Ferrostaal Industrieanlagen GmbH

Ferrostaal Industrieanlagen GmbH - GermanyFerrostaal Christof Romania SRL - RomaniaA Joint Venture of Ferrostaal and the Christof Group

OMV PETROM Hurezani Gas Delivery Project

Compressor Station Bulbuceni

Page 2: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 2

Gas Compressor Station Bulbuceni

General Project Information

Initial situation:Seasonal fluctuation (between 14 and 20 barg) in gas delivery to major consumers especially in summertime was causing significant production losses for OMV Petrom, due to the pressure increase in the National Transport System.

Project Objective: The new Hurezani Gas Delivery System will ensure OMV Petrom to deliver gas continuously to National Transport System with a constant pressure of 40barg.

Page 3: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 3

Gas Compressor Station Bulbuceni

Ferrostaal’s Scope of Work

Front End Engineering Design (Feed) Completion

Basic Engineering

Detail Engineering

Authority Engineering

Site Clearance from underground pipes & facilities

Procurement, (Turbo Compressor packages provided by OMV Petrom)

Construction

Commissioning

Two (2) months operation assistance

Maintenance Contract for 8 months

Page 4: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 4

Gas Compressor Station Bulbuceni

Project Overview

Page 5: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 5

Gas Compressor Station Bulbuceni

Project Key Data

Project Configuration:Three (3) identical Compressor trains consisting of one (1) Solar Gas Turbines, 7MW each

(Taurus 70) with Solar Centrifugal Compressors C50. Two trains being in operation and the third one in stand-by.

Each train comprises an inlet filter scrubber, a centrifugal compressor driven by a gas turbine of 7 MW power and a gas cooler. In addition, one finger type slug catcher, LP & HP fuel gas skids, an open & closed drain system, a flare system, instrument air & Nitrogen gas generation, emergency diesel generation, well water treatment, fire fighting system and control & emergency shutdown system (ESD & DCS) are provided.

Type of Contract: Fast Track (EPCC)• Feb 2009 - Nov 2009 (Open Book)• From Dec 2009 Lump Sum Turn Key

Execution Period: Feb 2009 – Aug 2010 (PAC issued)Construction Start: Nov 2009 First Gas Delivery: 29th Mai 2010Special Agreements: Solar Turbo-compressor packages furnished by Client

Page 6: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 6

Gas Compressor Station Bulbuceni

Project Key Data

Station Configuration: Design pressure: 64 barg

Operating pressure: 45 barg

Capacity, normal 5.500.000 Ncm/d.

Capacity, max. 6.050.000 Ncm/d

Capacity, min. 1.200.000 Ncm/d

Capacity per train 2.750.000 Ncm/d

Page 7: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 7

Gas Compressor Station Bulbuceni

Project Milestones

Page 8: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 8

Gas Compressor Station Bulbuceni

Project Features

March 2009 – Initial Situation

Page 9: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 9

Gas Compressor Station Bulbuceni

Project Features

August 2009 - Site Clearance

Page 10: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 10

Gas Compressor Station Bulbuceni

Project Features

November 2009 - Start Construction

Page 11: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 11

Gas Compressor Station Bulbuceni

Project Features

Civil Works – TUCO foundations

Page 12: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 12

Gas Compressor Station Bulbuceni

Project Features

Installation of 1st compressor

Page 13: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 13

Gas Compressor Station Bulbuceni

Project Features

TUCO’s on foundation

Page 14: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 14

Gas Compressor Station Bulbuceni

Project Features

Two shift system installed

Page 15: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 15

Gas Compressor Station Bulbuceni

Project Features

Winter measures for concrete works

Page 16: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 16

Gas Compressor Station Bulbuceni

Project Features

Gas cooler installation

Page 17: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 17

Gas Compressor Station Bulbuceni

Project Features

Steel structure compressor building

Page 18: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 18

Gas Compressor Station Bulbuceni

Project Features

Fire water tanks under construction

Page 19: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 19

Gas Compressor Station Bulbuceni

Project Features

Simultaneous construction activities

Page 20: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 20

Gas Compressor Station Bulbuceni

Project Features

Lift of 1st flare section by 500 to mobile crane

Page 21: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 21

Gas Compressor Station Bulbuceni

Project Features

View from the flare during construction

Page 22: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 22

Gas Compressor Station Bulbuceni

Project Features

75 m high flare

Page 23: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 23

Gas Compressor Station Bulbuceni

Project Features

2 x 1.100 m3 fire water tanks

Page 24: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 24

Gas Compressor Station Bulbuceni

Project Features

Gas cooler and suction scrubber

Page 25: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 25

Gas Compressor Station Bulbuceni

Project Features

TUCO package train #1

Page 26: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 26

Gas Compressor Station Bulbuceni

Project Features

Control Room

Page 27: Thomas Heitepriem Ferrostaal

Ferrostaal Industrieanlagen GmbH 03/02/2011 |Oil & Gas Division East 27

Gas Compressor Station Bulbuceni

Project Features

Station overview after completion of all works