24,360 33 1,015 -

PSSA62 62 GEORGE ST Sanitary Sewer Collector 1975 75 2050 21,040 33 877 -

PSSA62 63 GEORGE ST Sanitary Sewer Collector 1975 75 2050 22,080 33 920 -

PSSA62 64 GEORGE ST Sanitary Sewer Collector 1975 75 2050 22,490 33 938 -

PSSA62 65 GEORGE ST Sanitary Sewer Collector 1975 75 2050 33,160 33 1,382 -

PSSA62 67 CHARLES ST Sanitary Sewer Collector 1975 75 2050 27,980 33 1,166 -

PSSA72 88 GEORGE ST Sanitary Sewer Collector 2000 100 2100 22,100 83 548 -

PSSA62 51 LOWER SPRING ST Sanitary Sewer Collector 1975 75 2050 23,940 33 998 -

PSSA62 73 UPPER SPRING ST Sanitary Sewer Collector 1975 75 2050 17,520 33 730 -

PSSA62 77 MEEK ST Sanitary Sewer Collector 1975 75 2050 23,730 33 989 -

PSSA62 76 MEEK ST Sanitary Sewer Collector 1975 75 2050 26,740 33 1,115 -

Page 113: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-32

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

PSSA62 75 UPPER SPRING ST Sanitary Sewer Collector 1975 75 2050 25,700 33 1,071 -

PSSA10 10 CARLOW RD Sanitary Sewer Collector 1972 75 2047 42,090 30 1,879 -

PSSA51 39 BRIDGE ST Sanitary Sewer Collector 1972 75 2047 23,900 30 1,067 -

PSSA52 12 SECOND ST Sanitary Sewer Collector 1972 75 2047 30,630 30 1,368 -

PSSA62 38 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 29,740 33 1,240 -

PSSA62 39 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 30,680 33 1,279 -

PSSA62 40 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 29,850 33 1,244 -

PSSA62 41 WEST EDITH CAVELL BLVD Sanitary Sewer Collector 1975 75 2050 30,260 33 1,261 -

PSSA13305 Carlow Road (William to KYC) Sanitary Sewer Collector 2013 100 2113 108,200 96 2,544 -

PSSA13306 Carlow Road (Bridge PS to William) Sanitary Sewer Collector 2013 100 2113 71,390 96 1,679 -

Total Port Stanley 7,160,030 301,941 -

BSA4096 OAKDALE CRES Sanitary Sewer Collector 1980 75 2055 14,510 38 549 -

BSA4097 DUFFERIN ST Sanitary Sewer Collector 1980 75 2055 13,470 38 509 -

BSA4098 DUFFERIN ST Sanitary Sewer Collector 1980 75 2055 18,760 38 710 -

BSA4099 BRENTWOOD CRES Sanitary Sewer Collector 1980 75 2055 2,590 38 98 -

BSA4100 BRENTWOOD CRES Sanitary Sewer Collector 1980 75 2055 12,960 38 490 -

BSA4101 BRENTWOOD CRES Sanitary Sewer Collector 1980 75 2055 14,060 38 532 -

BSA2051 DUFFERIN ST Sanitary Sewer Collector 2001 100 2101 24,140 84 596 -

BSA2052 CHURCH ST Sanitary Sewer Collector 1974 75 2049 12,440 32 530 -

BSA2053 CHURCH ST Sanitary Sewer Collector 1974 75 2049 12,440 32 530 -

BSA2054 CHURCH ST Sanitary Sewer Collector 1974 75 2049 10,260 32 437 -

BSA2141 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 1,940 32 83 -

BSA2142 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 14,080 32 600 -

BSA3055 KETTLE CREEK DR Sanitary Sewer Collector 1974 75 2049 27,210 32 1,159 -

BSA3056 HAZELWOOD CRES Sanitary Sewer Collector 1974 75 2049 25,910 32 1,104 -

BSA2057 HAZELWOOD CRES Sanitary Sewer Collector 1974 75 2049 20,080 32 856 -

BSA3058 HAZELWOOD CRES Sanitary Sewer Collector 1974 75 2049 15,680 32 668 -

BSA3059 LOUISE ST Sanitary Sewer Collector 1974 75 2049 30,190 32 1,286 -

BSA3060 LOUISE ST Sanitary Sewer Collector 1974 75 2049 34,560 32 1,473 -

BSA3061 LOUISE ST Sanitary Sewer Collector 1974 75 2049 34,560 32 1,473 -

BSA3062 LOUISE ST Sanitary Sewer Collector 1974 75 2049 29,000 32 1,236 -

BSA3063 LOUISE ST Sanitary Sewer Collector 1974 75 2049 29,000 32 1,236 -

BSA3064 BORDEN AVE Sanitary Sewer Collector 1974 75 2049 25,910 32 1,104 -

BSA3065 BORDEN AVE Sanitary Sewer Collector 1974 75 2049 25,910 32 1,104 -

BSA3066 BORDEN AVE Sanitary Sewer Collector 1974 75 2049 25,910 32 1,104 -

BSA3067 BORDEN AVE Sanitary Sewer Collector 1974 75 2049 25,910 32 1,104 -

BSA3068 BORDEN AVE Sanitary Sewer Collector 1974 75 2049 23,840 32 1,016 -

BSA3069 BORDEN AVE Sanitary Sewer Collector 1974 75 2049 23,840 32 1,016 -

BSA3070 BORDEN AVE Sanitary Sewer Collector 1974 75 2049 22,800 32 972 -

Page 114: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-33

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

BSA3071 ROUEN ST Sanitary Sewer Collector 1974 75 2049 27,880 32 1,188 -

BSA3072 ROUEN ST Sanitary Sewer Collector 1974 75 2049 27,880 32 1,188 -

BSA3073 ROUEN ST Sanitary Sewer Collector 1974 75 2049 17,200 32 733 -

BSA3074 ROUEN ST Sanitary Sewer Collector 1974 75 2049 16,870 32 719 -

BSA3075 LORNE ST Sanitary Sewer Collector 1974 75 2049 31,000 32 1,321 -

BSA3076 BELMONT RD Sanitary Sewer Collector 1974 75 2049 22,300 32 950 -

BSA3077 BELMONT RD Sanitary Sewer Collector 1974 75 2049 8,790 32 375 -

BSA3078 BELMONT RD Sanitary Sewer Collector 1974 75 2049 31,090 32 1,325 -

BSA1001 KETTLE CREEK DR Sanitary Sewer Collector 1974 75 2049 22,540 32 960 -

BSA1002 BELMONT RD Sanitary Sewer Collector 1974 75 2049 41,840 32 1,783 -

BSA1003 BELMONT RD Sanitary Sewer Collector 1974 75 2049 16,580 32 706 -

BSA1004 BELMONT RD Sanitary Sewer Collector 1974 75 2049 12,960 32 552 -

BSA1005 BELMONT RD Sanitary Sewer Collector 1974 75 2049 26,560 32 1,132 -

BSA1006 BELMONT RD Sanitary Sewer Collector 1974 75 2049 38,220 32 1,629 -

BSA1007 BELMONT RD Sanitary Sewer Collector 1974 75 2049 10,880 32 464 -

BSA1008 BELMONT RD Sanitary Sewer Collector 1974 75 2049 23,940 32 1,020 -

BSA1009 BELMONT RD Sanitary Sewer Collector 1974 75 2049 23,940 32 1,020 -

BSA1010 BELMONT RD Sanitary Sewer Collector 1974 75 2049 26,950 32 1,148 -

BSA1011 BELMONT RD Sanitary Sewer Collector 1974 75 2049 26,950 32 1,148 -

BSA1012 BELMONT RD Sanitary Sewer Collector 1974 75 2049 20,200 32 861 -

BSA1013 BELMONT RD Sanitary Sewer Collector 1974 75 2049 19,070 32 813 -

BSA1014 BELMONT RD Sanitary Sewer Collector 1974 75 2049 18,650 32 795 -

BSA1015 BELMONT RD Sanitary Sewer Collector 1974 75 2049 17,620 32 751 -

BSA1016 COPELAND/WEST ST Sanitary Sewer Collector 1974 75 2049 8,550 32 364 -

BSA1017 COPELAND/WEST ST Sanitary Sewer Collector 1974 75 2049 8,910 32 380 -

BSA1018 COPELAND/WEST ST Sanitary Sewer Collector 1974 75 2049 12,900 32 550 -

BSA1019 COPELAND/WEST ST Sanitary Sewer Collector 1974 75 2049 10,360 32 441 -

BSA1020 COPELAND/WEST ST Sanitary Sewer Collector 1974 75 2049 10,360 32 441 -

BSA1021 WEST ST Sanitary Sewer Collector 1974 75 2049 12,130 32 517 -

BSA1022 WEST ST Sanitary Sewer Collector 1974 75 2049 19,380 32 826 -

BSA1023 WEST ST Sanitary Sewer Collector 1974 75 2049 3,260 32 139 -

BSA1024 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 17,620 32 751 -

BSA1025 ODELL ST Sanitary Sewer Collector 1974 75 2049 11,920 32 508 -

BSA1026 UNION ST Sanitary Sewer Collector 1974 75 2049 34,200 32 1,457 -

BSA1027 UNION ST Sanitary Sewer Collector 1974 75 2049 31,610 32 1,347 -

BSA1028 UNION ST Sanitary Sewer Collector 2001 100 2101 29,020 84 716 -

BSA1029 UNION ST Sanitary Sewer Collector 2001 100 2101 29,540 84 729 -

BSA1030 UNION ST Sanitary Sewer Collector 2001 100 2101 28,710 84 708 -

BSA1031 UNION ST Sanitary Sewer Collector 1974 75 2049 17,830 32 760 -

Page 115: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-34

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

BSA1032 COLLEGE ST Sanitary Sewer Collector 1974 75 2049 24,460 32 1,042 -

BSA1033 COLLEGE ST Sanitary Sewer Collector 1974 75 2049 23,940 32 1,020 -

BSA1034 COLLEGE ST Sanitary Sewer Collector 1974 75 2049 21,770 32 928 -

BSA1035 COLLEGE ST Sanitary Sewer Collector 1974 75 2049 20,730 32 883 -

BSA1036 CHURCH ST Sanitary Sewer Collector 1974 75 2049 6,740 32 287 -

BSA1037 VICTORIA ST Sanitary Sewer Collector 1974 75 2049 14,510 32 618 -

BSA1038 VICTORIA ST Sanitary Sewer Collector 1974 75 2049 14,510 32 618 -

BSA1039 VICTORIA ST Sanitary Sewer Collector 1974 75 2049 14,510 32 618 -

BSA1040 SEVENTH AVE Sanitary Sewer Collector 1974 75 2049 12,440 32 530 -

BSA1041 SEVENTH AVE Sanitary Sewer Collector 1974 75 2049 12,440 32 530 -

BSA1042 SEVENTH AVE Sanitary Sewer Collector 1974 75 2049 12,440 32 530 -

BSA1043 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 30,320 32 1,292 -

BSA1044 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 16,580 32 706 -

BSA1045 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 4,140 32 176 -

BSA2046 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 9,850 32 420 -

BSA2047 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 19,380 32 826 -

BSA2048 WASHBURN ST Sanitary Sewer Collector 1974 75 2049 10,360 32 441 -

BSA2049 DUFFERIN ST Sanitary Sewer Collector 2001 100 2101 27,460 84 678 -

BSA2050 DUFFERIN ST Sanitary Sewer Collector 2001 100 2101 26,950 84 665 -

BSA3079 BELMONT RD Sanitary Sewer Collector 1974 75 2049 25,910 32 1,104 -

BSA3080 DYER ST Sanitary Sewer Collector 1974 75 2049 13,730 32 585 -

BSA3081 DYER ST Sanitary Sewer Collector 1974 75 2049 14,250 32 607 -

BSA3082 DYER ST Sanitary Sewer Collector 1974 75 2049 8,030 32 342 -

BSA3083 LORNE ST Sanitary Sewer Collector 1974 75 2049 10,360 32 441 -

BSA3084 BELMONT RD Sanitary Sewer Collector 1974 75 2049 23,840 32 1,016 -

BSA3085 BARONS CRT Sanitary Sewer Collector 1988 100 2088 29,240 71 775 -

BSA3087 DYER ST Sanitary Sewer Collector 1988 100 2088 35,360 71 937 -

BSA3088 BELMONT RD Sanitary Sewer Collector 1989 100 2089 45,480 72 1,197 -

BSA3089 CANTERBURY PL Sanitary Sewer Collector 1989 100 2089 31,450 72 828 -

BSA3090 CANTERBURY PL Sanitary Sewer Collector 1989 100 2089 39,610 72 1,043 -

BSA3091 CANTERBURY PL Sanitary Sewer Collector 1989 100 2089 39,100 72 1,029 -

BSA3092 CANTERBURY PL Sanitary Sewer Collector 1989 100 2089 31,280 72 824 -

BSA3093 CANTERBURY PL Sanitary Sewer Collector 1989 100 2089 32,560 72 857 -

BSA3094 SHERWOOD AVE Sanitary Sewer Collector 1989 100 2089 37,400 72 985 -

BSA3095 SCARLETT PL Sanitary Sewer Collector 1989 100 2089 36,720 72 967 -

BSA3105 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 18,240 36 716 -

BSA3106 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 10,360 36 406 -

BSA3107 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 5,390 36 211 -

Page 116: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-35

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

BSA3108 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 21,450 36 842 -

BSA3109 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 17,360 36 681 -

BSA3110 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 12,280 36 482 -

BSA3111 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 2,850 36 112 -

BSA3112 HAZELWOOD CRES Sanitary Sewer Collector 1978 75 2053 8,170 36 321 -

BSA4102 BRENTWOOD CRES Sanitary Sewer Collector 1980 75 2055 23,420 38 886 -

BSA4103 BRENTWOOD CRES Sanitary Sewer Collector 1980 75 2055 23,420 38 886 -

BSA4104 BRENTWOOD CRES Sanitary Sewer Collector 1980 75 2055 10,050 38 380 -

BSA5113 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 9,610 74 250 -

BSA5114 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 31,710 74 825 -

BSA5115 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 4,170 74 108 -

BSA5116 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 21,590 74 561 -

BSA5117 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 39,570 74 1,029 -

BSA5118 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 33,250 74 865 -

BSA5119 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 35,570 74 925 -

BSA5120 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 18,840 74 490 -

BSA5121 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 20,160 74 524 -

BSA5122 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 23,530 74 612 -

BSA5123 KETTLE CREEK DR Sanitary Sewer Collector 1991 100 2091 18,800 74 489 -

BSA5124 RAMONA LANE Sanitary Sewer Collector 1997 100 2097 40,890 80 1,029 -

BSA5125 ANDREA CRES Sanitary Sewer Collector 1997 100 2097 34,140 80 859 -

BSA5126 ANDREA CRES Sanitary Sewer Collector 1997 100 2097 34,850 80 877 -

BSA5127 ANDREA CRES Sanitary Sewer Collector 1997 100 2097 12,780 80 322 -

BSA5128 RAMONA LN SNDYERS AVE Sanitary Sewer Collector 1997 100 2097 25,810 80 649 -

BSA5129 RAMONA LN SNDYERS AVE Sanitary Sewer Collector 1997 100 2097 25,640 80 645 -

BSA5130 RAMONA LN SNDYERS AVE Sanitary Sewer Collector 1997 100 2097 34,440 80 867 -

BSA5131 ANITA CRT Sanitary Sewer Collector 1997 100 2097 22,680 80 571 -

BSA5132 SNYDERS AVE Sanitary Sewer Collector 1997 100 2097 33,320 80 838 -

BSA5133 PLYMOUTH COURT Sanitary Sewer Collector 2000 100 2100 22,920 83 568 -

BSA5134 SNYDERS AVE Sanitary Sewer Collector 2000 100 2100 32,910 83 816 -

BSA5135 LANDON LANE Sanitary Sewer Collector 2000 100 2100 27,030 83 670 -

BSA5136 LANDON LANE Sanitary Sewer Collector 2000 100 2100 25,500 83 632 -

BSA5137 LANDON LANE Sanitary Sewer Collector 2000 100 2100 12,520 83 310 -

BSA5138 JONATHAN WAY Sanitary Sewer Collector 2000 100 2100 32,300 83 801 -

BSA5139 JONATHAN WAY Sanitary Sewer Collector 2000 100 2100 30,540 83 757 -

BSA5140 JONATHAN WAY Sanitary Sewer Collector 2000 100 2100 13,320 83 330 -

BSA3086 DYER ST Sanitary Sewer Collector 1988 100 2088 8,500 71 225 -

BSA13011 Belmont Splash Pad Sanitary Sewer Collector 2013 100 2113 18,610 96 438 -

Robin Ridge Estates Sanitary Sewer Collector 2013 100 2113 200,436 96 4,713 -

Total Belmont 3,264,946 112,651 -

Page 117: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page B-36

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

ID Road Name DescriptionYear

Installed

Estimated

Life

Replacement

Year

Total Main

Replacement

Costs

Years until

Replacement

Annual Lifecycle

Contribution

Amount to

be included

in 10 year

Forecast

EWSA09 012 PAUL ST Sanitary Sewer Collector 2009 100 2109 17,480 92 417 -

EWSA09 008 ELMWOOD AV Sanitary Sewer Collector 2009 100 2109 36,340 92 867 -

EWSA09 007 ELMWOOD AV Sanitary Sewer Collector 2009 100 2109 45,110 92 1,076 -

EWSA09 010 BAILEY AV Sanitary Sewer Collector 2009 100 2109 24,010 92 573 -

EWSA09 006 PAUL ST Sanitary Sewer Collector 2009 100 2109 19,080 92 455 -

EWSA09 005 PAUL ST Sanitary Sewer Collector 2009 100 2109 19,080 92 455 -

EWSA09 004 BAILEY AV Sanitary Sewer Collector 2009 100 2109 48,380 92 1,154 -

EWSA09 003 BAILEY AV Sanitary Sewer Collector 2009 100 2109 48,380 92 1,154 -

EWSA09 002 BAILEY AV Sanitary Sewer Collector 2009 100 2109 39,570 92 944 -

EWSA09 001 ELM LN Sanitary Sewer Collector 2009 100 2109 29,000 92 692 -

EWSA09 013 ELMWOOD AV Sanitary Sewer Collector 2009 100 2109 13,270 92 317 -

EWSA09 009 ELMWOOD AV Sanitary Sewer Collector 2009 100 2109 36,340 92 867 -

EWSA09 011 PAUL ST Sanitary Sewer Collector 2009 100 2109 17,480 92 417 -

Total Eastwood 393,520 9,389 -

Centennial Ave Sanitary Sewer Collector (64) 2016 100 2116 2,373,214 99 55,242 -

Total 16,074,752 555,553 -

Page 118: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix C – Central Elgin System Detailed

Water Rate Calculations

Page 119: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix C-1

Municipality of Central Elgin

Water Service

Capital Budget Forecast

Uninflated $

Actual Actual

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures (from capital budget)

Water Main Replacement - Catherine St, Warren St to Stanley St 160,655 -

Port Stanley Watermain Replacement 41,536 -

Edith Cavell Watermain 557,943 734,020 -

Catherine Street Watermain 97,401 -

Seventh Ave Watermain 26,969 -

Harrison/McClary Ave Watermain 6,115 -

Transfer to UFCO from prior years (2005-2015) 3,768,673 -

SCADA Server Virtualization -

SCADA Report Upgrades -

Kettle Creek Watermain Crossing - St. George Street Watermain Replacement 115,500 115,500

Dalewood Campground Water Servicing - Watermain Replacement 190,000 190,000

Annual Capital Equipment Purchases 40,000 20,000 20,000

Rate Study 15,000 15,000

Lifecycle: -

Water Towers: - - - - - - - - - - -

Belmont - - - - - - - - - - -

Port Stanley - - - - - - - - - - -

Water Towers - Non-spatial - - - - - - - - - - -

Water Meters Replacement Program 600,000 300,000 300,000 - - - - - - - -

Water Chambers - - - - - - - - - - -

Non-Spatial Equipment - Eastwood 20,000 - - - - - - - - - 20,000

Pump House - Belmont 35,000 35,000 - - - - - - - - -

SCADA - - - - - - - - - - -

Watermains: - - - - - - - - - - -

Belmont 249,310 - - - - - - - 249,310 - -

Port Stanley 674,290 - - - - 93,020 - - 581,270 - -

Lynhurst 433,410 - - 433,410 - - - - - - -

Eastwood 118,000 - - 118,000 - - - -

Rural Area - - - - - - - - - - -

Growth Related: -

Port Stanley: -

Water Supply - PS 550,000 - - - - - - - 550,000

Southblock: -

W1 - 400 dia New Development Main East of Fairview from Elm to Raven (oversizing) - - - - - - 11,000 - - - -

W2 - 300 dia Bill Martyn from Sauve to Southdale - - - - - - 22,000 - - - -

W3 - 400 dia Southdale from Fairview to existing 200 dia at Lake Margaret Tr. - - - - - - 92,000 - - - -

W5 - 400 dia Southdale from Lake Margaret Tr. To Sunset Drive - - - - - - 94,000 - - - -

W6 - 400 dia Southdale from Fairview east to City Limit - - - - - - 44,000 - - - -

W7 - 300 dia Southdale from Sunset Drive west to Shaw Valley Drive - - 36,000 - - - - - - - -

Total Capital Expenditures 787,104 4,606,208 3,025,510 655,500 320,000 571,410 - 93,020 26,000 - 830,580 - 570,000

ForecastTotalDescription

Page 120: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix C-2

Municipality of Central Elgin

Water Service

Capital Budget Forecast

Inflated $

Actual Actual

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures:

Water Main Replacement - Catherine St, Warren St to Stanley St 160,655 - - - - - - - - - - - -

Port Stanley Watermain Replacement 41,536 - - - - - - - - - - - -

Edith Cavell Watermain 557,943 734,020 - - - - - - - - - - -

Catherine Street Watermain - 97,401 - - - - - - - - - - -

Seventh Ave Watermain 26,969 - - - - - - - - - - - -

Harrison/McClary Ave Watermain - 6,115 - - - - - - - - - - -

Transfer to UFCO from prior years (2005-2015) - 3,768,673 - - - - - - - - - - -

SCADA Server Virtualization - - - - - - - - - - - - -

SCADA Report Upgrades - - - - - - - - - - - - -

Kettle Creek Watermain Crossing - St. George Street Watermain Replacement - - 115,500 115,500 - - - - - - - - -

Dalewood Campground Water Servicing - Watermain Replacement - - 190,000 190,000 - - - - - - - - -

Annual Capital Equipment Purchases - - 41,200 - 20,400 20,800 - - - - - - -

Rate Study - - 31,600 15,000 - - - - 16,600 - - - -

Lifecycle: - - - - - - - - - - - - -

Water Towers: - - - - - - - - - - - - -

Belmont - - - - - - - - - - - - -

Port Stanley - - - - - - - - - - - - -

Water Towers - Non-spatial - - - - - - - - - - - - -

Water Meters Replacement Program - - 606,000 300,000 306,000 - - - - - - - -

Water Chambers - - - - - - - - - - - - -

Non-Spatial Equipment - Eastwood - - 23,900 - - - - - - - - - 23,900

Pump House - Belmont - - 35,000 35,000 - - - - - - - - -

SCADA - - - - - - - - - - - - -

Watermains: - - - - - - - - - - - - -

Belmont - - 286,400 - - - - - - - 286,400 - -

Port Stanley - - 768,400 - - - - 100,700 - - 667,700 - -

Lynhurst - - 450,900 - - 450,900 - - - - - - -

Eastwood - - 122,800 - - 122,800 - - - - - - -

Rural Area - - - - - - - - - - - - -

Growth Related: - - - - - - - - - - - - -

Port Stanley: - - - - - - - - - - - - -

Water Supply - PS - - 657,300 - - - - - - - - - 657,300

Southblock: - - - - - - - - - - - - -

W1 - 400 dia New Development Main East of Fairview from Elm to Raven (oversizing) - - 12,100 - - - - - 12,100 - - - -

W2 - 300 dia Bill Martyn from Sauve to Southdale - - 24,300 - - - - - 24,300 - - - -

W3 - 400 dia Southdale from Fairview to existing 200 dia at Lake Margaret Tr. - - 101,600 - - - - - 101,600 - - - -

W5 - 400 dia Southdale from Lake Margaret Tr. To Sunset Drive - - 103,800 - - - - - 103,800 - - - -

W6 - 400 dia Southdale from Fairview east to City Limit - - 48,600 - - - - - 48,600 - - - -

W7 - 300 dia Southdale from Sunset Drive west to Shaw Valley Drive - - 36,700 - 36,700 - - - - - - - -

Total Capital Expenditures 787,104 4,606,208 3,656,100 655,500 363,100 594,500 - 100,700 307,000 - 954,100 - 681,200

Capital Financing

Provincial/Federal Grants 144,752 - - - - - - - - - - - -

Development Charges Reserve Fund - - 36,700 - 36,700 - - - - - - - -

Non-Growth Related Debenture Requirements 542,061 4,582,208 1,692,500 655,500 326,400 594,500 - 100,700 - - 15,400 - -

Growth Related Debenture Requirements - - 817,219 - - - - - 290,400 - - - 526,819

Operating Contributions 30,000 24,000 - - - - - - - - - - -

Lifecycle Reserve Fund - - - - - - - - - - - - -

Water Reserve 70,291 - 1,109,681 - - - - - 16,600 - 938,700 - 154,381

Total Capital Financing 787,104 4,606,208 3,656,100 655,500 363,100 594,500 - 100,700 307,000 - 954,100 - 681,200

TotalDescriptionForecast

Page 121: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix C-3

Municipality of Central Elgin

Water Service

Schedule of Non-Growth Related Debenture Repayments

Inflated $

Debenture Principal

Year (Inflated) 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

2018 655,500 80,817 80,817 80,817 80,817 80,817 80,817 80,817 80,817 80,817

2019 326,400 40,242 40,242 40,242 40,242 40,242 40,242 40,242 40,242

2020 594,500 73,296 73,296 73,296 73,296 73,296 73,296 73,296

2021 - - - - - - -

2022 100,700 12,415 12,415 12,415 12,415 12,415

2023 - - - - -

2024 - - - -

2025 15,400 1,899 1,899

2026 - -

2027 -

Total Annual Debt Charges - - 1,692,500 - 80,817 121,059 194,356 194,356 206,771 206,771 206,771 208,670 208,670

Appendix C-4

Municipality of Central Elgin

Water Service

Schedule of Growth Related Debenture Repayments

Inflated $

Debenture Principal

Year (Inflated) 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

2018 - - - - - - - - - -

2019 - - - - - - - - -

2020 - - - - - - - -

2021 - - - - - - -

2022 - - - - - -

2023 290,400 35,804 35,804 35,804 35,804

2024 - - - -

2025 - - -

2026 - -

2027 526,819

Total Annual Debt Charges - - 817,219 - - - - - - 35,804 35,804 35,804 35,804

Appendix C-5

Municipality of Central Elgin

Water Service

Discretionary Reserve Fund - Water/ Reserve Funds Continuity

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Opening Balance 70,457 (136,742) (404,054) (618,047) (723,631) (656,442) (430,574) 35,640 744,136 1,357,624 1,088,829 1,175,000

Transfer from Operating - - - - 80,060 234,311 465,516 710,505 586,868 648,555 63,132 270,856

Transfer to Capital 70,291 - - - - - - 16,600 - 938,700 - 154,381

Transfer to Operating 134,227 259,389 201,874 91,396

Closing Balance (134,061) (396,131) (605,928) (709,442) (643,571) (422,132) 34,941 729,545 1,331,004 1,067,479 1,151,961 1,291,475

Interest (2,681) (7,923) (12,119) (14,189) (12,871) (8,443) 699 14,591 26,620 21,350 23,039 25,830

2017

2017

2016

2016

Forecast

Forecast

Page 122: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix C-6

Municipality of Central Elgin

Water Service

Water Development Charges Reserve Fund Continuity

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Opening Balance 91,457 1,788 9,136 (15,436) (78,064) (103,826) (129,824) (156,061) (182,956) (246,163) (310,326) (336,991)

Development Charge Proceeds 33,039 45,060 13,450 13,321 13,993 14,267 14,542 14,412 15,143 14,996 15,746 15,037

Transfer to Capital - 36,700 - - - - - - - -

Transfer to Operating - Growth-related Debt Charges 123,763 37,719 37,719 37,719 37,719 37,719 37,719 37,719 73,523 73,075 35,804 35,804

Closing Balance 733 9,128 (15,133) (76,534) (101,791) (127,278) (153,001) (179,369) (241,336) (304,242) (330,384) (357,758)

Interest 1,055 8 (303) (1,531) (2,036) (2,546) (3,060) (3,587) (4,827) (6,085) (6,608) (7,155)

Required from Development Charges - - - 36,700 - - - 290,400 - - - 526,819

Appendix C-7

Municipality of Central Elgin

Water Service

Water Lifecycle Reserve Fund Continuity

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Opening Balance - - - - - - - - - 306,000 618,120 2,058,482

Transfer from Operating - - - - - - - - 300,000 300,000 1,400,000 2,000,000

Transfer to Capital - - - - - - - - - - - -

Transfer to Operating - - - - - - - - - - - -

Closing Balance - - - - - - - - 300,000 606,000 2,018,120 4,058,482

Interest - - - - - - - - 6,000 12,120 40,362 81,170

Page 123: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix C-8

Municipality of Central Elgin

Water Services

Operating Budget Forecast

Inflated $

Actual Actual

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Expenditures:

Operating Costs:

Supervision 103,802 134,383 138,845 141,622 144,454 147,300 150,200 153,200 156,300 159,400 162,600 165,900

Union (including Overtime) 129,976 73,434 56,898 58,036 59,197 60,400 61,600 62,800 64,100 65,400 66,700 68,000

Casual (including Overtime) 3,186 2,260 411 420 428 400 400 400 400 400 400 400

On-Call - - - - - - - - - - - -

CPP 8,327 7,565 6,885 7,023 7,164 7,300 7,400 7,500 7,700 7,900 8,100 8,300

EI 4,454 3,491 3,412 3,480 3,550 3,600 3,700 3,800 3,900 4,000 4,100 4,200

WSIB 2,854 2,305 6,041 6,162 6,285 6,400 6,500 6,600 6,700 6,800 6,900 7,000

OMERS 24,171 22,909 18,506 18,876 19,253 19,600 20,000 20,400 20,800 21,200 21,600 22,000

EHT 4,677 4,397 3,825 3,902 3,980 4,100 4,200 4,300 4,400 4,500 4,600 4,700

LTD/ADD/LIFE 25,693 23,536 19,173 19,556 19,947 20,300 20,700 21,100 21,500 21,900 22,300 22,700

Employee Assistance 289 271 191 195 198 200 200 200 200 200 200 200

Employee Records 200 - - - - - - - - - - -

Mileage - - - - - - - - - - - -

Travel and Conventions 2,178 66 3,000 3,060 3,121 3,200 3,300 3,400 3,500 3,600 3,700 3,800

Safety Apparel 163 - - - - - - - - - - -

Clothing Allowance 3,134 3,276 3,600 3,672 3,745 3,800 3,900 4,000 4,100 4,200 4,300 4,400

Dues/Memberships 1,088 403 959 978 997 1,000 1,000 1,000 1,000 1,000 1,000 1,000

Employee Recognition 772 125 449 458 467 500 500 500 500 500 500 500

Meetings - - 33 33 34 - - - - - - -

Flowers/Memorials - - 17 17 17 - - - - - - -

Employee Recruitment 36 722 253 258 263 300 300 300 300 300 300 300

Advertising 203 199 134 137 139 100 100 100 100 100 100 100

Insurance 19,469 20,483 23,323 23,789 24,265 24,800 25,300 25,800 26,300 26,800 27,300 27,800

Radio Licensing 614 1,229 1,500 1,530 1,561 1,600 1,600 1,600 1,600 1,600 1,600 1,600

Licenses/Permits 1,316 1,591 2,271 2,316 2,363 2,400 2,400 2,400 2,400 2,400 2,400 2,400

Office Supplies 359 896 651 664 677 700 700 700 700 700 700 700

Office Equipment 637 - 694 708 722 700 700 700 700 700 700 700

Equipment Charges 15,736 18,448 15,271 15,576 15,887 16,200 16,500 16,800 17,100 17,400 17,700 18,100

Small Tools/Equipment 7,834 869 8,000 8,160 8,323 8,500 8,700 8,900 9,100 9,300 9,500 9,700

Truck Maintenance - - - - - - - - - - - -

Parts & Supplies 2,917 15,601 6,325 6,452 6,581 6,700 6,800 6,900 7,000 7,100 7,200 7,300

Water - 12,351 - - - - - - - - - -

Telephone 3,491 3,960 4,401 4,489 4,579 4,700 4,800 4,900 5,000 5,100 5,200 5,300

IT Supplies 254 - 85 86 88 100 100 100 100 100 100 100

IT Equipment 414 729 381 389 396 400 400 400 400 400 400 400

Courier 8 - - - - - - - - - - -

Legal Service 13 - - - - - - - - - - -

Consulting - 638 - - - - - - - - - -

Answering Service 575 627 610 622 634 600 600 600 600 600 600 600

IT Service 7,941 22,388 20,920 21,338 21,765 22,200 22,600 23,100 23,600 24,100 24,600 25,100

Contracted Services 479 1,276 585 597 609 600 600 600 600 600 600 600

SCADA Service 23,489 20,911 23,000 23,460 23,929 24,400 24,900 25,400 25,900 26,400 26,900 27,400

Rate Study Consulting 265 13,103 3,000 3,060 3,121 - - 11,600 - - - -

Bank Charges 136 87 - - - - - - - - - -

Payments in Lieu 13,396 16,841 11,107 11,329 11,556 11,800 12,000 12,200 12,400 12,600 12,900 13,200

White Station Lease - - - - - - - - - - - -

Copier Lease 586 932 900 918 936 1,000 1,000 1,000 1,000 1,000 1,000 1,000

Training 14,433 12,232 13,342 13,609 13,881 14,200 14,500 14,800 15,100 15,400 15,700 16,000

Health & Safety:

Training 3,360 1,476 1,612 1,644 1,677 1,700 1,700 1,700 1,700 1,700 1,700 1,700

Health and Safety Supplies 1,657 981 4,000 4,080 4,162 4,200 4,300 4,400 4,500 4,600 4,700 4,800

Health and Safety Services 376 309 342 349 356 400 400 400 400 400 400 400

Forecast

Page 124: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Actual Actual

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

DWQMS

Audit Services 3,843 2,162 3,268 3,334 3,401 3,500 3,600 3,700 3,800 3,900 4,000 4,100

Billing and Collection

Supervision 47,777 9,316 10,399 10,607 10,819 11,000 11,200 11,400 11,600 11,800 12,000 12,200

Union (including Overtime) 15,087 20,170 18,357 18,724 19,099 19,500 19,900 20,300 20,700 21,100 21,500 21,900

Casual (including Overtime) 4,623 38,399 6,991 7,131 7,274 7,400 7,500 7,700 7,900 8,100 8,300 8,500

CPP 2,893 2,852 1,354 1,381 1,408 1,400 1,400 1,400 1,400 1,400 1,400 1,400

EI 1,538 1,367 695 709 723 700 700 700 700 700 700 700

WSIB 751 964 1,126 1,149 1,172 1,200 1,200 1,200 1,200 1,200 1,200 1,200

OMERS 5,421 5,962 2,667 2,720 2,775 2,800 2,900 3,000 3,100 3,200 3,300 3,400

EHT 1,308 1,317 697 711 725 700 700 700 700 700 700 700

LTD/ADD/LIFE 8,199 1,938 3,101 3,163 3,226 3,300 3,400 3,500 3,600 3,700 3,800 3,900

Office Supplies - - - - - - - - - - - -

Postage - - - - - - - - - - - -

Billing and Collection Services 9 1,486 1,684 1,718 1,752 1,800 1,800 1,800 1,800 1,800 1,800 1,800

Equipment Charges 3,814 5,932 3,864 3,941 4,020 4,100 4,200 4,300 4,400 4,500 4,600 4,700

Small Tools and Equipment - - 500 510 520 500 500 500 500 500 500 500

Meter Reading Services 509 - - - - - - - - - - -

Purchase of Water - - - - - - -

Elgin Primary Area Water Supply System 216,735 224,107 234,842 246,068 255,369 264,900 274,800 283,700 292,900 302,400 312,200 322,300

Malahide Secondary Water Supply System 23,240 21,704 22,246 22,691 23,145 24,300 25,600 26,900 28,300 29,800 31,300 32,900

Alymer Secondary Water Supply System 31,982 35,815 36,710 37,444 38,193 40,000 41,900 43,900 46,000 48,200 50,500 52,900

St. Thomas Secondary Water Supply System 59,500 60,707 62,224 63,469 64,738 71,600 79,200 87,600 96,800 107,000 118,300 130,800

Belmont Pumphouse 74,433 84,586 84,597 86,289 88,015 89,800 91,600 93,400 95,300 97,200 99,100 101,100

Port Stanley Rechlorination 22,560 10,680 8,583 8,754 8,929 9,100 9,300 9,500 9,700 9,900 10,100 10,300

Water Distribution & Transmission - - - - - - -

Belmont Water Tower 44,944 14,687 29,949 30,548 31,159 31,800 32,400 33,000 33,700 34,400 35,100 35,800

Port Stanley Water Tower 25,845 12,350 12,403 12,651 12,904 13,200 13,500 13,800 14,100 14,400 14,700 15,000

Bulk Water Fill Station 488 182 270 275 280 300 300 300 300 300 300 300

Fruit Ridge Booster 2,170 2,206 13,436 13,705 13,979 14,300 14,600 14,900 15,200 15,500 15,800 16,100

Water Chambers 10,008 4,461 3,932 4,010 4,091 4,200 4,300 4,400 4,500 4,600 4,700 4,800

Water Mains 128,255 135,474 112,224 114,469 116,758 119,100 121,500 123,900 126,400 128,900 131,500 134,100

Water Mains - Sampling 23,145 24,383 20,226 20,631 21,043 21,500 21,900 22,300 22,700 23,200 23,700 24,200

Water Mains - Locates - 1,865 14,000 14,280 14,566 14,900 15,200 15,500 15,800 16,100 16,400 16,700

Water Services 77,078 112,843 82,083 83,725 85,399 87,100 88,800 90,600 92,400 94,200 96,100 98,000

Water Services - Water Meters - - - - - - - - - - - -

Fire Hydrants 48,418 48,933 36,683 37,417 38,165 38,900 39,700 40,500 41,300 42,100 42,900 43,800

Sub Total Operating 1,319,529 1,334,144 1,234,061 1,265,271 1,294,956 1,329,300 1,368,200 1,419,000 1,448,500 1,491,200 1,535,800 1,582,500

Capital-Related:

Existing Debt (Principal) - Growth Related 23,619 24,781 26,000 27,279 28,621 30,028 31,506 33,055 34,681 36,387 - -

Existing Debt (Interest) - Growth Related 14,100 12,938 11,719 10,440 9,098 7,691 6,213 4,664 3,038 884 - -

New Growth Related Debt (Principal) - - - - - - 24,188 25,155 26,161 27,208

New Growth Related Debt (Interest) - - - - - - 11,616 10,648 9,642 8,596

Existing Debt (Principal) - Non-Growth Related 614,374 768,102 948,233 974,065 991,002 1,018,079 1,046,069 982,030 1,011,953 1,042,897 615,852 -

Existing Debt (Interest) - Non-Growth Related 348,536 372,907 391,451 361,415 330,667 299,288 267,088 215,968 186,045 154,296 126,277 -

New Non-Growth Related Debt (Principal) - 54,597 83,967 136,842 142,316 156,396 162,652 169,158 177,207 184,295

New Non-Growth Related Debt (Interest) - 26,220 37,092 57,513 52,040 50,375 44,119 37,613 31,463 24,375

Transfer to Capital 30,000 24,000 - - - - - - - - - -

Transfer to Water Discretionary Reserve Fund 80,060 234,311 465,516 710,505 586,868 648,555 63,132 270,856

Transfer to Water Development Charge Reserve Fund - - - - - - - - - - - -

Sub Total Capital Related 1,030,629 1,202,728 1,377,403 1,454,016 1,560,508 1,783,753 2,010,748 2,152,993 2,065,160 2,125,595 1,049,734 515,330

Total Expenditures 2,350,157 2,536,872 2,611,464 2,719,287 2,855,464 3,113,053 3,378,948 3,571,993 3,513,660 3,616,795 2,585,534 2,097,830

Forecast

Page 125: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Actual Actual

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Revenues

Base Charge 605,366 624,023 616,735 654,232 693,704 735,732 757,936 780,734 803,881 827,906 852,301 877,616

Revenue Other Municipality - - - - - - - - - - - -

Hydrant Maintenance Revenue - 44,040 45,000 45,900 46,818 47,750 48,710 49,680 50,670 51,680 52,710 53,760

Water Meter Revenue 14,825 20,336 13,748 14,023 14,303 14,590 14,880 15,180 15,480 15,790 16,110 16,430

Water Rent Revenue 2,968 3,000 3,000 3,060 3,121 3,180 3,240 3,300 3,370 3,440 3,510 3,580

New Connection Charge - 3,883 1,294 1,320 1,347

New Water Service Hook Up 8,300 15,200 10,733 10,948 11,167 11,390 11,620 11,850 12,090 12,330 12,580 12,830

Bulk Water Fill Station Revenue 2,498 2,411 1,636 1,669 1,702 1,740 1,770 1,810 1,850 1,890 1,930 1,970

Bulk Fill Station Keys 5,098 3,085 4,301 4,387 4,474

Water Sundry Revenue 2,511 2,730 1,000 1,020 1,040 1,060 1,080 1,100 1,120 1,140 1,160 1,180

Water Recovery (1,417) (1,488) (1,291) (1,317) (1,343)

Water Reconnect Charge 8,700 12,600 10,767 10,982 11,202 11,430 11,660 11,890 12,130 12,370 12,620 12,870

Water Penalty 14,552 14,467 15,062 15,363 15,670 15,980 16,300 16,630 16,960 17,300 17,650 18,000

Federal - Water Distribution Grant 1,968 - - - -

Source Water Protection Grant - - - - -

Local Improvement Collections 10,990 10,990 10,990 10,990

Contributions from Development Charges Reserve Fund 123,763 37,719 37,719 37,719 37,719 37,719 37,719 37,719 73,523 73,075 35,804 35,804

Contributions from Reserves / Reserve Funds 134,227 259,389 201,874 91,396 - - - - - - - -

Total Operating Revenue 934,348 1,052,386 972,568 901,691 840,924 880,571 904,915 929,893 991,073 1,016,921 1,006,375 1,034,040

Water Billing Recovery - Operating 1,415,809 1,484,486 1,638,896 1,817,596 2,014,540 2,232,482 2,474,033 2,642,101 2,522,587 2,599,874 1,579,160 1,063,790

Lifecycle Reserve Contribution ($) 300,000 300,000 1,400,000 2,000,000

Water Billing Recovery - Total 1,415,809 1,484,486 1,638,896 1,817,596 2,014,540 2,232,482 2,474,033 2,642,101 2,822,587 2,899,874 2,979,160 3,063,790

Forecast

Page 126: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page C-9

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix C-9

Municipality of Central Elgin

Water Services

Water Rate Forecast

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Total Water Billing Recovery 1,415,809 1,484,486 1,638,896 1,817,596 2,014,540 2,232,482 2,474,033 2,642,101 2,822,587 2,899,874 2,979,160 3,063,790

Total Volume (m3) 528,287 528,287 530,387 534,587 538,647 542,847 547,047 551,247 555,307 559,507 563,567 567,767

Constant Rate 2.68 2.81 3.09 3.40 3.74 4.11 4.52 4.79 5.08 5.18 5.29 5.40

Annual Percentage Change 5% 10% 10% 10% 10% 10% 6% 6% 2% 2% 2%

Page 127: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix D – Central Elgin System Detailed

Wastewater Rate Calculations

Page 128: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix D-1

Municipality of Central Elgin

Wastewater Service

Capital Budget Forecast

Uninflated $

Actuals Actuals

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures:

Pumping Station 73 Upgrades-Belmont (partly funded by ERTH 609 -

Talbot Line Sanitary Pump Station - -

St. George Street 55,287 -

SCADA Virtualization 119,760 -

Transfer to UFCO Prior Years (2005-2015) 850,506 -

Union Sanitary E. A. 150,000 150,000

Sewer Rate Study 15,000 15,000

Lifecycle:

Wastewater Facilities (Port Stanley) - - - - - - - - - - - - -

Non-Spatial Equipment - - 244,140 - - - - 73,920 - - 170,220 - -

Manholes - - - - - - - - - - - - -

Sanitary Sewers: - - - - - - - - - - - - -

Belmont - - - - - - - - - - - - -

Port Stanley - - - - - - - - - - - - -

Lynhurst - - - - - - - - - - - - -

Eastwood - - - - - - - - - - - - -

Water Meters Replacement Program 400,000 200,000 200,000

Growth Related: -

Belmont:

Sewage Forcemain (Belmont) 474,868 - - - 474,868 - - - - - -

Port Stanley: -

Sunset Road Sanitary Sewer Extension - Port Stanley 789,344 38,772 500,000 500,000 - - - - - - - - -

Downtown Pumping Station Upgrade - Pump Station 52 10,060 10,539 - - - - - - - - - - -

Wastewater Treatment for Lagoon 2,223,729 16,122,855 - - - - - - - - - - -

Replace and Expand Trunk Sanitary Sewers - Pump Station 51 - 930 - - - - - - - - - - -

Southblock:

S4 - Trunk sewer from P.S. to Southdale Road 173,554 - 173,554 - - - - - - - -

Total Capital Expenditures 3,079,030 17,143,361 1,957,562 865,000 373,554 - 474,868 73,920 - - 170,220 - -

ForecastDescription Total

Page 129: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix D-2

Municipality of Central Elgin

Wastewater Service

Capital Budget Forecast

Inflated $

Actual Actual

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capital Expenditures:

Pumping Station 73 Upgrades-Belmont (partly funded by ERTH 609 - - - - - - - - - - - -

Talbot Line Sanitary Pump Station - - - - - - - - - - - - -

St. George Street 55,287 - - - - - - - - - - - -

SCADA Virtualization - 119,760 - - - - - - - - - - -

Transfer to UFCO Prior Years (2005-2015) - 850,506 - - - - - - - - - - -

Union Sanitary E. A. - - 150,000 150,000 - - - - - - - - -

Sewer Rate Study - - 15,000 15,000 - - - - - - - - -

Lifecycle: - - - - - - - - - - -

Wastewater Facilities (Port Stanley) - - - - - - - - - - - - -

Non-Spatial Equipment - - 275,500 - - - - 80,000 - - 195,500 - -

Manholes - - - - - - - - - - - - -

Sanitary Sewers: - - - - - - - - - - - - -

Belmont - - - - - - - - - - - - -

Port Stanley - - - - - - - - - - - - -

Lynhurst - - - - - - - - - - - - -

Eastwood - - - - - - - - - - - - -

Water Meters Replacement Program - - 404,000 200,000 204,000 - - - - - - - -

Growth Related: - - - - - - - - - - - - -

Belmont: - - - - - - - - - - - -

Sewage Forcemain (Belmont) - - 503,900 - - - 503,900 - - - - - -

Port Stanley: - - - - - - - - - - - -

Sunset Road Sanitary Sewer Extension - Port Stanley 789,344 38,772 500,000 500,000 - - - - - - - - -

Downtown Pumping Station Upgrade - Pump Station 52 10,060 10,539 - - - - - - - - - - -

Wastewater Treatment for Lagoon 2,223,729 16,122,855 - - - - - - - - - - -

Replace and Expand Trunk Sanitary Sewers - Pump Station 51 - 930 - - - - - - - - - - -

Southblock: - - - - - - - - - - - - -

S4 - Trunk sewer from P.S. to Southdale Road - - 177,000 - 177,000 - - - - - - - -

Total Capital Expenditures 3,079,030 17,143,361 2,025,400 865,000 381,000 - 503,900 80,000 - - 195,500 - -

Capital Financing

Provincial/Federal Grants 1,100,000 400,000 -

Development Charges Reserve Fund - - - - - - - - - - - - -

Growth Related Debenture Requirements - 2016/17 Debt Issue 976,009 8,102,632 - - - - - - - - - - -

Non-Growth Related Debenture Requirements - 2016/17 Debt Issue 75,809 8,640,729 - - - - - - - - - - -

Non-Growth Related Debenture Requirements - - 574,400 365,000 204,000 - - 1,600 - - 3,800 - -

Growth Related Debenture Requirements 927,212 - 1,180,900 500,000 177,000 - 503,900 - - - - - -

Operating Contributions - - - - - - - - - - - - -

Lifecycle Reserve Fund - - - - - - - - - - - - -

Connection Reserve Fund - - 78,400 - - - - 78,400 - - - - -

Wastewater Reserve - - 191,700 - - - - - - - 191,700 - -

Total Capital Financing 3,079,030 17,143,361 2,025,400 865,000 381,000 - 503,900 80,000 - - 195,500 - -

Description TotalForecast

Page 130: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix D-3

Municipality of Central Elgin

Wastewater Service

Schedule of Non-Growth Related Debenture Repayments

Inflated $

Debenture Principal

Year (Inflated) 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

2018 365,000 45,001 45,001 45,001 45,001 45,001 45,001 45,001 45,001 45,001

2019 204,000 25,151 25,151 25,151 25,151 25,151 25,151 25,151 25,151

2020 - - - - - - - -

2021 - - - - - - -

2022 1,600 197 197 197 197 197

2023 - - - - -

2024 - - - -

2025 3,800 469 469

2026 - -

2027 -

Total Annual Debt Charges - - 574,400 - 45,001 70,153 70,153 70,153 70,350 70,350 70,350 70,818 70,818

Appendix D-4

Municipality of Central Elgin

Wastewater Service

Schedule of Growth Related Debenture Repayments

Inflated $

Debenture Principal

Year (Inflated) 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

2018 500,000 61,645 61,645 61,645 61,645 61,645 61,645 61,645 61,645 61,645

2019 177,000 21,822 21,822 21,822 21,822 21,822 21,822 21,822 21,822

2020 - - - - - - - -

2021 503,900 62,126 62,126 62,126 62,126 62,126 62,126

2022 - - - - - -

2023 - - - - -

2024 - - - -

2025 - - -

2026 - -

2027 -

Total Annual Debt Charges - - 1,180,900 - 61,645 83,468 83,468 145,594 145,594 145,594 145,594 145,594 145,594

Appendix D-5

Municipality of Central Elgin

Wastewater Service

Wastewater Discretionary Reserve Fund Continuity

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Opening Balance 105,655 107,450 498,899 94,520 (115,159) (117,462) (119,812) (122,208) (85,120) 26,588 (110,129) 654,577

Transfer from Operating 221,488 381,666 - - - - - 38,757 111,186 57,143 751,871 376,026

Transfer to Capital - - - 191,700

Transfer to Operating - 406,232 207,421 - -

Closing Balance 105,655 489,116 92,666 (112,901) (115,159) (117,462) (119,812) (83,451) 26,067 (107,969) 641,743 1,030,603

Interest 2,113 9,782 1,853 (2,258) (2,303) (2,349) (2,396) (1,669) 521 (2,159) 12,835 20,612

2016

2016

2017

2017

Forecast

Forecast

Page 131: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix D-6

Municipality of Central Elgin

Wastewater Service

Wastewater Connection Charges Reserve Fund Continuity

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Opening Balance 1,135,117 1,279,222 450,693 459,707 360,020 179,508 87,699 9,116 9,298 9,484 9,674 9,867

Transfer from Revenue 144,105 265,722 - - - - - - - - - -

Transfer to Capital - 78,400

Transfer to City of St. Thomas for Connection Charges 696,726

Transfer to Operating - 406,418 106,745 184,032 93,529 362 - -

Closing Balance 1,279,222 441,801 450,693 352,961 175,989 85,979 8,937 9,116 9,298 9,484 9,674 9,867

Interest - 8,892 9,014 7,059 3,520 1,720 179 182 186 190 193 197

Appendix D-7

Municipality of Central Elgin

Wastewater Service

Wastewater Development Charges Reserve Fund Continuity

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Opening Balance 54,239 277,671 663,487 222,092 (293,908) (828,625) (1,368,375) (1,976,537) (2,600,003) (2,958,036) (3,318,623) (3,447,218)

Development Charge Proceeds 497,103 660,388 266,038 263,196 276,787 282,336 287,976 284,897 557,351 559,298 579,842 573,115

Transfer to Capital - - -

Transfer to Operating 275,070 275,070 711,788 773,433 795,256 795,256 857,382 857,382 857,382 854,814 640,845 640,845

Closing Balance 276,272 662,989 217,738 (288,145) (812,377) (1,341,544) (1,937,782) (2,549,023) (2,900,035) (3,253,552) (3,379,626) (3,514,949)

Interest 1,399 498 4,355 (5,763) (16,248) (26,831) (38,756) (50,980) (58,001) (65,071) (67,593) (70,299)

Required from Development Charges 1,903,221 8,102,632 500,000 177,000 - 503,900 - - - - - -

Appendix D-8

Municipality of Central Elgin

Wastewater Service

Wastewater Lifecycle Reserve Fund Continuity

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Opening Balance - - - - - - - - - - - -

Transfer from Operating - - - - - - - - - - - 500,000

Transfer to Capital - - - - - - - - - - - -

Transfer to Operating - - - - - - - - - - - -

Closing Balance - - - - - - - - - - - 500,000

Interest - - - - - - - - - - - 10,000

Page 132: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix D-9

Municipality of Central Elgin

Wastewater Services

Operating Budget Forecast

Inflated $

Actuals Actuals

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Expenditures:

Operating Costs:

Wastewater Administration and Office

Supervision 25,305 46,570 49,027 50,008 51,008 52,000 53,000 54,100 55,200 56,300 57,400 58,500

Union (including Overtime) 30,442 17,305 29,186 29,769 30,365 31,000 31,600 32,200 32,800 33,500 34,200 34,900

Casual (including Overtime) 826 595 501 511 521 500 500 500 500 500 500 500

On-Call Pay - - - - - - - - - - - -

CPP 1,881 2,327 2,767 2,823 2,879 2,900 3,000 3,100 3,200 3,300 3,400 3,500

EI 1,003 1,092 1,324 1,351 1,378 1,400 1,400 1,400 1,400 1,400 1,400 1,400

WSIB 667 795 2,422 2,470 2,520 2,600 2,700 2,800 2,900 3,000 3,100 3,200

OMERS 5,892 6,832 7,899 8,057 8,218 8,400 8,600 8,800 9,000 9,200 9,400 9,600

EHT 1,109 1,269 1,535 1,566 1,597 1,600 1,600 1,600 1,600 1,600 1,600 1,600

LTD/ADD/LIFE 5,977 6,922 8,453 8,622 8,794 9,000 9,200 9,400 9,600 9,800 10,000 10,200

Employee Records Checks 200 - - - - - - - - - - -

Travel & Conventions 3,613 4,286 4,000 4,080 4,162 4,200 4,300 4,400 4,500 4,600 4,700 4,800

Clothing Allowance 2,936 2,800 3,400 3,468 3,537 3,600 3,700 3,800 3,900 4,000 4,100 4,200

Dues/Memberships - - - - - - - - - - - -

Employee Recruitment 36 390 - - - - - - - - - -

Advertising - - - - - - - - - - - -

Insurances 13,218 12,408 14,830 15,127 15,429 15,700 16,000 16,300 16,600 16,900 17,200 17,500

Radio Licenses 614 614 615 627 640 700 700 700 700 700 700 700

Licenses/Permits 261 2,709 1,446 1,475 1,505 1,500 1,500 1,500 1,500 1,500 1,500 1,500

Office Supplies 194 894 761 776 792 800 800 800 800 800 800 800

Postage 14,613 15,404 16,000 16,320 16,646 17,000 17,300 17,600 18,000 18,400 18,800 19,200

Office Equipment 295 - - - - - - - - - - -

Equipment Charges 6,145 6,782 5,738 5,853 5,970 6,100 6,200 6,300 6,400 6,500 6,600 6,700

Maintenance 1,375 717 1,500 1,530 1,561 1,600 1,600 1,600 1,600 1,600 1,600 1,600

Sampling Services - - - - - - - - - - - -

Truck Maintenance - - - - - - - - - - - -

Treatment Plant Operations - - - - - - - - - - - -

Pump Station Operations - - - - - - - - - - - -

Systems Operations Maintenance - - - - - - - - - - - -

Hydro - - - - - - - - - - - -

Water 108 - - - - - - - - - - -

Telephone 1,403 1,380 1,450 1,479 1,509 1,500 1,500 1,500 1,500 1,500 1,500 1,500

IT Supplies 102 - - - - - - - - - - -

IT Equipment 414 729 2,000 2,040 2,081 2,100 2,100 2,100 2,100 2,100 2,100 2,100

St. Thomas Sewer Operations 233,895 251,104 230,000 234,600 239,292 244,100 249,000 254,000 259,100 264,300 269,600 275,000

Legal Services - 52 - - - - - - - - - -

Audit Services 1,680 - - - - - - - - - - -

Answering Service 519 1,453 846 863 880 900 900 900 900 900 900 900

IT Services 7,795 22,388 21,004 21,424 21,852 22,300 22,700 23,200 23,700 24,200 24,700 25,200

Contracted Services - 715 - - - - - - - - - -

SCADA Services 23,489 27,078 28,500 29,070 29,651 30,200 30,800 31,400 32,000 32,600 33,300 34,000

Locates - 535 14,000 14,280 14,566 14,900 15,200 15,500 15,800 16,100 16,400 16,700

Wastewater Rate Study 265 5,032 2,000 - - - - 11,600 - - - -

Bank Charges - 4 - - - - - - - - - -

Payments-in-Lieu - 47,517 28,424 28,993 29,573 30,200 30,800 31,400 32,000 32,600 33,300 34,000

White Station Lease - - - - - - - - - - - -

Copier Lease 586 933 900 900 900 900 900 900 900 900 900 900

Training - Operator 6,881 11,280 12,000 12,240 12,485 12,700 13,000 13,300 13,600 13,900 14,200 14,500

Health & Safety - - - - - - - - - - - -

Health & Safety Training 3,249 941 1,397 1,425 1,453 1,500 1,500 1,500 1,500 1,500 1,500 1,500

Health & Safety Supplies 437 1,048 512 523 533 500 500 500 500 500 500 500

Forecast

Page 133: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-7

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Actuals Actuals

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Health & Safety Services 372 89 267 273 278 300 300 300 300 300 300 300

Wastewater Treatment

Belmont WWTP 164,024 193,602 161,179 164,402 167,690 171,000 174,400 177,900 181,500 185,100 188,800 192,600

Port Stanley WWTP 108,782 68,869 289,513 290,203 296,007 301,900 307,900 314,100 320,400 326,800 333,300 340,000

Wastewater Collection

Pumping Stations 154,875 102,951 96,340 98,266 100,232 102,200 104,200 106,300 108,400 110,600 112,800 115,100

Collection System Total 68,289 34,442 64,414 65,702 67,016 68,400 69,800 71,200 72,600 74,100 75,600 77,100

Sub Total Operating 893,766 902,854 1,106,150 1,121,115 1,143,519 1,166,200 1,189,200 1,224,500 1,237,000 1,261,600 1,286,700 1,312,300

Capital-Related:

Existing Debt (Principal) - Growth Related 135,592 142,262 149,260 156,602 164,305 172,387 180,867 189,764 199,099 208,892 - -

Existing Debt (Interest) - Growth Related 80,945 74,275 67,277 59,935 52,232 44,150 35,670 26,773 17,438 5,076 - -

New Growth Related Debt (Principal) - 41,645 58,054 60,376 104,761 108,952 113,310 117,842 122,556 127,458

New Growth Related Debt (Interest) - 20,000 25,414 23,092 40,833 36,643 32,284 27,752 23,038 18,136

New WWTP, PS51, and PS52 Debt (Principal) - Growth-related - 108,448 222,343 229,809 237,525 245,501 253,744 262,264 271,070 280,172 289,579 299,303

New WWTP, PS51, and PS52 Debt (Interest) - Growth-related - 139,177 272,908 265,442 257,726 249,750 241,507 232,987 224,181 215,079 205,672 195,948

Existing Debt (Principal) - Non-Growth Related 517,436 530,769 572,124 590,482 596,964 615,990 635,699 656,117 677,274 699,200 93,523 47,622

Existing Debt (Interest) - Non-Growth Related 173,868 166,972 160,016 141,658 122,635 103,609 83,901 63,482 42,325 17,610 2,889 583

New Non-Growth Related Debt (Principal) - 30,401 48,609 50,553 52,575 54,811 57,004 59,284 61,972 64,451

New Non-Growth Related Debt (Interest) - 14,600 21,544 19,600 17,577 15,538 13,346 11,066 8,847 6,368

New WWTP, PS51, and PS52 Debt (Principal) - Non growth-related - 139,757 286,533 296,154 306,098 316,376 326,999 337,979 349,327 361,057 373,180 385,710

New WWTP, PS51, and PS52 Debt (Interest) - Non growth-related - 179,357 351,695 342,074 332,130 321,852 311,229 300,250 288,901 277,172 265,048 252,518

Transfer to Capital - - - - - - - - - - - -

Transfer to Wastewater Discretionary Reserve Fund 221,488 381,666 - 38,757 111,186 57,143 751,871 376,026

Transfer to Wastewater Development Charge Reserve Fund - - - - - - - - - - - -

Sub Total Capital Related 1,129,329 1,862,684 2,082,156 2,188,803 2,223,237 2,223,237 2,285,363 2,324,317 2,396,747 2,337,345 2,198,175 1,774,124

Total Expenditures 2,023,095 2,765,538 3,188,306 3,309,918 3,366,756 3,389,437 3,474,563 3,548,817 3,633,747 3,598,945 3,484,875 3,086,424

Revenues

Base Charge 554,748 612,087 632,332 671,891 713,546 757,980 782,070 806,821 835,812 869,746 904,703 940,711

Wastewater Penalty 9,294 10,197 9,843 10,040 10,240 10,400 10,600 10,800 11,000 11,200 11,400 11,600

Wastewater Revenue From St. Thomas Energy 322,132 523,472

Port Stanley Plant Land Rent 24,900 24,900 24,900 25,398 25,906 26,400 26,900 27,400 27,900 28,500 29,100 29,700

Frontage/Connection Wastewater System 900 13,825 18,900 18,900 18,900 900 - - - - - -

Local Improvement Charges - 150,616 129,572 129,572 129,572 129,572 129,572 129,572 129,572 - - -

Other Revenue 392 813 - - -

Contributions from Development Charges Reserve Fund 275,070 275,070 711,788 773,433 795,256 795,256 857,382 857,382 857,382 854,814 640,845 640,845

Contribution from Connection Reserve Fund - - - 106,745 184,032 93,529 362 - - - - -

Contributions from Reserves / Reserve Funds - - 406,232 207,421 - - - - - - - -

Total Operating Revenue 1,187,435 1,610,979 1,933,567 1,943,400 1,877,453 1,814,036 1,806,886 1,831,975 1,861,666 1,764,260 1,586,049 1,622,856

Wastewater Billing Recovery - Operating 835,659 1,154,559 1,254,739 1,366,518 1,489,303 1,575,400 1,667,677 1,716,842 1,772,081 1,834,685 1,898,826 1,463,567

Lifecycle Reserve Contribution ($) 500,000

Wastewater Billing Recovery - Total 835,659 1,154,559 1,254,739 1,366,518 1,489,303 1,575,400 1,667,677 1,716,842 1,772,081 1,834,685 1,898,826 1,963,567

Forecast

Page 134: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page D-8

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix D-10

Municipality of Central Elgin

Wastewater Services

Wastewater Rate Forecast

Inflated $

Description 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Total Wastewater Billing Recovery 835,659 1,154,559 1,254,739 1,366,518 1,489,303 1,575,400 1,667,677 1,716,842 1,772,081 1,834,685 1,898,826 1,963,567

Total Volume (m3) 360,198 473,180 475,280 479,480 483,540 487,740 491,940 496,140 501,950 509,580 517,210 524,840

Constant Rate 2.32 2.44 2.64 2.85 3.08 3.23 3.39 3.46 3.53 3.60 3.67 3.74

Annual Percentage Change 8% 8% 8% 5% 5% 2% 2% 2% 2% 2%

Page 135: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page E-1

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix E – Alternate Calculation for the

Water System – Water Base Charge

Page 136: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page E-2

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Appendix E – Alternate Calculation for the Water System – Water Base Charge

Municipal staff requested that an alternative base charge rate be calculated for the

water system based on varying the rates by meter size. Where an increasing base

charge by meter size is desired, this can be established by calculation or by policy. If a

calculation is desired, the American Waterworks Association has provided a basis for

this in their “Principles of Water Rates, Fees and Charges” Manual of Practice. An

example service ratio charge (page 57 of the above-noted document) is provided below.

This chart closely resembles the relationship of many increasing base charge rates in

use throughout Ontario. The breakdown of Central Elgin water customers by metre size

was provided by staff to undertake these calculations. Table E-1 provides for the

calculation of varying base charges based on these ratios.

The difference between the base charge revenue generated under the current, constant

rate structure and the optional varying charge rate structure is summarized in Table 7-6.

For 2018, this type of base charge structure would generate approximately $24,000 in

additional revenue. At the current inflationary rates recommended for the base charges

(as set out in Table 6-1), over the forecast, this amount would grow with approximately

$31,400 additional revenue being generated.

The additional revenue could be used to increase transfers to lifecycle reserves to

assist in funding future asset replacement needs, reduce minor shortfalls anticipated

over the forecast, reduce reliance on future debt requirements, or reduce increases

required to the volume rates. If this structure was imposed and the funds were used to

reduce the rate increases to the volume rate, it would equate to an 8.5% increase in

Meter

Size

(in.)

Meter

Size

(mm)

AWWA

(capacity)

Equivalent

Meter and

Service

Ratio

5/8 15 20 1.0

3/4 18 30 1.1

1 25 50 1.4

1.5 40 100 1.8

2 50 160 2.9

3 75 300 11.0

4 100 500 14.0

6 150 1,000 21.0

8 200 1,600 29.0

Page 137: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page E-3

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

2018 vs. a 10% increase. This would be a one time adjustment, therefore the volume

rate increases anticipated throughout the balance of the forecast would not be

impacted.

Page 138: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page E-4

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table E-1 (page 1) Water Base Charges – Option to Varied by Meter Size

Water 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902 2,902

New 15 45 74 104 134 164 193 223 252 282

Subtotal Customers 2,917 2,947 2,976 3,006 3,036 3,066 3,095 3,125 3,154 3,184

Total Annual Revenue $640,796 $679,496 $720,230 $763,585 $786,346 $809,712 $833,439 $858,055 $883,053 $908,983

Customers - 5/8" 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 2,839 2,839 2,839 2,839 2,839 2,839 2,839 2,839 2,839 2,839

New 15 45 74 104 134 164 193 223 252 282

Subtotal Customers 2,854 2,884 2,913 2,943 2,973 3,003 3,032 3,062 3,091 3,121

Monthly Base Charge $17.62 $18.50 $19.42 $20.40 $20.80 $21.22 $21.64 $22.08 $22.52 $22.97

Annual Base Charge $211.43 $222.00 $233.10 $244.75 $249.65 $254.64 $259.74 $264.93 $270.23 $275.63

Total Annual Revenue $603,416 $640,246 $679,018 $720,312 $742,208 $764,691 $787,517 $811,216 $835,276 $860,251

Customers - 1" 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 34 34 34 34 34 34 34 34 34 34

New 0 0 0 0 0 0 0 0 0 0

Subtotal Customers 34 34 34 34 34 34 34 34 34 34

Monthly Base Charge $24.67 $25.90 $27.19 $28.55 $29.13 $29.71 $30.30 $30.91 $31.53 $32.16

Annual Base Charge $296.00 $310.80 $326.34 $342.66 $349.51 $356.50 $363.63 $370.90 $378.32 $385.89

Total Annual Revenue $10,064 $10,567 $11,096 $11,650 $11,883 $12,121 $12,363 $12,611 $12,863 $13,120

Customers - 1 1/2" 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 4 4 4 4 4 4 4 4 4 4

New 0 0 0 0 0 0 0 0 0 0

Subtotal Customers 4 4 4 4 4 4 4 4 4 4

Monthly Base Charge $31.71 $33.30 $34.96 $36.71 $37.45 $38.20 $38.96 $39.74 $40.53 $41.34

Annual Base Charge $380.57 $399.60 $419.58 $440.56 $449.37 $458.36 $467.52 $476.87 $486.41 $496.14

Total Annual Revenue $1,522 $1,598 $1,678 $1,762 $1,797 $1,833 $1,870 $1,907 $1,946 $1,985

Customers - 2" 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 20 20 20 20 20 20 20 20 20 20

New 0 0 0 0 0 0 0 0 0 0

Subtotal Customers 20 20 20 20 20 20 20 20 20 20

Monthly Base Charge $51.10 $53.65 $56.33 $59.15 $60.33 $61.54 $62.77 $64.02 $65.31 $66.61

Annual Base Charge $613.14 $643.80 $675.99 $709.79 $723.98 $738.46 $753.23 $768.30 $783.66 $799.34

Total Annual Revenue $12,263 $12,876 $13,520 $14,196 $14,480 $14,769 $15,065 $15,366 $15,673 $15,987

Page 139: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page E-5

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

Table E-1 (page 2) Water Base Charges – Option to Varied by Meter Size

Table E-2

Water Base Charges Summary of Annual Base Charge Revenue for Constant vs. Varying Rate Structure

Customers - 3" 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 2 2 2 2 2 2 2 2 2 2

New 0 0 0 0 0 0 0 0 0 0

Subtotal Customers 2 2 2 2 2 2 2 2 2 2

Monthly Base Charge $193.81 $203.50 $213.67 $224.36 $228.85 $233.42 $238.09 $242.85 $247.71 $252.66

Annual Base Charge $2,325.71 $2,441.99 $2,564.09 $2,692.30 $2,746.14 $2,801.07 $2,857.09 $2,914.23 $2,972.51 $3,031.96

Total Annual Revenue $4,651 $4,884 $5,128 $5,385 $5,492 $5,602 $5,714 $5,828 $5,945 $6,064

Customers - 4" 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Existing 3 3 3 3 3 3 3 3 3 3

New 0 0 0 0 0 0 0 0 0 0

Subtotal Customers 3 3 3 3 3 3 3 3 3 3

Monthly Base Charge $246.67 $259.00 $271.95 $285.55 $291.26 $297.08 $303.02 $309.08 $315.27 $321.57

Annual Base Charge $2,959.99 $3,107.99 $3,263.39 $3,426.56 $3,495.09 $3,564.99 $3,636.29 $3,709.02 $3,783.20 $3,858.86

Total Annual Revenue $8,880 $9,324 $9,790 $10,280 $10,485 $10,695 $10,909 $11,127 $11,350 $11,577

Water 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Constant Base Charge Revenue $616,735 $654,232 $693,704 $735,732 $757,936 $780,734 $803,881 $827,906 $852,301 $877,616

Varying Base Charge Revnue $640,796 $679,496 $720,230 $763,585 $786,346 $809,712 $833,439 $858,055 $883,053 $908,983

Additional Revenue Generated from

Varying Base Charges $24,061 $25,264 $26,527 $27,853 $28,410 $28,978 $29,558 $30,149 $30,752 $31,367

Page 140: The Municipality of Central Elgin Water and Wastewater ... · Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx management

Page E-6

Watson & Associates Economists Ltd. H:\Central Elgin\2018 W & WW and O.Reg\Report\2018 CE Rate Report.docx

This additional revenue could be used to increase transfers to lifecycle reserves, reduce

minor shortfalls anticipated over the forecast, reduce reliance on future debt

requirements, or reduce increases required to the volume rates.