tour 1 - the open petroleum data project...cond mud & circ trips rig service repair rig cut off...

31
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 TOTAL Rig Up Drill Actual Reaming Coring Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test BOP Drillstem Test Plug Back Squeeze Cement Fishing Dir Work Safety Meeting Tear Down Waiting On Rig Watch Other HOURS Tour 1 Tour 2 Tour 3 Total DAILY CHECKS OP RM 1) Daily Walk Around Inspection 2) Detailed Inspection - Weekly (Using Check List) 3) H2S Signs Posted if Required 4) Well Licence & Stick Diagram Posted 5) Flare Lines Staked 6) BOP Drills Performed 7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month) 2) CAODC Rig Safety Inspection Checklist (one/rig/month) 3) Mast Inspection before Raising or Lowering 4) Crown Saver Checked 5) Motor Kills Checked Kelly Bushing Op Fuel FUEL @ 08:00 HOURS Rig Boiler WEATHER Time Temp Current Conditions Wind Direction Wind Strength Road Condition FRONT PAGE SUMMARY Tour Sheet Serial Number Vendor Software Version Year Month Day Well Type Re-Entry Spud Date Time Rig Release Date Time License No Well Name Surface Location Prov Loc Type Unique Well Id Contractor Rig No Contractor’s Job No Signature of Contractor’s Rig Manager Operator Operator’s AFE Signature of Operator Representative Pason TOUR 1 SIGNATURE OF DRILLER START TIME END TIME Remarks: TIME LOG From To Elapsed Code Details of Operations in Sequence & Remarks SAFETY Safety Topic MEHL MACP TOUR 3 SIGNATURE OF DRILLER START TIME END TIME TOUR 2 SIGNATURE OF DRILLER START TIME END TIME MUD MATERIALS ADDED Product Amount Type SOLIDS CONTROL Equipment Name Hours Run Intake Density Over Flow Density Under Flow Density DEVIATION SURVEYS Time Depth Deviation Direction Type Boiler Boiler # Hours Run pH Stack Temp V. 1.3 Remarks: TIME LOG From To Elapsed Code Details of Operations in Sequence & Remarks SAFETY Safety Topic MEHL MACP Remarks: TIME LOG From To Elapsed Code Details of Operations in Sequence & Remarks SAFETY Safety Topic MEHL MACP CUTTING STRUCTURE TI Gage TO ODC MDC Reason Pulled LOC Total Run (m/hr) BRG DRILLING ASSEMBLY No Component OD ID Length Drill Pipe Stands Drill Pipe Singles Kelly Down Total Weight of DC Weight of String BITS Bit Number Size IADC Code Manufacturer Type Serial No Jets Depth Out (m) Depth In (m) Total Drilled (m) Hrs Run Today Cumulative Hrs Run Entry Date METRES DRILLED From To D-R-C RPM WOB REDUCED PUMP SPEED Pump No. Pressure Strokes/min Depth @ @ @ @ @ @ MUD RECORD Mud Type Water Oil Other Time Density Funnel Viscosity Fluid Loss pH Location of Sample Depth PVT CIRCULATION Pump# Type Liner Size SPM Pressure Hours Run Remarks: HOLE CONDITION Hole Drag Up Down Torque at Bottom Fill on Bottom CUTTING STRUCTURE TI Gage T0 ODC MDC Reason Pulled LOC Total Run (m/hr) BRG DRILLING ASSEMBLY No Component OD ID Length Drill Pipe Stands Drill Pipe Singles Kelly Down Total Weight of DC Weight of String BITS Bit Number Size IADC Code Manufacturer Type Serial No Jets Depth Out (m) Depth In (m) Total Drilled (m) Hrs Run Today Cumulative Hrs Run Entry Date METRES DRILLED From To D-R-C RPM WOB REDUCED PUMP SPEED Pump No. Pressure Strokes/min Depth @ @ @ @ @ @ MUD RECORD Mud Type Water Oil Other Time Density Funnel Viscosity Fluid Loss pH Location of Sample Depth PVT CIRCULATION Pump# Type Liner Size SPM Pressure Hours Run Remarks: HOLE CONDITION Hole Drag Up Down Torque at Bottom Fill on Bottom CUTTING STRUCTURE TI Gage TO ODC MDC Reason Pulled LOC Total Run (m/hr) BRG DRILLING ASSEMBLY No Component OD ID Length Drill Pipe Stands Drill Pipe Singles Kelly Down Total Weight of DC Weight of String BITS Bit Number Size IADC Code Manufacturer Type Serial No Jets Depth Out (m) Depth In (m) Total Drilled (m) Hrs Run Today Cumulative Hrs Run Entry Date METRES DRILLED From To D-R-C RPM WOB REDUCED PUMP SPEED Pump No. Pressure Strokes/min Depth @ @ @ @ @ @ MUD RECORD Mud Type Water Oil Other Time Density Funnel Viscosity Fluid Loss pH Location of Sample Depth PVT CIRCULATION Pump# Type Liner Size SPM Pressure Hours Run Remarks: HOLE CONDITION Hole Drag Up Down Torque at Bottom Fill on Bottom MUD MATERIALS ADDED Product Amount Type SOLIDS CONTROL Equipment Name Hours Run Intake Density Over Flow Density Under Flow Density DEVIATION SURVEYS Time Depth Deviation Direction Type Boiler Boiler # Hours Run pH Stack Temp MUD MATERIALS ADDED Product Amount Type SOLIDS CONTROL Equipment Name Hours Run Intake Density Over Flow Density Under Flow Density DEVIATION SURVEYS Time Depth Deviation Direction Type Boiler Boiler # Hours Run pH Stack Temp 0 0 07:15 0.25 24:00 19:00 19:00 15-101-02 2015/02/27 16:45 Ed Tallon 1 of 2 11.75 6.25 FAIR 0.50 0.25 CANELSON DRILLING INC. 165 165 5.00 0.50 18.50 3200.00 02 200/d-002-G/094-G-02/00 1 -4.00 2 22 21D 22 HORIZ DARRYL GIBBONS GREG EVERSON GREG EVERSON 101 Progress HZ Julienne d-23-G/94-G-2 0 CALM W 0 PRE-JOB SAFETY ON LOWERING DERRICK VISUALLY INSPECT AND LOWER DERRICK @ 0030HRS 30261 UNSPOOOL BLOCKS, RIG OUT DERRICK LINES AND CORDS. TEAR OUT RIG. CREW CHANGE OVER MEETING RIG OUT TO MOVE & WASH RIG. MOVE TANK FARM,PIPE TUBS, VAC SHACK,MANIFOLD,FLARE TANK, MUD TANKS,CATWALK,ALL THIRD PARTY RENTALS 0 0 GEN#1 9787 (0 HRS RUN TODAY) GEN#2 10442 HRS (RUN FOR 24 HRS) GEN#3 10480 HRS (0 HRS RUN TODAY) LP#1 10596 HRS ( RUN FOR 24 HRS) LP#2 10273 HRS (0 HRS RUN TODAY) 5.00 0 5.00 0 11.75 22 9880.00 21 NTS 0.25 BC PROGRESS ENERGY CANADA LTD. 1153054 24:00 165 07:00 19:00 165 165 165 0 0 0 0 0 0 0 d-023-G/094-G-02 0 0 1 UNKN101_20150223_1C W/O DAYLIGHT TO MOVE RIG W/D.R.S. 2 23B 2 1 WASHING RIG LOWER DERRICK- REVIEW JSA D-08 2015 00:45 00:15 D.W.A.D.G 07:15 0 07:00 07:00 06:00 GG ET 7.00 2688.00 24.00 12.00 5.00 23 0.25 6.75 00:00 19:00 07:00 PARTLY CLOUDY Pason 00:00 00:15 00:45 GREG GODDU

Upload: others

Post on 12-May-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

0

0

07:15

0.25

24:0019:00

19:00

15-101-02 2015/02/27 16:45

Ed Tallon

1 of 2

11.75

6.25

FAIR

0.50

0.25

CANELSON DRILLING INC.

165

165

5.000.50 18.50

3200.00

02

200/d-002-G/094-G-02/00

1

-4.00

2

22

21D

22

HORIZ

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

101

Progress HZ Julienne d-23-G/94-G-2

0

CALMW

0

PRE-JOB SAFETY ON LOWERING DERRICK

VISUALLY INSPECT AND LOWER DERRICK @ 0030HRS

30261

UNSPOOOL BLOCKS, RIG OUT DERRICK LINES AND CORDS. TEAR OUT RIG.

CREW CHANGE OVER MEETING

RIG OUT TO MOVE & WASH RIG. MOVE TANK FARM,PIPE TUBS, VACSHACK,MANIFOLD,FLARE TANK, MUD TANKS,CATWALK,ALL THIRD PARTY RENTALS

0

0

GEN#1 9787 (0 HRS RUN TODAY) GEN#2 10442 HRS (RUN FOR 24 HRS) GEN#3 10480 HRS (0 HRS RUN TODAY)

LP#1 10596 HRS ( RUN FOR 24 HRS) LP#2 10273 HRS (0 HRS RUN TODAY)

5.00

0

5.00

0

11.75 22

9880.00

21

NTS

0.25

BC

PROGRESS ENERGY CANADA LTD.

1153054

24:00

165

07:00

19:00

165

165

165

0

0

0

0

0

0 0

d-023-G/094-G-02

0

01

UNKN101_20150223_1C

W/O DAYLIGHT TO MOVE RIG W/D.R.S.

2

23B

2

1

WASHING RIG

LOWER DERRICK- REVIEW JSA D-08

2015

00:45

00:15

D.W.A.D.G

07:15

0

07:00

07:00

06:00

GGET

7.00

2688.00

24.00

12.00

5.00

23

0.25 6.75

00:00

19:00

07:00

PARTLY CLOUDY

Pason

00:00

00:15

00:45

GREG GODDU

Page 2: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

0

0

08:00

0.50

24:0019:00

19:0008:30

15-101-02 2015/02/27 16:45

Ed Tallon

1 of 1

1.00

FAIR

7.00

CANELSON DRILLING INC.

165

165

13.000.50

3200.00

02

200/d-002-G/094-G-02/00

1

-3.00

2

23B

HORIZ

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

101

Progress HZ Julienne d-23-G/94-G-2

0

CALMW

0

W/O DAYLIGHT TO MOVE RIG

30261

W/O DAYLIGHT

PRE-JOB SAFETY ON RIG MOVE AND CRANE WORK WITH DRS TRUCKINGMOVE RIG WITH DRS TRUCKING. RIG OFF OLD LOCATION 1400HRS. SPOT MATTING ON

TOGETHER DERRICK.PLACE BOP,S AND BLOCKS.

NEW LOCATION, SPOT AND LEVEL SUB, LIFT DRAWWOKS AND DOGHOUSES ONTO SUB. PIN

0

0

5.00

0

5.00

0

0.5010.50 1A

21D

8750.00

23B

NTS

1.00

BC

PROGRESS ENERGY CANADA LTD.

1153054

24:00

165

07:00

19:00

165

165

165

0

0

0

0

0

0 0

d-023-G/094-G-02

0

10.50

01

UNKN101_20150224_1D

W/O DAYLIGHT

2

23B

2

1

2015

07:00

0

08:00

07:00

08:30

06:00

10.50

7.00

2688.00

24.00

12.00

5.00

24

7.00

00:00

19:00

07:00

CLEAR

Pason

00:00

GREG GODDU

Page 3: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

0

0

23:00

07:30

24:00

0.50

23:0019:00

15:00

10:0008:00

15-101-02

19:00

16:00

2015/02/27 16:45

Ed Tallon

1 of 1

0.50

GOOD

7.00

CANELSON DRILLING INC.

165

165

250

4.007.500.50

3200.00

02

200/d-002-G/094-G-02/00

1

-13.00

2

23B

HORIZ

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

101

Progress HZ Julienne d-23-G/94-G-2

0

CALMW

0

W/O DAYLIGHT

30261

W/O DAYLIGHT

PRE-JOB SAFETY WITH DRS TRUCKING PRIOR TO SPOTTING RIGSPOT RIG/LOADS/BUILDINGS,PICK PIN MAST

HRS.

15:00 HRS.NO INCIDENTS NO EQUIPMENT DAMAGE.

SPOT RIG/LOADS/BUILDINGS,SPOT REST OF RIG,CEMENT BINS ETC.DONE WITH TRUCKS

INSTALL BRIDAL LINES & SPOOL BLOCKS 10 LINES.HEAD OF STEAM ON BOILER 19:00

1

RIG UP POWER CORDS GEN. FIRED UP @ 16:00 HRS.

0

0

4.00

0

4.00

0

1.00

5.00

0.502.00

1.00

3.00

1C21D

8750.00

23B

1

1

NTS

0.50

1C

BC

PROGRESS ENERGY CANADA LTD.

1153054

24:00

165

07:00

19:00

165

165

165

0

0

0

0

0

0 0

d-023-G/094-G-02

0

11.00

01

RIG UP WATER STEAM LINES.

UNKN101_20150225_1C

OTHER NIGHTS WORKED TILL 16:00 HRS.BACK OUT 23:00 HRS.

2

25

1

2

1

1.00

2015

07:00

15:00

16:00

0

07:30

07:00

10:00

08:00

06:00

5

12.00

10.5

RG

7.00

2688.00

24.00

12.00

5.00

25

7.00

00:00

19:00

07:00

LIGHT SNOW

Pason

00:00

GREG GODDU

Page 4: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

19:15

20:00

x

19:00

0.75

15-101-02 2015/02/27 16:45

7.00

250

270

3200.00

02

1

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

101

Progress HZ Julienne d-23-G/94-G-2

RIG UP- FINISH POWER CORDS, STEAM & WATER AROUND, READY DERRICK FOR RAISING,

SUB TARPS, FLARE LINES

30261

CREW CHANGE OVER MEETING

RIG UP TO RAISE DERRICKSAFETY MEETING BEFORE RAISING DERRICK

RIG UP B.O.P HANDLER, SPOT CATWALK, INSTALL BEAVER TAIL, FINISH UP BOOM WORK

RAISE SUB PINNED @12:15

RIG UP TO RAISE SUB, RIG UP PANELS ETC. ON DOGHOUSE BACK OF SUB TOP OF

RAISE DERRICK PINNED @ 09:00 HRS.110,000 DAN. TO LIFT OFF CROWN STAND

1

SAFETY MEETING BEFORE RAISING SUB

DRAWORKS

0

0

0.25 4.00

4.00

0

0

0.25

0.75

0.502.25

1.000.25

0.75

4.50

0.25

211

7540.00

21

21

0.25

1

NTS

1

1

1

BC

PROGRESS ENERGY CANADA LTD.

0

0

d-023-G/094-G-02

sacks

sacks

11.25

sacks

7.00

25

21

1

0.75

RAISE DERRICK & SUB

2015

WELD CONDUCTER BRL

07:00

5

12

19.00

RG

RGRG

7.00

24.00

12.00

5.00

26

00:00

19:00

07:00

FROST

Ross Guynup

0

0

07:15

24:00

20:00

19:15

1

11:15

RG

09:00

08:3008:15

16:45

12:15

11:30

Ed Tallon

1 of 2

GOOD

CANELSON DRILLING INC.

165

165

21

4.001.00

200/d-002-G/094-G-02/00

1

-13.00

2

7

HORIZ

1

0

CALMW

0

10.5

10.51

1

16:45

GEN#1 9787HRS (0 HRS RUN TODAY) GEN#2 10454HRS (0 HRS RUN TODAY) GEN#3 10494HRS (RUN FOR 14 HRS TODAY)

LP #1, 10666HRS RUN FOR 24 HRS, LP #2 10273HRS (0 HRS RUN TODAY)

19:00 HANG & CHANGE OUT BLOWER CORD IN SERVICE LOOP

1153054

24:00

165

07:00

19:00

165

165

165

Drispac RegularKELZAN

0

STARDRIL

0

0

0 0

0

0

DRESS WELD CONDUCTOR BBL.

RIG UP- INSTALL STEAM HEATERS IN SUB/ STEAM & WATER AROUND

1

SAFETY MEETING PRE. TOUR

UNKN101_20150226_1C

2

2

1

D.W.A.D.G.

09:00

11:30

11:15

0

07:15

07:00

08:30

08:15

06:00

12:15

10.5

2268.00

2.25

250

Pason

00:00

Page 5: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

22:45

19:15

DC (6.75 IN)

22:30

x

2.00

x

0.75

19:00

HWDP(5.0 IN)

15-101-02 2015/02/27 16:45

1

56

59

78

83

84

840

3.00

0

3.75

0.25

0.50

2

240

270

0.00m

3200.00

02

70

NEWALTA 1

1B

21

1

23:00

14.3

21:45

14.3

20:45

14.3

19:45

14.3

56

14.3

73

70

14.3

NEWALTA 2

SHAKERS

14.3 14.3

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

SHAKERS

101

Progress HZ Julienne d-23-G/94-G-2

132.76m

94.91m113.85m

76.17m

0.00m

40.00kdaN

SAFETY MEETING- REVIEW JSA C-12

30261

RIG UPCONTINUE RIG UP KELLY HOSE, UNBRIDLE ,SLIP DRLG LINE,MIX PREMIX

MUD,RIG IN FLOW LINE,INSTALL STEAM HEATERS IN SUB

RIG UP TOP DRIVE CHANGED OUT BLOWER 7-PIN CORD.

CREW CHANGE OVER MEETING

1.25

RIG UP TOP DRIVERIG UP TO SPUD, RIG UP FLOOR TONGS, SPINNER, PASON CORDS, P/U MOUSE HOLES

DRILL 311mm SURFACE HOLE F/0m-57m

CIRCULATE & CHECK FOR LEAKS

PRE -SPUD SAFETY MEETINGETC.STRAP I.D/O.D BHA.

PICK UP DIRECTIONAL TOOLS

1

SAFETY MEETING BEFORE PICKING UP DIRECTIONAL TOOLS

1600

174

16002015/02/27

0.25

57.75m

0.25

1.25

80

0.25

0

3.25

0.25

2.754.00

0.25

1000

1.75

1000

0.25

2.00

1

26520.00

1

21

20:30

20

19:30

21

0.25

NTS

21

2

5

BC

1000

18.73m

1000

PROGRESS ENERGY CANADA LTD.

0.28m

8.55m

4

0

0.3

0.10.1

0.1

5.23m1.50m

sacks

2.81m

each

0.95m

1.27m9.46m

8.97m

0.25

d-023-G/094-G-02

sacks

1.756.75

sackssacks

6.75

5

0.00m

51020

7

10

21

2

3.25

DIRECTIONALDIRECTIONALDIRECTIONALDIRECTIONAL

0.25

RIG UP TO SPUD

TOP DRIVE- REVIEW JSA C-12

2015

PICKING UP DRILL COLLARS- REVIEW JSA B-22

04:00

00:15

57m

158m

07:00

11

1010

1

0.25

5

0.25

12

1830

5.00

1830

13.50

RGRG

8.5

RGRG

8.97m

8.55m

0.28m

1020

7.00

24.00

12.00

5.00

54s/l

0.95m

2.81m

27

2

9.46m

1

1.27m

1.50m

5.23m

00:00

19:00

07:00

0

3

14.314.3

45s/l

14.3

34.7m

84.28m

14.3

7kdaN

14.3

S

14.3

14.3

2

14.3

2

3kdaN

OVERCAST

Ross Guynup

SINGLE

SINGLE

0

0

07:15

24:00

22:45

22:30

19:15

14:15

10

RG

14:0010:00

18:30

RG

16:45

16:30

14:30

311

Ed Tallon

74

1 of 3

73

GOOD

CANELSON DRILLING INC.

165

165

2

57m DRILL

120

311

8

201

1.25

174

127

2.00

174

175

172

SVP616

196

202

205

202

1

1

1

200/d-002-G/094-G-02/00

1

1

21kdaN

1

1

1.75

-17.00

1

1

2

1

S 2

TJ5645

7

HORIZ

32

3000.00Nm

5800.00Nm

0.00m

311

10

0

0.00m

CALMW

40.40m3

1.75

40.4m3

11

9

10.5

4

0.00m

0m

0

1

1

1

1

sackssacks

sackssacks

sackssacks

SINGLE

SINGLE

sacks

18:30

GEN #1 9787 HRS ( 0 HRS RUN TODAY) GEN #2 10469 HRS (RUN FOR 15 HRS TODAY) GEN #3 10504 HRS ( RUN FOR 10 HRS TODAY)

LP#1 10689HRS, (RUN FOR 24 HRS) LP#2 10273 HRS ( 0 HRS RUN TODAY)

202205

231.7

202

201

174175

172

196

19:00

259.4

208249.2

CHECKED POP VALVE PINS,BRAKE PADS, FLOOR & CROWN SAVERS

TOTAL TIME FOR SURVEYS & CONNECTIONS

TJ5645

0

1153054

0

158

J&L SHEARBITS

24:00

165

07:00

19:00

165

2

165

165

Drispac Regular

Sulphamic Acid

Kelzan XCD

Soda Ash

SawdustBentonite

SOAPSTICKS

Drispac RegularStardril

0

Stardril

0

Sawdust

Kelzan XCD

0

110

311

1.75

5.00 4800

1

2

2015/02/27

0

0

71m

RIG SERVICE

89m

DEVIATION SURVEY

DRILL 311MM HOLE FROM 57M-158M

1

SAFETY MEETING- CREW CHANGE OVER

UNKN101_20150227_1D

2

MOTOR HS

BIT

X/O

GAP SUB

2

SLICK COLLAR

1

SLICK COLLAR

SHOCK SUBTORSION SHOCKSUBJARS-HYD/MECH

158.00m

D.W.A.D.G.

14:15

14:00

SVP616

16:30

14:30

07:15

4800

07:00

10:00

06:00

16:4557

J&L SHEARBITS

10.5

DRILL

DWDW

DW

10920.00

0

0.25

0.50

GAP SUB

1.75

SLICK COLLAR

SLICK COLLARMOTOR HS

BIT

3.25

250

DC (6.75 IN)

84

1

83

1

78

1

59

1

Pason

0

0

1

84

34kdaN

1

3kdaN

1

1

1

3040

00:00

00:15

04:00

X/O

14kdaN

SHOCK SUB

30

TORSION SHOCKSUBJARS-HYD/MECH

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 6: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

DC (6.75 IN)

DC (6.75 IN)

DC (6.75 IN)

0.25

DC (6.75 IN)

33.54

2015/02/27 16:45

2

2

77

17501750

3.00

2

270

5.33m

285m

3200.00

NEWALTA 1

10

2

7

74

S 2 2

73

3

5670

NEWALTA 2

DARRYL GIBBONS

13:30

LLOYD BAUER

09:00

GREG EVERSON

83

208.43m

84

208.43m

84

Progress HZ Julienne d-23-G/94-G-2

189.49m

0

170.68m

70

189.49m

56

170.68m

59

151.72m

78

0

JARS-HYD/MECH

TORSION SHOCKSUB

BIT

MOTOR HS

SLICK COLLAR

SLICK COLLAR

GAP SUB

30261

X/O

SHOCK SUB

CREW CHANGE OVER MEETING

DRILL 311mm SURFACE HOLE F/285m- 540MDEVIATION SURVEY/CONNECTIONS

0.40.50.6

WIPER TRIP OUT OF HOLE FR 540M TO 30MCIRCULATE CLEAN HOLE

1

TRIP IN HOLE

174

7000

173

7000

0.6

174

0.8

173

0.2

0.1

2015/02/27

0.25

1.00

1.75

1.25

0.50

0.25

NTSBC

9.37m

18.76m

18.69m

9.33m

0

PROGRESS ENERGY CANADA LTD.

0.28m

8.55m

0.00m

TD

161.7m

84.28m

5.23m1.50m

2.81m

0.95m

1.27m9.46m

8.97m

2.250.506.00

10401040

0

0.00m

0

21

20

5

6B

6A

2

42.1m341.5m3NEWALTA 1NEWALTA 2

PICKING UP H.W.D.P.

DRIFT & PREP CASING- REVIEW JSA B-03

2015

TRIPPING PIPE

545m

4020

1

0.25

7

4.00

7

2.25

12

11.25

RGRG

17

RGRG

11

00:00

1050

45s/l

19:00

44s/l

07:00

0

14.314.314.3

14.3 14.3

14.3

14.3 14.3

1055

5kdaN

OVERCAST

9

Ross Guynup

07:15

18:30

RG

16:45

16:1513:15

RG

19:00

Doug Watchorn

73

73

1 of 6

73

41m3 41m3

73

CANELSON DRILLING INC.

165

165

540m

311

201

0.501.00

5.23m

0.95m

1.27m

1.50m

2.81m

174

175

172

196

202

205

202

200/d-002-G/094-G-02/00

0.28m

1

8.55m

8.97m

9.46m

2

S 2

TJ5645

7

HORIZ

32

SHAKERSSHAKERS

6500.00Nm

7500.00Nm

0.00m

5700.00Nm

311

9

311

0.00m

9

NO

10.5

0.00m

0

1

1

sackseach

sackssacks

1

5.00

277.5

sacks

277.5

COMBIN-ED

273.7

COMBIN-ED

260

273.7

LP #1 10689 HRS ( RUN FOR 24 HRS TODAY ) LP #2 10273 HRS ( 0 HRS RUN TODAY )

266251.8

MATT YARROW/ VERBAL WARNING & WRITTEN WARNINGGEN#1 9787 HRS (0 HRS RUN TODAY) GEN#2 10492 HRS ( RUN FOR 24 HRS TODAY ) GEN #3 10520 HRS (RUN FOR 16 HRS TODAY)

F/T FLOOR & CROWN SAVERS/POP VALVE PINS/ BRAKE PADS

545

CHECK FLOOR /CROWN SAVER/BRAKE PADS/POP VALVES PINS

460m337m

0

545

24:00

165

07:00

19:00

2

165

1

1

2

Soap SticksSawdust

Drispac RegularStardril

78

78

Kelzan XCD

16.00

158m

1050

8641

1050

2

2

2015/02/27

SAFETY MEETING BEFORE LAYING DOWN DIRECTIONAL TOOLS

2

LAY DOWN DIRECTIONAL TOOLS

CONDITION MUD & CIRCULATE/CLEAN HOLE

TRIP OUT OF HOLE FR 545M

1

DRILL 311MM HOLE FR 540M TO 545M

UNKN101_20150228_1D

TRIP IN HOLE

2

MOTOR HS

BIT

X/O

GAP SUB

SLICK COLLAR

SLICK COLLAR

SHOCK SUBTORSION SHOCKSUBJARS-HYD/MECH

545.00m

SVP616

8641

10:4511:30

J&L SHEARBITS

08:0008:4509:30

10:00

07:00

10

DRILL

8568.00

0

DC (6.75 IN)

0.4

4.75

DC (6.75 IN)

0.70.6

14.3

0.70.6

0.25

0.80.8

260

DC (6.75 IN)

DC (6.75 IN)

814.3 8

1830

14.3 14.3 14.3

14.3

1830

10.00

14.3 14.3

1

1

1

1

Pason

1

1

1

1

1

40

J&L SHEARBITS

00:00

05:00

05:15

23:00

21:30

22:45

8

19:30

x

19:45

x

2

x

10

19:00

15-101-02

56

59

78

83

84

840

1.75

0

0.25

5.00

240

30

22

02

1

1

1

1

1

1

1

1

1

70

285

14.314.3

14.314.3

73

NEWALTA 1

14.3

73NEWALTA 2

WT

14.3

73

73

14.3 14.3

101

397.59m

303.13m

284.2m

378.67m359.72m340.88m321.94m

0.33m

48.00kdaN

DRILL 311MM HOLE FROM 158M-285M

RIG SERVICE

40.00kdaN

DEVIATION SURVEY

44.00kdaN

285.00m

10201020

0.25

540.00m

1.00

77

77

0.501.75

6.003.00

0.50

10

23920.00

2

21

6A

6B

0.25

5D

00

02:00 03:00

1212

40

2

2

1030

d-023-G/094-G-02

1030

5.00 0.25

0

0.25 1.751.75

05:15

05:00

540m

07:00

127

174

5

00

8.97m

8.55m

0.28m

0

7.00

24.00

12.00

5.00

0.95m

28

2.81m

9.46m

1.27m

1.50m

5.23m

18.76m

1020

3

9.33m

1020

5kdaN

SHAKERS

18.69m

SHAKERS

9.37m

6kdaN

S 22

G

37kdaN

1

5

24:00

6

23:00

22:45

21:30

19:45

19:30

0

311

GOOD

0

DRILL

0.00m

174

311

201

202

173

174

173

124.3

sacks

115.9

255

1.75

108.8

117.8

251.6

SVP616

266.8

1

1

11

1

6.00

1

-12.00

1

11

192m 208m

X

0.00m

CALM

0

N

1

10.5

1

2

285m

sackssacks

sackssacks

DC (6.75 IN)

1

each

1

HWDP(5.0 IN)

196

172

205

COMBINED

202

COMBINED

175

174

202205

202

201

174175

172

196

48s/l46s/l

TJ5645

0

1153054

02:00

J&L SHEARBITS

01:45

03:0003:00

04:00

01:00

165

00:45

165

77

77

311

0

SawdustStardril

16.25

Kelzan XCD

DRILL

Drispac RegularBentoniteSoap Sticks

2015/02/27 7200

7200

2

2

1

BOILER BLOW DOWN X3

VISUALLY INSPECTED BRAKE PADS

SVP616

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

D.W.A.D.G.

18:30

16:45

07:15

07:00

16:15

13:15

06:00

540

DWDW

DW

1

GAP SUBSLICK COLLAR

SLICK COLLARMOTOR HS

BIT

8483

78

59

0

0

14kdaN

84

TJ5645

X/O

40

SHOCK SUBTORSION SHOCKSUBJARS-HYD/MECH

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 7: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

19:15

50

19:30

19:00

1

x

0.25

15-101-02 2015/02/27 16:45

1.00

1.50

0.25

0.25

3.25

0.50

0.25

270

220

6.754.250.75

x

x

3200.00

03

12

NEWALTA 1

5

21

21

12

7

12

NEWALTA 2

LLOYD BAUER

DARRYL GIBBONS

DARRYL GIBBONS

101

Progress HZ Julienne d-23-G/94-G-2

RIG SERVICE WASH FLOOR

RIG IN TONG HAND

30261

SAFETY MEETING BEFORE RUNNING CASING, ELEVATOR CERT #81113

36.00kdaN

RUN 41 JOINTS OF 244.50mm,59.53Kg/m, L-80 CASING, SET @ 545m

SAFETY MEETING/HAND OVER NOTES

CEMENTING 244.5MM L-80 CASING/ PLUG DOWN@ 7:30RIG OUT CEMENTERS/FLUSH CONDUCTOR

0

PRESSURE TEST BOWL

PRE HEAT BOWL/CUT CONDUCTOR /CUT CASINGWAIT ON CEMENT/RIG OUT FLOW LINE /BLOW OUT CASING/

1

LET BLOW COOL

WELD ON BLOW

4.50

SAFETY MEETING BEFORE CEMENTING CASING

CIRCULATE CASING & WORK PIPE

RFC@1740KG/M3 75%EXCESS OVER GAUGE HOLE F/0-545M.DISPLACE W/21M3.WATERPLUG

0

CEMENT SURFACE CASING W/SCHLUMBERGER: PUMP 4M3 WATER PRE-FLUSH, 30t 28M3

0

DOWN W/8MPA@07:40 W6/M3 GOOD CEMENT RETURNS PT CSG TO 14MPA

0

0.50

4.50

0

0

0.25

0.25

4.251.50

0.250.50

0.50

1.25

3.50

12C12C

18980.00

21

14

14

0.25

14

NTS

13

14

BC

00

05:30

PROGRESS ENERGY CANADA LTD.

0

0

0

d-023-G/094-G-02

0

0.251.50

00

0

14

21

21

57m3NEWALTA 1NEWALTA 2

CUTTING CONDUCTOR /NIPPLING UP BOP

RUN CASING

2015

NIPPLE UP B.O.P.

00:45

00:15

07:00

04:15

01:00

06:00

05:45

0.25

5

00

1.50

12

00

RG

RGRG

0

7.00

24.00

12.00

5.00

01

00:00

19:00

07:00

1070

PARTLY CLOUDY

Ross Guynup

0

1.5

07:15

24:00

19:30

19:15

13:45

RG

12:15

08:0007:30

RG

19:00

18:30

15:00

Doug Watchorn

1 of 3

GOOD

CANELSON DRILLING INC.

165

165

1.25

4.75

200/d-002-G/094-G-02/00

1

-14.00

2

7

HORIZ

545m

SHAKERS

0

CALMW

0

10.5

11

sackssacks

1

1

BOILER BLOW DOWN X1

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

SINGLE

VISUALLY INSPECTED BRAKE PADS

SINGLE

D.W.A.D.G.

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

53s/l

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

1153054

24:00

165

07:00

19:00

165

165

165

0

56

0

0

Desco CFBentonite

0

500

500

NIPPLE UP B.O.P

1

SAFETY MEETING BEFORE NIPPLING UP B.O.P.

UNKN101_20150301_1D

CREW CHANGE OVER MEETING

2

2

1

CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS

13:45

12:15

18:30

15:00

0

07:15

07:00

08:00

07:30

06:00

10.5

DWDW

DW

6090.00

0.50

11.254.255.50

275

00

Pason

00:00

00:15

00:45

01:0004:15

05:45

06:00

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 8: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

22:00

22:15

19:15

1

TORSION SHOCKSUB

19:30

2.00

2

DC (6.75 IN)

0.50

19:00

1

JARS-HYD/MECH

HWDP(5.0 IN)

15-101-02 2015/02/27 16:45

1

0.50

69

72

72

69

72

0.75

72

3.25

0

0

563

638

0.25

1.00

1680

2.00

1140

732

1

275

2.25

240

0.50

15

4.14m

x

x

x

3200.00

03

59

NEWALTA 1

15

15

14

21

11.9

20:45

11.9

20:15

11.9

19:30

11.9

19:00

11.9

NEWALTA 1

70

69

11.9

22:00

NEWALTA 256

59

15

21:30

73

NEWALTA 2

21:15

73

SHAKERS

LLOYD BAUER

DARRYL GIBBONS

18:3014:30

DARRYL GIBBONS

SHAKERS

101

Progress HZ Julienne d-23-G/94-G-2

678.12m

583.18m

564.42m

659.12m640.2m621.05m602.21m

07:00

791.93m810.91m

754.04m772.98m

715.89m734.91m

697m

0.00m

INSTALL ROTATING HEAD FLANGE

57.00kdaN

SAFETY MEETING BEFORE PRESSURE TESTING B.O.P.

30261

PRESSURE TEST UPPER, LOWER PIPES & BLIND RAMS, KILL LINE VALVES, INSIDE

B.O.P, STABBING VALVE, WORKING SPOOLS, CHOKE & CHOKE LINES TO 1000 kPa LOW,

SAFETY MEETING/HAND OVER NOTES

1.75

PICK UP MOUSE HOLES/RIG UP KATCH KAN AND OVER FLOW LINE/FUNCTION CROWN

SAVER/PRE SPUD CKECK LIST

DRILL 222MM HOLE FR 551M TO 562M

0.3

0

PRESSURE TEST/LEAK OFF TEST

0.30.4

TRIP IN HOLE/TAGED CEMENT @ 525MDIRECTIONAL WORK/SAFETY MEETING/PICK UP TOOLS

DRILL CEMENT/DRILL OUT CEMENT/DRILL FLOAT&SHOE TO 551M

1

DISPLACE TO OIL BASE

ACCUMULATOR FUNCTION TEST 4 FUNCTIONS STARTING PRESSURE-20500 kPa, FINAL

21000kPa HIGH & HOLD FOR 10 MIN EACH, ANNULAR 10500 kPa, FOR 10 MINS

kPa

10500

174

PRESSURE 11250 kPa, RE-CHARGE TIME 2 MIN 15 SECS, PRE-CHARGE PRESSURE 6800

10500

175

0.4

174

INSTALL WEAR BUSHING

0.5

173

0.2

2015/03/02

0.3

0

0.50

696.12m

1.75

2.50

0.25

80

0.25

0

0.25

2.001.00

2.25

0.50

1100

0.50

1100

0.50

1.25

14A

16380.00

21

2C

23:00

5B

21:30

0.25

6A

NTS

20

2

12E

BC

1100

1.50m

1100

18.69m

5.23m

9.37m

PROGRESS ENERGY CANADA LTD.

55

49

40

4000

0.29m

8.97m

4

0

00.10.50.1

0.40.4

0.1

2.81m0.78m

9.13m

9.32m

1.67m9.18m

4.65m

0.251.00

0

0.50

d-023-G/094-G-02

0

3.00

10401050

5

9.50m

5

10

1090

2

7

21

21

2.50

NEWALTA 1

0.25

NEWALTA 2

PICKING UP BHA

PRESSURE TEST B.O.P.

2015

B.O.P. DRILL

01:15

01:00

696m

05:45

890m

04:30

05:15

05:45

0.50

5

0

1.00

0

0.50

12

RG

1750

RG

5.50

1750

RG

2090

RG

3589

RGRG

4.65m

8.97m

0.29m

1090

7.00

24.00

12.00

5.00

68s/l

9.32m

9.13m

02

9.18m

1.67m

0.78m

2.81m

00:00

1120

INSTALL KACTH-KAN AND KILL LINES

19:00

105s/l

07:00

71s/l

710.06m

545

84.28m

11.9

71s/l

SHAKERS

5.23m

SHAKER

1.50m

11.9 11.9

9kdaN

11.9

11.9 11.9

1110

8kdaN

BLOWING SNOW

Ross Guynup

SINGLE

SINGLE

0

24:00

0

07:15

22:15

22:00

19:30

19:15

12:30

1

11:30

RG

09:30

15:15

RG

14:45

14:15

RG

13:00

Doug Watchorn

222

73

70

1 of 3

74

70m3

56

63.50m3

GOOD

CANELSON DRILLING INC.

165

165

696m DRILL

222

184

1.25

127

1.25

175

174

2.00

173

315.4301.5

350.5

315.8

4.50

345.3

1.00

172

168

163

325.6

DP606X

165

276.2

165

161

167

1

1

11

200/d-002-G/094-G-02/00

25

1

1

1

2.50

-17.00

1

2

11

7149525

7

HORIZ

9500.00Nm

9500.00Nm

28.49m

222

21A

0

0.00m

UP TO 39 KM/HW

6

71m375m3

1

10.5

1

11

12

1

0.00m

545m

sacks

545

bblbbl

2

bbl

1

2

1

SINGLE

SINGLE

15:15

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

15:30

16:45

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

17:00

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

D.W.A.D.G.

165161

212.9

167

184

172168

163

165

10415kPa

19:00

918.8

15:30

145.382.2

17:00

346

16:45

3.3

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

DRILL 222MM HOLE FR 563M TO 696M

RIG SERVICE/FUNCTION UPPER HCR 3 SEC TO OPEN

DEVIATION SURVEY/CONNECTIONS

BOP DRILL WITH CREW WELL SHUT IN IN 90 SEC

690m551m

7149525

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

0

1153054

1

345

HUGHES

24:00

165

07:00

19:00

1

1

165

165

165

1

2

0

0

0

104

222

2.50

1

1

5.00

Lime - HydratedOpti-WetOpti-PlusOpti-Mul

17500

11201050

1

1

0

2015/03/02

0

75

TOTAL TIME FOR SURVEYS & CONNECTIONS

790m

DRILL 222mm HOLE F/696m-890m

866m

RIG SERVICE FUNCTION LOWER PIPE RAMS 4 SECS TO CLOSE(RS)

B.O.P. DRILL WELL SECURE IN 85 SECS

1

CREW CHANGE MEETING

UNKN101_20150302_1C

2

MOTOR LS

BIT

1.25

SPIRAL NM

GAP SUB

2

SPIRAL NM

1

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

7

2

10

890.00m

CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

12:30

11:30

DP606X

14:15

13:00

07:15

17500

07:00

09:30

06:00

14:45151

18:0018:30

HUGHES

16:0016:3017:15

17:30

15:30

10.5

DWDW

DRILL

DWDWDW

DW

3906.00

0

1.25

2.00

1.25

0.25

0.25

0.25

GAP SUB

DC (6.75 IN)

3.75

SPIRAL NM

DC (6.75 IN)

PONY SLICKCOLLAR

MOTOR LS

4.50

BIT

3.250.50

2.50

275

TORSION SHOCKSUB

JARS-HYD/MECH

00

72

1

69

1

72

1

72

1

Pason

0

0

1

72

60kdaN

1

1

1

1

4052

00:00

01:00

01:15

04:30

SPIRAL NM

14kdaN

SPIRAL NM

30

X/O

05:15

SHOCK SUB

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 9: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

TORSION SHOCKSUB

DC (6.75 IN)

0.25

JARS-HYD/MECH

HWDP(5.0 IN)

2015/02/27 16:45

2

2

1720

3.25

1130

1379

2

275

1.26m

1122m

3200.00

NEWALTA 1

10

2

7

70

73

56

6959

NEWALTA 2

74

SHAKERS

LLOYD BAUER

11:00

DARRYL GIBBONS

08:00

DARRYL GIBBONS

69

1000.67m

72

981.67m

72

Progress HZ Julienne d-23-G/94-G-2

962.7m

0

943.76m

59

924.76m

69

905.83m

72

886.87m

72

0

SHOCK SUB

X/O

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES

DRILL 222MM HOLE FR 1122M TO 1390MRIG SERVICE/FUNCTION UPPER PIPES 5 SEC TO CLOSE

0.80.50.9

DEVIATION SURVEY/CONNECTIONS /WORK PIPE

1

174

15000

175

15000

0.4

127

0.2

173

0.2

0.8

2015/03/02

0.25

0.25

0.50

3.50

0.25

0.25

NTSBC

1.50m

710.06m

5.23m

84.28m

9

PROGRESS ENERGY CANADA LTD.

55

50

50

903

.26m

8.97m

1055

0.00m

5.23m

1.50m

2.81m

710.06m

0.78m

84.28m

9.13m

9.32m

1.67m9.18m

4.65m

0.258.25

10701080

0

0.00m

0

7

21

20

6

21

5

60m369m3NEWALTA 1NEWALTA 2

PICKING UP PIPE

WORKING IN COLD WEATHER

2015

P.O.O.H

184

0.75

4558

7

3.50

7

0.25

RG

12

12.75

RG

RG

3850

9

3767

1

RG

75

RG

742

00:00

1100

67s/l

19:00

61s/l

07:00

1390

10.310.310.3

11.9 10.3

10.3

11.9 11.9

1100

8kdaN

OVERCAST

1

Ross Guynup

SINGLE

SINGLE

07:15

RG

19:00

15:4515:30

RG

RG

Doug Watchorn

73

70

1 of 8

74

70m3 68m3

56

CANELSON DRILLING INC.

165

165

222

184

0.750.50

2.81m

9.32m

1.67m

0.78m

9.13m

172

168

163

165

165

161

167

200/d-002-G/094-G-02/00

0.29m

8.97m

1

4.65m

68kdaN

9.18m

2

7 1

7149525

7

HORIZ

3

SHAKERSSHAKERS

9500.00Nm

9500.00Nm

540.87m

9500.00Nm1

1

222

10

222

256.12m

2

2

11

0.00m

545

2

1

sackssacks

m3sacks

4.50

71.8100.3

SINGLE

33.5

SINGLE

133.6

42.3

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

358.3180.3

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

D.W.A.D.G.

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

4075

3850

1230m1120m

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

19

24:00

165

07:00

19:00

1

165

1

9

75

Lime - Hydrated

BariteBentone 150

0

104

Base Oil

17.75

890m

1100

0

1080

2

2

2015/03/03

RIG SERVICE FUNCTION BLIND RAMS(OUT OF HOLE) 4 SECS TO CLOSE(RS)

SAFETY MEETING BEFORE WORKING WITH DIRECTIONAL TOOLS

2

LAY DOWN M.W.D. TOOL & CHANGE BIT

P.O.O.H. FLOW CHECK @ 1387m,1254m, 713m & OUT OF HOLE HOLE FILL CAL-12.19m3,

ACTUAL-12.20m3, DIFF-+0.01m3

1

CIRCULATE BOTTOMS UP

UNKN101_20150303_1C

CREW CHANGE OVER MEETING

2

MOTOR LS

BIT

SPIRAL NM

GAP SUB

SPIRAL NM

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

1389.97m

DP606X

0

11:1512:00

HUGHES

08:1509:0009:45

10:30

07:30

11

DRILL

10122.00

0

DC (6.75 IN)

0

5.50

HWDP(5.0 IN)

0.50

0.50.3

0.50.3

270

TORSION SHOCKSUB

JARS-HYD/MECH

11.9

1750

11.9 11.9

11.9

1750

9.50

11.9 11.9

1

1

1

1

Pason

1

1

14kdaN

1

1

1

HUGHES

31

00:00

04:30

04:45

23:15

23:45

23:00

84

19:15

19:30

2070

19:00

15-101-02

69

72

72

69

72

720

2.25

0

1055

1132

1170

0.25

4.50

270

202

2025

112

x

x

x

03

1

1

1

1

1

1

1

1

1

59

577

11.911.9

11.911.9

70

NEWALTA 1

11.9

56NEWALTA 2

11.9

74

73

101

1247.31m

1152.41m

1133.42m

1228.3m1209.33m

1190.39m

1171.41m

1.26m

75.00kdaN

DRILL 222mm HOLE F/890m-1122m

RIG SERVICE FUNCTION ANNULAR 8 SECS TO CLOSE(RS)

72.00kdaN

TOTAL TIME FOR SURVEYS & CONNECTIONS

73.00kdaN

1122.88m

11001100

0.50

1390.00m

0.50

100

110

3.25

8.250.25

1100

7

34840.00

2

21

19:00

0.25

10

00

00:00 03:30

1212

52

1357

40

50

0

0

1090

d-023-G/094-G-02

1090

4.50 0.25

0

3.500.25 0.25

04:45

04:30

1390m

07:00

127

174

173

175

5

00

4.65m

8.97m

0.29m

0

7.00

24.00

12.00

5.00

9.32m

9.13m

03

9.18m

1.67m

0.78m

2.81m

710.06m

1100

84.28m

1100

9kdaN

52s/l

SHAKERS

5.23m

SHAKERS

1.50m

66kdaN

24:00

0

23:45

6.5

23:15

23:00

19:30

19:15

0

222

GOOD

545

18.89m

127

222

184

167

175

174

173

289.7

m3

324

bbl

293.4

bblsacks

2.25

299.4

312.1

332.6

Z713

267.9

1

1

11

1

8.25

1

-24.00

1

11

890m 1018m

540.87m

CALMW

63m3

1

10.5

9

1

1122m

sacksm3

sackssacks

TORSION SHOCKSUB

3

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

165

163

161

SINGLE

165

SINGLE

168

172

165161

167

184

172168

163

165

10469kPa

10469kPa

10469kPa

69s/l68s/l

JK2152

19

1153054

SMITH

01:4501:00

02:4502:15

03:15

00:30

165

00:00

165

62

0

222

Opti-Mul

2

Opti-Plus

2

Used InvertBase Oil

1

Cal Chloride Powder

2

0.00

Ultraseal XP

DRILL

Gilsonite HTLime - HydratedBarite

2015/03/02 17000

17000

75

1390m

2

1

DP606X

CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

07:15

07:00

15:45

15:30

06:00

845

DW

DWDWDW

DW

2

GAP SUBSPIRAL NM

PONY SLICKCOLLAR

MOTOR LS

BIT

7269

72

72

0

0

14kdaN

72

68kdaN

7149525

14kdaN

SPIRAL NM

35

SPIRAL NM

X/OSHOCK SUB

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 10: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

TORSION SHOCKSUB

DC (6.75 IN)

JARS-HYD/MECH

0.25

HWDP(5.0 IN)

2015/02/27 16:45

2

2

17601150

0.75

275

0.00m

1407m

3200.00

NEWALTA 1

2

7

6

5

70

73

56

6959

74

NEWALTA 2

LLOYD BAUER

11:00

DARRYL GIBBONS

09:00

DARRYL GIBBONS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

0

59

69

1399.19m

72

72

0

SHOCK SUB

X/O

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES

DRILL 222MM HOLE FR 1407M TO 1463MDEVIATION SURVEY/CONNECTIONS

TRIP OUT OF HOLE

BACK REAMING FR 817M TO 589M

TRIP OUT OF HOLE FR 1463M /FLOW CHECK @ 1462, 1343 /WORK TIGHT SPOT @ 980M

CIRCULATE BOTTOMS UP/MIX PILL

1

CIRCULATE OUT GAS @ 817M

/FLOW CHECK @ 817M

174

11500

175

11500

0.7

127

1732015/03/03

0.75

1.75

0.50

0.25

0.25

0.25

1.25

NTSBC

1.50m

710.06m

5.23m

84.28m

19

PROGRESS ENERGY CANADA LTD.

39

.24m

1397

8.95m

0.00m

5.23m

1.50m

2.81m

710.06m

0.78m

84.28m

9.13m

9.32m

1.67m9.18m

4.65m

3.001.001.006.00

10901100

0

0.00m

0

20

6

20

7

21

21

6

65m3NEWALTA 1NEWALTA 2

WASHING THE SUB

R.I.H.

2015

P.O.O.H

642

0.50

3

1.00

3

10.001.50

RG

12

RG

8.25

RG

2300

9

1

RGRG

75

58

00:00

1120

55s/l

19:00

52s/l

07:00

1463

15.9 15.9 15.9

1110

10kdaN

PARTLY CLOUDY

1

Ross Guynup

07:15

17:00

RG

14:30

14:0013:15

RG

19:00

18:30

RG

17:30

Doug Watchorn

73

70

1 of 6

74

63m3 60m3

56

CANELSON DRILLING INC.

165

165

222

184

0.751.25

2.81m

9.32m

1.67m

0.78m

9.13m

172

168

163

165

165

161

167

200/d-002-G/094-G-02/00

.26m

1

8.97m

4.65m

75kdaN

9.18m

2

6 2

JK2152

7

HORIZ

X7

SHAKERS

8500.00Nm

626.36m

8500.00Nm1

222

0

222

540.87m

7

10.5

9.50m

1390

3

1

sackssacks

sackssacks

2.25

SINGLE

SINGLE

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

277.6

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

D.W.A.D.G.

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

2300

1445m1424m

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

22

24:00

165

07:00

19:00

1

165

1

9

75

Bentone 150

Cal Chloride PowderBarite

0

Lime - Hydrated

78

8.25

1390m

1120

0

1100

2

2015/03/04

PICK UP & SCRIBE DIRECTIONAL TOOLS PUT ON BIT

R.I.H FLOW CHECK @ 731m & FILL PIPE

LAY DOWN DIRECTIONAL TOOLS

2

RIG SERVICE WASH FLOOR FUNCTION BLIND RAMS(OUT OF HOLE) 4 SECS TO CLOSE(RS)

ACTUAL-10.02m3, DIFF-+0.34m3

SAFETY MEETING BEFORE WORKING WITH DIRECTIONAL TOOLS

1

P.O.O.H FLOW CHECK @ 546m & OUT OF HOLE HOLE FILL CAL-9.68m3,

UNKN101_20150304_1C

CREW CHANGE OVER MEETING

2

MOTOR LS

BIT

SPIRAL NM

GAP SUB

SPIRAL NM

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

1474.16m

Z713

0

SMITH

10:30

10

DRILL

8022.00

1

0.5

DC (6.75 IN)

HWDP(5.0 IN)

0.75

10.3

270

TORSION SHOCKSUB

JARS-HYD/MECH

10.3

1750

10.3 10.3 10.3

11.9

1750

2.25

11.9 11.9

1

1

1

1

Pason

1

1

14kdaN

1

1

1

SMITH

00:00

04:00

04:30

06:45

21:15

21:30

20:30

20:45

84

19:15

19:00

15-101-02

69

72

72

69

72

720

2.25

0

0.25

1397

0.50

4.00

240

x

x

x

03

1

1

1

1

1

1

1

1

1

59

17

10.310.3

10.311.9

70

NEWALTA 1

11.9

56NEWALTA 2

11.9

74

73

10.3 10.3

22:15

101

1437.21m

7.79m

50.00kdaN

MAKE UP BIT & R.I.H. FLOW CHECK @ 608m & FILL PIPE, INSTALL ROTATING HEAD

CIRCULATE BOTTOMS UP @ REDUCE RATE

77.00kdaN

PATTERN BIT & DRILL 222mm HOLE F/1390m-1407m

77.00kdaN

RIG SERVICE FUNCTION UPPER PIPE RAMS 4 SECS TO CLOSERS)

1407.72m

11101110

0.50

1463.00m

1.25

78

0

0.502.50

6.000.75

1.00

0.50

0.50

10

45240.00

2

21

5D

6B

0.25

5D

6B

3B

00

06:00

1212

39

15

0

0

1100

d-023-G/094-G-02

1100

2.25 0.254.000.50

0

3.00 0.25

04:30

04:00

1463m

07:00

06:45

127

174

173

175

5

00

4.65m

8.97m

.26m

0

7.00

24.00

12.00

5.00

9.32m

04

9.13m

9.18m

1.67m

0.78m

2.81m

710.06m

84.28m

1110

10kdaN

SHAKERS

5.23m

SHAKERS

1.50m

75kdaN

24:00

22:15

0

21:30

3

21:15

20:45

20:30

19:15

0

222

GOOD

1390

19.01m

127

222

184

167

175

174

173

354.9

FHi50

1

1

11

1

-22.00

6.00

11

11

1397m

597.87m

CALMW

1

10.5

9

1

1407m

TORSION SHOCKSUB

4

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

165

163

161

SINGLE

165

SINGLE

168

172

165161

167

184

172168

163

165

10362kPa

10415kPa

10415kPa

58s/l

RD6946

21

1153054

SMITH

165

06:15

165

0

0

222

2

1

0.00

DRILL

Barite

2015/03/03 11500

11500

75

2

1

Z713

CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

14:30

17:30

17:00

07:15

07:00

14:00

13:15

06:00

18:3073

DW

DWDWDW

DW

3

GAP SUBSPIRAL NM

PONY SLICKCOLLAR

MOTOR LS

BIT

7269

72

72

0

0

14kdaN

72

75kdaN

JK2152

14kdaN

SPIRAL NM

15

SPIRAL NM

X/OSHOCK SUB

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 11: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

TORSION SHOCKSUB

DC (6.75 IN)

JARS-HYD/MECH

0.25

HWDP(5.0 IN)

2015/02/27 16:45

2

2

17601240

0.50

1512

2

270

0.39m

1474m

3200.00

NEWALTA 1

2

6

5

70

6

73

2 7

56

X

6959

NEWALTA 2

74

SHAKERS

LLOYD BAUER

11:00

DARRYL GIBBONS

08:00

DARRYL GIBBONS

SHAKERS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

0

59

69

72

72

0

SHOCK SUB

X/O

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES

DRILL 222MM HOLE FR 1474M TO 1509MRIG SERVICE/FUNCTION LOWER HCR 3 SEC TO OPEN

DEVIATION SURVEY/CONNECTION

1

174

10000

175

10000

1.7

127

1.3

1732015/03/04

0.25

0.25

4.50

NTSBC

1.50m

710.06m

5.23m

84.28m

22

PROGRESS ENERGY CANADA LTD.

52

.24m

8.95m

0.00m

5.23m

1.50m

2.81m

710.06m

0.78m

84.28m

9.13m

9.32m

1.67m9.18m

4.65m

0.2511.00

10201040

5

19.00m

5

7

21

2

71.5m373m3NEWALTA 1NEWALTA 2

WASHING RIG

R.I.H

2015

WASHING SUB

1522m

584

555

104

0.50

44

1.500.75

RG

12

RG

20.25

RG

4340

9

1

RGRG

75

103

00:00

1180

59s/l

19:00

55s/l

07:00

1463

15.9 15.9 15.9

1170

24kdaN

PARTLY CLOUDY

1

Ross Guynup

SINGLE

SINGLE

07:15

RG

19:00

18:3018:15

RG

RG

Doug Watchorn

73

70

1 of 6

74

70m3 69m3

56

CANELSON DRILLING INC.

165

165

1509m

222

184

0.50

2.81m

9.32m

1.67m

0.78m

9.13m

172

168

163

165

165

161

167

200/d-002-G/094-G-02/00

.24m

1

8.95m

4.65m

79kdaN

9.18m

2

6 2

RD6946

7

HORIZ

X7

SHAKERSSHAKERS

2800.00Nm

8500.00Nm

654.81m

2800.00Nm

222

0

222

626.36m

11.5

1

10.5

0.00m

1463

4

1

bblsacks

m3bbl

sacks

4.75

sackssacks

SINGLE

sacks

SINGLE

sacks

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

D.W.A.D.G.

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

1487m1475m

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

23

59

24:00

165

07:00

19:00

1

165

1

9

75

BariteBentone 150

Ultraseal XPGilsonite HT

Lime - HydratedCyber Seal

Opti-MulOpti-Plus

0

78

Base Oil

15.75

1463m

1170

15216

1040

3

2

2015/03/04

2

RIG SERVICE FUNCTION UPPER PIPE RAMS 4 SECS TO CLOSE(RS)

1

DRILL 222mm HOLE F/1509m-1522m

UNKN101_20150305_1D

CREW CHANGE OVER MEETING

2

MOTOR LS

BIT

SPIRAL NM

GAP SUB

SPIRAL NM

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

1522.00m

FHi50

15216

SMITH

13:4507:45

10.5

DRILL

6342.00

0

DC (6.75 IN)

HWDP(5.0 IN)

0.50

4.50

270

TORSION SHOCKSUB

JARS-HYD/MECH

1260

15.9

2000

4.75

15.9 15.9

1

1

1

1

Pason

1

1

14kdaN

1

1

1

20

SMITH

51

00:00

01:30

02:15

256

19:15

23:45

81

19:00

15-101-02

69

72

72

69

72

720

4.75

0

1475

0.75

1.50

270

x

x

x

03

1

1

1

1

1

1

1

1

1

59

11

15.9

70

NEWALTA 1

15.9

56NEWALTA 2

15.9

74

73

101

1494.12m

1475.13m

6.39m

81.00kdaN

R.I.H. & INSTALL ROTATING HEAD

CIRCULATE BOTTOMS UP @ REDUCE RATE

81.00kdaN

PATTERN BIT & DRILL 222mm HOLE F/1463m-1474m

81.00kdaN

1474.16m

11701030

0.25

1509.00m

78

0

0.50

11.000.25

11701170

7

41600.00

2

21

23:4522:00

0.25

10

10401170

02:30 05:30

1212

4000

15

4.5

0

1010

d-023-G/094-G-02

1030

4.75 1.500.75

1040

4.50 0.25

02:15

01:30

1509m

07:00

127

174

173

175

5

12401760

4.65m

8.95m

.24m

1020

7.00

24.00

12.00

5.00

52s/l

9.32m

05

9.13m

9.18m

1.67m

0.78m

2.81m

710.06m

1170

X

84.28m

1130

18kdaN

52s/l

SHAKERS

5.23m

SHAKERS

1.50m

24kdaN

6 72

79kdaN

0

5.5

24:00

23:45

19:15

2

222

GOOD

1463

DRILL

0.00m

127

222

184

167

175

174

173

1.7

FHi50

350.1

1

1

11

1

11.00

1

-12.00

1

11

1463m 1470m

654.81m

CALMW

65m365.5m3

1

10.5

9

1

1474m

bblm3

TORSION SHOCKSUB

4

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

165

163

161

SINGLE

165

SINGLE

168

172

165161

167

184

172168

163

165

10095kPa

10095kPa

10095kPa

58s/l60s/l

RD6946

23

1153054

SMITH

165

165

0

103

222

0

1

20.25

DRILL

Used InvertOpti-WetBarite

2015/03/04 10000

10000

75

1517m 1521m

2

1

FHi50

CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

07:15

07:00

18:30

18:15

06:00

46

DW

DWDWDW

DW

4

GAP SUBSPIRAL NM

PONY SLICKCOLLAR

MOTOR LS

BIT

7269

72

72

0

0

14kdaN

72

76kdaN

RD6946

14kdaN

SPIRAL NM

20

SPIRAL NM

X/OSHOCK SUB

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 12: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

TORSION SHOCKSUB

DC (6.75 IN)

JARS-HYD/MECH

0.25

HWDP(5.0 IN)

2015/02/27 16:45

2

2

17501210

1549

2

270

4.62m

1543m

3200.00

NEWALTA 1

2

2

7

70

6

73

2 7

56

X

6959

NEWALTA 2

74

SHAKERS

LLOYD BAUER

11:00

DARRYL GIBBONS

08:00

DARRYL GIBBONS

SHAKERS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

0

59

69

72

1541.46m

72

0

SHOCK SUB

X/O

1588.88m

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES

DRILL 222MM HOLE FR 1543M TO 1587MRIG SERVICE/FUNCTION ANNULAR 15 SEC TO CLOSE

1

174

15000

175

15000

2.6

127

1732015/03/04

0.25

4.75

NTSBC

1.50m

710.06m

5.23m

84.28m

24

PROGRESS ENERGY CANADA LTD.

52

51

.24m

1512

8.95m

2.47m

5.23m

1.50m

2.81m

710.06m

0.78m

84.28m

9.13m

9.32m

1.67m9.18m

4.65m

0.2511.50

10401060

5

9.50m

5

21

2

66m365m3NEWALTA 1NEWALTA 2

WORKING WITH INVERT MUD

RIG SERVICE

2015

HOUSEKEEPING

1602m

1

155

1015

0.50

55

RG

12

RG

23.00

RG

4000

9

4002

1

RG

75

1686

00:00

1170

51s/l

19:00

52s/l

07:00

1463

15.9 15.9 15.9

1170

24kdaN

FROST

1

Ross Guynup

SINGLE

SINGLE

07:15

RG

19:0018:45

RG

RG

Doug Watchorn

73

70

1 of 6

74

65.50m3 65m3

56

CANELSON DRILLING INC.

165

165

1587m

222

184

0.50

2.81m

9.32m

1.67m

0.78m

9.13m

172

168

163

165

165

161

167

200/d-002-G/094-G-02/00

.24m

8.95m

1

4.65m

76kdaN

9.18m

2

6 2

RD6946

7

HORIZ

X7

SHAKERSSHAKERS

3500.00Nm

4200.00Nm

740.08m

3500.00Nm1

222

0

222

683.25m

11.5

1

10.5

0.00m

1463

4

1

sackssacks

sacksm3

6.75

sackssacks

SINGLE

bbl

SINGLE

bbl

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

188

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

D.W.A.D.G.

205.1

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

4000

1561m1525m

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

26

139

24:00

165

07:00

19:00

1

165

1

9

75

Opti-Plus

Cyber SealOpti-Mul

Gilsonite HTUltraseal XP

Base OilLime - Hydrated

0

103

Barite

38.00

1522m

1170

14900

1060

2

3

2015/03/04

2

1

DRILL 222mm HOLE F/1587m-1602m

UNKN101_20150306_1E

CREW CHANGE OVER MEETING

2

MOTOR LS

BIT

SPIRAL NM

GAP SUB

SPIRAL NM

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

1602.00m

FHi50

14900

SMITH

14:00

10

DRILL

5250.00

0

DC (6.75 IN)

3

HWDP(5.0 IN)

4.75

270

TORSION SHOCKSUB

JARS-HYD/MECH

1240

15.9

1760

27.00

15.9 15.9

1

1

1

1

Pason

1

1

14kdaN

1

1

1

20

SMITH

52

00:00

03:00

03:15

84

19:15

55

19:00

15-101-02

69

72

72

69

72

720

3.75

0

1512

1549

0.25

3.00

240

51

55

1

x

x

x

03

1

1

1

1

1

1

1

1

1

59

80

19:45

15.9

70

NEWALTA 1

15.9

56NEWALTA 2

15.9

74

73

101

1569.88m

0.00m

80.00kdaN

DRILL 222mm HOLE F/1522m-1530m

RIG SERVICE FUNCTION LOWER PIPE RAMS 4 SECS TO CLOSE(RS)

81.00kdaN

DRILL 222mm HOLE F/1530m-1543m

80.00kdaN

1543.00m

11701040

0.25

1587.88m

103

0

11.500.25

11701170

7

35360.00

2

21

23:4520:00

0.25

10601170

00:00 03:00

1212

4002

51

20

4.75

0

1.2

1020

d-023-G/094-G-02

1040

6.75 0.25

1060

4.75

03:15

03:00

1587m

07:00

127

174

173

175

5

12101750

4.65m

8.95m

.24m

1040

7.00

24.00

12.00

5.00

48s/l

9.32m

9.13m

06

9.18m

1.67m

0.78m

2.81m

710.06m

1165

X

84.28m

1165

24kdaN

49s/l

SHAKERS

5.23m

SHAKERS

1.50m

24kdaN

6 72

76kdaN

0

6.5

24:00

19:15

1

222

GOOD

1463

DRILL

9.48m

127

222

184

167

175

174

173

m3bblbbl

189.5

FHi50

1

1

11

1

11.00

1

-10.00

1

11

1522m 1530m

740.08m

CALMN

67m368.5m3

1

10.5

9

1

1543m

sackssacks

sackssacks

TORSION SHOCKSUB

4

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

165

163

161

SINGLE

165

SINGLE

168

172

165161

167

184

172168

163

165

10095kPa

10095kPa

10095kPa

51s/l51s/l

RD6946

26

1153054

SMITH

165

06:15

165

0

104

222

Opti-PlusOpti-Mul

1

Base OilUltraseal XP

1

1

42.75

Gilsonite HT

DRILL

Cyber SealBentone 150Barite

2015/03/04 15000

15000

75

1589m 1601m

2

1

FHi50

CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

07:15

07:00

18:45

06:00

124

DW

DWDWDW

DW

4

GAP SUBSPIRAL NM

PONY SLICKCOLLAR

MOTOR LS

BIT

7269

72

72

0

0

14kdaN

72

80kdaN

RD6946

14kdaN

SPIRAL NM

20

SPIRAL NM

X/OSHOCK SUB

Page 13: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

TORSION SHOCKSUB

DC (6.75 IN)

2.25

JARS-HYD/MECH

0.25

HWDP(5.0 IN)

2015/02/27 16:45

2

2

1625

2

270

0.34m

1622m

3200.00

NEWALTA 1

2

10

2

7

70

6

73

2 7

56

X

6959

74

NEWALTA 2

SHAKERS

LLOYD BAUER

DARRYL GIBBONS

08:00

DARRYL GIBBONS

SHAKERS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

0

59

69

1608.7m

72

72

0

SHOCK SUB

X/O

1627.66m

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES

DRILL 222MM HOLE FR 1622M TO 1625MCIRCULATE BOTTOMS UP

RIG SERVICE FUNCTION ANNULAR 15 SEC TO CLOSE

REAM - OPEN HOLE FR 1512M TO BOTTOM

RECORD CAL-13.19 ACT-12.89 DIFF--0.3TRIP OUT OF HOLE /FLOW CHECK @ 1623M,1454M,845M,135M,OUT OF HOLE /TRIP

1

TRIP IN HOLE TO 1512M /FILL EVERY 500M

DIRECTIONAL WORK /LAY OUT MWD TOOL /MOTOR/CHANGE BIT/CHANGE OUT SHOCK SUB

174

14900

175

14900127

1732015/03/07

4.00

0.50

0.25

0.25

NTSBC

1.50m

710.06m

5.23m

84.28m

27

PROGRESS ENERGY CANADA LTD.

52

.22m

1606

8.89m

5.65m

5.23m

1.50m

3.78m

710.06m

0.78m

84.28m

9.13m

9.32m

1.67m9.18m

4.65m

0.256.750.501.250.75

5

0.00m

5

2

20

21

21

67.5m367m3NEWALTA 1NEWALTA 2

TRIPPING PIPE

FUELING CREW TRUCK

2015

B.O.P. DRILL

1646m

0.50

7

1.25

7

6.750.50

RG

12

RGRG

11.25

RG

3825

9

1

RGRG

75

00:00

19:00

07:00

1625

11.1

11.1 11.1

11.1

11.1 11.1

24kdaN

FROST

1

Ross Guynup

SINGLE

SINGLE

07:15

RG

12:15

08:3008:00

RG

19:00

18:45

RG

17:30

14:30

Doug Watchorn

73

70

1 of 8

74

56

CANELSON DRILLING INC.

165

165

1625m

222

184

0.752.75

2.81m

9.32m

1.67m

0.78m

9.13m

172

168

163

165

165

161

167

200/d-002-G/094-G-02/00

.24m

1

8.95m

4.65m

79kdaN

9.18m

2

A207720

7

HORIZ

SHAKERSSHAKERS

3000.00Nm

5500.00Nm

796.97m

3000.00Nm1

222

0

222

768.55m

2

1

10.5

0.00m

1625

5

1

6.50

SINGLE

SINGLE

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

317.8

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

D.W.A.D.G.

24.5

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

3825

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

28

21

24:00

165

07:00

19:00

1

165

1

9

75

0

104

0.00

1602m

13000

3

3

2015/03/07

3

PATTERN BIT & DRILL 222mm HOLE F/1625m-1646m

DOWN LINK M.W.D. TOOL

1

B.O.P. DRILL WELL SECURE IN 75 SECS

UNKN101_20150307_1C

CREW CHANGE OVER MEETING

2

MOTOR LS

BIT

SPIRAL NM

GAP SUB

SPIRAL NM

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

1646.00m

SKH1813D

13000

REED

10.5

DRILL

3360.00

0

0.6

DC (6.75 IN)

HWDP(5.0 IN)

0.25

4.00

270

TORSION SHOCKSUB

JARS-HYD/MECH

1210

15.9

1750

49.25

15.9 15.9

1

1

1

1

Pason

1

1

14kdaN

1

1

1

20

SMITH

47

00:00

01:45

02:00

06:45

23:30

84

19:15

19:30

54

19:00

15-101-02

69

72

72

69

72

720

4.75

0

0.25

1606

0.25

1.75

275

105

x

x

x

03

1

1

1

1

1

1

1

1

1

59

159

11.111.1

11.1

19:45

11.1

70

11.1

56

11.1

74

73

101

5.65m

84.00kdaN

DRILL 222mm HOLE F/1602m-1606m

RIG SERVICE FUNCTION UPPER PIPE RAMS 4 SECS TO CLOSE(RS)

82.00kdaN

DRILL 222mm HOLE F/1606m-1622m

81.00kdaN

TOTAL TIME FOR SURVEYS & CONNECTIONS

1622.00m

11701060

0.50

1622.89m

0.50

104

0

3.75

0.750.50

1230

1.25

1195

0.25

2.25

3.00

5D

29640.00

2

21

23:45

6A

21:00

20

0.25

6B

7

3C

11201230

00:00 03:00

3400

52

20

4

0

0.7

1040

d-023-G/094-G-02

1060

6.50 0.25

1120

4.00

02:00

01:45

1625m

07:00

06:45

127

174

173

175

5

12701810

4.65m

8.89m

.22m

1100

7.00

24.00

12.00

5.00

50s/l

9.32m

07

9.13m

9.18m

1.67m

0.78m

3.78m

710.06m

1170

84.28m

1170

24kdaN

53s/l

5.23m

SHAKERS

1.50m

8kdaN

79kdaN

0

6.5

24:00

23:30

19:30

19:15

0

222

GOOD

1463

DRILL

0.00m

127

222

184

167

175

174

173

0.25

SKH1813D

1

1

11

1

-13.00

11

11

1602m 1610m

768.55m

CALMW

66m366m3

1

11

9

1

1622m

sackssacks

m3sacks

TORSION SHOCKSUB

5

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

165

163

161

SINGLE

165

SINGLE

168

172

165161

167

184

172168

163

165

9774kPa

10095kPa

10095kPa

49s/l48s/l

A207720

27

1153054

REED

165

02:45

165

0

94

222

0

Ultraseal XP

1

4.00

Lime - Hydrated

DRILL

Cyber SealBase OilBarite

2015/03/04 14900

14900

75

1636m 1645m

2

1

FHi50

CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

12:15

17:30

14:30

07:15

07:00

08:30

08:00

06:00

18:45

ETETETETET

ET

4

GAP SUBSPIRAL NM

PONY SLICKCOLLAR

MOTOR LS

BIT

7269

72

72

0

0

14kdaN

72

79kdaN

RD6946

14kdaN

SPIRAL NM

20

SPIRAL NM

X/OSHOCK SUB

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 14: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

TORSION SHOCKSUB

DC (6.75 IN)

JARS-HYD/MECH

0.50

HWDP(5.0 IN)

2015/02/27 16:45

2

2

17001400

0.50

2

270

0.00m

1664m

3200.00

NEWALTA 1

2

2

7

70

73

56

6959

NEWALTA 2

74

SHAKERS

LLOYD BAUER

12:00

GREG EVERSON

08:00

DARRYL GIBBONS

SHAKERS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

0

59

69

72

1646.57m

72

0

SHOCK SUB

X/O

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES

DRILL 222MM HOLE FR 1664M TO1702MDRILLS/BOP, ETC.- WELL SECURE IN 97 SECS

RIG SERVICE- F/T TOP HCR 2 SECS O/CDRILL 222MM HOLE FROM 1702M-1712M

1

DEVIATION SURVEY

174

14500

175

14500

0.6

127

1.3

1732015/03/07

4.25

0.75

NTSBC

1.50m

710.06m

5.23m

84.28m

28

PROGRESS ENERGY CANADA LTD.

47

.22m

1625

8.89m

0.00m

5.23m

1.50m

3.78m

710.06m

0.78m

84.28m

9.13m

9.32m

1.67m9.18m

4.65m

0.25

sacks

10.75

sackssacks

9801030

5

18.93m

5

2

10

66.5m366m3NEWALTA 1NEWALTA 2

SHORT CHANGE

LONG CHANGE

2015

BOP DRILL

1721m

510

0.50

66

RG

4.0

RGRG

20.75

RG

3400

9

1

RGRG

75

16810

00:00

1290

50s/l

19:00

49s/l

07:00

1625

11.1

11.1 11.1

11.1

11.1 11.1

1290

8kdaN

PARTLY CLOUDY

1

Ross Guynup

SINGLE

SINGLE

07:15

18:30

RG

18:15

16:3016:15

RG

RG

19:00

Doug Watchorn

73

70

1 of 6

74

65m3 64m3

56

CANELSON DRILLING INC.

165

165

1712m

222

184

0.50

3.78m

9.32m

1.67m

0.78m

9.13m

172

168

163

165

165

161

167

200/d-002-G/094-G-02/00

.22m

1

8.89m

4.65m

79kdaN

9.18m

2

A207720

6

HORIZ

SHAKERSSHAKERS

4500.00Nm

4200.00Nm

853.79m

4500.00Nm1

222

0

222

796.97m

11

10.5

9.49m

1625

5

1

m3sacks

sackssacks

5.75

SINGLE

SINGLE

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

38.9

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

D.W.A.D.G.

F/T FLOOR & CROWN SAVERS/POP VALVE PINS, BRAKE PADS

3400

1680m1640m

30

96

24:00

165

07:00

19:00

1

165

1

9

75

Bentone 150

Lime - HydratedBase Oil

0

93

Barite

20.50

1646m

1300

14600

1030

3

4

2015/03/07

3

1

DEVIATION SURVEY/CONNECTION

UNKN101_20150308_1C

DRILL 222 MM HOLE FROM 1712M- 1721M

2

MOTOR LS

BIT

SPIRAL NM

GAP SUB

SPIRAL NM

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

1721.41m

SKH1813D

14600

REED

14:1507:15

10

DRILL

2100.00

1

DC (6.75 IN)

1

HWDP(5.0 IN)

1.25

4.25

275

TORSION SHOCKSUB

JARS-HYD/MECH

11.1

1270

11.1 11.1

11.1

1810

9.75

11.1 11.1

1

1

1

1

Pason

1

1

14kdaN

1

1

1

20

REED

00:00

03:00

03:15

546

23:15

102

19:00

15-101-02

69

72

72

69

72

720

3.75

0

1625

0.25

2.00

220

x

x

x

03

1

1

1

1

1

1

1

1

1

59

39

11.111.1

11.111.1

70

NEWALTA 1

11.1

56NEWALTA 2

11.1

74

73

101

1693.97m

1665.52m

0.00m

85.00kdaN

DRILL 222mm HOLE F/1646m-1652m

RIG SERVICE FUNCTION ANNULAR 8 SECS TO CLOSE(RS)

83.00kdaN

DRILL 222mm HOLE F/1652m-1664m

83.00kdaN

0.75

1664.57m

12301120

1711.97m

93

0

1.750.25

9.000.25

12901300

0.50

21A

24180.00

2

21

22:0020:15

10

7

0.25

2

10301300

00:00 03:30

1212

47

20

4

0

sacks

bblbbl

1100

d-023-G/094-G-02

1120

5.75 0.25

1030

4.25

03:15

03:00

1712m

07:00

127

174

173

175

0

14001700

4.65m

8.89m

.22m

980

6.00

23.00

12.00

5.00

48s/l

9.32m

08

9.13m

9.18m

1.67m

0.78m

3.78m

710.06m

1250

84.28m

1230

8kdaN

48s/l

SHAKERS

5.23m

SHAKERS

1.50m

11kdaN

79kdaN

0

6

24:00

23:15

102

222

GOOD

126

1625

10

DRILL

10

18.91m

11

127

222

184

167

175

174

173

19.7

SKH1813D

16.9

1

1

11

1

10.75

1

-4.00

1

11

1646m 1654m

853.79m

CALMN

59.8m360.4m3

1

10.5

9

1

1664m

bblsacks

TORSION SHOCKSUB

5

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

165

163

161

SINGLE

165

SINGLE

168

172

165161

167

184

172168

163

165

9400kPa

9400kPa

9400kPa

50s/l50s/l

A207720

30

1153054

REED

165

00:15

165

Gilsonite HTCyber Seal

Opti-PlusBarite

Ultraseal XPOpti-Mul

0

93

222

2

1

24.75

DRILL

Lime - HydratedOpti-WetBarite

2015/03/07 14500

14500

75

1713m 1716m

2

1

SKH1813D

TOUR SHEET 23 HRS. DUE TO DAYLIGHT SAVINGS TIME CHANGE

CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

18:30

18:15

07:15

07:00

16:30

16:15

06:00

87

ETETETETET

ET

5

GAP SUBSPIRAL NM

PONY SLICKCOLLAR

MOTOR LS

BIT

7269

72

72

0

0

14kdaN

72

79kdaN

A207720

14kdaN

SPIRAL NM

20

SPIRAL NM

X/OSHOCK SUB

Page 15: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

TORSION SHOCKSUB

DC (6.75 IN)

JARS-HYD/MECH

0.25

HWDP(5.0 IN)

2015/02/27 16:45

2

2

17001400

1.50

1758

2

240

0.00m

1734m

3200.00

NEWALTA 1

21A

2

7

70

73

56

6959

NEWALTA 2

74

SHAKERS

GREG EVERSON

10:30

LLOYD BAUER

07:30

LLOYD BAUER

SHAKERS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

0

59

69

72

1722.39m

72

0

SHOCK SUB

X/O

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES

DRILL 222MM HOLE FR 1734M-1757MRIG SERVICEF/T ANNULAR 8 SECS C/O

DEVIATION SURVEY

1

174

14133

175

14133127

1732015/03/07

0.25

4.75

NTSBC

1.50m

710.06m

5.23m

84.28m

31

PROGRESS ENERGY CANADA LTD.

46

.22m

1721

8.89m

3.11m

5.23m

1.50m

3.78m

710.06m

0.78m

84.28m

9.13m

9.32m

1.67m9.18m

4.65m

0.25

sacks

10.00

sackssacks

9801020

5

9.49m

5

21

2

67m359m3NEWALTA 1NEWALTA 2

SAMPLES- REVIEW JSA A-43

BOP DRILL

2015

CHANGING HEADS AND LINERS

1768m

21

2101010

0.50

77

RG

0

RGRG

21.25

RG

3486

9

RG

1

RGRG

75

1010

00:00

1280

48s/l

19:00

50s/l

07:00

1625

11.1

11.1 11.1

11.1

11.1 11.1

1290

13kdaN

OVERCAST

1

Ross Guynup

SINGLE

SINGLE

07:15

RG

19:00

17:3017:15

RG

RG

Doug Watchorn

73

70

1 of 4

74

65.4m3 64.1m3

56

CANELSON DRILLING INC.

165

165

1757m

222

184

0.75

3.78m

9.32m

1.67m

0.78m

9.13m

172

168

163

165

165

161

167

200/d-002-G/094-G-02/00

.22m

1

8.89m

4.65m

81kdaN

9.18m

2

A207720

7

HORIZ

SHAKERSSHAKERS

5000.00Nm

5400.00Nm

910.64m

4300.00Nm1

222

0

222

882.20m

11

1

10.5

18.96m

1625

5

1

sackssacks

sackssacks

6.75

bblsacks

SINGLE

SINGLE

sacks

45.4

GEN 1: 9923HR (24HR RUNTIME ONLINE), GEN 2: 10708HR (24HR RUNTIME ONLINE), GEN 3: 10581HR (OFF0

PERKINS 1:10724HR (OFFLINE), PRKINS 2; 10479HR (24HR RUNTIME ONLINE)

F/T FLOOR & CROWN SAVERS/ BRAKE PADS/ POP VALVE PINS

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

CHANGED HEADS AND LINERS IN PUMP #2 TO 5 1/2

3486

1740m1735m

32

143

24:00

165

07:00

19:00

1

165

1

9

75

Opti-WetBentone 150

Ultraseal XPBarite

Lime - HydratedCyber Seal

0

93

Gilsonite HT

42.50

1721m

1290

15000

1020

4

4

2015/03/07

4

1

DRILL 222MM HOLE FROM 1757M- 1768M

UNKN101_20150309_1D

SAFETY MEETING- CREW HAND OVER

2

MOTOR LS

BIT

SPIRAL NM

GAP SUB

SPIRAL NM

PONY SLICKCOLLAR

SPIRAL NM

X/O

SHOCK SUB

1768.82m

SKH1813D

15000

REED

10.5

DRILL

1638.00

2

DC (6.75 IN)

2.1

HWDP(5.0 IN)

1.50

4.75

260

TORSION SHOCKSUB

JARS-HYD/MECH

11.1

1390

11.1 11.1

11.1

1760

31.50

11.1 11.1

1

1

1

1

Pason

1

1

14kdaN

1

1

1

25

REED

47

00:00

06:30

06:45

84

19:15

510

19:00

15-101-02

69

72

72

69

72

720

0.25

0

1721

0.25

6.50

260

5

55

x

x

x

03

1

1

1

1

1

1

1

1

1

59

109

11.111.1

11.111.1

70

NEWALTA 1

11.1

56NEWALTA 2

11.1

74

73

101

7.15m

85.00kdaN

DRILL 222MM HOLE FROM 1721M - 1734M

RIG SERVICE/FUNCTION UPPER HCR 3 SEC TO OPEN

85.00kdaN

HELD BOP DRILL WITH CREW /REVIEWED BOP CHART

81.00kdaN

1734.00m

13001040

0.25

1757.00m

93

0

1.50

10.000.25

13101300

7

18200.00

2

21

23:4521:00

0.25

10

10401310

02:00 06:00

1212

3648

46

20

4

0

sacks

1020

d-023-G/094-G-02

1040

6.50 0.25

1040

4.75

06:45

06:30

1757m

07:00

127

174

173

175

5

14201760

4.65m

8.89m

.22m

1020

7.00

24.00

12.00

5.00

52s/l

9.32m

9.13m

09

9.18m

1.67m

0.78m

3.78m

710.06m

1290

84.28m

1300

11kdaN

51s/l

SHAKERS

5.23m

SHAKERS

1.50m

13.5kdaN

79kdaN

0

6.5

24:00

19:15

51

222

GOOD

1625

10

DRILL

5

0.00m

5

127

222

184

167

175

174

173

sacks

SKH1813D

1

1

11

1

10.00

1

-4.00

1

11

1724m 1732m

882.20m

CALMW

71m362m3

1

11

9

1

1734m

sackssacks

sackssacks

TORSION SHOCKSUB

5

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

165

163

161

SINGLE

165

SINGLE

168

172

165161

167

184

172168

163

165

9400kPa

9400kPa

9400kPa

50s/l49s/l

A207720

31

1153054

REED

165

00:30

165

Gilsonite HTLime - HydratedUltraseal XPCyber Seal

0

93

222

0

Cyber SealGilsonite HT

1

47.25

Ultraseal XP

DRILL

Bentone 150Lime - HydratedBarite

2015/03/07 14500

14500

75

1761m 1768m

2

1

SKH1813D

CHECKED FLOOR SAVER/CROWN SAVER/BRAKE PADS/POP VALVE PINS

07:15

07:00

17:30

17:15

06:00

132

ETETETETET

ET

5

0.25

GAP SUBSPIRAL NM

PONY SLICKCOLLAR

MOTOR LS

BIT

7269

72

72

0

0

14kdaN

72

81kdaN

A207720

14kdaN

SPIRAL NM

20

SPIRAL NM

X/OSHOCK SUB

Page 16: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

JARS-HYD/MECH

2.75

HWDP(5.0 IN)

0.50

2015/02/27 16:45

2

2

2.98

17001400

1.00

1768

1768

2

240

3.17m

1771m

3200.00

NEWALTA 1

6D

20

5D

6B

7

2

70

73

56

7269

74

NEWALTA 2

SHAKERS

GREG EVERSON

17:00

LLOYD BAUER

16:00

LLOYD BAUER

SHAKERS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

0

59

69

72

72

0

SHOCK SUB

X/O

1756.33m

BIT

MOTOR LS

PONY SLICK COLLAR

SPIRAL NM

GAP SUB

30261

SPIRAL NM

SPIRAL NM

SAFETY MEETING/HAND OVER NOTES- REVIEW JSA B-B-40

HANDLE DIRECTIONAL TOOLS- LAYDOWN BHA AND MAKE UP BHA/FT BLIND RAMS(5SECS),

WHILE OUT OF HOLE-FLOW CHECK OOH

TRIP IN HOLE- PICK UP DRILL PIPE TO TAG BOTTOM

RIG SERVICE- F/T ANNULAR 8 SECS C/O

SAFETY MEETING- REVIEW JSA B-40/ PRIOR TO SLIP & CUTTRIP IN HOLE

1

TRIP IN HOLE,FILL @ 620M & EVERY 500M TO BOTTOM ( TEST TOOL)- F/C @ 904M

SLIP/CUT DRILLING LINE-22M

127

21000

174

210002015/03/10

0.25

0.25

0.25

4.25

NTSBC

5.23m

710.06m

32

PROGRESS ENERGY CANADA LTD.

70

70

0.32m

12.21m

2.18m

5.23m

1.50m

0.78m

710.06m

9.40m

84.28m

9.18m

1.67m

9.25m4.65m

0.60m

0.254.00

sacks

2.50

9801020

1.00

5

0.00m

5

7

10

21

2

68m3NEWALTA1NEWALTA 2

SLIP & CUT- REVIVEW JSA B-40

MAKING CONNECTIONS

2015

WORKING WITH H2S

1791m

0.75 1.00

22

7.750.50

RG

12

RG

8.25

RG

6400

9

6075

1

RGRG

75

00:00

1300

50s/l

19:00

49s/l

07:00

1771

1300

2kdaN

PARTLY CLOUDY

1

2

Ross Guynup

COMBIN-ED

COMBIN-ED

07:15

10:45

RG

10:30

10:00

RG

15:30

13:15

RG

13:00

11:45

Doug Watchorn

74

1 of 4

64.2m3 64.1m3

70

CANELSON DRILLING INC.

165

165

1778m

216

213

0.753.75

3.78m

9.32m

1.67m

0.78m

9.13m

168

165

162

165

162

167

170

200/d-002-G/094-G-02/00

.22m

1

8.89m

4.65m

9.18m

2

JK3723

7

HORIZ

SHAKERS

2800.00Nm

2800.00Nm

BC

1024.48m

8500.00Nm

216

0

222

910.64m

0

1

10

2

18.99m

1771

6

1

1.75

COMBIN-ED

COMBIN-ED

15:30

18:00

GEN1: 9947HR (24HR RUNTIME ONLINE), GEN2: 10723HR (14HR RUNTIME OFFLINE), GEN 3:10591HR (10HR RUNTIME)

PERKINS 1: 10724HR (OFF), PERKINS 2: 10503HR (24HE RUNTIME)

CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

44.1

CHECK FLOOR /CROWN SAVER/BRAKE PADS/POP VALVES PINS

1772m1771m

36

20

24:00

140

07:00

19:00

75

165

1

0

93

2.50

1768m

1300

22200

1020

4

4

2015/03/10

4

RIG SERVICE F/T UPPER HCR 3 SEC TO OPEN

DEVIATION SURVEY / CONNECTION

1

DRILL 216MM HOLE FROM 1778M- 1791M

UNKN101_20150310_1C

SAFETY MEETING- CREW CHANGE OVER

2

TURBINE MOTOR

BIT

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

X/O

FLEX MONEL

FLEX MONEL

X/O

1791.00m

K507

22200

SMITH

10.5

DRILL

10500.00

2

1.00

2.50

1.25

4.25

240

JARS-HYD/MECH

HWDP(5.0 IN)

11.1

1420

11.1 11.1

11.1

1760

49.00

11.1 11.1

1

1

1

1

Pason

1

1

1

1

1

25

70

REED

70

00:00

00:15

01:45

02:1505:15

06:00

23:45

42

19:15

23:30

19:00

15-101-02

72

2

69

72

72

0.75

72

1.00

72

0.50

0

3.00

1768

1768

1.50

0.25

250

x

x

x

03

1

1

1

1

1

1

1

1

1

69

146

19:00

74

NEWALTA 170NEWALTA 2

101

0.00m

80.00kdaN

RIG SERVICE/FUNCTION UPPER PIPES 5 SEC TO CLOSE

DRILL 222mm HOLE FR 1768M - 1771M

85.00kdaN

CIRCULATE BOTTOMS UP / MIX PILL

80.00kdaN

TRIP OUT OF HOLE FROM 1771M /FLOW CHECK @1770M,1634M,846M,135M

0.25

1771.00m

1310

DIRECTIONAL WORKLAY OUT TOOLS

LAY DOWN BHA

1040

0.25

1778.33m

S

70

70

0.500.25

2.75

1330

0.25

1300

2.25

1.00

1.25

37440.00

20D

21

23:30

6A

20:00

9A

21

0.25

6A

6A

CT

7

10401300

02:00

33

6075

6400

28

4.5

4.5

1.3

1771

1020

d-023-G/094-G-02

1040

1.50 0.253.750.50

1040

4.25

DIRECTIONAL

0.25

01:45

00:15

1778m

05:15

02:15

07:00

06:00

127

174

173

175

5

14201750

0.60m

12.21m

0.32m

1020

7.00

24.00

12.00

5.00

50s/l

1.67m

10

9.18m

4.65m

9.25m

9.40m

0.78m

1310

14kdaN

49s/l

SHAKERS

710.06m

SHAKERS

5.23m

2kdaN

2

81kdaN

0

2.5

24:00

23:45

23:30

19:15

010

216

GOOD

1625

DRILL

9.49m

222

184

167

174

127

K507

1

1

11

1

-12.00

2.50

11

11

1771m

2

995.99m

CALMW

62m363m3

1

10

75

1771m

TORSION SHOCKSUB

6

sacks

1

HWDP(5.0 IN)

DC (6.75 IN)

JARS-HYD/MECH

PR

165

163

161

SINGLE

165

SINGLE

168

172

162167

170

213

168165

162

165

9346kPa

9400kPa

9400kPa

18:00

19:00

52s/l

DEVIATION SURVEY

BREAK IN BIT -DRILL 216MM HOLE FROM 1771M- 1778M

JK3723

35

1153054

SMITH

140

140

Lime - Hydrated

70

70

216

1

1

2

6.75

DRILL

Barite

2015/03/07 14895

14895

1778m 1789m

2

1

10

CHANGED 4 SHAKER SCREENS, 2 DECK FRAMES AND RUBBERS/ SWACO TECHS OUT

SKH1813D

HOLE FILL CAL 13.68M/3- ACT 14.35M/3- DIFF +.67M/3

CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES

10:45

10:30

X

13:00

11:45

07:15

07:00

10:00

06:00

13:157

0

ET

1.00

ETETET

ET

5

FLEX MONEL

PONY SLICKCOLLAR

X/OTURBINE MOTOR

BIT

7272

69

2

0

72

14kdaN

72

77kdaN

A207720

GAP SUB

25

FLEX MONEL

FLEX MONELX/O

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 17: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

19:15

JARS-HYD/MECH

126

23:45

5

0.25

19:00

HWDP(5.0 IN)

3

15-101-02 2015/02/27 16:45

2

2

72

2

69

72

72

7272

0

1806

1806

0.25

6.75

1740

0.50

1420

2

260

240

7

55

8.24m

1806m

x

x

x

3200.00

03

1

1

1

1

1

1

1

1

1

69

NEWALTA 1

2

10

74

35 70

NEWALTA 1

74

72

NEWALTA 270

69

NEWALTA

SHAKERS

GREG EVERSON

LLOYD BAUER

09:4507:30

LLOYD BAUER

SHAKERS

101

72

72

Progress HZ Julienne d-23-G/94-G-2

72

72

69

72

2

1803.78m

69

0

X/O

FLEX MONEL

0.00m

BIT

TURBINE MOTOR

X/O

DRILL 216MM HOLE FROM 1791M TO 1806M

80.00kdaN

PONY SLICKCOLLAR

DEVIATION SURVEY/CONNECTION

30261

FLEX MONEL

80.00kdaN

GAP SUB

80.00kdaN

FLEX MONEL

SAFETY MEETING /HAND OVER NOTES

DRILL 216MM HOLE FR 1806M-1835MRIG SERVICE- F/T UPPER PIPE RAMS 5 SECS C/O

1806.80m

1320

DEVIATION SURVEY

1

21300

127

21300

174

1050

2015/03/10

0.25

1835.26m

0.25

70

0.25

70

4.50

0.50

11.000.25

13101310

72

32240.00

21

23:3020:00

0.25

NTS

10

BC

5.23m

10501310

710.06m

03:00 06:30

36

PROGRESS ENERGY CANADA LTD.

1212

70

70

25

0.32m

12.21m

5

5

0.00m

710.06m

0.78m

5.23m

9.40m

9.18m

1.67m

9.25m4.65m

0.60m

0.25

10301050

d-023-G/094-G-02

sacks

11.00

6.75

9901030

5

0.00m

51050

7

21

2

4.50

64m362.50m3NEWALTA 1

0.25

NEWALTA 2

BLOWDOWN BOILER- REVIEW JSA N-05

CHANGING CATHEAD CABLES

2015

MIXING MUD PRODUCTS

07:00

06:45

1835m

1853m

127

8416

174

172510

0.50

5

77

12

RG

1440

22.25

1770

RG

6105

RG

75

6060

RGRG

0.60m

12.21m

0.32m

1030

7.00

24.00

12.00

5.00

50s/l

1.67m

9.18m

11

10

4.65m

25

9.25m

9.40m

0.78m

00:00

1310

19:00

50s/l

07:00

51s/l

1320

1771

1300

50s/l

3kdaN

710.06m

SHAKERS

5.23m

SHAKERS

3kdaN

1310

3kdaN

PARTLY CLOUDY

1

77kdaN

Ross Guynup

COMBIN-ED

COMBIN-ED

6.5

6.5

07:15

24:00

23:45

19:15

0168

19:00

RG

18:3018:15

RG

RG

Ed Tallon

216

74

1 of 4

62.5m3

70

61.7m3

GOOD

CANELSON DRILLING INC.

165

165

DRILL1835m

1771

18.97m

216

213

216

213

170

0.50

174

127

sacks

0.78m

0.25

1.67m

9.25m

9.40m

9.18m

168

165

162

K507

165

162

167

170

1

1

11

200/d-002-G/094-G-02/00

0.32m

12.21m

1

0.60m

4.65m

1

77kdaN

-13.00

1

11.00

1

2

11

JK3723

7

HORIZ

1800m 1806m

SHAKERSSHAKERS

2100.00Nm

2100.00Nm

1081.41m

2700.00Nm

216

12

1052.94m

216

CALMW

12

1024.48m

64.50m365m3

10.5

1

10

75

18.97m

1806m

sackssacks

m3

1771

sacks

JARS-HYD/MECH

sacks

6

1

6

1

HWDP(5.0 IN)

sackssacks

sackssacks

6.75

m3

COMBIN-ED

sacks

COMBIN-ED

sacks

165

162

GEN1: 9970HR (24HR RUNTIME ONLINE), GEN2: 10,723HR (OFF), GEN3: 10,615HR (24HR RUNTIME ONLINE)

COMBINED

167

101.8

PERKINS 1 : 10726HR (2 HR RUNTIME ONLINE), PERKINS 2: 10525HR (22 HR RUNTIME OFF)

COMBINED

162

F/T CROWN AN FLOOR SAVER/ BRAKE PAD / POP VALVE PINS

165

168

162167

170

213

168165

162

165

9436kPa

9400kPa

9346kPa

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

50s/l50s/l

1813m1809m

JK3723

37

1153054

38

82

24:00

SMITH

165

07:00

19:00

75

1

165

165

165

05:00

Barite

Base OilBarite

Gilsonite HTBentone 150

Lime - HydratedUltraseal XP

70

70

Cyber Seal

70

70

216

Bentone 150

2

Cyber Seal

24.50

1

2

1791m

29.00

Ultraseal XPGilsonite HT

DRILL

Base OilBarite

21800

13101030

2

4

2015/03/10 21215

2015/03/10

21215

4

1841m

RIG SERVICE/FUNCTION ANNULAR 15 SEC TO CLOSE

1852m

DRILL 216MM HOLE FROM 1835M- 1853M

1

SAFETY MEETING- CREW CHANGE OVER

UNKN101_20150311_1C

2

TURBINE MOTOR

BIT

GAP SUB

FLEX MONEL

2

PONY SLICKCOLLAR

1

X/O

FLEX MONEL

FLEX MONEL

X/O

1853.00m

K507

F/T CROWN AN FLOOR SAVER/ BRAKE PADS / POP VALVE PINS

K507

07:15

21800

07:00

18:30

18:15

06:00

64

SMITH

10.5

ET

DRILL

ETETET

ET

8190.00

6

2

FLEX MONEL

1.4

0.75

PONY SLICKCOLLAR

X/OTURBINE MOTOR

BIT

4.50

240

JARS-HYD/MECH

HWDP(5.0 IN)

1440

13.50

1760

72

1

72

1

69

1

2

1

Pason

0

72

1

77kdaN

72

1

1

1

JK3723

1

25

SMITH

00:00

06:45

GAP SUB

FLEX MONEL

25

FLEX MONELX/O

Page 18: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

JARS-HYD/MECH

HWDP(5.0 IN)

0.25

2015/02/27 16:45

2

2

17301420

0.50

2

280

1.40m

1868m

3200.00

NEWALTA 1

2

10

74

70

7269

NWALTA 2

SHAKERS

GREG EVERSON

13:00

LLOYD BAUER

08:00

LLOYD BAUER

SHAKERS

72

72

72

Progress HZ Julienne d-23-G/94-G-2

72

69

72

1860.68m

2

69

0

X/O

FLEX MONEL

BIT

TURBINE MOTOR

X/OPONY SLICKCOLLARFLEX MONEL

30261

GAP SUB

FLEX MONEL

SAFETY MEETING/HAND OVER NOTES WITH CREW

DRILL 216mm HOLE FR 1868M -1893MRIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O

DEVIATION SURVEY

1

127

20900

174

20900

2.2

2015/03/10

0.25

4.75

NTSBC

5.23m

710.06m

38

PROGRESS ENERGY CANADA LTD.

0.32m

1863

12.21m

1863

4.29m

710.06m

5.23m

0.78m9.40m

9.18m

1.67m

9.25m4.65m

0.60m

0.25

sacks

11.00

10001040

5

0.00m

5

21

2

62.80m363m3NEWALTA 1NEWALTA 2

MIXING MUD PRODUCTS- REVIEW JSA G-09

MAKING CONNECTIONS

2015

MAKING CONNECTIONS

1903m

11

755

2040

0.25

77

RG

7

RG

22.25

RGRG

75

RGRG

2168

00:00

1310

52s/l

19:00

51s/l

07:00

1771

1310

2kdaN

PARTLY CLOUDY

1

Ross Guynup

COMBIN-ED

COMBIN-ED

07:15

RG

19:00

18:3018:15

RG

RG

Ed Tallon

74

1 of 4

62.2m3 60.7m3

70

CANELSON DRILLING INC.

165

165

1893m

216

213

0.50

0.78m

1.67m

9.25m

9.40m

9.18m

168

165

162

165

162

167

170

200/d-002-G/094-G-02/00

0.32m

1

12.21m

0.60m

80kdaN

4.65m

2

JK3723

7

HORIZ

SHAKERSSHAKERS

2200.00Nm

1900.00Nm

1138.25m

2200.00Nm1

216

2

11

216

1081.41m

11

10

18.95m

1771

6

1

sackssacks

bblsacks

6.50

sackssacks

COMBIN-ED

m3

COMBIN-ED

sacks

133.5

GEN1: 9995HR (24HR RUNTIME ONLINE), GEN2: 10,723HR (OFF), GEN3 : 10,640HR (24HR RUNTIME)

PERKINS 1: 10,750HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525 (OFF)

CHECKED FLOOR /CROWN SAVER/BRAKE PADS/POP VALVES PINS

F/T FLOOR & CROWN SAVERS/BRAKE PADS/ POP VALVE PINS

5339

5383

1882m1873m

40

132

24:00

165

07:00

19:00

75

165

1

Base Oil

Ultraseal XPBentone 150

Gilsonite HTCyber Seal

BariteLime - Hydrated

70

Opti-Thin

70

46.50

1853m

1310

20800

1040

4

4

2015/03/10

4

1

DRILL 216MM HOLE FROM 1893M- 1903M

UNKN101_20150312_1C

SAFETY MEETING- CREW CHANGE OVER

2

TURBINE MOTOR

BIT

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

X/O

FLEX MONEL

FLEX MONEL

X/O

1903.00m

K507

20800

SMITH

10:45

10.5

DRILL

6216.00

2

2.6

1.00

4.75

260

JARS-HYD/MECH

HWDP(5.0 IN)

14101760

35.50

1

1

1

1

Pason

1

1

1

1

1

25

SMITH

00:00

06:30

294

19:15

109

19:00

15-101-02

72

2

69

72

72

7272

0

0.50

6.50

260

106

x

x

x

03

1

1

1

1

1

1

1

1

1

69

97

74

NEWALTA 170NEWALTA 2

101

1879.6m

0.85m

82.00kdaN

DRILL 216mm HOLE FR 1853M - 1868M

DEVIATION SURVEY/CONNECTION

80.00kdaN

80.00kdaN

1868.00m

13001030

0.25

1893.00m

70

70

0.50

11.000.25

13101310

7

24700.00

2

21

23:3020:00

0.25

10

10501310

03:00 06:00

1212

70

25

70

4

4

1010

d-023-G/094-G-02

1030

6.50

1050

4.75

07:00

06:30

1893m

127

174

5

14301760

0.60m

12.21m

0.32m

1020

7.00

24.00

12.00

5.00

50s/l

1.67m

12

9.18m

4.65m

9.25m

9.40m

0.78m

13101300

3kdaN

51s/l

SHAKERS

710.06m

SHAKERS

5.23m

3kdaN

77kdaN

6.50

6.5

24:00

19:15

1260

216

GOOD

1771

DRILL

18.95m

216

213

170

174

127

0.50

135.5

K507

1

1

11

1

11.00

1

-16.00

1

11

1860m 1867m

1109.85m

CALMW

62m363m3

1

10

75

1868m

sackssacks

m3sacks

JARS-HYD/MECH

6

sacks

1

HWDP(5.0 IN)

165

162

167

COMBINED

162

COMBINED

165

168

162167

170

213

168165

162

165

9346kPa

9293kPa

9346kPa

52s/l50s/l

JK3723

39

1153054

SMITH

165

03:15

165

Barite

70

70

216

2

Bentone 150

51.25

Gilsonite HT

DRILL

Lime - HydratedBase OilBarite

2015/03/10 21938

21938

1895m 1902m

2

1

K507

GREG PUKAS-FIELD SUPP/ CANELSON DRILLING OUT FOR RIG INSPECTION

CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PIND

07:15

07:00

18:30

18:15

06:00

122

ET

ETETET

ET

6

FLEX MONEL

PONY SLICKCOLLAR

X/OTURBINE MOTOR

BIT

7272

69

2

0

72

72

80kdaN

JK3723

GAP SUB

25

FLEX MONEL

FLEX MONELX/O

Page 19: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

21:45

22:45

19:15

210

JARS-HYD/MECH

10

0.25

19:00

3

HWDP(5.0 IN)

15-101-02 2015/02/27 16:45

2

2

72

2

69

72

72

72

0.25

72

0

1920

1920

0.25

6.50

1730

0.25

1390

2

250

240

5

55

0.00m

1922m

x

x

x

3200.00

03

1

1

1

1

1

1

1

1

1

69

10

2

7

151

74

70

NEWALTA 1

74

72

NEWALTA 270

69

GREG EVERSON

LLOYD BAUER

10:3007:45

LLOYD BAUER

101

72

72

Progress HZ Julienne d-23-G/94-G-2

72

72

69

72

2

1917.53m

69

0

X/O

FLEX MONEL

4.47m

BIT

TURBINE MOTOR

X/O

DRILL 216mm HOLE FR 1903M TO 1922M

80.00kdaN

PONY SLICKCOLLAR

RIG SERVICE/FUNCTION UPPER PIPES 5 SEC TO CLOSE

30261

FLEX MONEL

DEVIATION SURVEY/CONNECTIONS

GAP SUB

80.00kdaN

80.00kdaN

FLEX MONEL

SAFETY MEETING/HAND OVER NOTES

DRILL 216MM HOLE FROM 1922MRIG SERVICE-F/T LOWER PIPE RAMS 5 SECS C/O

1922.00m

1310

CONDITION MUD & CIRCULATEDEVIATION SURVEY

1

TRIP OUT OF HOLE- FLOW CHECK @ 1942M,PUMP PILL, FLOW CHECK @1816m

22588

127

22588

174

1050

2015/03/10

0.25

1944.00m

1.00

1.25

1.00

70

0.25

70

2.50

0.250.50

9.750.25

1.00

72

17680.00

21

6B

0.25

5

NTS

10

BC

5.23m

710.06m

03:00 06:00

40

PROGRESS ENERGY CANADA LTD.

1212

70

70

70

25

70

1920

0.28m

12.21m

0

0

1920

1.43m

710.06m

0.78m

5.23m

9.40m

9.18m

1.67m

9.25m4.65m

0.60m

0.251.00

1020

0.50

d-023-G/094-G-02

1050

9.75

6.50

990

0.25

1020

0.00m

6A

20

21

6B

65m360.50m3

3.75

NEWALTA 1NEWALTA 2

CLEANING SUB -REVIEW JSA K-05

MIXING BARITE

2015

TRIPPING PIPE

06:45

06:30

1944m

07:00

127

168

17

174

102020

0.50

0

7

4.75

7

0.50

2.5

RG

16.25

RG

5619

RG

5524

75

RGRG

0.60m

12.21m

0.32m

7.00

24.00

12.00

5.00

1.67m

9.18m

13

7

4.65m

7

9.25m

9.40m

0.78m

00:00

1320

19:00

53s/l

07:00

53s/l

1310

1944

1310

3kdaN

SHAKERS

710.06m

SHAKERS

5.23m

1320

3kdaN

OVERCAST

1

80kdaN

Ross Guynup

COMBIN-ED

COMBIN-ED

6.5

24:00

6.5

07:15

22:45

21:45

19:15

18:00

0

17:30

RG

17:1517:00

RG

RG

19:00

Ed Tallon

216

74

1 of 5

64.5m3

70

63.7m3

GOOD

CANELSON DRILLING INC.

165

165

1771

18.97m

216

213

216

213

170

0.50

174

127

1.00

sacks

0.78m

0.25

1.67m

9.25m

9.40m

9.18m

168

165

162

K507

165

162

167

170

1

1

11

200/d-002-G/094-G-02/00

0.32m

12.21m

1

0.60m

4.65m

1

80kdaN

1

9.75

-2.00

1

2

11

JK3723

7

HORIZ

1912m 1920m

SHAKERSSHAKERS

1900.00Nm

1900.00Nm

0.00m

2200.00Nm1

2

216

11

1166.70m

216

CALME

11

1138.25m

10

1

11

75

9.48m

1922m

sackssacks

sacks

1771

sacks

JARS-HYD/MECH

sacks

7R

1

6

1

HWDP(5.0 IN)

sackssacks

sackssacks

6.50

sacks

COMBIN-ED

m3

COMBIN-ED

sacksbbl

165

162

GEN1: 10,019HR (24HR RUNTIME ONLINE), GEN2: 10,723HR (OFFLINE), GEN 3: 10,664HR (24HR RUNTIME ONLINE)

COMBINED

167

135.8

PERKINS 1: 10,774HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525HR (OFFLINE)

COMBINED

162

CHECKED CROWN/FLOOR SAVER /BRAKE PADS /POP VALVES PINS

165

168

162167

170

213

168165

162

165

9346kPa

9346kPa

9346kPa

F/T FLOOR & CROWN SAVERS/BRAKE PADS/ POP VALVE PINS

FUNCTION BLIND RAMS WELL OUT OF HOLE

5619

54s/l54s/l

5524

1929m1924m

JH6335

41

1153054

0

SMITH

24:00

165

07:00

19:00

75

1

165

165

165

04:45

Barite

Bentone 150Opti-Thin

Gilsonite HTBase Oil

Ultraseal XPLime - Hydrated

70

70

Cyber Seal

70

70

216

Cyber Seal

2

Ultraseal XP

67.50

1

2

1903m

0.00

Gilsonite HTLime - Hydrated

DRILL

Bentone 150Barite

0

13201020

4

4

2015/03/10 20754

2015/03/13

20754

TRIP IN HOLE WITH NEW BIT TO 620M/FILL EVERY 500M

4

RECORD CAL-13.13 ACT-14.04 DIFF-.91

DIRECTIONAL WORK/CHANGE OUT MWD TOOL/CHANGE BIT

TRIP OUT OF HOLE FROM 1816m/FLOW CHECK @ 1360M ,762M,OUT OF HOLE /TRIP

1

SAFETY MEETING- CREW CHANGE OVER

UNKN101_20150313_1C

2

TURBINE MOTOR

BIT

GAP SUB

FLEX MONEL

2

PONY SLICKCOLLAR

1

X/O

FLEX MONEL

FLEX MONEL

X/O

763.31m

K507

F/T CRWON AND FLOOR SAVER / BRAKE PADS / POP VALVE PINS

18:00

17:30

K507

07:15

0

07:00

17:15

17:00

06:00

173

SMITH

10.5

ET

DRILL

ETETET

ET

5250.00

6

1

FLEX MONEL

1.5

0.50

PONY SLICKCOLLAR

X/OTURBINE MOTOR

BIT

240

JARS-HYD/MECH

HWDP(5.0 IN)

1420

57.75

1760

72

1

72

1

69

1

2

1

Pason

0

72

1

72

1

1

1

JK3723

1

SMITH

00:00

06:30

06:45

GAP SUB

FLEX MONEL

25

FLEX MONELX/O

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 20: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

JARS-HYD/MECH

HWDP(5.0 IN)

0.25

2015/02/27 16:45

2

2

17801420

0.50

1995

1995

2

260

0.17m

1953m

3200.00

NEWALTA 1

2

7

6A

3

74

70

7269

NEWALTA 2

SHAKERS

GREG EVERSON

10:30

LLOYD BAUER

08:00

LLOYD BAUER

SHAKERS

72

72

72

Progress HZ Julienne d-23-G/94-G-2

72

69

72

2

69

0

X/O

FLEX MONEL

BIT

TURBINE MOTOR

X/OPONY SLICKCOLLARFLEX MONEL

30261

GAP SUB

FLEX MONEL

SAFETY MEETING/HAND OVER NOTES

DRILL 216mm HOLE FR 1953M- 1994MRIG SERVICE- F/T ANNULAR 8 SECS C/O

DEVIATION SURVEY

1

127

22457

174

22457

1.6

0.90.8

1.4

2015/03/13

0.25

0.50

0.25

4.00

NTSBC

5.23m

710.06m

41

PROGRESS ENERGY CANADA LTD.

70

70

0.28m

12.21m

4.03m

710.06m

5.23m

0.78m9.40m

9.18m

1.67m

9.25m4.65m

0.60m

0.25

sacks

11.00

sackssacks

10001030

5

18.94m

5

7

10

21

2

68m357m3NEWALTA 1NWALTA 2

TUGGER USE- REVIEW JSA B-37

RUNNING IN THE HOLE

2015

MAKING CONNECTIONS

2006m

655

10

0.75

3

0.75

3

2.50

RG

3

RG

18.50

RG

5610

5560

75

RGRG

1510

00:00

1330

56s/l

19:00

53s/l

07:00

1944

1330

3kdaN

OVERCAST

1

Ross Guynup

COMBIN-ED

COMBIN-ED

07:15

RG

19:00

18:3018:15

RG

RG

Ed Tallon

74

1 of 4

67.7m3 67.6m3

70

CANELSON DRILLING INC.

165

165

1994m

216

213

0.50

0.78m

1.67m

9.25m

9.40m

9.18m

168

165

162

165

162

167

170

200/d-002-G/094-G-02/00

0.28m

1

12.21m

0.60m

80kdaN

4.65m

2

JH6335

2

HORIZ

SHAKERSSHAKERS

2300.00Nm

2250.00Nm

1223.58m

2200.00Nm

216

11

216

1166.70m

11

1

11

2

0.00m

1944

7R

1

sackssacks

sackssacks

3.50

sackssacks

COMBIN-ED

COMBIN-ED

GEN1: 10042HR (24HR RUNTIME ONLINE), GEN2:10723HR (OFF), GEN:310687HR(24HR RUNTIME)

PERKINS 1 : 10798HR (24HR RUNTIME), PERKINS 2 :10525HR (OFF)

CHECKE CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

1965m1957m

43

62

24:00

165

07:00

19:00

75

165

1

Bentone 150

Cyber SealUltraseal XP

Gilsonite HTLime - Hydrated

70

Cal Chloride Powder

70

14.50

1944m

1330

22700

1030

4

4

2015/03/13

4

RIG SERVICE/FUNCTION LOWER PIPES 5 SEC TO CLOSE

DEVIATION SURVEY/CONNECTION

1

DRILL 216MM HOLE FROM 1994M- 2006M

UNKN101_20150314_1B

SAFETY MEETING- CREW CHANGE OVER

2

TURBINE MOTOR

BIT

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

X/O

FLEX MONEL

FLEX MONEL

X/O

2006.00m

K507

22700

SMITH

12:4515:4518:15

07:00

10.5

DRILL

10920.00

0

1.00

4.00

240

JARS-HYD/MECH

HWDP(5.0 IN)

14501780

3.50

1

1

1

1

Pason

1

1

1

1

1

25

70

SMITH

70

00:00

02:30

03:15

06:45

23:30

126

19:15

23:15

10

19:00

15-101-02

72

2

69

72

72

7272

3.50

0

0.25

1958

1958

0.75

2.50

240

x

x

x

03

1

1

1

1

1

1

1

1

1

69

9

74

NEWALTA 170NEWALTA 2

101

1974.35m

1955.4m

1993.3m1983.83m

7.11m

82.00kdaN

TRIP IN HOLE FR 620M TO1928M/FILL EVERY 500M

REAMING FR 1928M TO 1944M

80.00kdaN

DRILL 216mm HOLE FR1944M TO 1953M

80.00kdaN

RIG SERVICE/FUNCTION LOWER HCR 3 SEC TO OPEN

0.50

1953.00m

13301060

0.25

1994.00m

70

70

0.50

11.000.25

13301330

7

45500.00

2

21

23:3021:00

0.25

10

10301330

03:45 06:00

1212

5662

5741

25

4

4

sackssacks

1030

d-023-G/094-G-02

1060

0.753.50 0.252.50

1030

4.00 0.25

03:15

02:30

1994m

07:00

06:45

127

174

5

14301760

0.60m

12.21m

0.28m

1000

7.00

24.00

12.00

5.00

55s/l

1.67m

14

9.18m

4.65m

9.25m

9.40m

0.78m

13301330

3kdaN

53s/l

SHAKERS

710.06m

SHAKERS

5.23m

3kdaN

80kdaN

4

4

24:00

23:30

23:15

19:15

102

216

GOOD

1944

5

DRILL

5

18.96m

55

216

213

170

174

127

134.9

153.3

130.4

K507

131.5

1

1

11

1

11.00

1

-2.00

1

11

1944m 1952m

1223.58m

CALME

65.50m366m3

1

10.5

75

1953m

sacks

JARS-HYD/MECH

7R

sacks

1

HWDP(5.0 IN)

165

162

167

COMBINED

162

COMBINED

165

168

162167

170

213

168165

162

165

9239kPa

9293kPa

9293kPa

56s/l56s/l

JH6335

43

1153054

SMITH

165

165

Lime - HydratedCal Chloride Powder

Cyber Seal

Gilsonite HTUltraseal XP

70

70

216

2

1

2

18.50

DRILL

Lime - HydratedBarite

2015/03/13 23151

23151

2000m 2005m

2

1

K507

CHECK FLOOR /CROWN SAVER/BRAKE PADS /POP VALVES PINS

07:15

07:00

18:30

18:15

06:00

50

ET

ETETET

ET

7R

FLEX MONEL

PONY SLICKCOLLAR

X/OTURBINE MOTOR

BIT

7272

69

2

0

72

72

80kdaN

JH6335

GAP SUB

25

FLEX MONEL

FLEX MONELX/O

Page 21: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

19:15

1

JARS-HYD/MECH

22:45

2.25

HWDP(5.0 IN)

0.75

19:00

14 STDS DP

15-101-02 2015/02/27 16:45

2

2

72

2

69

72

72

7272

0

1.50

5.50

0.25

2024

2029

2

250

240

0.00m

2020m

x

x

x

3200.00

03

1

1

1

1

1

1

1

1

1

69

2

10

11.1

76

74

11.1

11.1

21:00

11.1

20:15

70

11.1

74

69

11.1

70

89

11.1

GREG EVERSON

LLOYD BAUER

08:00

LLOYD BAUER

101

72

72

Progress HZ Julienne d-23-G/94-G-2

72

72

69

72

2

2013.03m

69

2022.51m

0

X/O

2041.47m

FLEX MONEL

2031.98m

0.00m

BIT

TURBINE MOTOR

X/O

DRILL 216mm HOLE FR 2006M TO 2020M

PONY SLICKCOLLAR

82.00kdaN

DEVIATION SURVEY/CONNECTIONS/WORK SLIDE

30261

FLEX MONEL

GAP SUB

81.00kdaN

FLEX MONEL

81.00kdaN

SAFETY MEETING/HAND OVER NOTES

1.25

DRILL 216MM HOLE FROM 2020M- 2024MDEVIATION SURVEY

2020.00m

HANDLE DIRECTIONAL TOOLS- P/U NEW MOTOR, SET UP TO 1.83, SCRIBE

1330

RIG SERVICE- F/T BLIND RAMS 5 SECS C/O

TRIP OUT OF HOLE- FLOW CHECK @ 2022M, PUMP PILL, FLOW CHECK @1891M,988M,OOH

CONDITION MUD & CIRCULATE

HANDLE DIRECTIONAL TOOLS- LAY OUT MOTOR

1

SAFETY MEETING WITH PHOENIX & SCHLUMBERGER

22000

127

22000

174

5.8

2015/03/15

1030

0.25

2024.76m

1.25

70

0.25

70

3.50

0.503.25

1.000.25

0.25

1.25

0.25

1.00

102

37960.00

21

20D

21

0.25

6B

NTS

5

20D

7

BC

5.23m

710.06m

03:00 06:00

44

PROGRESS ENERGY CANADA LTD.

2029

4281

25

0.16m

8.70m

1

4

10.3

8.1

4.70m

710.06m

113.89m

5.23m

0.78m

9.18m

9.25m

1.67m9.40m

4.65m

0.257.00

1000

0.50

d-023-G/094-G-02

1030

1.00

5.50

0.00m

10

21

2

3.50

63.70m364m3NEWALTA 1NEWALTA 2

BOP DRILL/ TRIPPING

WORKING PIPE AFTER A SLIDE

2015

CHANGING HEADS AND LINERS

07:00

05:30

2024m

2067m

127

174

0.25

5

7

7.00

7

0.50

12

RGRG

10.00

RG

RG

75

RGRG

0.60m

12.21m

0.28m

7.00

24.00

12.00

5.00

1.67m

9.18m

15

42

4.65m

9.25m

9.40m

0.78m

00:00

1330

19:00

56s/l

07:00

2024

1330

710.06m

1330

11.111.1

3kdaN

398.50m

SHAKERS

5.23m

11.1 11.1

5kdaN

11.1

11.1 11.1

3kdaN

BLOWING SNOW

1

80kdaN

Ross Guynup

SINGLE

SINGLE

6.5

6.5

07:15

24:00

22:45

19:15

12:15

0

09:00

RG

08:3008:15

15:00

RG

13:45

13:30

RG

12:30

Ed Tallon

200

74

89

1 of 3

58.3m3

70

FAIR

CANELSON DRILLING INC.

165

165

2024m

1944

DRILL

0.00m

216

213

216

213

170

1.00

170

127

2.25

127

0.78m

1.50

1.67m

9.25m

9.40m

9.18m

168

165

162

180.6

U5135

165

162

167

170

1

1

11

200/d-002-G/094-G-02/00

0.28m

12.21m

1

0.60m

1

4.65m

80kdaN

1

-14.00

1

1

2

1

14267

7

HORIZ

2013m 2019m

SHAKERSSHAKERS

2300.00Nm

4500.00Nm

796.50m

2300.00Nm

200

6A

2

1251.99m

216

UP TO 19 KM/HW

2

1251.99m

1

11

2

1

10

75

1

9.46m

2020m

2024

JARS-HYD/MECH

8

sacks

1

8

1

HWDP(5.0 IN)

sacks

5.50

COMBIN-ED

COMBIN-ED

15:00

165

17:15

162

17:30

GEN 1:10,067HR (24HR RUNTIME ONLINE), GEN 2: 10,724HR (OFFLINE), GEN3:10,712HR (24HR RUNTIME)

COMBINED

167

173.1

PERKINS 1: 10,282HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525 HR OFF

COMBINED

162

CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS

165

168

165162

179.5

167

213

127168

165

162

9239kPa

9239kPa

9239kPa

17:15

19:00

178.9

17:30

F/T FLOOR & CROWN SAVERS/BRAKE PADS,POP VALVE PINS

57s/l55s/l

DRILLS/BOP, ETC. WHILE TRIPPING, WELL SECURE IN 2MIN 20SEC

TRIP IN HOLE- WASH 28M TO BOTTOM

TRIP IN HOLE TO 618M,FLOW CHECK ,FILL EVERY 500M/ F/C @ 1129M

2024m

14267

44

1153054

28

43

ULTERRA

24:00

165

07:00

19:00

75

1

165

165

165

02:45

70

70

Barite

93

93

216

0

0.00

2006m

3.50

DRILL

Cal Chloride Powder

17582

4

3

2015/03/13 21245

2015/03/15

21245

4

DEVIATION SURVEY/CONNECTIONS

DRILL 216MM HOLE FR 2024M TO 2067M

1

SAFETY MEETING- CREW CHANGE OVER

UNKN101_20150315_1B

2

TURBINE MOTOR

BIT

GAP SUB

FLEX MONEL

2

PONY SLICKCOLLAR

1

X/O

FLEX MONEL

FLEX MONEL

X/O

6A

21A

2067.97m

HOLE FILL CAL 13.43M/3- ACT 14.65M/3- DIFF +1.22M/3

K507

CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS

12:15

09:00

U5135

13:30

12:30

07:15

17582

07:00

08:30

08:15

06:00

13:45

ULTERRA

07:15

10.5

ETET

DRILL

ETETET

ET

10836.00

7R

1

0.25

1.50

2.25

GAP SUB

4.6

3.00

FLEX MONEL

PONY SLICKCOLLAR

MOTOR HS

BIT

3.50

240

JARS-HYD/MECH

HWDP(5.0 IN)

14601760

24.00

72

1

69

1

2

1

72

1

Pason

0

72

1

72

1

1

1

JH6335

1

25

SMITH

47

47

00:00

05:30

FLEX MONEL

FLEX MONEL

25

X/O4 STDS DP

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 22: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

JARS-HYD/MECH

HWDP(5.0 IN)

0.25

14 STDS DP

2015/02/27 16:45

2

2

1820

3.50

1460

2275

2

240

3.68m

2153m

3200.00

NEWALTA 1

10

2

7

89

74

70

6989

NEWALTA

SHAKERS

GREG EVERSON

LLOYD BAUER

10:0007:15

LLOYD BAUER

69

2126.81m

72

2117.34m

72

Progress HZ Julienne d-23-G/94-G-2

2107.87m

72

2098.37m

89

2088.89m

69

2079.4m

72

2069.92m

2

0

2354.32m

2335.36m

2344.84m

4 STDS DP

2316.39m

X/O

2325.85m

2306.92m

BIT

MOTOR HS

PONY SLICK COLLAR

FLEX MONEL

GAP SUB

30261

FLEX MONEL

FLEX MONEL

SAFETY MEETING/HAND OVER NOTES

DRILL 216MM HOLE FR 2153M-2305MRIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O

46.149.553.2

DEVIATION SURVEY- ACCUMULATED

1

127

14800

170

14800

35.9

38.5

127

40.8

43.3

2015/03/15

1.50

0.25

0.25

3.00

NTSBC

5.23m

398.50m

710.06m

31

PROGRESS ENERGY CANADA LTD.

47

38

2124

0.16m

8.70m

2143

0.00m

398.50m

5.23m

113.89m0.78m

710.06m

9.18m

9.25m

1.67m9.40m

4.65m

0.25

sacks

8.00

sacks

10201050

5

18.96m

5

10

21A

21

2

62m364.5m3NEWALTA 1NEWEALTA 2

SAMPLES- REVIEW JSA A-43

WASHING RIG

2015

MIXING BARITE

2375m

220

10294

655

0.50

33

RG

5

RG

15.00

RG

3049

75

RG

4940

1

RGRG

1025

00:00

1340

58s/l

19:00

58s/l

07:00

2024

11.111.1

11.1 11.1

11.1

11.1 11.1

1340

10kdaN

PARTLY CLOUDY

1

Ross Guynup

SINGLE

SINGLE

07:15

RG

19:00

15:3015:15

RG

RG

Ed Tallon

74

89

1 of 6

59.9m3 55.0m3

70

CANELSON DRILLING INC.

165

165

2305m

216

213

0.75

113.89m

9.25m

1.67m

0.78m

9.18m

127

168

165

162

165

162

167

200/d-002-G/094-G-02/00

0.16m

8.70m

1

4.65m

84kdaN

9.40m

2

14267

7

HORIZ

SHAKERSSHAKERS

4500.00Nm

6400.00Nm

1080.89m

5400.00Nm2

2

200

11

200

881.80m

0

2

10

9.50m

2024

8

1

sackssacks

sackssacks

bbl

4.00

sacks

192.5

sacks

193.8

SINGLE

m3

194.3

SINGLE

sacks

192.4

191.6189.7

187

GEN1: 10,091HR (24HR RUNTIME ONLINE), GEN2: 10,724HR (OFFLINE), GEN3 :10,736HR (24HR RUNTIME ONLINE)

PERKINS 1: 10,846HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525HR (OFFLINE)

CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

189.5

190.2

190.9190.9

191191.1

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

4566

3049

2215m2162m

38

351

24:00

165

07:00

19:00

1

165

1

75

Base OilOpti-Thin

BariteBentone 150

Ultraseal XPCal Chloride Powder

Lime - HydratedCyber Seal

93

0

Gilsonite HT

15.50

2067m

1340

15000

1050

4

5

2015/03/15

DEVIATION SURVEY/CONNECTIONS/WORK PIPE

4

BOP DRILL WEL SHUT IN IN 90 SEC /CLOSED UPPER PIPES 5 SEC TO CLOSE/ OPEN

UPPER HCR 3 SEC TO OPEN

1

DRILL 216MM HOLE FROM 2305M TO 2375M

UNKN101_20150316_1B

SAFETY MEETING- CREW CHANGEC OVER

2

MOTOR HS

BIT

FLEX MONEL

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

FLEX MONEL

X/O

4 STDS DP

2375.00m

U5135

15000

11:1512:00

ULTERRA

08:1509:1509:45

10:45

07:45

10.5

DRILL

9156.00

1

HWDP(5.0 IN)

16.2

7.75

24.122.2

20.518.3

3.00

28.425.5

240

JARS-HYD/MECH

14 STDS DP

11.1

1460

11.1 11.1 11.1

11.1

1790

7.50

11.1 11.1

1

1

1

1

Pason

1

1

1

1

1

40

ULTERRA

47

00:00

04:00

04:15

22:30

11

19:15

22:15

155

19:00

15-101-02

69

72

2

69

72

7272

2.75

0

2143

2275

0.25

4.00

250

106

x

x

x

03

1

1

1

1

1

1

1

1

1

89

129

20:45

11.1

20:15

11.1

19:45

11.1

19:00

11.1

89

NEWALTA 1

11.1

70NEWALTA 2

11.1

22:15

74

21:30

11.1

101

2221.57m

2174.16m

2164.66m

2212.1m2202.6m2193.12m

2183.64m

0.00m

90.00kdaN

DRILL 216MM HOLE FR 2067M-

RIG SERVICE/FUNCTION ANNULAR 15 SEC TO CLOSE

82.00kdaN

DEVIATION SURVEY/CONNECTIONS /WORK PIPE

82.00kdaN

1.50

2153.27m

13401050

0.50

2304.97m

0

77

3.50

8.000.25

1330

7

32500.00

2

21

22:00

0.25

10

10301330

02:00 05:30

1212

47

4940

40

38

0

4

75.873.271.3

68.568.2

66.8

1020

d-023-G/094-G-02

1050

4.00 0.25

1030

3.00

04:15

04:00

2305m

07:00

127

127

170

5

14501780

4.65m

8.70m

0.16m

1000

7.00

24.00

12.00

5.00

9.25m

9.18m

16

9.40m

1.67m

0.78m

113.89m

1340

710.06m

1340

10kdaN

58s/l

SHAKERS

398.50m

SHAKERS

5.23m

7kdaN

6

0

24:00

22:30

22:15

19:15

1682

200

GOOD

10

2024

DRILL

0.00m

216

213

167

170

127

127

188.6188.2

188.5

2.75

188.6

187.9

187.8

U5135

188.8

1

1

11

1

8.00

1

-13.00

1

11

2102m 2143m

1024.00m

CALMW

62.40m3

1

10

75

1

2153m

sackssacks

sackssacks

JARS-HYD/MECH

8

m3

1

HWDP(5.0 IN)

14 STDS DP

162

165

162

SINGLE

165

SINGLE

168

127

165162

167

213

127168

165

162

9186kPa

9239kPa

9239kPa

60s/l60s/l

14267

36

1153054

ULTERRA

02:0001:30

03:1502:45

04:15

00:45

165

00:15

165

BariteGilsonite HT

77

0

216

0

Cal Chloride Powder

2

2

18.50

Gilsonite HT

DRILL

Lime - HydratedBentone 150Base Oil

2015/03/15 17047

17047

2340m

2

1

U5135

CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS

07:15

07:00

15:30

15:15

06:00

281

ETETETETET

ET

8

GAP SUBFLEX MONEL

PONY SLICKCOLLAR

MOTOR HS

BIT

7269

2

72

0

72

72

14267

FLEX MONEL

FLEX MONEL

40

X/O4 STDS DP

Page 23: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

JARS-HYD/MECH

HWDP(5.0 IN)

0.25

14 STDS DP

2015/02/27 16:45

4

7

1800

3.50

1440

2653

6

240

0.00m

2485m

3200.00

NEWALTA 1

7

2

10

89

74

70

6989

NEWALTA 2

SHAKERS

GREG EVERSON

LLOYD BAUER

09:4507:15

LLOYD BAUER

69

2439.67m

72

2430.21m

72

Progress HZ Julienne d-23-G/94-G-2

2420.74m

72

2411.27m

89

2401.77m

69

2392.27m

72

2382.8m

2

0

2714.58m

2733.55m

4 STDS DP

2686.11m

X/O

2695.58m

2676.65m

BIT

MOTOR HS

PONY SLICK COLLAR

FLEX MONEL

GAP SUB

30261

FLEX MONEL

FLEX MONEL

SAFETY MEETING/ CREW CHANGE HAND OVER NOTES

DRILL 200mm HOLE FR 2485M-2674MRIG SERVICE- F/TUPPER PIPE RAMS 5 SECS C/O

90.289.988.1

DEVIATION SURVEY

127

19800

170

19800

90

89.6

127

89.7

89.9

2015/03/15

1.75

0.25

3.00

NTSBC

5.23m

398.50m

710.06m

42

PROGRESS ENERGY CANADA LTD.

47

47

0.16m

8.70m

0.00m

398.50m

5.23m

113.89m0.78m

710.06m

9.18m

9.25m

1.67m9.40m

4.65m

0.25

sacks

8.00

10201050

5

18.94m

5

10

21

2

64m362m3NEWALTA 1NEWALTA 2

RE- FUELING CREW TRUCK- REVIEW JSA A-08

RIG SERVICE

2015

PICKING UP PIPE

2769m

5

102

1515

5

0.50

77

RG

3

15.00

RG

5130

75

RG

5195

1

RGRG

1685

00:00

1330

57s/l

19:00

57s/l

07:00

2375

11.111.1

11.1 11.1

11.1

11.1 11.1

1330

6.5kdaN

PARTLY CLOUDY

1

Ross Guynup

SINGLE

SINGLE

07:15

RG

19:00

15:3015:15

RG

RG

Ed Tallon

74

89

1 of 6

63.4m3 60.8m3

70

CANELSON DRILLING INC.

165

165

2674m

216

213

0.50

113.89m

9.25m

1.67m

0.78m

9.18m

127

168

165

162

165

162

167

200/d-002-G/094-G-02/00

0.16m

8.70m

1

4.65m

85kdaN

9.40m

2

14267

5

HORIZ

SHAKERSSHAKERS

11500.00Nm

11400.00Nm

1479.08m

8500.00Nm

200

11

200

1194.69m

0

2

10

9.47m

2375

8

1

sackssacks

sackssacks

4.00

bbl

188.1

sacks

188.5

SINGLE

sacks

187.9

SINGLE

m3

188.4

187.6188.4189.6

GEN1 : 10,114HR (24HR RUNTIME ONLINE) ,GEN 2: 10,727HR (3HR RUNTIME ONLINE), GEN 3: 10,756 (21HR RUNTIME OFF)

PERKINS 1: 10,852HR, PERKINS 2: 10,544HR (24HR RUNTIME ONLINE)

F/T CROWN AN FLOOR SAVER/ BRAKE PADS / POP VALVE PINS

149.6

145.4143

148.6146.9

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

2541m

52

394

24:00

165

07:00

19:00

1

165

1

75

Bentone 150

Opti-WetBase Oil

Lime - HydratedGilsonite HT

Cyber SealUltraseal XP

93

0

Barite

30.50

2375m

1330

20200

1050

12

12

2015/03/15

4

DEVIATION SURVEY/CONNECTIONS

1

DRILL 200 MM HOLE FROM 2674M TO 2769M

UNKN101_20150317_1A

SAFETY MEETING-CREW CHANGE OVER

2

MOTOR HS

BIT

FLEX MONEL

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

FLEX MONEL

X/O

4 STDS DP

2769.49m

U5135

20200

09:1510:00

ULTERRA

07:3008:0008:15

08:45

07:00

DRILL

8148.00

1

HWDP(5.0 IN)

80.3

8.00

85.184.3

82.781.6

3.00

86.586

240

JARS-HYD/MECH

14 STDS DP

11.1

1460

11.1 11.1 11.1

11.1

1780

22.50

11.1 11.1

1

1

1

1

Pason

1

1

1

1

1

40

ULTERRA

47

00:00

04:00

06:45

210

19:15

22:15

55

19:00

15-101-02

69

72

2

69

72

7272

0.25

0

2504

2653

2.75

4.00

55

x

x

x

03

1

1

1

1

1

1

1

1

1

89

110

21:00

11.1

20:00

11.1

19:30

11.1

19:00

11.1

89

NEWALTA 1

11.1

70NEWALTA 2

11.1

74

21:45

11.1

101

2544m

2496.57m

2487.09m

2534.54m

2525.04m

2515.56m

2506.07m

0.00m

95.00kdaN

DRILL 200MM HOLE FROM 2375 TO 2485M

DEVIATION SURVEY/CONNECTIONS/WORK PIPE

84.00kdaN

RIG SERVICE/FUNCTION LOWER PIPS 5 SEC TO CLOSE

84.00kdaN

1.75

2485.10m

13301030

0.25

2674.67m

0

93

3.50

8.000.25

1350

7

27040.00

2

21

22:00

0.25

10

10601350

03:00 06:00

1212

5195

40

0

4

88.589.3

89.990.4

90.2

1000

d-023-G/094-G-02

1030

4.00 0.25

1060

3.00

06:45

04:00

2674m

07:00

127

127

170

14801810

4.65m

8.70m

0.16m

1030

7.00

24.00

12.00

5.00

9.25m

9.18m

17

9.40m

1.67m

0.78m

113.89m

1330

710.06m

1330

6kdaN

60s/l

SHAKERS

398.50m

SHAKERS

5.23m

11kdaN

6.5

0

24:00

22:15

19:15

2102

200

GOOD

2375

DRILL

18.94m

216

213

167

170

127

127

182.1180.8

182.8

2.75

184

177.2

183.6

U5135

182.4

1

1

11

1

8.00

1

-8.00

1

11

2426m 2475m

1393.73m

CALMW

56m3

1

10

75

1

2485m

sackssacks

sackssacks

JARS-HYD/MECH

8

sacks

1

HWDP(5.0 IN)

14 STDS DP

162

165

162

SINGLE

165

SINGLE

168

127

165162

167

213

127168

165

162

9239kPa

9239kPa

9239kPa

57s/l58s/l

14267

49

1143092

ULTERRA

02:0001:15

03:3002:45

03:45

00:45

165

00:15

165

Barite

93

0

216

2

Ultraseal XP

2

2

33.50

Gilsonite HT

DRILL

Cyber SealLime - HydratedBarite

2015/03/15 18200

18200

2737m

2

1

U5135

CHANGED OUT 4 SHAKER SCREENS

FUNCTION TEST CROWN AN FLOOR SAVER / BRAKE PADS / POP VALVE PIN

07:15

07:00

15:30

15:15

06:00

299

ET

ETETET

ET

8

GAP SUBFLEX MONEL

PONY SLICKCOLLAR

MOTOR HS

BIT

7269

2

72

0

72

72

85kdaN

14267

FLEX MONEL

FLEX MONEL

40

X/O4 STDS DP

Page 24: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

DP(5.0 IN)

DP(5.0 IN)

JARS-HYD/MECH

0.75

HWDP(5.0 IN)

2015/02/27 16:45

8

9

18001490

0.25

240

0.00m

2921m

3200.00

NEWALTA 1

10

2

7

89

74

70

6974

NEWALTA 2

GREG EVERSON

09:15

DARRYL GIBBONS

07:00

LLOYD BAUER

69

2885.29m

72

2866.29m

72

Progress HZ Julienne d-23-G/94-G-2

2847.37m

72

2828.44m

89

2809.45m

69

2790.45m

2771.47m

72

2

0

4 STDS DP

X/O

BIT

MOTOR HS

PONY SLICK COLLAR

FLEX MONEL

GAP SUB

30261

FLEX MONEL

FLEX MONEL

SAFETY MEETING/HAND OVER NOTES

DRILL 200mm HOLE FR 2921M-2940MCONDITION MUD & CIRCULATE/ WORK PIPE STEADY

P.O.O.H. FLOW CHECK @ 1513m

CREW CHANGE OVER MEETING

DEVIATION SURVEYDRILL 200MM HOLE FROM 2940M-2996M

1

TRIP OUT OF HOLE- FLOW CHECK @ 2995M,PUMP PILL, FLOW CHECK @2853M,

CONDITION MUD & CIRCULATE

127

21545

170

21545

91.2

90.9

127

90.8

2015/03/15

0.25

1.00

0.25

0.25

0.75

0.50

2.00

NTSBC

5.23m

398.50m

710.06m

58

PROGRESS ENERGY CANADA LTD.

0.18m

2769

8.47m

2883

0.00m

398.50m

5.23m

28.46m0.78m

710.06m

9.18m

9.25m

1.67m9.40m

4.65m

5.503.002.50

10201050

0

0.00m

11

0

21

11

7

21

20

6

58m361.50m3NEWALTA 1NEWALTA 2

COMMUNICATION

MIXING MUD

2015

LOG WELL

55

0.50

77

6.003.00

GG

4

GGGG

7.50

GG

75

1

GGGG

2945

00:00

1370

62s/l

19:00

62s/l

07:00

2996

12.7 12.7

12.7

12.7 12.7

1370

14kdaN

OVERCAST

1

GREG GODDU

SINGLE

SINGLE

07:15

11:30

GG

11:15

09:0007:30

GG

16:45

15:00

14:45

13:00

Ed Tallon

89

70

1 of 7

74

56.6m3 54.3m3

89

CANELSON DRILLING INC.

165

165

216

213

1.250.75

113.89m

9.25m

1.67m

0.78m

9.18m

127

168

165

162

165

162

167

200/d-002-G/094-G-02/00

0.16m

1

8.70m

4.65m

85kdaN

9.40m

2

14267

7

HORIZ

SHAKERSSHAKERS

14200.00Nm

540.32m

14200.00Nm2

200

2

6

200

1649.80m

0

10

18.95m

2024

8

1

sackssacks

sackssacks

5.00

141.8141.5

SINGLE

141.7

SINGLE

141.3

141.4

16:45

141.4

17:00

141.6

GEN1 : 10,115HR (OFF), GEN2 :10,752HR (24HR RUNTIME ONLINE), GEN3 : 10,781HR (24HR RUNTIME ONLINE)

PERKINS 1: 10,852HR (OFFLINE), PERKINS 2: 10,568HR (24HR RUNTIME ONLINE)

CHECKED FLOOR /CROWN SAVER /BRAKE PADS/POP VALVES PINS

D.W.A.D.G.

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

5180

5511

2945m2930m

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

19

24:00

165

07:00

19:00

1

165

1

75

Cyber Seal

Lime - HydratedUltraseal XP

93

Barite

0

40.75

2769m

1370

0

1050

1400

2015/03/18

LOG WELL WITH TOOL MAI-MSS-MPD-MDN-MGS-MTC-MCG/ TAGGED @ 2268M @ 2330 PM

SAFETY MEETING BEFORE RIGGING IN LOGGERS

RIG IN LOGGING TRUCK

RIG SERVICE FUNCTION BLIND RAMS (OUT OF HOLE) 4 SECS TO CLOSE(RS) & CLEAN

1400

FLOOR

SAFETY MEETING BEFORE LAYING DOWN DIRECTION TOOLS

LAY DOWN DIRECTIONAL TOOLS

1

DIFF-+0.06m3

UNKN101_20150318_1A

P.O.O.H FLOW CHECK OUT OF HOLE, HOLE FILL CAL-17.31m3, ACTUAL-17.37m3,

2

MOTOR HS

BIT

FLEX MONEL

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

FLEX MONEL

X/O

4 STDS DP

3006.87m

U5135

0

ULTERRA

10:0011:00

09:15

10.5

DRILL

7350.00

2

2.00

0.25

89.3

HWDP(5.0 IN)

3.002.00

91.189.7

90.590.4

9191.4

240

JARS-HYD/MECH

14 STDS DP

11.1

1480

11.1 11.1 11.1

11.1

1780

38.50

11.1 11.1

1

1

1

1

Pason

1

1

1

1

1

ULTERRA

00:00

05:00

05:15

20:45

19:45

20:30

168

19:30

2020

19:00

15-101-02

69

72

2

69

72

7272

1.75

0

0.25

5.00

270

55

1510

x

x

x

03

1

1

1

1

1

1

1

1

1

89

546

11.111.1

11.111.1

89

NEWALTA 1

11.1

70NEWALTA 2

11.1

74

11.1

22:00

21:00

101

2961.04m

2942.1m

2979.99m

0.00m

35.00kdaN

DRILL 200mm HOLE FR 2769M- 2921M

RIG SERVICE/FUNCTION UPPER HCR 3 SEC TO OPEN

85.00kdaN

DEVIATION SURVEY/CONNECTIONS

84.00kdaN

3.00

2921.27m

13801060

0.50

2996.99m

0.75

0

93

2.250.25

0.251.50

0.25

1.75

1.50

1.75

5

20280.00

2

21

6B

5

10

0.25

2

6

21

00

03:00 06:00

66

47

40

47

0

0

1030

d-023-G/094-G-02

1060

5.00 0.25

0

0.50 0.25

05:15

05:00

2996m

07:00

127

127

170

5

00

4.65m

8.70m

0.16m

0

7.00

24.00

12.00

5.00

9.25m

18

9.18m

9.40m

1.67m

0.78m

113.89m

681.60m

1380

1622.26m

1380

12kdaN

SHAKERS

5.23m

SHAKERS

85.42m

85kdaN

22:00

21:00

6

0

20:45

20:30

19:45

19:30

0

200

24:00

GOOD

2024

0.00m

127

216

213

167

127

170

127

sackssacks

141.7

1.75

141.4

KX516D

141.5

1

1

13

1

2.25

1

-11.00

1

11

2838m 2911m

21

1706.57m

CALMN

9

10

171

1

2921m

m3sacks

sackssacks

JARS-HYD/MECH

9

sacks

1

HWDP(5.0 IN)

14 STDS DP

162

165

162

SINGLE

165

SINGLE

168

127

165162

167

180

127168

165

162

9025kPa

8972kPa

8972kPa

17:00

19:00

60s/l60s/l

P.O.O.H. FLOW CHECK @ 697m

B.O.P. DRILL WHILE TRIPPING WELL SECURE IN 75 SECS

AX34572F

60

1153054

02:45

R.B.I.

01:45

04:1503:30

05:00

01:00

165

00:00

165

93

0

200

Cyber Seal

0

Ultraseal XPBentone 150

0.00

Base Oil

DRILL

Gilsonite HTLime - HydratedBarite

2015/03/15 20468

20468

72

2

1

6

U5135

HELD CREW MEETING WITH RIG MANAGER ABOUT CREW TRUCK/ ALCOHOL & DRUG POLICIES/ CAMP POLICIES

CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS

11:30

11:15

14:45

13:00

07:15

07:00

09:00

07:30

06:00

15:00621

ETETETETET

ET

8

GAP SUBFLEX MONEL

PONY SLICKCOLLAR

MOTOR HS

BIT

7269

2

72

0

72

72

85kdaN

14267

FLEX MONEL

40

FLEX MONEL

X/OHWDP(5.0 IN)

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 25: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

23:00

19:15

DP(5.0 IN)

420

22:45

1.25

DP(5.0 IN)

0.50

19:00

JARS-HYD/MECH

1

HWDP(5.0 IN)

15-101-02 2015/02/27 16:45

5

69

72

2

69

72

7272

0

7.00

00

3006

4

260

270

0.29m

x

x

x

3200.00

03

1

1

1

1

1

1

1

1

3

74

NEWALTA 1

11

70

22:15

12.7

89

21:15

12.7

20:00

12.7

19:00

89

12.7

NEWALTA 1

70

69

12.7

NEWALTA 289

74

74

74

NEWALTA 2

23:15

89

SHAKERS

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

SHAKERS

101

69

72

Progress HZ Julienne d-23-G/94-G-2

72

72

74

69

72

2

0

3065.71m

3084.74m

HWDP(5.0 IN)

3027.82m

X/O

3046.75m

3008.86m

BIT

0.00m

MOTOR HS

PONY SLICK COLLAR

WIRELINE LOGS-CONTINUE TO RUN MAI,MSS,MPD,MDN,MGS,MTC,MCG LOGS/ FLOW CHECK

85.00kdaN

FLEX MONEL

EVERY 1/2 HR WHILE OUT OF HOLE- TAGGED @ 2268M @ 2330PM

30261

GAP SUB

FLEX MONEL

90.00kdaN

FLEX MONEL

CREW CHANGE OVER & SAFETY MEETING BEFORE PICKING UP DIRECTIONAL TOOLS

1.00

PICK UP DIRECTIONAL TOOLSR.I.H. TO CASING SHOE & FLOW CHECK

3006.87m

REAM & CLEAN F/2949m-2996m

R.I.H. TO 2949m

CUT OFF 23.50m OF DRILL LINE, FUNCTION TEST CROWN & FLOOR SAVERSSAFETY MEETING BEFORE SLIP & CUT

CIRCULATE BOTTOMS UP @ 1927m

1

R.I.H. TO 1927m, FILL PIPE EVERY 600m, FLOW CHECK @ 1500m

19200

170

19200

127

127

1272015/03/18

0.25

3006.87m

0.25

1.00

0

0.25

93

3.50

0.250.75

1.251.00

2.25

1390

2.00

1390

3.00

0.25

620

15860.00

21

5

21:30

6

19:15

0.25

9

NTS

21

3

6

BC

85.42m

10501390

681.60m

5.23m

1622.26m

19

PROGRESS ENERGY CANADA LTD.

00

5835

0.18m

8.47m

0

4

91.591.1

90.990.7

90.6

0.00m

5.23m

28.46m

85.42m

0.78m

681.60m

9.18m

1622.26m

9.25m

1.67m9.40m

4.65m

6.250.25

d-023-G/094-G-02

2.00

sacks

1.00

sackssacks

00

0.75

5

9.51m

51050

7

10

21

2

3.50

DIRECTIONALDIRECTIONALDIRECTIONALDIRECTIONAL

0.25

SLIP & CUT DRILL LINE

LOGGING - REVIEW JSA B-16

2015

CREW TRUCK OIL CHANGE- REVIEW JSA A-04

07:00

2996m

3006m

DIRECTIONAL

3102m

127

170

127

127

0.25 0.752.00

5

6.250.25

12

GG

1480

4.50

1820

GG

171

GG

1

GG

72

GG

4.65m

8.47m

0.18m

1020

7.00

24.00

12.00

5.00

65s/l

9.25m

9.18m

19

7

9.40m

9

1.67m

0.78m

28.46m

00:00

19:00

07:00

681.60m

2996

1622.26m

68s/l

5.23m

85.42m

12.7 12.7

10kdaN

12.7

12.7 12.7

6kdaN

2kdaN

OVERCAST

9

85kdaN

GREG GODDU

SINGLE

SINGLE

0

0

07:15

24:00

23:00

22:45

19:15

10:30

15

09:45

GG

09:3008:30

18:00

GG

16:00

13:45

13:30

Ed Tallon

200

89

70

1 of 3

74

89

GOOD

CANELSON DRILLING INC.

165

165

DRILL3006m

2996

55

0.00m

200

180

127

200

180

167

0.75

127

170

1.25

127

28.46m

7.00

9.25m

1.67m

0.78m

9.18m

127

168

165

KX516D

162

165

162

167

1

1

13

200/d-002-G/094-G-02/00

0.18m

8.47m

1

4.65m

9.40m

1

69kdaN

-11.00

1

1.00

1

2

11

AX34572F

7

HORIZ

6500.00Nm

9300.00Nm

625.65m

200

2

3.5

540.32m

200

CALMN

0

540.32m

62.5m359.8m3

2

10.5

2996m

9

10.5

171

1

0.00m

2949m

bbl

2996

DP(5.0 IN)

sacks

9

1

9

HWDP(5.0 IN)

1

DP(5.0 IN)

JARS-HYD/MECH

sacksm3

SINGLE

SINGLE

18:00

162

165

LP #1 10852 HRS ( 0 HRS RUN TODAY ) LP #2 10591 HRS ( RUN FOR 24 HRS )

162

165

GEN #1 10115 HRS ( 0 HRS RUN TODAY ) GEN #2 10775 HRS ( RUN FOR 24 HRS ) GEN #3 10804 HRS ( RUN FOR 24 HRS )

168

127

165

142.4

162

167

180

127168

165

162

8918kPa

8972kPa

9025kPa

19:00

140.7140.5

142.4141.6

F/T FLOOR & CROWN SAVERS/POP VALVE PINS/ BRAKE PADS

PATTERN BIT & DRILL 200mm HOLE F/2996m- 3006m

AX34572F

19

1153054

22

106

R.B.I.

24:00

165

07:00

19:00

1

9

165

165

165

171

72

Cyber SealUltraseal XP

Base Oil

Lime - Hydrated

0

0

Bentone 150

93

0

200

0

1.00

4.50

Opti-ThinBarite

21200

00

3

14

2015/03/18 0

2015/03/18

0

72

3025m

RIG SERVICE- F/T UPPER PIPE RAMS 5 SECS C/O

3050m

DEVIATION SURVEY

DRILL200MM HOLE FROM 3006M-3102M

1

SAFETY MEETING-CREW CHANGE OVER

UNKN101_20150319_1A

2

MOTOR HS

BIT

FLEX MONEL

GAP SUB

2

FLEX MONEL

1

PONY SLICKCOLLAR

FLEX MONEL

X/O

HWDP(5.0 IN)

3102.00m

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINESFUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

KX516D

D.W.A.D.G.

10:30

09:45

KX516D

13:45

13:30

07:15

21200

07:00

09:30

08:30

06:00

16:00

R.B.I.

10.5

ET

REAM

ET

DRILL

ETET

ET

6468.00

9

0

1.00

7.00

GAP SUB

DP(5.0 IN)

1.00

FLEX MONEL

HWDP(5.0 IN)

PONY SLICKCOLLAR

MOTOR HS

BIT

3.50

260

DP(5.0 IN)

JARS-HYD/MECH

12.7

12.7

12.7 12.7

0.00

12.7

72

1

69

1

2

1

72

1

Pason

0

72

1

69kdaN

72

1

1

1

AX34572F

3

40

R.B.I.

48

00:00

FLEX MONEL

40

FLEX MONEL

40

X/OHWDP(5.0 IN)

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 26: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

DP(5.0 IN)

DP(5.0 IN)

0.25

JARS-HYD/MECH

HWDP(5.0 IN)

2015/02/27 16:45

3

4

1810

4.00

1490

4

270

2.85m

3253m

3200.00

NEWALTA 1

10

2

7

70

89

89

6974

NEWALTA 2

74

SHAKERS

DARRYL GIBBONS

GREG EVERSON

11:0009:00

GREG EVERSON

SHAKERS

69

3217.55m

72

3198.56m

72

Progress HZ Julienne d-23-G/94-G-2

3179.61m

72

3160.64m

74

3141.57m

69

3122.61m

72

3103.63m

72

0

HWDP(5.0 IN)

3502.15m

X/O

3483.19m

BIT

MOTOR HS

PONY SLICK COLLAR

FLEX MONEL

GAP SUB

30261

FLEX MONEL

FLEX MONEL

CREW CHANGE OVER MEETING

DRILL 200mm HOLE F/3253m-3424mRIG SERVICE FUNCTION ANNULAR 8 SECS TO CLOSE(RS)

90.2TOTAL TIME FOR SURVEYS & CONNECTIONSDRILL 200mm HOLE F/3424m-3465m

1

170

22500

127

22500

90.4

127

90.7

127

90.4

90.2

2015/03/18

0.25

1.00

0.25

3.50

NTSBC

85.42m

681.60m

5.23m

1622.26m

27

PROGRESS ENERGY CANADA LTD.

46

46

3153

0.18m

8.47m

0.00m

5.23m

85.42m

28.46m

681.60m

0.78m

1622.26m

9.18m

9.25m

1.67m9.40m

4.65m

0.25

m3

7.50

sackssacks

10201050

5

0.00m

5

7

10

21

2

69.2m358.9m3NEWALTA 1NEWALTA 2

DRIFTING CASING

PREPARE & DRIFT CASING- REVIEW JSA B-03

2015

SNOW REMOVEAL- REVIEW JSA A-3.8

3522m

22

1151525

5

0.75

77

GG

12

15.50

GG

5575

171

GG

5750

1

GGGG

72

GG

7147

00:00

1380

60s/l

19:00

58s/l

07:00

2996

12.7 12.7

12.7

12.7 12.7

1400

10kdaN

LIGHT SNOW

9

GREG GODDU

SINGLE

SINGLE

07:15

19:00

GG

15:00

12:1512:00

GGEd Tallon

89

70

1 of 6

74

63m3 78m3

89

CANELSON DRILLING INC.

165

165

3465m

200

180

0.50

28.46m

9.25m

1.67m

0.78m

9.18m

127

168

165

162

165

162

167

200/d-002-G/094-G-02/00

0.18m

8.47m

1

4.65m

83kdaN

9.40m

2

AX34572F

7

HORIZ

SHAKERSSHAKERS

11000.00Nm

13500.00Nm

1052.60m

10900.00Nm2

200

11

200

768.00m

0

10.5

0.00m

2996

9

1

sackssacks

sacksm3

sacks

4.50

sacks

139.5

sacks

139.4

SINGLE

sacks

139.7

SINGLE

bbl

140.9

140.6140.5140.5

GEN#1- 10115 HRS ( 0 HRS RUN TODAY ), GEN #2- 10799 HRS ( RUN FOR 24 HRS ), GEN #3- 10828 HRS ( RUN FOR 24 HRS )

LP #1- 10852 HRS ( 0 HRS RUN TODAY ), PL #2- 10615 HRS ( RUN FOR 24 HRS TODAY )

F/T FLOOR & CROWN SAVERS/ BRAKE PADS/ POP VALVE PINS

137.1137.7

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

6075

3342m3292m

37

526

24:00

165

07:00

19:00

1

165

9

171

72

WalnutGraphite

Cyber SealOpti-Wet

Lime - HydratedUltraseal XP

Base OilBentone 150

93

0

Barite

16.50

3102m

1380

23100

1050

10

16

2015/03/18

14

RIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O

DEVIATION SURVEY

1

DRILL 200MM HOLE FROM 3465M-3522M

UNKN101_20150320_1A

SAFETY MEETINGCREW CHANGE OVER

2

MOTOR HS

BIT

FLEX MONEL

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

FLEX MONEL

X/O

HWDP(5.0 IN)

3522.00m

KX516D

23100

R.B.I.

07:4509:1510:15

11:00

07:00

10.5

DRILL

4830.00

0

DP(5.0 IN)

90.9

7.25

HWDP(5.0 IN)

90.290.8

90.690.4

3.50

89.989.9

260

DP(5.0 IN)

JARS-HYD/MECH

12.7

1490

12.7

12.7

1810

9.00

12.7 12.7

1

1

1

1

Pason

1

1

1

1

3

40

R.B.I.

00:00

04:30

04:45

23:00

1

19:15

22:45

102

19:00

15-101-02

69

72

72

69

72

7272

2.25

0

3271

3424

0.25

4.50

260

6136

x

x

x

03

1

1

1

1

1

1

1

1

3

74

257

12.7

22:00

12.7

20:15

12.7

70

NEWALTA 1

12.7

89NEWALTA 2

12.7

74

89

101

3274.41m

3255.46m

3331.39m

3312.44m

3293.43m

2.79m

95.00kdaN

DRILL 200MM HOLE FROM 3102M-3253M

RIG SERVICE- UPPER PIPE RAMS 5 SECS C/O

90.00kdaN

DEVIATION SURVEY

90.00kdaN

1.00

3253.54m

13801050

0.25

3465.00m

0

92

2.754.00

4.750.25

14201410

7

40560.00

2

21

22:4520:00

10

0.25

2

10501420

02:15 05:30

1212

47

40

0

4

91.3

90.2

sacks

sacksbbl

1020

d-023-G/094-G-02

1050

4.50 0.25

1050

3.50

DIRECTIONALDIRECTIONAL

0.25

04:45

04:30

3465m

07:00

127

170

127

127

5

14901810

4.65m

8.47m

0.18m

1020

7.00

24.00

12.00

5.00

62s/l

9.25m

9.18m

20

9.40m

1.67m

0.78m

28.46m

681.60m

1380

1622.26m

1380

10kdaN

62s/l

SHAKERS

5.23m

SHAKERS

85.42m

10kdaN

83kdaN

6

0

24:00

23:00

22:45

19:15

100

200

FAIR

2

168

2996

DRILL

34

18.99m

1

127

200

180

167

127

170

127

138.9

139.1

2.25

139

139.4

KX516D

139.2

1

1

13

1

7.50

1

-7.00

1

11

3149m 3215m

995.66m

CALMN

67.4m366.9m3

9

10.5

171

1

3253m

sackssacks

sacksm3

DP(5.0 IN)

9

sacks

1

HWDP(5.0 IN)

DP(5.0 IN)

JARS-HYD/MECH

162

165

162

SINGLE

165

SINGLE

168

127

165162

167

180

127168

165

162

8812kPa

8972kPa

8758kPa

60s/l60s/l

AX34572F

35

1153054

R.B.I.

02:4502:00

05:0003:45

05:30

01:15

165

00:30

165

Base OilBarite

Opti-ThinGraphite

Bentone 150Walnut

93

0

200

2

Barite

2

2

20.00

Bentone 150

DRILL

Base OilGraphiteWalnut

2015/03/18 22300

22300

72

3482m 3505m

2

1

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINESFUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

KX516D

D.W.A.D.G.

15:00

07:15

07:00

12:15

12:00

06:00

469

ET

ETETETETET

9

GAP SUBFLEX MONEL

PONY SLICKCOLLAR

MOTOR HS

BIT

7269

72

72

0

72

72

83kdaN

AX34572F

FLEX MONEL

FLEX MONEL

40

X/OHWDP(5.0 IN)

Page 27: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

DP(5.0 IN)

DP(5.0 IN)

JARS-HYD/MECH

0.25

HWDP(5.0 IN)

2015/02/27 16:45

4

5

18101490

2.25

3802

5

275

3.25m

3633m

3200.00

NEWALTA 1

10

2

7

70

89

89

6974

NEWALTA 2

74

SHAKERS

DARRYL GIBBONS

14:00

GREG EVERSON

10:00

GREG EVERSON

SHAKERS

69

72

72

Progress HZ Julienne d-23-G/94-G-2

3616.07m

72

3597.12m

74

3578.13m

69

3559.12m

72

3540.15m

72

0

3805.75m

HWDP(5.0 IN)

X/O

3824.75m

3786.82m

BIT

MOTOR HS

PONY SLICK COLLAR

FLEX MONEL

GAP SUB

30261

FLEX MONEL

FLEX MONEL

CREW CHANGE OVER MEETING

DRILL 200mm HOLE F/3633m-3775mRIG SERVICE ISOLATE & FUNCTION H.C.R'S 1 SEC TO OPEN(RS)

91.190.8

TOTAL TIME FOR SURVEYS & CONNECTIONS

1

170

21500

127

21500

90.9

127

91.5

127

91.2

91.6

2015/03/18

0.25

1.00

0.25

3.50

NTSBC

85.42m

681.60m

5.23m

1622.26m

41

PROGRESS ENERGY CANADA LTD.

46

0.18m

3572

8.47m

0.00m

5.23m

85.42m

28.46m

681.60m

0.78m

1622.26m

9.18m

9.25m

1.67m9.40m

4.65m

0.259.25

10201050

5

9.50m

5

7

10

21

2

62.3m364.5m3NEWALTA 1NEWALTA 2

WORKING WITH INVERT

RIG SERVICE - REVIEW JSA - A-20

2015

BOILER BLOW DOWN- REVIEW JSA N-05

3845m

0.75

77

GG

12

GG

17.25

GG

5750

171

1

GGGG

72

00:00

1420

60s/l

19:00

56s/l

07:00

2996

12.7 12.7

12.7

12.7 12.7

1420

8kdaN

OVERCAST

9

GREG GODDU

SINGLE

SINGLE

07:15

GG

19:00

16:4516:30

GGEd Tallon

89

70

1 of 6

74

72m3 68m3

89

CANELSON DRILLING INC.

165

165

3775m

200

180

0.50

28.46m

9.25m

1.67m

0.78m

9.18m

127

168

165

162

165

162

167

200/d-002-G/094-G-02/00

0.18m

8.47m

1

4.65m

81kdaN

9.40m

2

AX34572F

7

HORIZ

SHAKERSSHAKERS

11000.00Nm

12800.00Nm

1365.70m

13400.00Nm2

200

11.5

200

1166.52m

0

2

10.5

0.00m

2996

9

1

4.50

SINGLE

141.4

SINGLE

140.2

140.3139.5139.2

GEN #1 10115 HRS (0HRS RUN TODAY), GEN #2 10823 HRS ( RUN FOR 24 HRS ), GEN #3 10852 HRS ( RUN FOR 24 HRS )

LP #1 10852 HRS ( 0 HRS RUN TODAY ) LP #2 10639 HRS ( RUN FOR 24 HRS TODAY )

F/T FLOOR & CROWN SAVERS/ BRAKE PADS/POP VALVE PINS

141.8141.5141.3

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

6225

3709m3670m

48

849

24:00

165

07:00

19:00

1

165

9

171

72

93

0

33.75

3522m

1420

23000

1050

12

20

2015/03/18

18

RIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O

DEVIATION SURVEY

1

DRILL 200MM HOLE FROM 3775M-3845M

UNKN101_20150321_1A

SAFETY MEETING- CREW CHANGE OVER

2

MOTOR HS

BIT

FLEX MONEL

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

FLEX MONEL

X/O

HWDP(5.0 IN)

3845.00m

KX516D

23000

15:30

R.B.I.

08:3010:1511:30

13:45

07:15

10.5

DRILL

3234.00

0

DP(5.0 IN)

91.1

HWDP(5.0 IN)

5.50

90.791.8

92.191.6

3.50

260

DP(5.0 IN)

JARS-HYD/MECH

12.7

1490

12.7

12.7

1810

24.50

12.7 12.7

1

1

1

1

Pason

1

1

1

1

3

40

R.B.I.

47

00:00

04:30

04:45

23:00

1

19:15

22:45

5

19:00

15-101-02

69

72

72

69

72

7272

2.25

0

3689

0.25

4.50

250

x

x

x

03

1

1

1

1

1

1

1

1

3

74

637

22:30

12.7

21:15

12.7

19:30

12.7

70

NEWALTA 1

12.7

89NEWALTA 2

12.7

74

89

101

3654.03m

3635.09m

3729.86m3710.9m3691.93m

3672.99m

0.00m

90.00kdaN

DRILL 200MM HOLE FROM 3522M-3633M

RIG SERVICE- F/T ANNULAR 8 SECS C/O

90.00kdaN

DEVIATION SURVEY- ACCUMULATED

86.00kdaN

1.00

3633.07m

14201050

0.25

3775.34m

0

92

2.25

9.250.25

14201420

7

33280.00

2

21

23:3019:15

0.25

10

10501420

01:00 03:45

1212

6050

47

40

0

4

89.590.2

90.8

1020

d-023-G/094-G-02

1050

4.50 0.25

1050

3.50

DIRECTIONALDIRECTIONALDIRECTIONAL

0.25

04:45

04:30

3775m

07:00

127

170

127

127

5

14901810

4.65m

8.47m

0.18m

120

7.00

24.00

12.00

5.00

56s/l

9.25m

9.18m

21

9.40m

1.67m

0.78m

28.46m

681.60m

1420

1622.26m

1420

10kdaN

56s/l

SHAKERS

5.23m

SHAKERS

85.42m

10kdaN

81kdaN

6

0

24:00

23:00

22:45

19:15

1

200

FAIR

2996

DRILL

0.00m

127

200

180

167

127

170

127

142.3142

141.4

2.25

141.4

141.4

KX516D

141.4

1

1

13

1

9.25

1

-8.00

1

11

3540m 3581m

1308.79m

CALMN

63.7m359.3m3

9

10.5

171

1

3633m

sacks

DP(5.0 IN)

9

pails

1

HWDP(5.0 IN)

DP(5.0 IN)

JARS-HYD/MECH

162

165

162

SINGLE

165

SINGLE

168

127

165162

167

180

127168

165

162

8758kPa

8758kPa

8758kPa

61s/l62s/l

AX34572F

46

1153054

R.B.I.

04:3003:45

06:00

02:00

165

01:15

165

93

0

200

0

2

37.25

DRILL

WalnutNew Wash

2015/03/18 23000

23000

72

3784m 3840m

2

1

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

KX516D

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

D.W.A.D.G.

07:15

07:00

16:45

16:30

06:00

779

ET

ETETET

ET

9

GAP SUBFLEX MONEL

PONY SLICKCOLLAR

MOTOR HS

BIT

7269

72

72

0

72

72

81kdaN

AX34572F

FLEX MONEL

40

FLEX MONEL

X/OHWDP(5.0 IN)

Page 28: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

DP(5.0 IN)

DP(5.0 IN)

JARS-HYD/MECH

0.50

HWDP(5.0 IN)

2015/02/27 16:45

5

5

18101490

0.25

275

4.45m

3974m

3200.00

10

2

7

70

89

89

6974

74

DARRYL GIBBONS

12:00

GREG EVERSON

09:00

GREG EVERSON

3976.59m

69 3957.62m

723938.67m

72

Progress HZ Julienne d-23-G/94-G-2

3919.75m

723900.78m

74

3881.75m

69

3862.75m

72

72

0

HWDP(5.0 IN)

X/O

BIT

MOTOR HS

PONY SLICK COLLAR

FLEX MONEL

GAP SUB

30261

FLEX MONEL

FLEX MONEL

CREW CHANGE OVER MEETING

DRILL 200mm HOLE F/3974m-4017mTOTAL TIME FOR SURVEYS & CONNECTIONS

SAFETY MEETING BEFORE LAYING DOWN DRILL PIPEWORK PIPE & CIRCULATE HOLE CLEAN

1

LAY DOWN DRILL PIPE FLOW CHECK @ 4010m, 3878m,

170

23000

127

23000

89.5

127

89.1

1272015/03/18

0.25

4.75

NTSBC

85.42m

681.60m

5.23m

1622.26m

53

PROGRESS ENERGY CANADA LTD.

46

0.18m

3936

8.47m

0.00m

5.23m

85.42m

28.46m

681.60m

0.78m

1622.26m

9.18m

9.25m

1.67m9.40m

4.65m

4.755.001.50

10201050

9.46m

21

6F

62.7m365.5m3NEWALTA 1NEWALTA 2

LAY DOWN DRILL PIPE

STEAM USE-REVIEW JSA A-20

2015

LAYING DOWN PIPE -REVIEW JSA 6-8

0.25

77

9.505.00

GG

12

GG

6.50

GG

5950

171

1

GGGG

72

60

00:00

1425

55s/l

19:00

54s/l

07:00

2996

12.7 12.7

12.7

12.7 12.7

1425

10kdaN

OVERCAST

9

GREG GODDU

07:15

14:15

GG

14:00

09:0008:45

GG

19:00

Ed Tallon

89

70

1 of 5

74

73m3 69m3

89

CANELSON DRILLING INC.

165

165

200

180

0.75

28.46m

9.25m

1.67m

0.78m

9.18m

127

168

165

162

165

162

167

200/d-002-G/094-G-02/00

0.18m

1

8.47m

4.65m

81kdaN

9.40m

2

AX34572F

5

HORIZ

SHAKERSSHAKERS

12500.00Nm

1536.54m

12700.00Nm2

200

7.5

200

1508.07m

0

10.5

9.46m

2996

9

1

sacks

5.00

138.8139.8

SINGLE

140

SINGLE

140.8

141.1140.9141.5

GEN #1 10115 HRS ( 0 HRS RUN TODAY ), GEN #2 10847 HRS ( RUN FOR 24 HRS ), GEN #3 10876 HRS (RUN FOR 24 HRS)

LP #1 10852 HRS ( 0 HRS RUN TODAY ), LP #2 10663 HRS ( RUN FOR 24 HRS TODAY )

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS

5970

4017m4017m

54

24:00

165

07:00

19:00

1

165

9

171

72

93

Barite

0

44.00

3845m

1420

0

1050

20

2015/03/18

20

1

LAY DOWN DRILL PIPE FROM 2800M/ FLOW CECK @ 2800M,2036M,929M

UNKN101_20150322_1A

SAFETY MEETING- CREW CHANGE OVER

2

MOTOR HS

BIT

FLEX MONEL

GAP SUB

FLEX MONEL

PONY SLICKCOLLAR

FLEX MONEL

X/O

HWDP(5.0 IN)

4017.00m

KX516D

0

R.B.I.

07:4507:45

10.5

DRILL

3822.00

1

89.8

DP(5.0 IN)

HWDP(5.0 IN)

2.00

89.289.2

89.489.4

89.789.2

260

DP(5.0 IN)

JARS-HYD/MECH

12.7

1490

12.7

12.7

1810

42.50

12.7 12.7

1

1

1

1

Pason

1

1

1

1

3

R.B.I.

00:00

05:00

05:15

19:15

19:00

15-101-02

69

72

72

69

72

7272

1.75

0

4016

0.25

5.00

250

x

x

x

03

1

1

1

1

1

1

1

1

3

74

978

12.7

12.712.7

70

NEWALTA 1

12.7

89NEWALTA 2

12.7

74

89

101

4000m

3995.55m

4.45m

50.00kdaN

DRILL 200MM HOLE FROM 3845M-3974M

RIG SERVICE-F/T UPPER PIPE RAMS 5 SECS C/O

90.00kdaN

DEVIATION SURVEY

90.00kdaN

3974.62m

14201050

0.25

4017.00m

0

93

5.000.25

1.500.25

4.75

10

23920.00

2

21

6

21

0.25

5

00:15 03:00

1212

47

40

0

0

1020

d-023-G/094-G-02

1050

5.00 0.25

4.75

05:15

05:00

4017m

07:00

127

170

127

127

5

4.65m

8.47m

0.18m

7.00

24.00

12.00

5.00

9.25m

22

9.18m

9.40m

1.67m

0.78m

28.46m

681.60m

1420

1622.26m

1420

10kdaN

SHAKERS

5.23m

SHAKERS

85.42m

81kdaN

6

0

24:00

19:15

1

200

FAIR

2996

0.00m

127

200

180

167

127

170

127

1.75

138.6

KX516D

138

1

1

13

1

1.50

1

-10.00

1

11

3858m 3905m

1536.54m

CALMN

9

10.5

171

1

3974m

DP(5.0 IN)

9

1

HWDP(5.0 IN)

DP(5.0 IN)

JARS-HYD/MECH

162

165

162

SINGLE

165

SINGLE

168

127

165162

167

180

127168

165

162

8758kPa

8758kPa

8758kPa

54s/l55s/l

AX34572F

54

1153054

03:45

R.B.I.

02:45

05:1504:30

06:45

01:45

165

00:30

165

0

0

200

0

2

44.00

DRILL

2015/03/18 23100

23100

72

2

1

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES

KX516D

FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

D.W.A.D.G.

14:15

14:00

07:15

07:00

09:00

08:45

06:00

1021

ET

ETETET

ET

9

GAP SUBFLEX MONEL

PONY SLICKCOLLAR

MOTOR HS

BIT

7269

72

72

0

72

72

81kdaN

AX34572F

FLEX MONEL

40

FLEX MONEL

X/OHWDP(5.0 IN)

Page 29: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

22:30

22:45

19:15

20:45

0.25

19:00

15-101-02 2015/02/27 16:45

23.20

2.25

0.50

0.25

0.25

0.50

0.25

0.75

0.25

2.00

00

260

275

11.75

x

x

x

3200.00

03

1

1

1

1

1

1

1

1

3

12A

21

7

25

21

20D

6F

21A

70

1021

89

89

NEWALTA 1NEWALTA 2

74

12B

SHAKERS

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

69

101

72

72

Progress HZ Julienne d-23-G/94-G-2

72

74

69

72

72

0

HWDP(5.0 IN)

X/O

BIT

MOTOR HS

PONY SLICK COLLAR

FLEX MONEL

80.00kdaN

LAY DOWN DRILL PIPE FROM 768M/ FLOW CHECK OOH

GAP SUB

30261

DRILLS/BOP, ETC. WELL SECURE IN 94 SECS

FLEX MONEL

30.00kdaN

SAFETY MEETING- PRIOR TO LAYING DOWN TOOLS/PHOENIX

FLEX MONEL

50.00kdaN

HANDLE DIRECTIONAL TOOLS- LAY OUT

CREW CHANGE OVER & SAFETY MEETING BEFORE RUNNING CASING

RUN CASING FLOW CHECK @ 1847m

4017.00m

2.75

1

OTHER- REMOVE WEAR BUSHING

RIG SERVICE- FT BLIND RAMS 5 SECS C/O- FLOW CHECK OOH

0

SAFETY MEETING WITH GIANT POWER TONGS

0

RIG UP/DOWN TO RUN CASING

RUN 132 joints 0f 114.3mm 20.09kgm, P-110 casing 1847.44m followed by 154

0.50

1.25

1.75

A

0.25

0

0.25

0

1.50

11.75

1410

18460.00

12

21

22:30

NTS

0.25

CT

BC

54

PROGRESS ENERGY CANADA LTD.

00

0

2

4.45m

5.23m

85.42m

681.60m

1622.26m

4017

d-023-G/094-G-02

0

0.25

0

2.00

12C

5

21

21

12B

1.75

RUN CASING

RUN CASING- REVIEW JSA 7-4,7-9

2015

RUN CASING/ CIRCULATING- REVIEW JSA 7-5

02:15

02:00

04:45

04:30

07:00

03:15

02:30

04:00

03:30

127

170

127

127

0.25

5

2.001.75

GG

12

GG

GG

171

1

GGGG

72

7.00

24.00

12.00

5.00

23

00:00

19:00

joints of 139.7mm, 34.23kgm, L-80 2167.74m set at 4015m

07:00

65s/l

0

PARTLY CLOUDY

9

81kdaN

0

GREG GODDU

SINGLE

SINGLE

0

0

24:00

22:45

07:15

22:30

20:45

19:15

GG

19:00

GGEd Tallon

1 of 3

GOOD

CANELSON DRILLING INC.

165

165

2996

9.46m

0.50

200

180

167

1.500.75

2.75

28.46m

9.25m

1.67m

0.78m

9.18m

200/d-002-G/094-G-02/00

0.18m

1

8.47m

4.65m

9.40m

-11.00

2

7

HORIZ

CT

0

200

CALMW

1536.54m

0

38.3m3

10.5

10.5

DP(5.0 IN)

1

HWDP(5.0 IN)

DP(5.0 IN)

1

JARS-HYD/MECH0.00

SINGLE

SINGLE

TD

162

165

162

GEN #1 10115 HRS ( 0 HRS RUN TODAY ), GEN #2 10871 HRS ( RUN FOR 24 HRS ), GEN #3 10900 HRS ( RUN FOR 24 HRS )

165

LP #1 10852 HRS (0 HRS RUN TODAY ), LP #2 10687 HRS ( RUN FOR 24 HRS )

HOLE FILL CAL 21.41M/3- ACT 22.19M/3- DIFF +.78M/3

168

127

8758kPa

8758kPa

1153054

24:00

165

07:00

19:00

165

165

165

0

0

55

0

1

2800

00

2015/03/18 0

0

CEMENTING- RIG UP CEMENTERS & CEMENT CASING

4017m

CONDITION MUD & CIRCULATE

SAFETY MEETING WITH SCHLUMBERGER

1

RUN CASING FROM 3704M/ P/U CASING JT TO TAG BOTTOM

UNKN101_20150323_1A

SAFETY MEETING- CREW CHANGE OVER

2

2

1

FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN

VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINESFUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)

KX516D

D.W.A.D.G.

X

2800

07:15

07:00

06:00

0

10.5

0.75

ET

ETETET

ET

3108.00

9

0.500.75

17.25

260

12.7

12.7

12.7

44.00

12.7 12.7

Pason

AX34572F

R.B.I.

00:00

02:00

02:15

02:3003:15

03:30

04:00

04:30

04:45

rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
rossdahl
Highlight
Page 30: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

0

0

07:15

19:15 24:00

0.75

19:1519:00

14:15

GG

14:0007:30

15-101-02

19:00

2015/02/27 16:45

Ed Tallon

1 of 2

4.75

2.75

1.00

GOOD

0.75

2.50

CANELSON DRILLING INC.

165

165

260

6.50

270

1.00 9.50

3.25 3.75

x

3200.00

03

200/d-002-G/094-G-02/00

1

-6.00

2

14B

14B

12C

12C

7

HORIZ

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

101

Progress HZ Julienne d-23-G/94-G-2

0

CALMW

0

CONTINUE TO CEMENT CASING/PLUG DOWN @ 2:30AM

30261

RIG OUT CEMENTERS AND FLUSH BOP,S

10.580.00kdaN

NIPPLE DOWN BOPS

SET CASING SLIPS AND CUT CASING

CREW CHANGE OVER MEETING

10.5

SAFETY MEETING BEFORE CHANGING ANNULAR ELEMENTCHANGE OUT ANNULAR ELEMENT, OPEN DOORS,CHANGE OUT RAM RUBBERS & WASH UP

SAFETY MEETING BEFORE RIGGING OUT TOP DRIVEB.O.P.

1

RIG OUT TOP DRIVE & CHANGE OIL IN GEAR BOX

1

0

1

0

pails

LP #1 10852 HRS ( 0 HRS RUN TODAY )- PL #2 10711 HRS ( RUN FOR 243 HRS TODAY )

0.25 4.75

GEN #1 10115 HRS ( 0 HRS RUN TODAY )- GEN #2 10895 HRS ( RUN FOR 24 HRS )- GEN #3 10924 HRS ( RUN FOR 24 HRS )

0

0.25

0

4.75

0.25

0.256.50

4.75

14

15600.00

21

21

22

NTS

21

0.25

BC

PROGRESS ENERGY CANADA LTD.

1153054

24:00

165

07:00

19:00

165

165

165

0

0

0

New Wash

0

0

0 0

d-023-G/094-G-02

0

0

EQUIPMENT, V -DOOR READY FOR SKID

1

TEAR DOWN- CLEAN MUD TANKS, BRIDAL BLOCKS, SUB TARPS, RIG OUT RENTAL

UNKN101_20150324_1A

SAFETY MEETING- CREW HAND OVER

2

21

22

2

1

CHANGE OUT ANNULAR ELEMENT

CEMENTING CASING- REVIEW JSA 7-7

2015

03:15

02:30

14:15

14:00

07:00

07:15

0

06:00

07:00

07:30

06:00

5

12

10.5

GG

GGGGET

ET

ET

7.00

1260.00

24.00

12.00

5.00

24

7

00:00

10.25

19:00

3.25

07:00

260

PARTLY CLOUDY

Pason

00:00

02:30

03:15

06:00

GREG GODDU

Page 31: TOUR 1 - The Open Petroleum Data Project...Cond Mud & Circ Trips Rig Service Repair Rig Cut Off Drilg Line Dev Survey Wireline Logs Run Csg & Cement Wait On Cement Nipple Up BOP Test

CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

TOTALRigUp

Drill Actual Reaming Coring Cond Mud

& Circ Trips Rig Service

RepairRig

Cut Off Drilg Line

Dev Survey

Wireline Logs

Run Csg& Cement

Wait On Cement

Nipple Up BOP

TestBOP

Drillstem Test

PlugBack

Squeeze Cement Fishing Dir

WorkSafety

MeetingTear

DownWaiting

OnRig

Watch Other

HO

UR

S Tour 1Tour 2

Tour 3Total

DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked

Kelly Bushing Op Fuel

FUEL @ 08:00 HOURSRig Boiler

WE

AT

HE

R Time Temp

Current Conditions

Wind Direction Wind Strength

Road Condition

FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day

Well Type Re-Entry

Spud Date Time

Rig Release Date Time

License No Well Name Surface Location Prov Loc Type Unique Well Id

Contractor Rig No

Contractor’s Job No

Signature of Contractor’s Rig Manager

Operator

Operator’s AFE

Signature of Operator RepresentativePason

TOUR 1 SIGNATURE OF DRILLER START TIME END TIME

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

TOUR 3 SIGNATURE OF DRILLER START TIME END TIME

TOUR 2 SIGNATURE OF DRILLER START TIME END TIME

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

V. 1.3

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

Remarks:

TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks

SAFETYSafety Topic MEHL MACP

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

T0 ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

CUTTING STRUCTURETI Gage

TO ODC

MDC Reason Pulled

LOC Total Run (m/hr)BRG

DRILLING ASSEMBLYNo Component OD ID Length

Drill Pipe Stands

Drill Pipe Singles

Kelly DownTotal

Weight of DCWeight of String

BITSBit Number

Size

IADC Code

Manufacturer

Type

Serial No

Jets

Depth Out (m)

Depth In (m)

Total Drilled (m)

Hrs Run Today

Cumulative Hrs RunEntry Date

METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED

Pump No. Pressure Strokes/min Depth

@ @

@ @

@ @

MUD RECORDMud Type Water Oil

Other

TimeDensity

Funnel Viscosity

Fluid Loss

pH

Location of Sample

Depth

PVT

CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run

Remarks:

HOLE CONDITIONHole Drag Up Down

Torque at Bottom

Fill on Bottom

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

MUD MATERIALS ADDEDProduct Amount Type

SOLIDS CONTROLEquipment

NameHours Run

Intake Density

Over Flow Density

Under Flow Density

DEVIATION SURVEYSTime Depth Deviation Direction Type

BoilerBoiler # Hours Run pH Stack Temp

0

21:00

0

24:0022:30

22:30

19:15

07:15

21:0020:30

20:30

0.75

19:1519:00

16:3012:30

12:00

15-101-02

19:00

2015/02/27 16:45

Ed Tallon

1 of 1

4.75

GOOD

7.00

CANELSON DRILLING INC.

165

165

260

2015/03/25 23:59

245

1.00 16.50

3200.00

03

200/d-002-G/094-G-02/00

1

-8.00

2

22

7

HORIZ

DARRYL GIBBONS

GREG EVERSON

GREG EVERSON

101

Progress HZ Julienne d-23-G/94-G-2

0

CALMW

0

RIG OUT TO SKID, CLEAN MUD TANKS,

30261

10.5

CREW CHANGE OVER MEETING

10

TEAR OUT TO SKID, CLEAN MUD TANKS. JACK RIG WITH ARDY'S RIG JACKING AND

LAYDOWN TEFLON FOR SKID

SKID RIG OVER NEW WELL, SPOT BULDINGSHOLD SAFETY MEETING WITH D&D TRUCKING PRIOR TO SKIDDING RIG

1

RIG UP, RUN POWER CORDS, FIRE UP GEN.

1

0

1

0

LP #1 -10852 HRS ( 0 HRS RUN TODAY ) - LP #2 - 10735 HRS ( RUN FOR 24 HRS TODAY )

0.25 4.75

GEN #1 - 10119 HRS ( RUN FOR 4 HRS TODAY )- GEN #2 - 10916 HRS ( RUN FOR 21 HRS ) - GEN #3 - 10927 HRS ( RUN FOR3 HRS TODAY )

1.50

0.50

1.50

0

0.25

0

1.25

0.504.00

4.75

2.50

22

13000.00

21

1

NTS

1A

0.25

21D

BC

PROGRESS ENERGY CANADA LTD.

1153054

24:00

165

07:00

19:00

165

165

165

0

0

0

0

0

0 0

d-023-G/094-G-02

0

6.50

0

HANG BLOCKS AND REMOVE WEIGHT INDICATORS AND DEADLINE PANCAKE FOR RE-CERT/

Rig Released @ 2359hrs on the 25th of March / 2015

VISUALLY INSPECT AND LOWER SUB @ 2100HRS

PREP TO LOWER DERRICK, VISUALLY INSPECT AND LOWER DERRICK @ 2230HRS

1

PREP TO LOWER SUB

UNKN101_20150325_1B

SAFETY MEETING- CREW CHANGE OVER

2

22

22

22

21

22

2

1

2015

07:00

16:30

12:30

07:15

0

07:00

12:00

06:00

5

12

6.50

10.5

7.00

840.00

24.00

12.00

5.00

25

7.00

00:00

19:00

07:00

260

PARTLY CLOUDY

Pason

00:00

GREG GODDU