tour 1 - the open petroleum data project...cond mud & circ trips rig service repair rig cut off...
TRANSCRIPT
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
0
0
07:15
0.25
24:0019:00
19:00
15-101-02 2015/02/27 16:45
Ed Tallon
1 of 2
11.75
6.25
FAIR
0.50
0.25
CANELSON DRILLING INC.
165
165
5.000.50 18.50
3200.00
02
200/d-002-G/094-G-02/00
1
-4.00
2
22
21D
22
HORIZ
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
101
Progress HZ Julienne d-23-G/94-G-2
0
CALMW
0
PRE-JOB SAFETY ON LOWERING DERRICK
VISUALLY INSPECT AND LOWER DERRICK @ 0030HRS
30261
UNSPOOOL BLOCKS, RIG OUT DERRICK LINES AND CORDS. TEAR OUT RIG.
CREW CHANGE OVER MEETING
RIG OUT TO MOVE & WASH RIG. MOVE TANK FARM,PIPE TUBS, VACSHACK,MANIFOLD,FLARE TANK, MUD TANKS,CATWALK,ALL THIRD PARTY RENTALS
0
0
GEN#1 9787 (0 HRS RUN TODAY) GEN#2 10442 HRS (RUN FOR 24 HRS) GEN#3 10480 HRS (0 HRS RUN TODAY)
LP#1 10596 HRS ( RUN FOR 24 HRS) LP#2 10273 HRS (0 HRS RUN TODAY)
5.00
0
5.00
0
11.75 22
9880.00
21
NTS
0.25
BC
PROGRESS ENERGY CANADA LTD.
1153054
24:00
165
07:00
19:00
165
165
165
0
0
0
0
0
0 0
d-023-G/094-G-02
0
01
UNKN101_20150223_1C
W/O DAYLIGHT TO MOVE RIG W/D.R.S.
2
23B
2
1
WASHING RIG
LOWER DERRICK- REVIEW JSA D-08
2015
00:45
00:15
D.W.A.D.G
07:15
0
07:00
07:00
06:00
GGET
7.00
2688.00
24.00
12.00
5.00
23
0.25 6.75
00:00
19:00
07:00
PARTLY CLOUDY
Pason
00:00
00:15
00:45
GREG GODDU
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
0
0
08:00
0.50
24:0019:00
19:0008:30
15-101-02 2015/02/27 16:45
Ed Tallon
1 of 1
1.00
FAIR
7.00
CANELSON DRILLING INC.
165
165
13.000.50
3200.00
02
200/d-002-G/094-G-02/00
1
-3.00
2
23B
HORIZ
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
101
Progress HZ Julienne d-23-G/94-G-2
0
CALMW
0
W/O DAYLIGHT TO MOVE RIG
30261
W/O DAYLIGHT
PRE-JOB SAFETY ON RIG MOVE AND CRANE WORK WITH DRS TRUCKINGMOVE RIG WITH DRS TRUCKING. RIG OFF OLD LOCATION 1400HRS. SPOT MATTING ON
TOGETHER DERRICK.PLACE BOP,S AND BLOCKS.
NEW LOCATION, SPOT AND LEVEL SUB, LIFT DRAWWOKS AND DOGHOUSES ONTO SUB. PIN
0
0
5.00
0
5.00
0
0.5010.50 1A
21D
8750.00
23B
NTS
1.00
BC
PROGRESS ENERGY CANADA LTD.
1153054
24:00
165
07:00
19:00
165
165
165
0
0
0
0
0
0 0
d-023-G/094-G-02
0
10.50
01
UNKN101_20150224_1D
W/O DAYLIGHT
2
23B
2
1
2015
07:00
0
08:00
07:00
08:30
06:00
10.50
7.00
2688.00
24.00
12.00
5.00
24
7.00
00:00
19:00
07:00
CLEAR
Pason
00:00
GREG GODDU
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
0
0
23:00
07:30
24:00
0.50
23:0019:00
15:00
10:0008:00
15-101-02
19:00
16:00
2015/02/27 16:45
Ed Tallon
1 of 1
0.50
GOOD
7.00
CANELSON DRILLING INC.
165
165
250
4.007.500.50
3200.00
02
200/d-002-G/094-G-02/00
1
-13.00
2
23B
HORIZ
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
101
Progress HZ Julienne d-23-G/94-G-2
0
CALMW
0
W/O DAYLIGHT
30261
W/O DAYLIGHT
PRE-JOB SAFETY WITH DRS TRUCKING PRIOR TO SPOTTING RIGSPOT RIG/LOADS/BUILDINGS,PICK PIN MAST
HRS.
15:00 HRS.NO INCIDENTS NO EQUIPMENT DAMAGE.
SPOT RIG/LOADS/BUILDINGS,SPOT REST OF RIG,CEMENT BINS ETC.DONE WITH TRUCKS
INSTALL BRIDAL LINES & SPOOL BLOCKS 10 LINES.HEAD OF STEAM ON BOILER 19:00
1
RIG UP POWER CORDS GEN. FIRED UP @ 16:00 HRS.
0
0
4.00
0
4.00
0
1.00
5.00
0.502.00
1.00
3.00
1C21D
8750.00
23B
1
1
NTS
0.50
1C
BC
PROGRESS ENERGY CANADA LTD.
1153054
24:00
165
07:00
19:00
165
165
165
0
0
0
0
0
0 0
d-023-G/094-G-02
0
11.00
01
RIG UP WATER STEAM LINES.
UNKN101_20150225_1C
OTHER NIGHTS WORKED TILL 16:00 HRS.BACK OUT 23:00 HRS.
2
25
1
2
1
1.00
2015
07:00
15:00
16:00
0
07:30
07:00
10:00
08:00
06:00
5
12.00
10.5
RG
7.00
2688.00
24.00
12.00
5.00
25
7.00
00:00
19:00
07:00
LIGHT SNOW
Pason
00:00
GREG GODDU
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
19:15
20:00
x
19:00
0.75
15-101-02 2015/02/27 16:45
7.00
250
270
3200.00
02
1
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
101
Progress HZ Julienne d-23-G/94-G-2
RIG UP- FINISH POWER CORDS, STEAM & WATER AROUND, READY DERRICK FOR RAISING,
SUB TARPS, FLARE LINES
30261
CREW CHANGE OVER MEETING
RIG UP TO RAISE DERRICKSAFETY MEETING BEFORE RAISING DERRICK
RIG UP B.O.P HANDLER, SPOT CATWALK, INSTALL BEAVER TAIL, FINISH UP BOOM WORK
RAISE SUB PINNED @12:15
RIG UP TO RAISE SUB, RIG UP PANELS ETC. ON DOGHOUSE BACK OF SUB TOP OF
RAISE DERRICK PINNED @ 09:00 HRS.110,000 DAN. TO LIFT OFF CROWN STAND
1
SAFETY MEETING BEFORE RAISING SUB
DRAWORKS
0
0
0.25 4.00
4.00
0
0
0.25
0.75
0.502.25
1.000.25
0.75
4.50
0.25
211
7540.00
21
21
0.25
1
NTS
1
1
1
BC
PROGRESS ENERGY CANADA LTD.
0
0
d-023-G/094-G-02
sacks
sacks
11.25
sacks
7.00
25
21
1
0.75
RAISE DERRICK & SUB
2015
WELD CONDUCTER BRL
07:00
5
12
19.00
RG
RGRG
7.00
24.00
12.00
5.00
26
00:00
19:00
07:00
FROST
Ross Guynup
0
0
07:15
24:00
20:00
19:15
1
11:15
RG
09:00
08:3008:15
16:45
12:15
11:30
Ed Tallon
1 of 2
GOOD
CANELSON DRILLING INC.
165
165
21
4.001.00
200/d-002-G/094-G-02/00
1
-13.00
2
7
HORIZ
1
0
CALMW
0
10.5
10.51
1
16:45
GEN#1 9787HRS (0 HRS RUN TODAY) GEN#2 10454HRS (0 HRS RUN TODAY) GEN#3 10494HRS (RUN FOR 14 HRS TODAY)
LP #1, 10666HRS RUN FOR 24 HRS, LP #2 10273HRS (0 HRS RUN TODAY)
19:00 HANG & CHANGE OUT BLOWER CORD IN SERVICE LOOP
1153054
24:00
165
07:00
19:00
165
165
165
Drispac RegularKELZAN
0
STARDRIL
0
0
0 0
0
0
DRESS WELD CONDUCTOR BBL.
RIG UP- INSTALL STEAM HEATERS IN SUB/ STEAM & WATER AROUND
1
SAFETY MEETING PRE. TOUR
UNKN101_20150226_1C
2
2
1
D.W.A.D.G.
09:00
11:30
11:15
0
07:15
07:00
08:30
08:15
06:00
12:15
10.5
2268.00
2.25
250
Pason
00:00
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
22:45
19:15
DC (6.75 IN)
22:30
x
2.00
x
0.75
19:00
HWDP(5.0 IN)
15-101-02 2015/02/27 16:45
1
56
59
78
83
84
840
3.00
0
3.75
0.25
0.50
2
240
270
0.00m
3200.00
02
70
NEWALTA 1
1B
21
1
23:00
14.3
21:45
14.3
20:45
14.3
19:45
14.3
56
14.3
73
70
14.3
NEWALTA 2
SHAKERS
14.3 14.3
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
SHAKERS
101
Progress HZ Julienne d-23-G/94-G-2
132.76m
94.91m113.85m
76.17m
0.00m
40.00kdaN
SAFETY MEETING- REVIEW JSA C-12
30261
RIG UPCONTINUE RIG UP KELLY HOSE, UNBRIDLE ,SLIP DRLG LINE,MIX PREMIX
MUD,RIG IN FLOW LINE,INSTALL STEAM HEATERS IN SUB
RIG UP TOP DRIVE CHANGED OUT BLOWER 7-PIN CORD.
CREW CHANGE OVER MEETING
1.25
RIG UP TOP DRIVERIG UP TO SPUD, RIG UP FLOOR TONGS, SPINNER, PASON CORDS, P/U MOUSE HOLES
DRILL 311mm SURFACE HOLE F/0m-57m
CIRCULATE & CHECK FOR LEAKS
PRE -SPUD SAFETY MEETINGETC.STRAP I.D/O.D BHA.
PICK UP DIRECTIONAL TOOLS
1
SAFETY MEETING BEFORE PICKING UP DIRECTIONAL TOOLS
1600
174
16002015/02/27
0.25
57.75m
0.25
1.25
80
0.25
0
3.25
0.25
2.754.00
0.25
1000
1.75
1000
0.25
2.00
1
26520.00
1
21
20:30
20
19:30
21
0.25
NTS
21
2
5
BC
1000
18.73m
1000
PROGRESS ENERGY CANADA LTD.
0.28m
8.55m
4
0
0.3
0.10.1
0.1
5.23m1.50m
sacks
2.81m
each
0.95m
1.27m9.46m
8.97m
0.25
d-023-G/094-G-02
sacks
1.756.75
sackssacks
6.75
5
0.00m
51020
7
10
21
2
3.25
DIRECTIONALDIRECTIONALDIRECTIONALDIRECTIONAL
0.25
RIG UP TO SPUD
TOP DRIVE- REVIEW JSA C-12
2015
PICKING UP DRILL COLLARS- REVIEW JSA B-22
04:00
00:15
57m
158m
07:00
11
1010
1
0.25
5
0.25
12
1830
5.00
1830
13.50
RGRG
8.5
RGRG
8.97m
8.55m
0.28m
1020
7.00
24.00
12.00
5.00
54s/l
0.95m
2.81m
27
2
9.46m
1
1.27m
1.50m
5.23m
00:00
19:00
07:00
0
3
14.314.3
45s/l
14.3
34.7m
84.28m
14.3
7kdaN
14.3
S
14.3
14.3
2
14.3
2
3kdaN
OVERCAST
Ross Guynup
SINGLE
SINGLE
0
0
07:15
24:00
22:45
22:30
19:15
14:15
10
RG
14:0010:00
18:30
RG
16:45
16:30
14:30
311
Ed Tallon
74
1 of 3
73
GOOD
CANELSON DRILLING INC.
165
165
2
57m DRILL
120
311
8
201
1.25
174
127
2.00
174
175
172
SVP616
196
202
205
202
1
1
1
200/d-002-G/094-G-02/00
1
1
21kdaN
1
1
1.75
-17.00
1
1
2
1
S 2
TJ5645
7
HORIZ
32
3000.00Nm
5800.00Nm
0.00m
311
10
0
0.00m
CALMW
40.40m3
1.75
40.4m3
11
9
10.5
4
0.00m
0m
0
1
1
1
1
sackssacks
sackssacks
sackssacks
SINGLE
SINGLE
sacks
18:30
GEN #1 9787 HRS ( 0 HRS RUN TODAY) GEN #2 10469 HRS (RUN FOR 15 HRS TODAY) GEN #3 10504 HRS ( RUN FOR 10 HRS TODAY)
LP#1 10689HRS, (RUN FOR 24 HRS) LP#2 10273 HRS ( 0 HRS RUN TODAY)
202205
231.7
202
201
174175
172
196
19:00
259.4
208249.2
CHECKED POP VALVE PINS,BRAKE PADS, FLOOR & CROWN SAVERS
TOTAL TIME FOR SURVEYS & CONNECTIONS
TJ5645
0
1153054
0
158
J&L SHEARBITS
24:00
165
07:00
19:00
165
2
165
165
Drispac Regular
Sulphamic Acid
Kelzan XCD
Soda Ash
SawdustBentonite
SOAPSTICKS
Drispac RegularStardril
0
Stardril
0
Sawdust
Kelzan XCD
0
110
311
1.75
5.00 4800
1
2
2015/02/27
0
0
71m
RIG SERVICE
89m
DEVIATION SURVEY
DRILL 311MM HOLE FROM 57M-158M
1
SAFETY MEETING- CREW CHANGE OVER
UNKN101_20150227_1D
2
MOTOR HS
BIT
X/O
GAP SUB
2
SLICK COLLAR
1
SLICK COLLAR
SHOCK SUBTORSION SHOCKSUBJARS-HYD/MECH
158.00m
D.W.A.D.G.
14:15
14:00
SVP616
16:30
14:30
07:15
4800
07:00
10:00
06:00
16:4557
J&L SHEARBITS
10.5
DRILL
DWDW
DW
10920.00
0
0.25
0.50
GAP SUB
1.75
SLICK COLLAR
SLICK COLLARMOTOR HS
BIT
3.25
250
DC (6.75 IN)
84
1
83
1
78
1
59
1
Pason
0
0
1
84
34kdaN
1
3kdaN
1
1
1
3040
00:00
00:15
04:00
X/O
14kdaN
SHOCK SUB
30
TORSION SHOCKSUBJARS-HYD/MECH
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
DC (6.75 IN)
DC (6.75 IN)
DC (6.75 IN)
0.25
DC (6.75 IN)
33.54
2015/02/27 16:45
2
2
77
17501750
3.00
2
270
5.33m
285m
3200.00
NEWALTA 1
10
2
7
74
S 2 2
73
3
5670
NEWALTA 2
DARRYL GIBBONS
13:30
LLOYD BAUER
09:00
GREG EVERSON
83
208.43m
84
208.43m
84
Progress HZ Julienne d-23-G/94-G-2
189.49m
0
170.68m
70
189.49m
56
170.68m
59
151.72m
78
0
JARS-HYD/MECH
TORSION SHOCKSUB
BIT
MOTOR HS
SLICK COLLAR
SLICK COLLAR
GAP SUB
30261
X/O
SHOCK SUB
CREW CHANGE OVER MEETING
DRILL 311mm SURFACE HOLE F/285m- 540MDEVIATION SURVEY/CONNECTIONS
0.40.50.6
WIPER TRIP OUT OF HOLE FR 540M TO 30MCIRCULATE CLEAN HOLE
1
TRIP IN HOLE
174
7000
173
7000
0.6
174
0.8
173
0.2
0.1
2015/02/27
0.25
1.00
1.75
1.25
0.50
0.25
NTSBC
9.37m
18.76m
18.69m
9.33m
0
PROGRESS ENERGY CANADA LTD.
0.28m
8.55m
0.00m
TD
161.7m
84.28m
5.23m1.50m
2.81m
0.95m
1.27m9.46m
8.97m
2.250.506.00
10401040
0
0.00m
0
21
20
5
6B
6A
2
42.1m341.5m3NEWALTA 1NEWALTA 2
PICKING UP H.W.D.P.
DRIFT & PREP CASING- REVIEW JSA B-03
2015
TRIPPING PIPE
545m
4020
1
0.25
7
4.00
7
2.25
12
11.25
RGRG
17
RGRG
11
00:00
1050
45s/l
19:00
44s/l
07:00
0
14.314.314.3
14.3 14.3
14.3
14.3 14.3
1055
5kdaN
OVERCAST
9
Ross Guynup
07:15
18:30
RG
16:45
16:1513:15
RG
19:00
Doug Watchorn
73
73
1 of 6
73
41m3 41m3
73
CANELSON DRILLING INC.
165
165
540m
311
201
0.501.00
5.23m
0.95m
1.27m
1.50m
2.81m
174
175
172
196
202
205
202
200/d-002-G/094-G-02/00
0.28m
1
8.55m
8.97m
9.46m
2
S 2
TJ5645
7
HORIZ
32
SHAKERSSHAKERS
6500.00Nm
7500.00Nm
0.00m
5700.00Nm
311
9
311
0.00m
9
NO
10.5
0.00m
0
1
1
sackseach
sackssacks
1
5.00
277.5
sacks
277.5
COMBIN-ED
273.7
COMBIN-ED
260
273.7
LP #1 10689 HRS ( RUN FOR 24 HRS TODAY ) LP #2 10273 HRS ( 0 HRS RUN TODAY )
266251.8
MATT YARROW/ VERBAL WARNING & WRITTEN WARNINGGEN#1 9787 HRS (0 HRS RUN TODAY) GEN#2 10492 HRS ( RUN FOR 24 HRS TODAY ) GEN #3 10520 HRS (RUN FOR 16 HRS TODAY)
F/T FLOOR & CROWN SAVERS/POP VALVE PINS/ BRAKE PADS
545
CHECK FLOOR /CROWN SAVER/BRAKE PADS/POP VALVES PINS
460m337m
0
545
24:00
165
07:00
19:00
2
165
1
1
2
Soap SticksSawdust
Drispac RegularStardril
78
78
Kelzan XCD
16.00
158m
1050
8641
1050
2
2
2015/02/27
SAFETY MEETING BEFORE LAYING DOWN DIRECTIONAL TOOLS
2
LAY DOWN DIRECTIONAL TOOLS
CONDITION MUD & CIRCULATE/CLEAN HOLE
TRIP OUT OF HOLE FR 545M
1
DRILL 311MM HOLE FR 540M TO 545M
UNKN101_20150228_1D
TRIP IN HOLE
2
MOTOR HS
BIT
X/O
GAP SUB
SLICK COLLAR
SLICK COLLAR
SHOCK SUBTORSION SHOCKSUBJARS-HYD/MECH
545.00m
SVP616
8641
10:4511:30
J&L SHEARBITS
08:0008:4509:30
10:00
07:00
10
DRILL
8568.00
0
DC (6.75 IN)
0.4
4.75
DC (6.75 IN)
0.70.6
14.3
0.70.6
0.25
0.80.8
260
DC (6.75 IN)
DC (6.75 IN)
814.3 8
1830
14.3 14.3 14.3
14.3
1830
10.00
14.3 14.3
1
1
1
1
Pason
1
1
1
1
1
40
J&L SHEARBITS
00:00
05:00
05:15
23:00
21:30
22:45
8
19:30
x
19:45
x
2
x
10
19:00
15-101-02
56
59
78
83
84
840
1.75
0
0.25
5.00
240
30
22
02
1
1
1
1
1
1
1
1
1
70
285
14.314.3
14.314.3
73
NEWALTA 1
14.3
73NEWALTA 2
WT
14.3
73
73
14.3 14.3
101
397.59m
303.13m
284.2m
378.67m359.72m340.88m321.94m
0.33m
48.00kdaN
DRILL 311MM HOLE FROM 158M-285M
RIG SERVICE
40.00kdaN
DEVIATION SURVEY
44.00kdaN
285.00m
10201020
0.25
540.00m
1.00
77
77
0.501.75
6.003.00
0.50
10
23920.00
2
21
6A
6B
0.25
5D
00
02:00 03:00
1212
40
2
2
1030
d-023-G/094-G-02
1030
5.00 0.25
0
0.25 1.751.75
05:15
05:00
540m
07:00
127
174
5
00
8.97m
8.55m
0.28m
0
7.00
24.00
12.00
5.00
0.95m
28
2.81m
9.46m
1.27m
1.50m
5.23m
18.76m
1020
3
9.33m
1020
5kdaN
SHAKERS
18.69m
SHAKERS
9.37m
6kdaN
S 22
G
37kdaN
1
5
24:00
6
23:00
22:45
21:30
19:45
19:30
0
311
GOOD
0
DRILL
0.00m
174
311
201
202
173
174
173
124.3
sacks
115.9
255
1.75
108.8
117.8
251.6
SVP616
266.8
1
1
11
1
6.00
1
-12.00
1
11
192m 208m
X
0.00m
CALM
0
N
1
10.5
1
2
285m
sackssacks
sackssacks
DC (6.75 IN)
1
each
1
HWDP(5.0 IN)
196
172
205
COMBINED
202
COMBINED
175
174
202205
202
201
174175
172
196
48s/l46s/l
TJ5645
0
1153054
02:00
J&L SHEARBITS
01:45
03:0003:00
04:00
01:00
165
00:45
165
77
77
311
0
SawdustStardril
16.25
Kelzan XCD
DRILL
Drispac RegularBentoniteSoap Sticks
2015/02/27 7200
7200
2
2
1
BOILER BLOW DOWN X3
VISUALLY INSPECTED BRAKE PADS
SVP616
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
D.W.A.D.G.
18:30
16:45
07:15
07:00
16:15
13:15
06:00
540
DWDW
DW
1
GAP SUBSLICK COLLAR
SLICK COLLARMOTOR HS
BIT
8483
78
59
0
0
14kdaN
84
TJ5645
X/O
40
SHOCK SUBTORSION SHOCKSUBJARS-HYD/MECH
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
19:15
50
19:30
19:00
1
x
0.25
15-101-02 2015/02/27 16:45
1.00
1.50
0.25
0.25
3.25
0.50
0.25
270
220
6.754.250.75
x
x
3200.00
03
12
NEWALTA 1
5
21
21
12
7
12
NEWALTA 2
LLOYD BAUER
DARRYL GIBBONS
DARRYL GIBBONS
101
Progress HZ Julienne d-23-G/94-G-2
RIG SERVICE WASH FLOOR
RIG IN TONG HAND
30261
SAFETY MEETING BEFORE RUNNING CASING, ELEVATOR CERT #81113
36.00kdaN
RUN 41 JOINTS OF 244.50mm,59.53Kg/m, L-80 CASING, SET @ 545m
SAFETY MEETING/HAND OVER NOTES
CEMENTING 244.5MM L-80 CASING/ PLUG DOWN@ 7:30RIG OUT CEMENTERS/FLUSH CONDUCTOR
0
PRESSURE TEST BOWL
PRE HEAT BOWL/CUT CONDUCTOR /CUT CASINGWAIT ON CEMENT/RIG OUT FLOW LINE /BLOW OUT CASING/
1
LET BLOW COOL
WELD ON BLOW
4.50
SAFETY MEETING BEFORE CEMENTING CASING
CIRCULATE CASING & WORK PIPE
RFC@1740KG/M3 75%EXCESS OVER GAUGE HOLE F/0-545M.DISPLACE W/21M3.WATERPLUG
0
CEMENT SURFACE CASING W/SCHLUMBERGER: PUMP 4M3 WATER PRE-FLUSH, 30t 28M3
0
DOWN W/8MPA@07:40 W6/M3 GOOD CEMENT RETURNS PT CSG TO 14MPA
0
0.50
4.50
0
0
0.25
0.25
4.251.50
0.250.50
0.50
1.25
3.50
12C12C
18980.00
21
14
14
0.25
14
NTS
13
14
BC
00
05:30
PROGRESS ENERGY CANADA LTD.
0
0
0
d-023-G/094-G-02
0
0.251.50
00
0
14
21
21
57m3NEWALTA 1NEWALTA 2
CUTTING CONDUCTOR /NIPPLING UP BOP
RUN CASING
2015
NIPPLE UP B.O.P.
00:45
00:15
07:00
04:15
01:00
06:00
05:45
0.25
5
00
1.50
12
00
RG
RGRG
0
7.00
24.00
12.00
5.00
01
00:00
19:00
07:00
1070
PARTLY CLOUDY
Ross Guynup
0
1.5
07:15
24:00
19:30
19:15
13:45
RG
12:15
08:0007:30
RG
19:00
18:30
15:00
Doug Watchorn
1 of 3
GOOD
CANELSON DRILLING INC.
165
165
1.25
4.75
200/d-002-G/094-G-02/00
1
-14.00
2
7
HORIZ
545m
SHAKERS
0
CALMW
0
10.5
11
sackssacks
1
1
BOILER BLOW DOWN X1
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
SINGLE
VISUALLY INSPECTED BRAKE PADS
SINGLE
D.W.A.D.G.
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
53s/l
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
1153054
24:00
165
07:00
19:00
165
165
165
0
56
0
0
Desco CFBentonite
0
500
500
NIPPLE UP B.O.P
1
SAFETY MEETING BEFORE NIPPLING UP B.O.P.
UNKN101_20150301_1D
CREW CHANGE OVER MEETING
2
2
1
CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS
13:45
12:15
18:30
15:00
0
07:15
07:00
08:00
07:30
06:00
10.5
DWDW
DW
6090.00
0.50
11.254.255.50
275
00
Pason
00:00
00:15
00:45
01:0004:15
05:45
06:00
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
22:00
22:15
19:15
1
TORSION SHOCKSUB
19:30
2.00
2
DC (6.75 IN)
0.50
19:00
1
JARS-HYD/MECH
HWDP(5.0 IN)
15-101-02 2015/02/27 16:45
1
0.50
69
72
72
69
72
0.75
72
3.25
0
0
563
638
0.25
1.00
1680
2.00
1140
732
1
275
2.25
240
0.50
15
4.14m
x
x
x
3200.00
03
59
NEWALTA 1
15
15
14
21
11.9
20:45
11.9
20:15
11.9
19:30
11.9
19:00
11.9
NEWALTA 1
70
69
11.9
22:00
NEWALTA 256
59
15
21:30
73
NEWALTA 2
21:15
73
SHAKERS
LLOYD BAUER
DARRYL GIBBONS
18:3014:30
DARRYL GIBBONS
SHAKERS
101
Progress HZ Julienne d-23-G/94-G-2
678.12m
583.18m
564.42m
659.12m640.2m621.05m602.21m
07:00
791.93m810.91m
754.04m772.98m
715.89m734.91m
697m
0.00m
INSTALL ROTATING HEAD FLANGE
57.00kdaN
SAFETY MEETING BEFORE PRESSURE TESTING B.O.P.
30261
PRESSURE TEST UPPER, LOWER PIPES & BLIND RAMS, KILL LINE VALVES, INSIDE
B.O.P, STABBING VALVE, WORKING SPOOLS, CHOKE & CHOKE LINES TO 1000 kPa LOW,
SAFETY MEETING/HAND OVER NOTES
1.75
PICK UP MOUSE HOLES/RIG UP KATCH KAN AND OVER FLOW LINE/FUNCTION CROWN
SAVER/PRE SPUD CKECK LIST
DRILL 222MM HOLE FR 551M TO 562M
0.3
0
PRESSURE TEST/LEAK OFF TEST
0.30.4
TRIP IN HOLE/TAGED CEMENT @ 525MDIRECTIONAL WORK/SAFETY MEETING/PICK UP TOOLS
DRILL CEMENT/DRILL OUT CEMENT/DRILL FLOAT&SHOE TO 551M
1
DISPLACE TO OIL BASE
ACCUMULATOR FUNCTION TEST 4 FUNCTIONS STARTING PRESSURE-20500 kPa, FINAL
21000kPa HIGH & HOLD FOR 10 MIN EACH, ANNULAR 10500 kPa, FOR 10 MINS
kPa
10500
174
PRESSURE 11250 kPa, RE-CHARGE TIME 2 MIN 15 SECS, PRE-CHARGE PRESSURE 6800
10500
175
0.4
174
INSTALL WEAR BUSHING
0.5
173
0.2
2015/03/02
0.3
0
0.50
696.12m
1.75
2.50
0.25
80
0.25
0
0.25
2.001.00
2.25
0.50
1100
0.50
1100
0.50
1.25
14A
16380.00
21
2C
23:00
5B
21:30
0.25
6A
NTS
20
2
12E
BC
1100
1.50m
1100
18.69m
5.23m
9.37m
PROGRESS ENERGY CANADA LTD.
55
49
40
4000
0.29m
8.97m
4
0
00.10.50.1
0.40.4
0.1
2.81m0.78m
9.13m
9.32m
1.67m9.18m
4.65m
0.251.00
0
0.50
d-023-G/094-G-02
0
3.00
10401050
5
9.50m
5
10
1090
2
7
21
21
2.50
NEWALTA 1
0.25
NEWALTA 2
PICKING UP BHA
PRESSURE TEST B.O.P.
2015
B.O.P. DRILL
01:15
01:00
696m
05:45
890m
04:30
05:15
05:45
0.50
5
0
1.00
0
0.50
12
RG
1750
RG
5.50
1750
RG
2090
RG
3589
RGRG
4.65m
8.97m
0.29m
1090
7.00
24.00
12.00
5.00
68s/l
9.32m
9.13m
02
9.18m
1.67m
0.78m
2.81m
00:00
1120
INSTALL KACTH-KAN AND KILL LINES
19:00
105s/l
07:00
71s/l
710.06m
545
84.28m
11.9
71s/l
SHAKERS
5.23m
SHAKER
1.50m
11.9 11.9
9kdaN
11.9
11.9 11.9
1110
8kdaN
BLOWING SNOW
Ross Guynup
SINGLE
SINGLE
0
24:00
0
07:15
22:15
22:00
19:30
19:15
12:30
1
11:30
RG
09:30
15:15
RG
14:45
14:15
RG
13:00
Doug Watchorn
222
73
70
1 of 3
74
70m3
56
63.50m3
GOOD
CANELSON DRILLING INC.
165
165
696m DRILL
222
184
1.25
127
1.25
175
174
2.00
173
315.4301.5
350.5
315.8
4.50
345.3
1.00
172
168
163
325.6
DP606X
165
276.2
165
161
167
1
1
11
200/d-002-G/094-G-02/00
25
1
1
1
2.50
-17.00
1
2
11
7149525
7
HORIZ
9500.00Nm
9500.00Nm
28.49m
222
21A
0
0.00m
UP TO 39 KM/HW
6
71m375m3
1
10.5
1
11
12
1
0.00m
545m
sacks
545
bblbbl
2
bbl
1
2
1
SINGLE
SINGLE
15:15
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
15:30
16:45
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
17:00
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
D.W.A.D.G.
165161
212.9
167
184
172168
163
165
10415kPa
19:00
918.8
15:30
145.382.2
17:00
346
16:45
3.3
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
DRILL 222MM HOLE FR 563M TO 696M
RIG SERVICE/FUNCTION UPPER HCR 3 SEC TO OPEN
DEVIATION SURVEY/CONNECTIONS
BOP DRILL WITH CREW WELL SHUT IN IN 90 SEC
690m551m
7149525
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
0
1153054
1
345
HUGHES
24:00
165
07:00
19:00
1
1
165
165
165
1
2
0
0
0
104
222
2.50
1
1
5.00
Lime - HydratedOpti-WetOpti-PlusOpti-Mul
17500
11201050
1
1
0
2015/03/02
0
75
TOTAL TIME FOR SURVEYS & CONNECTIONS
790m
DRILL 222mm HOLE F/696m-890m
866m
RIG SERVICE FUNCTION LOWER PIPE RAMS 4 SECS TO CLOSE(RS)
B.O.P. DRILL WELL SECURE IN 85 SECS
1
CREW CHANGE MEETING
UNKN101_20150302_1C
2
MOTOR LS
BIT
1.25
SPIRAL NM
GAP SUB
2
SPIRAL NM
1
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
7
2
10
890.00m
CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
12:30
11:30
DP606X
14:15
13:00
07:15
17500
07:00
09:30
06:00
14:45151
18:0018:30
HUGHES
16:0016:3017:15
17:30
15:30
10.5
DWDW
DRILL
DWDWDW
DW
3906.00
0
1.25
2.00
1.25
0.25
0.25
0.25
GAP SUB
DC (6.75 IN)
3.75
SPIRAL NM
DC (6.75 IN)
PONY SLICKCOLLAR
MOTOR LS
4.50
BIT
3.250.50
2.50
275
TORSION SHOCKSUB
JARS-HYD/MECH
00
72
1
69
1
72
1
72
1
Pason
0
0
1
72
60kdaN
1
1
1
1
4052
00:00
01:00
01:15
04:30
SPIRAL NM
14kdaN
SPIRAL NM
30
X/O
05:15
SHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
TORSION SHOCKSUB
DC (6.75 IN)
0.25
JARS-HYD/MECH
HWDP(5.0 IN)
2015/02/27 16:45
2
2
1720
3.25
1130
1379
2
275
1.26m
1122m
3200.00
NEWALTA 1
10
2
7
70
73
56
6959
NEWALTA 2
74
SHAKERS
LLOYD BAUER
11:00
DARRYL GIBBONS
08:00
DARRYL GIBBONS
69
1000.67m
72
981.67m
72
Progress HZ Julienne d-23-G/94-G-2
962.7m
0
943.76m
59
924.76m
69
905.83m
72
886.87m
72
0
SHOCK SUB
X/O
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES
DRILL 222MM HOLE FR 1122M TO 1390MRIG SERVICE/FUNCTION UPPER PIPES 5 SEC TO CLOSE
0.80.50.9
DEVIATION SURVEY/CONNECTIONS /WORK PIPE
1
174
15000
175
15000
0.4
127
0.2
173
0.2
0.8
2015/03/02
0.25
0.25
0.50
3.50
0.25
0.25
NTSBC
1.50m
710.06m
5.23m
84.28m
9
PROGRESS ENERGY CANADA LTD.
55
50
50
903
.26m
8.97m
1055
0.00m
5.23m
1.50m
2.81m
710.06m
0.78m
84.28m
9.13m
9.32m
1.67m9.18m
4.65m
0.258.25
10701080
0
0.00m
0
7
21
20
6
21
5
60m369m3NEWALTA 1NEWALTA 2
PICKING UP PIPE
WORKING IN COLD WEATHER
2015
P.O.O.H
184
0.75
4558
7
3.50
7
0.25
RG
12
12.75
RG
RG
3850
9
3767
1
RG
75
RG
742
00:00
1100
67s/l
19:00
61s/l
07:00
1390
10.310.310.3
11.9 10.3
10.3
11.9 11.9
1100
8kdaN
OVERCAST
1
Ross Guynup
SINGLE
SINGLE
07:15
RG
19:00
15:4515:30
RG
RG
Doug Watchorn
73
70
1 of 8
74
70m3 68m3
56
CANELSON DRILLING INC.
165
165
222
184
0.750.50
2.81m
9.32m
1.67m
0.78m
9.13m
172
168
163
165
165
161
167
200/d-002-G/094-G-02/00
0.29m
8.97m
1
4.65m
68kdaN
9.18m
2
7 1
7149525
7
HORIZ
3
SHAKERSSHAKERS
9500.00Nm
9500.00Nm
540.87m
9500.00Nm1
1
222
10
222
256.12m
2
2
11
0.00m
545
2
1
sackssacks
m3sacks
4.50
71.8100.3
SINGLE
33.5
SINGLE
133.6
42.3
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
358.3180.3
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
D.W.A.D.G.
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
4075
3850
1230m1120m
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
19
24:00
165
07:00
19:00
1
165
1
9
75
Lime - Hydrated
BariteBentone 150
0
104
Base Oil
17.75
890m
1100
0
1080
2
2
2015/03/03
RIG SERVICE FUNCTION BLIND RAMS(OUT OF HOLE) 4 SECS TO CLOSE(RS)
SAFETY MEETING BEFORE WORKING WITH DIRECTIONAL TOOLS
2
LAY DOWN M.W.D. TOOL & CHANGE BIT
P.O.O.H. FLOW CHECK @ 1387m,1254m, 713m & OUT OF HOLE HOLE FILL CAL-12.19m3,
ACTUAL-12.20m3, DIFF-+0.01m3
1
CIRCULATE BOTTOMS UP
UNKN101_20150303_1C
CREW CHANGE OVER MEETING
2
MOTOR LS
BIT
SPIRAL NM
GAP SUB
SPIRAL NM
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
1389.97m
DP606X
0
11:1512:00
HUGHES
08:1509:0009:45
10:30
07:30
11
DRILL
10122.00
0
DC (6.75 IN)
0
5.50
HWDP(5.0 IN)
0.50
0.50.3
0.50.3
270
TORSION SHOCKSUB
JARS-HYD/MECH
11.9
1750
11.9 11.9
11.9
1750
9.50
11.9 11.9
1
1
1
1
Pason
1
1
14kdaN
1
1
1
HUGHES
31
00:00
04:30
04:45
23:15
23:45
23:00
84
19:15
19:30
2070
19:00
15-101-02
69
72
72
69
72
720
2.25
0
1055
1132
1170
0.25
4.50
270
202
2025
112
x
x
x
03
1
1
1
1
1
1
1
1
1
59
577
11.911.9
11.911.9
70
NEWALTA 1
11.9
56NEWALTA 2
11.9
74
73
101
1247.31m
1152.41m
1133.42m
1228.3m1209.33m
1190.39m
1171.41m
1.26m
75.00kdaN
DRILL 222mm HOLE F/890m-1122m
RIG SERVICE FUNCTION ANNULAR 8 SECS TO CLOSE(RS)
72.00kdaN
TOTAL TIME FOR SURVEYS & CONNECTIONS
73.00kdaN
1122.88m
11001100
0.50
1390.00m
0.50
100
110
3.25
8.250.25
1100
7
34840.00
2
21
19:00
0.25
10
00
00:00 03:30
1212
52
1357
40
50
0
0
1090
d-023-G/094-G-02
1090
4.50 0.25
0
3.500.25 0.25
04:45
04:30
1390m
07:00
127
174
173
175
5
00
4.65m
8.97m
0.29m
0
7.00
24.00
12.00
5.00
9.32m
9.13m
03
9.18m
1.67m
0.78m
2.81m
710.06m
1100
84.28m
1100
9kdaN
52s/l
SHAKERS
5.23m
SHAKERS
1.50m
66kdaN
24:00
0
23:45
6.5
23:15
23:00
19:30
19:15
0
222
GOOD
545
18.89m
127
222
184
167
175
174
173
289.7
m3
324
bbl
293.4
bblsacks
2.25
299.4
312.1
332.6
Z713
267.9
1
1
11
1
8.25
1
-24.00
1
11
890m 1018m
540.87m
CALMW
63m3
1
10.5
9
1
1122m
sacksm3
sackssacks
TORSION SHOCKSUB
3
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
165
163
161
SINGLE
165
SINGLE
168
172
165161
167
184
172168
163
165
10469kPa
10469kPa
10469kPa
69s/l68s/l
JK2152
19
1153054
SMITH
01:4501:00
02:4502:15
03:15
00:30
165
00:00
165
62
0
222
Opti-Mul
2
Opti-Plus
2
Used InvertBase Oil
1
Cal Chloride Powder
2
0.00
Ultraseal XP
DRILL
Gilsonite HTLime - HydratedBarite
2015/03/02 17000
17000
75
1390m
2
1
DP606X
CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
07:15
07:00
15:45
15:30
06:00
845
DW
DWDWDW
DW
2
GAP SUBSPIRAL NM
PONY SLICKCOLLAR
MOTOR LS
BIT
7269
72
72
0
0
14kdaN
72
68kdaN
7149525
14kdaN
SPIRAL NM
35
SPIRAL NM
X/OSHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
TORSION SHOCKSUB
DC (6.75 IN)
JARS-HYD/MECH
0.25
HWDP(5.0 IN)
2015/02/27 16:45
2
2
17601150
0.75
275
0.00m
1407m
3200.00
NEWALTA 1
2
7
6
5
70
73
56
6959
74
NEWALTA 2
LLOYD BAUER
11:00
DARRYL GIBBONS
09:00
DARRYL GIBBONS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
0
59
69
1399.19m
72
72
0
SHOCK SUB
X/O
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES
DRILL 222MM HOLE FR 1407M TO 1463MDEVIATION SURVEY/CONNECTIONS
TRIP OUT OF HOLE
BACK REAMING FR 817M TO 589M
TRIP OUT OF HOLE FR 1463M /FLOW CHECK @ 1462, 1343 /WORK TIGHT SPOT @ 980M
CIRCULATE BOTTOMS UP/MIX PILL
1
CIRCULATE OUT GAS @ 817M
/FLOW CHECK @ 817M
174
11500
175
11500
0.7
127
1732015/03/03
0.75
1.75
0.50
0.25
0.25
0.25
1.25
NTSBC
1.50m
710.06m
5.23m
84.28m
19
PROGRESS ENERGY CANADA LTD.
39
.24m
1397
8.95m
0.00m
5.23m
1.50m
2.81m
710.06m
0.78m
84.28m
9.13m
9.32m
1.67m9.18m
4.65m
3.001.001.006.00
10901100
0
0.00m
0
20
6
20
7
21
21
6
65m3NEWALTA 1NEWALTA 2
WASHING THE SUB
R.I.H.
2015
P.O.O.H
642
0.50
3
1.00
3
10.001.50
RG
12
RG
8.25
RG
2300
9
1
RGRG
75
58
00:00
1120
55s/l
19:00
52s/l
07:00
1463
15.9 15.9 15.9
1110
10kdaN
PARTLY CLOUDY
1
Ross Guynup
07:15
17:00
RG
14:30
14:0013:15
RG
19:00
18:30
RG
17:30
Doug Watchorn
73
70
1 of 6
74
63m3 60m3
56
CANELSON DRILLING INC.
165
165
222
184
0.751.25
2.81m
9.32m
1.67m
0.78m
9.13m
172
168
163
165
165
161
167
200/d-002-G/094-G-02/00
.26m
1
8.97m
4.65m
75kdaN
9.18m
2
6 2
JK2152
7
HORIZ
X7
SHAKERS
8500.00Nm
626.36m
8500.00Nm1
222
0
222
540.87m
7
10.5
9.50m
1390
3
1
sackssacks
sackssacks
2.25
SINGLE
SINGLE
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
277.6
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
D.W.A.D.G.
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
2300
1445m1424m
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
22
24:00
165
07:00
19:00
1
165
1
9
75
Bentone 150
Cal Chloride PowderBarite
0
Lime - Hydrated
78
8.25
1390m
1120
0
1100
2
2015/03/04
PICK UP & SCRIBE DIRECTIONAL TOOLS PUT ON BIT
R.I.H FLOW CHECK @ 731m & FILL PIPE
LAY DOWN DIRECTIONAL TOOLS
2
RIG SERVICE WASH FLOOR FUNCTION BLIND RAMS(OUT OF HOLE) 4 SECS TO CLOSE(RS)
ACTUAL-10.02m3, DIFF-+0.34m3
SAFETY MEETING BEFORE WORKING WITH DIRECTIONAL TOOLS
1
P.O.O.H FLOW CHECK @ 546m & OUT OF HOLE HOLE FILL CAL-9.68m3,
UNKN101_20150304_1C
CREW CHANGE OVER MEETING
2
MOTOR LS
BIT
SPIRAL NM
GAP SUB
SPIRAL NM
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
1474.16m
Z713
0
SMITH
10:30
10
DRILL
8022.00
1
0.5
DC (6.75 IN)
HWDP(5.0 IN)
0.75
10.3
270
TORSION SHOCKSUB
JARS-HYD/MECH
10.3
1750
10.3 10.3 10.3
11.9
1750
2.25
11.9 11.9
1
1
1
1
Pason
1
1
14kdaN
1
1
1
SMITH
00:00
04:00
04:30
06:45
21:15
21:30
20:30
20:45
84
19:15
19:00
15-101-02
69
72
72
69
72
720
2.25
0
0.25
1397
0.50
4.00
240
x
x
x
03
1
1
1
1
1
1
1
1
1
59
17
10.310.3
10.311.9
70
NEWALTA 1
11.9
56NEWALTA 2
11.9
74
73
10.3 10.3
22:15
101
1437.21m
7.79m
50.00kdaN
MAKE UP BIT & R.I.H. FLOW CHECK @ 608m & FILL PIPE, INSTALL ROTATING HEAD
CIRCULATE BOTTOMS UP @ REDUCE RATE
77.00kdaN
PATTERN BIT & DRILL 222mm HOLE F/1390m-1407m
77.00kdaN
RIG SERVICE FUNCTION UPPER PIPE RAMS 4 SECS TO CLOSERS)
1407.72m
11101110
0.50
1463.00m
1.25
78
0
0.502.50
6.000.75
1.00
0.50
0.50
10
45240.00
2
21
5D
6B
0.25
5D
6B
3B
00
06:00
1212
39
15
0
0
1100
d-023-G/094-G-02
1100
2.25 0.254.000.50
0
3.00 0.25
04:30
04:00
1463m
07:00
06:45
127
174
173
175
5
00
4.65m
8.97m
.26m
0
7.00
24.00
12.00
5.00
9.32m
04
9.13m
9.18m
1.67m
0.78m
2.81m
710.06m
84.28m
1110
10kdaN
SHAKERS
5.23m
SHAKERS
1.50m
75kdaN
24:00
22:15
0
21:30
3
21:15
20:45
20:30
19:15
0
222
GOOD
1390
19.01m
127
222
184
167
175
174
173
354.9
FHi50
1
1
11
1
-22.00
6.00
11
11
1397m
597.87m
CALMW
1
10.5
9
1
1407m
TORSION SHOCKSUB
4
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
165
163
161
SINGLE
165
SINGLE
168
172
165161
167
184
172168
163
165
10362kPa
10415kPa
10415kPa
58s/l
RD6946
21
1153054
SMITH
165
06:15
165
0
0
222
2
1
0.00
DRILL
Barite
2015/03/03 11500
11500
75
2
1
Z713
CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
14:30
17:30
17:00
07:15
07:00
14:00
13:15
06:00
18:3073
DW
DWDWDW
DW
3
GAP SUBSPIRAL NM
PONY SLICKCOLLAR
MOTOR LS
BIT
7269
72
72
0
0
14kdaN
72
75kdaN
JK2152
14kdaN
SPIRAL NM
15
SPIRAL NM
X/OSHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
TORSION SHOCKSUB
DC (6.75 IN)
JARS-HYD/MECH
0.25
HWDP(5.0 IN)
2015/02/27 16:45
2
2
17601240
0.50
1512
2
270
0.39m
1474m
3200.00
NEWALTA 1
2
6
5
70
6
73
2 7
56
X
6959
NEWALTA 2
74
SHAKERS
LLOYD BAUER
11:00
DARRYL GIBBONS
08:00
DARRYL GIBBONS
SHAKERS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
0
59
69
72
72
0
SHOCK SUB
X/O
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES
DRILL 222MM HOLE FR 1474M TO 1509MRIG SERVICE/FUNCTION LOWER HCR 3 SEC TO OPEN
DEVIATION SURVEY/CONNECTION
1
174
10000
175
10000
1.7
127
1.3
1732015/03/04
0.25
0.25
4.50
NTSBC
1.50m
710.06m
5.23m
84.28m
22
PROGRESS ENERGY CANADA LTD.
52
.24m
8.95m
0.00m
5.23m
1.50m
2.81m
710.06m
0.78m
84.28m
9.13m
9.32m
1.67m9.18m
4.65m
0.2511.00
10201040
5
19.00m
5
7
21
2
71.5m373m3NEWALTA 1NEWALTA 2
WASHING RIG
R.I.H
2015
WASHING SUB
1522m
584
555
104
0.50
44
1.500.75
RG
12
RG
20.25
RG
4340
9
1
RGRG
75
103
00:00
1180
59s/l
19:00
55s/l
07:00
1463
15.9 15.9 15.9
1170
24kdaN
PARTLY CLOUDY
1
Ross Guynup
SINGLE
SINGLE
07:15
RG
19:00
18:3018:15
RG
RG
Doug Watchorn
73
70
1 of 6
74
70m3 69m3
56
CANELSON DRILLING INC.
165
165
1509m
222
184
0.50
2.81m
9.32m
1.67m
0.78m
9.13m
172
168
163
165
165
161
167
200/d-002-G/094-G-02/00
.24m
1
8.95m
4.65m
79kdaN
9.18m
2
6 2
RD6946
7
HORIZ
X7
SHAKERSSHAKERS
2800.00Nm
8500.00Nm
654.81m
2800.00Nm
222
0
222
626.36m
11.5
1
10.5
0.00m
1463
4
1
bblsacks
m3bbl
sacks
4.75
sackssacks
SINGLE
sacks
SINGLE
sacks
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
D.W.A.D.G.
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
1487m1475m
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
23
59
24:00
165
07:00
19:00
1
165
1
9
75
BariteBentone 150
Ultraseal XPGilsonite HT
Lime - HydratedCyber Seal
Opti-MulOpti-Plus
0
78
Base Oil
15.75
1463m
1170
15216
1040
3
2
2015/03/04
2
RIG SERVICE FUNCTION UPPER PIPE RAMS 4 SECS TO CLOSE(RS)
1
DRILL 222mm HOLE F/1509m-1522m
UNKN101_20150305_1D
CREW CHANGE OVER MEETING
2
MOTOR LS
BIT
SPIRAL NM
GAP SUB
SPIRAL NM
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
1522.00m
FHi50
15216
SMITH
13:4507:45
10.5
DRILL
6342.00
0
DC (6.75 IN)
HWDP(5.0 IN)
0.50
4.50
270
TORSION SHOCKSUB
JARS-HYD/MECH
1260
15.9
2000
4.75
15.9 15.9
1
1
1
1
Pason
1
1
14kdaN
1
1
1
20
SMITH
51
00:00
01:30
02:15
256
19:15
23:45
81
19:00
15-101-02
69
72
72
69
72
720
4.75
0
1475
0.75
1.50
270
x
x
x
03
1
1
1
1
1
1
1
1
1
59
11
15.9
70
NEWALTA 1
15.9
56NEWALTA 2
15.9
74
73
101
1494.12m
1475.13m
6.39m
81.00kdaN
R.I.H. & INSTALL ROTATING HEAD
CIRCULATE BOTTOMS UP @ REDUCE RATE
81.00kdaN
PATTERN BIT & DRILL 222mm HOLE F/1463m-1474m
81.00kdaN
1474.16m
11701030
0.25
1509.00m
78
0
0.50
11.000.25
11701170
7
41600.00
2
21
23:4522:00
0.25
10
10401170
02:30 05:30
1212
4000
15
4.5
0
1010
d-023-G/094-G-02
1030
4.75 1.500.75
1040
4.50 0.25
02:15
01:30
1509m
07:00
127
174
173
175
5
12401760
4.65m
8.95m
.24m
1020
7.00
24.00
12.00
5.00
52s/l
9.32m
05
9.13m
9.18m
1.67m
0.78m
2.81m
710.06m
1170
X
84.28m
1130
18kdaN
52s/l
SHAKERS
5.23m
SHAKERS
1.50m
24kdaN
6 72
79kdaN
0
5.5
24:00
23:45
19:15
2
222
GOOD
1463
DRILL
0.00m
127
222
184
167
175
174
173
1.7
FHi50
350.1
1
1
11
1
11.00
1
-12.00
1
11
1463m 1470m
654.81m
CALMW
65m365.5m3
1
10.5
9
1
1474m
bblm3
TORSION SHOCKSUB
4
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
165
163
161
SINGLE
165
SINGLE
168
172
165161
167
184
172168
163
165
10095kPa
10095kPa
10095kPa
58s/l60s/l
RD6946
23
1153054
SMITH
165
165
0
103
222
0
1
20.25
DRILL
Used InvertOpti-WetBarite
2015/03/04 10000
10000
75
1517m 1521m
2
1
FHi50
CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
07:15
07:00
18:30
18:15
06:00
46
DW
DWDWDW
DW
4
GAP SUBSPIRAL NM
PONY SLICKCOLLAR
MOTOR LS
BIT
7269
72
72
0
0
14kdaN
72
76kdaN
RD6946
14kdaN
SPIRAL NM
20
SPIRAL NM
X/OSHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
TORSION SHOCKSUB
DC (6.75 IN)
JARS-HYD/MECH
0.25
HWDP(5.0 IN)
2015/02/27 16:45
2
2
17501210
1549
2
270
4.62m
1543m
3200.00
NEWALTA 1
2
2
7
70
6
73
2 7
56
X
6959
NEWALTA 2
74
SHAKERS
LLOYD BAUER
11:00
DARRYL GIBBONS
08:00
DARRYL GIBBONS
SHAKERS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
0
59
69
72
1541.46m
72
0
SHOCK SUB
X/O
1588.88m
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES
DRILL 222MM HOLE FR 1543M TO 1587MRIG SERVICE/FUNCTION ANNULAR 15 SEC TO CLOSE
1
174
15000
175
15000
2.6
127
1732015/03/04
0.25
4.75
NTSBC
1.50m
710.06m
5.23m
84.28m
24
PROGRESS ENERGY CANADA LTD.
52
51
.24m
1512
8.95m
2.47m
5.23m
1.50m
2.81m
710.06m
0.78m
84.28m
9.13m
9.32m
1.67m9.18m
4.65m
0.2511.50
10401060
5
9.50m
5
21
2
66m365m3NEWALTA 1NEWALTA 2
WORKING WITH INVERT MUD
RIG SERVICE
2015
HOUSEKEEPING
1602m
1
155
1015
0.50
55
RG
12
RG
23.00
RG
4000
9
4002
1
RG
75
1686
00:00
1170
51s/l
19:00
52s/l
07:00
1463
15.9 15.9 15.9
1170
24kdaN
FROST
1
Ross Guynup
SINGLE
SINGLE
07:15
RG
19:0018:45
RG
RG
Doug Watchorn
73
70
1 of 6
74
65.50m3 65m3
56
CANELSON DRILLING INC.
165
165
1587m
222
184
0.50
2.81m
9.32m
1.67m
0.78m
9.13m
172
168
163
165
165
161
167
200/d-002-G/094-G-02/00
.24m
8.95m
1
4.65m
76kdaN
9.18m
2
6 2
RD6946
7
HORIZ
X7
SHAKERSSHAKERS
3500.00Nm
4200.00Nm
740.08m
3500.00Nm1
222
0
222
683.25m
11.5
1
10.5
0.00m
1463
4
1
sackssacks
sacksm3
6.75
sackssacks
SINGLE
bbl
SINGLE
bbl
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
188
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
D.W.A.D.G.
205.1
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
4000
1561m1525m
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
26
139
24:00
165
07:00
19:00
1
165
1
9
75
Opti-Plus
Cyber SealOpti-Mul
Gilsonite HTUltraseal XP
Base OilLime - Hydrated
0
103
Barite
38.00
1522m
1170
14900
1060
2
3
2015/03/04
2
1
DRILL 222mm HOLE F/1587m-1602m
UNKN101_20150306_1E
CREW CHANGE OVER MEETING
2
MOTOR LS
BIT
SPIRAL NM
GAP SUB
SPIRAL NM
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
1602.00m
FHi50
14900
SMITH
14:00
10
DRILL
5250.00
0
DC (6.75 IN)
3
HWDP(5.0 IN)
4.75
270
TORSION SHOCKSUB
JARS-HYD/MECH
1240
15.9
1760
27.00
15.9 15.9
1
1
1
1
Pason
1
1
14kdaN
1
1
1
20
SMITH
52
00:00
03:00
03:15
84
19:15
55
19:00
15-101-02
69
72
72
69
72
720
3.75
0
1512
1549
0.25
3.00
240
51
55
1
x
x
x
03
1
1
1
1
1
1
1
1
1
59
80
19:45
15.9
70
NEWALTA 1
15.9
56NEWALTA 2
15.9
74
73
101
1569.88m
0.00m
80.00kdaN
DRILL 222mm HOLE F/1522m-1530m
RIG SERVICE FUNCTION LOWER PIPE RAMS 4 SECS TO CLOSE(RS)
81.00kdaN
DRILL 222mm HOLE F/1530m-1543m
80.00kdaN
1543.00m
11701040
0.25
1587.88m
103
0
11.500.25
11701170
7
35360.00
2
21
23:4520:00
0.25
10601170
00:00 03:00
1212
4002
51
20
4.75
0
1.2
1020
d-023-G/094-G-02
1040
6.75 0.25
1060
4.75
03:15
03:00
1587m
07:00
127
174
173
175
5
12101750
4.65m
8.95m
.24m
1040
7.00
24.00
12.00
5.00
48s/l
9.32m
9.13m
06
9.18m
1.67m
0.78m
2.81m
710.06m
1165
X
84.28m
1165
24kdaN
49s/l
SHAKERS
5.23m
SHAKERS
1.50m
24kdaN
6 72
76kdaN
0
6.5
24:00
19:15
1
222
GOOD
1463
DRILL
9.48m
127
222
184
167
175
174
173
m3bblbbl
189.5
FHi50
1
1
11
1
11.00
1
-10.00
1
11
1522m 1530m
740.08m
CALMN
67m368.5m3
1
10.5
9
1
1543m
sackssacks
sackssacks
TORSION SHOCKSUB
4
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
165
163
161
SINGLE
165
SINGLE
168
172
165161
167
184
172168
163
165
10095kPa
10095kPa
10095kPa
51s/l51s/l
RD6946
26
1153054
SMITH
165
06:15
165
0
104
222
Opti-PlusOpti-Mul
1
Base OilUltraseal XP
1
1
42.75
Gilsonite HT
DRILL
Cyber SealBentone 150Barite
2015/03/04 15000
15000
75
1589m 1601m
2
1
FHi50
CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
07:15
07:00
18:45
06:00
124
DW
DWDWDW
DW
4
GAP SUBSPIRAL NM
PONY SLICKCOLLAR
MOTOR LS
BIT
7269
72
72
0
0
14kdaN
72
80kdaN
RD6946
14kdaN
SPIRAL NM
20
SPIRAL NM
X/OSHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
TORSION SHOCKSUB
DC (6.75 IN)
2.25
JARS-HYD/MECH
0.25
HWDP(5.0 IN)
2015/02/27 16:45
2
2
1625
2
270
0.34m
1622m
3200.00
NEWALTA 1
2
10
2
7
70
6
73
2 7
56
X
6959
74
NEWALTA 2
SHAKERS
LLOYD BAUER
DARRYL GIBBONS
08:00
DARRYL GIBBONS
SHAKERS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
0
59
69
1608.7m
72
72
0
SHOCK SUB
X/O
1627.66m
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES
DRILL 222MM HOLE FR 1622M TO 1625MCIRCULATE BOTTOMS UP
RIG SERVICE FUNCTION ANNULAR 15 SEC TO CLOSE
REAM - OPEN HOLE FR 1512M TO BOTTOM
RECORD CAL-13.19 ACT-12.89 DIFF--0.3TRIP OUT OF HOLE /FLOW CHECK @ 1623M,1454M,845M,135M,OUT OF HOLE /TRIP
1
TRIP IN HOLE TO 1512M /FILL EVERY 500M
DIRECTIONAL WORK /LAY OUT MWD TOOL /MOTOR/CHANGE BIT/CHANGE OUT SHOCK SUB
174
14900
175
14900127
1732015/03/07
4.00
0.50
0.25
0.25
NTSBC
1.50m
710.06m
5.23m
84.28m
27
PROGRESS ENERGY CANADA LTD.
52
.22m
1606
8.89m
5.65m
5.23m
1.50m
3.78m
710.06m
0.78m
84.28m
9.13m
9.32m
1.67m9.18m
4.65m
0.256.750.501.250.75
5
0.00m
5
2
20
21
21
67.5m367m3NEWALTA 1NEWALTA 2
TRIPPING PIPE
FUELING CREW TRUCK
2015
B.O.P. DRILL
1646m
0.50
7
1.25
7
6.750.50
RG
12
RGRG
11.25
RG
3825
9
1
RGRG
75
00:00
19:00
07:00
1625
11.1
11.1 11.1
11.1
11.1 11.1
24kdaN
FROST
1
Ross Guynup
SINGLE
SINGLE
07:15
RG
12:15
08:3008:00
RG
19:00
18:45
RG
17:30
14:30
Doug Watchorn
73
70
1 of 8
74
56
CANELSON DRILLING INC.
165
165
1625m
222
184
0.752.75
2.81m
9.32m
1.67m
0.78m
9.13m
172
168
163
165
165
161
167
200/d-002-G/094-G-02/00
.24m
1
8.95m
4.65m
79kdaN
9.18m
2
A207720
7
HORIZ
SHAKERSSHAKERS
3000.00Nm
5500.00Nm
796.97m
3000.00Nm1
222
0
222
768.55m
2
1
10.5
0.00m
1625
5
1
6.50
SINGLE
SINGLE
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
317.8
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
D.W.A.D.G.
24.5
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
3825
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
28
21
24:00
165
07:00
19:00
1
165
1
9
75
0
104
0.00
1602m
13000
3
3
2015/03/07
3
PATTERN BIT & DRILL 222mm HOLE F/1625m-1646m
DOWN LINK M.W.D. TOOL
1
B.O.P. DRILL WELL SECURE IN 75 SECS
UNKN101_20150307_1C
CREW CHANGE OVER MEETING
2
MOTOR LS
BIT
SPIRAL NM
GAP SUB
SPIRAL NM
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
1646.00m
SKH1813D
13000
REED
10.5
DRILL
3360.00
0
0.6
DC (6.75 IN)
HWDP(5.0 IN)
0.25
4.00
270
TORSION SHOCKSUB
JARS-HYD/MECH
1210
15.9
1750
49.25
15.9 15.9
1
1
1
1
Pason
1
1
14kdaN
1
1
1
20
SMITH
47
00:00
01:45
02:00
06:45
23:30
84
19:15
19:30
54
19:00
15-101-02
69
72
72
69
72
720
4.75
0
0.25
1606
0.25
1.75
275
105
x
x
x
03
1
1
1
1
1
1
1
1
1
59
159
11.111.1
11.1
19:45
11.1
70
11.1
56
11.1
74
73
101
5.65m
84.00kdaN
DRILL 222mm HOLE F/1602m-1606m
RIG SERVICE FUNCTION UPPER PIPE RAMS 4 SECS TO CLOSE(RS)
82.00kdaN
DRILL 222mm HOLE F/1606m-1622m
81.00kdaN
TOTAL TIME FOR SURVEYS & CONNECTIONS
1622.00m
11701060
0.50
1622.89m
0.50
104
0
3.75
0.750.50
1230
1.25
1195
0.25
2.25
3.00
5D
29640.00
2
21
23:45
6A
21:00
20
0.25
6B
7
3C
11201230
00:00 03:00
3400
52
20
4
0
0.7
1040
d-023-G/094-G-02
1060
6.50 0.25
1120
4.00
02:00
01:45
1625m
07:00
06:45
127
174
173
175
5
12701810
4.65m
8.89m
.22m
1100
7.00
24.00
12.00
5.00
50s/l
9.32m
07
9.13m
9.18m
1.67m
0.78m
3.78m
710.06m
1170
84.28m
1170
24kdaN
53s/l
5.23m
SHAKERS
1.50m
8kdaN
79kdaN
0
6.5
24:00
23:30
19:30
19:15
0
222
GOOD
1463
DRILL
0.00m
127
222
184
167
175
174
173
0.25
SKH1813D
1
1
11
1
-13.00
11
11
1602m 1610m
768.55m
CALMW
66m366m3
1
11
9
1
1622m
sackssacks
m3sacks
TORSION SHOCKSUB
5
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
165
163
161
SINGLE
165
SINGLE
168
172
165161
167
184
172168
163
165
9774kPa
10095kPa
10095kPa
49s/l48s/l
A207720
27
1153054
REED
165
02:45
165
0
94
222
0
Ultraseal XP
1
4.00
Lime - Hydrated
DRILL
Cyber SealBase OilBarite
2015/03/04 14900
14900
75
1636m 1645m
2
1
FHi50
CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
12:15
17:30
14:30
07:15
07:00
08:30
08:00
06:00
18:45
ETETETETET
ET
4
GAP SUBSPIRAL NM
PONY SLICKCOLLAR
MOTOR LS
BIT
7269
72
72
0
0
14kdaN
72
79kdaN
RD6946
14kdaN
SPIRAL NM
20
SPIRAL NM
X/OSHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
TORSION SHOCKSUB
DC (6.75 IN)
JARS-HYD/MECH
0.50
HWDP(5.0 IN)
2015/02/27 16:45
2
2
17001400
0.50
2
270
0.00m
1664m
3200.00
NEWALTA 1
2
2
7
70
73
56
6959
NEWALTA 2
74
SHAKERS
LLOYD BAUER
12:00
GREG EVERSON
08:00
DARRYL GIBBONS
SHAKERS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
0
59
69
72
1646.57m
72
0
SHOCK SUB
X/O
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES
DRILL 222MM HOLE FR 1664M TO1702MDRILLS/BOP, ETC.- WELL SECURE IN 97 SECS
RIG SERVICE- F/T TOP HCR 2 SECS O/CDRILL 222MM HOLE FROM 1702M-1712M
1
DEVIATION SURVEY
174
14500
175
14500
0.6
127
1.3
1732015/03/07
4.25
0.75
NTSBC
1.50m
710.06m
5.23m
84.28m
28
PROGRESS ENERGY CANADA LTD.
47
.22m
1625
8.89m
0.00m
5.23m
1.50m
3.78m
710.06m
0.78m
84.28m
9.13m
9.32m
1.67m9.18m
4.65m
0.25
sacks
10.75
sackssacks
9801030
5
18.93m
5
2
10
66.5m366m3NEWALTA 1NEWALTA 2
SHORT CHANGE
LONG CHANGE
2015
BOP DRILL
1721m
510
0.50
66
RG
4.0
RGRG
20.75
RG
3400
9
1
RGRG
75
16810
00:00
1290
50s/l
19:00
49s/l
07:00
1625
11.1
11.1 11.1
11.1
11.1 11.1
1290
8kdaN
PARTLY CLOUDY
1
Ross Guynup
SINGLE
SINGLE
07:15
18:30
RG
18:15
16:3016:15
RG
RG
19:00
Doug Watchorn
73
70
1 of 6
74
65m3 64m3
56
CANELSON DRILLING INC.
165
165
1712m
222
184
0.50
3.78m
9.32m
1.67m
0.78m
9.13m
172
168
163
165
165
161
167
200/d-002-G/094-G-02/00
.22m
1
8.89m
4.65m
79kdaN
9.18m
2
A207720
6
HORIZ
SHAKERSSHAKERS
4500.00Nm
4200.00Nm
853.79m
4500.00Nm1
222
0
222
796.97m
11
10.5
9.49m
1625
5
1
m3sacks
sackssacks
5.75
SINGLE
SINGLE
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
38.9
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
D.W.A.D.G.
F/T FLOOR & CROWN SAVERS/POP VALVE PINS, BRAKE PADS
3400
1680m1640m
30
96
24:00
165
07:00
19:00
1
165
1
9
75
Bentone 150
Lime - HydratedBase Oil
0
93
Barite
20.50
1646m
1300
14600
1030
3
4
2015/03/07
3
1
DEVIATION SURVEY/CONNECTION
UNKN101_20150308_1C
DRILL 222 MM HOLE FROM 1712M- 1721M
2
MOTOR LS
BIT
SPIRAL NM
GAP SUB
SPIRAL NM
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
1721.41m
SKH1813D
14600
REED
14:1507:15
10
DRILL
2100.00
1
DC (6.75 IN)
1
HWDP(5.0 IN)
1.25
4.25
275
TORSION SHOCKSUB
JARS-HYD/MECH
11.1
1270
11.1 11.1
11.1
1810
9.75
11.1 11.1
1
1
1
1
Pason
1
1
14kdaN
1
1
1
20
REED
00:00
03:00
03:15
546
23:15
102
19:00
15-101-02
69
72
72
69
72
720
3.75
0
1625
0.25
2.00
220
x
x
x
03
1
1
1
1
1
1
1
1
1
59
39
11.111.1
11.111.1
70
NEWALTA 1
11.1
56NEWALTA 2
11.1
74
73
101
1693.97m
1665.52m
0.00m
85.00kdaN
DRILL 222mm HOLE F/1646m-1652m
RIG SERVICE FUNCTION ANNULAR 8 SECS TO CLOSE(RS)
83.00kdaN
DRILL 222mm HOLE F/1652m-1664m
83.00kdaN
0.75
1664.57m
12301120
1711.97m
93
0
1.750.25
9.000.25
12901300
0.50
21A
24180.00
2
21
22:0020:15
10
7
0.25
2
10301300
00:00 03:30
1212
47
20
4
0
sacks
bblbbl
1100
d-023-G/094-G-02
1120
5.75 0.25
1030
4.25
03:15
03:00
1712m
07:00
127
174
173
175
0
14001700
4.65m
8.89m
.22m
980
6.00
23.00
12.00
5.00
48s/l
9.32m
08
9.13m
9.18m
1.67m
0.78m
3.78m
710.06m
1250
84.28m
1230
8kdaN
48s/l
SHAKERS
5.23m
SHAKERS
1.50m
11kdaN
79kdaN
0
6
24:00
23:15
102
222
GOOD
126
1625
10
DRILL
10
18.91m
11
127
222
184
167
175
174
173
19.7
SKH1813D
16.9
1
1
11
1
10.75
1
-4.00
1
11
1646m 1654m
853.79m
CALMN
59.8m360.4m3
1
10.5
9
1
1664m
bblsacks
TORSION SHOCKSUB
5
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
165
163
161
SINGLE
165
SINGLE
168
172
165161
167
184
172168
163
165
9400kPa
9400kPa
9400kPa
50s/l50s/l
A207720
30
1153054
REED
165
00:15
165
Gilsonite HTCyber Seal
Opti-PlusBarite
Ultraseal XPOpti-Mul
0
93
222
2
1
24.75
DRILL
Lime - HydratedOpti-WetBarite
2015/03/07 14500
14500
75
1713m 1716m
2
1
SKH1813D
TOUR SHEET 23 HRS. DUE TO DAYLIGHT SAVINGS TIME CHANGE
CHECK CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
18:30
18:15
07:15
07:00
16:30
16:15
06:00
87
ETETETETET
ET
5
GAP SUBSPIRAL NM
PONY SLICKCOLLAR
MOTOR LS
BIT
7269
72
72
0
0
14kdaN
72
79kdaN
A207720
14kdaN
SPIRAL NM
20
SPIRAL NM
X/OSHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
TORSION SHOCKSUB
DC (6.75 IN)
JARS-HYD/MECH
0.25
HWDP(5.0 IN)
2015/02/27 16:45
2
2
17001400
1.50
1758
2
240
0.00m
1734m
3200.00
NEWALTA 1
21A
2
7
70
73
56
6959
NEWALTA 2
74
SHAKERS
GREG EVERSON
10:30
LLOYD BAUER
07:30
LLOYD BAUER
SHAKERS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
0
59
69
72
1722.39m
72
0
SHOCK SUB
X/O
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES
DRILL 222MM HOLE FR 1734M-1757MRIG SERVICEF/T ANNULAR 8 SECS C/O
DEVIATION SURVEY
1
174
14133
175
14133127
1732015/03/07
0.25
4.75
NTSBC
1.50m
710.06m
5.23m
84.28m
31
PROGRESS ENERGY CANADA LTD.
46
.22m
1721
8.89m
3.11m
5.23m
1.50m
3.78m
710.06m
0.78m
84.28m
9.13m
9.32m
1.67m9.18m
4.65m
0.25
sacks
10.00
sackssacks
9801020
5
9.49m
5
21
2
67m359m3NEWALTA 1NEWALTA 2
SAMPLES- REVIEW JSA A-43
BOP DRILL
2015
CHANGING HEADS AND LINERS
1768m
21
2101010
0.50
77
RG
0
RGRG
21.25
RG
3486
9
RG
1
RGRG
75
1010
00:00
1280
48s/l
19:00
50s/l
07:00
1625
11.1
11.1 11.1
11.1
11.1 11.1
1290
13kdaN
OVERCAST
1
Ross Guynup
SINGLE
SINGLE
07:15
RG
19:00
17:3017:15
RG
RG
Doug Watchorn
73
70
1 of 4
74
65.4m3 64.1m3
56
CANELSON DRILLING INC.
165
165
1757m
222
184
0.75
3.78m
9.32m
1.67m
0.78m
9.13m
172
168
163
165
165
161
167
200/d-002-G/094-G-02/00
.22m
1
8.89m
4.65m
81kdaN
9.18m
2
A207720
7
HORIZ
SHAKERSSHAKERS
5000.00Nm
5400.00Nm
910.64m
4300.00Nm1
222
0
222
882.20m
11
1
10.5
18.96m
1625
5
1
sackssacks
sackssacks
6.75
bblsacks
SINGLE
SINGLE
sacks
45.4
GEN 1: 9923HR (24HR RUNTIME ONLINE), GEN 2: 10708HR (24HR RUNTIME ONLINE), GEN 3: 10581HR (OFF0
PERKINS 1:10724HR (OFFLINE), PRKINS 2; 10479HR (24HR RUNTIME ONLINE)
F/T FLOOR & CROWN SAVERS/ BRAKE PADS/ POP VALVE PINS
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
CHANGED HEADS AND LINERS IN PUMP #2 TO 5 1/2
3486
1740m1735m
32
143
24:00
165
07:00
19:00
1
165
1
9
75
Opti-WetBentone 150
Ultraseal XPBarite
Lime - HydratedCyber Seal
0
93
Gilsonite HT
42.50
1721m
1290
15000
1020
4
4
2015/03/07
4
1
DRILL 222MM HOLE FROM 1757M- 1768M
UNKN101_20150309_1D
SAFETY MEETING- CREW HAND OVER
2
MOTOR LS
BIT
SPIRAL NM
GAP SUB
SPIRAL NM
PONY SLICKCOLLAR
SPIRAL NM
X/O
SHOCK SUB
1768.82m
SKH1813D
15000
REED
10.5
DRILL
1638.00
2
DC (6.75 IN)
2.1
HWDP(5.0 IN)
1.50
4.75
260
TORSION SHOCKSUB
JARS-HYD/MECH
11.1
1390
11.1 11.1
11.1
1760
31.50
11.1 11.1
1
1
1
1
Pason
1
1
14kdaN
1
1
1
25
REED
47
00:00
06:30
06:45
84
19:15
510
19:00
15-101-02
69
72
72
69
72
720
0.25
0
1721
0.25
6.50
260
5
55
x
x
x
03
1
1
1
1
1
1
1
1
1
59
109
11.111.1
11.111.1
70
NEWALTA 1
11.1
56NEWALTA 2
11.1
74
73
101
7.15m
85.00kdaN
DRILL 222MM HOLE FROM 1721M - 1734M
RIG SERVICE/FUNCTION UPPER HCR 3 SEC TO OPEN
85.00kdaN
HELD BOP DRILL WITH CREW /REVIEWED BOP CHART
81.00kdaN
1734.00m
13001040
0.25
1757.00m
93
0
1.50
10.000.25
13101300
7
18200.00
2
21
23:4521:00
0.25
10
10401310
02:00 06:00
1212
3648
46
20
4
0
sacks
1020
d-023-G/094-G-02
1040
6.50 0.25
1040
4.75
06:45
06:30
1757m
07:00
127
174
173
175
5
14201760
4.65m
8.89m
.22m
1020
7.00
24.00
12.00
5.00
52s/l
9.32m
9.13m
09
9.18m
1.67m
0.78m
3.78m
710.06m
1290
84.28m
1300
11kdaN
51s/l
SHAKERS
5.23m
SHAKERS
1.50m
13.5kdaN
79kdaN
0
6.5
24:00
19:15
51
222
GOOD
1625
10
DRILL
5
0.00m
5
127
222
184
167
175
174
173
sacks
SKH1813D
1
1
11
1
10.00
1
-4.00
1
11
1724m 1732m
882.20m
CALMW
71m362m3
1
11
9
1
1734m
sackssacks
sackssacks
TORSION SHOCKSUB
5
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
165
163
161
SINGLE
165
SINGLE
168
172
165161
167
184
172168
163
165
9400kPa
9400kPa
9400kPa
50s/l49s/l
A207720
31
1153054
REED
165
00:30
165
Gilsonite HTLime - HydratedUltraseal XPCyber Seal
0
93
222
0
Cyber SealGilsonite HT
1
47.25
Ultraseal XP
DRILL
Bentone 150Lime - HydratedBarite
2015/03/07 14500
14500
75
1761m 1768m
2
1
SKH1813D
CHECKED FLOOR SAVER/CROWN SAVER/BRAKE PADS/POP VALVE PINS
07:15
07:00
17:30
17:15
06:00
132
ETETETETET
ET
5
0.25
GAP SUBSPIRAL NM
PONY SLICKCOLLAR
MOTOR LS
BIT
7269
72
72
0
0
14kdaN
72
81kdaN
A207720
14kdaN
SPIRAL NM
20
SPIRAL NM
X/OSHOCK SUB
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
JARS-HYD/MECH
2.75
HWDP(5.0 IN)
0.50
2015/02/27 16:45
2
2
2.98
17001400
1.00
1768
1768
2
240
3.17m
1771m
3200.00
NEWALTA 1
6D
20
5D
6B
7
2
70
73
56
7269
74
NEWALTA 2
SHAKERS
GREG EVERSON
17:00
LLOYD BAUER
16:00
LLOYD BAUER
SHAKERS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
0
59
69
72
72
0
SHOCK SUB
X/O
1756.33m
BIT
MOTOR LS
PONY SLICK COLLAR
SPIRAL NM
GAP SUB
30261
SPIRAL NM
SPIRAL NM
SAFETY MEETING/HAND OVER NOTES- REVIEW JSA B-B-40
HANDLE DIRECTIONAL TOOLS- LAYDOWN BHA AND MAKE UP BHA/FT BLIND RAMS(5SECS),
WHILE OUT OF HOLE-FLOW CHECK OOH
TRIP IN HOLE- PICK UP DRILL PIPE TO TAG BOTTOM
RIG SERVICE- F/T ANNULAR 8 SECS C/O
SAFETY MEETING- REVIEW JSA B-40/ PRIOR TO SLIP & CUTTRIP IN HOLE
1
TRIP IN HOLE,FILL @ 620M & EVERY 500M TO BOTTOM ( TEST TOOL)- F/C @ 904M
SLIP/CUT DRILLING LINE-22M
127
21000
174
210002015/03/10
0.25
0.25
0.25
4.25
NTSBC
5.23m
710.06m
32
PROGRESS ENERGY CANADA LTD.
70
70
0.32m
12.21m
2.18m
5.23m
1.50m
0.78m
710.06m
9.40m
84.28m
9.18m
1.67m
9.25m4.65m
0.60m
0.254.00
sacks
2.50
9801020
1.00
5
0.00m
5
7
10
21
2
68m3NEWALTA1NEWALTA 2
SLIP & CUT- REVIVEW JSA B-40
MAKING CONNECTIONS
2015
WORKING WITH H2S
1791m
0.75 1.00
22
7.750.50
RG
12
RG
8.25
RG
6400
9
6075
1
RGRG
75
00:00
1300
50s/l
19:00
49s/l
07:00
1771
1300
2kdaN
PARTLY CLOUDY
1
2
Ross Guynup
COMBIN-ED
COMBIN-ED
07:15
10:45
RG
10:30
10:00
RG
15:30
13:15
RG
13:00
11:45
Doug Watchorn
74
1 of 4
64.2m3 64.1m3
70
CANELSON DRILLING INC.
165
165
1778m
216
213
0.753.75
3.78m
9.32m
1.67m
0.78m
9.13m
168
165
162
165
162
167
170
200/d-002-G/094-G-02/00
.22m
1
8.89m
4.65m
9.18m
2
JK3723
7
HORIZ
SHAKERS
2800.00Nm
2800.00Nm
BC
1024.48m
8500.00Nm
216
0
222
910.64m
0
1
10
2
18.99m
1771
6
1
1.75
COMBIN-ED
COMBIN-ED
15:30
18:00
GEN1: 9947HR (24HR RUNTIME ONLINE), GEN2: 10723HR (14HR RUNTIME OFFLINE), GEN 3:10591HR (10HR RUNTIME)
PERKINS 1: 10724HR (OFF), PERKINS 2: 10503HR (24HE RUNTIME)
CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
44.1
CHECK FLOOR /CROWN SAVER/BRAKE PADS/POP VALVES PINS
1772m1771m
36
20
24:00
140
07:00
19:00
75
165
1
0
93
2.50
1768m
1300
22200
1020
4
4
2015/03/10
4
RIG SERVICE F/T UPPER HCR 3 SEC TO OPEN
DEVIATION SURVEY / CONNECTION
1
DRILL 216MM HOLE FROM 1778M- 1791M
UNKN101_20150310_1C
SAFETY MEETING- CREW CHANGE OVER
2
TURBINE MOTOR
BIT
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
X/O
FLEX MONEL
FLEX MONEL
X/O
1791.00m
K507
22200
SMITH
10.5
DRILL
10500.00
2
1.00
2.50
1.25
4.25
240
JARS-HYD/MECH
HWDP(5.0 IN)
11.1
1420
11.1 11.1
11.1
1760
49.00
11.1 11.1
1
1
1
1
Pason
1
1
1
1
1
25
70
REED
70
00:00
00:15
01:45
02:1505:15
06:00
23:45
42
19:15
23:30
19:00
15-101-02
72
2
69
72
72
0.75
72
1.00
72
0.50
0
3.00
1768
1768
1.50
0.25
250
x
x
x
03
1
1
1
1
1
1
1
1
1
69
146
19:00
74
NEWALTA 170NEWALTA 2
101
0.00m
80.00kdaN
RIG SERVICE/FUNCTION UPPER PIPES 5 SEC TO CLOSE
DRILL 222mm HOLE FR 1768M - 1771M
85.00kdaN
CIRCULATE BOTTOMS UP / MIX PILL
80.00kdaN
TRIP OUT OF HOLE FROM 1771M /FLOW CHECK @1770M,1634M,846M,135M
0.25
1771.00m
1310
DIRECTIONAL WORKLAY OUT TOOLS
LAY DOWN BHA
1040
0.25
1778.33m
S
70
70
0.500.25
2.75
1330
0.25
1300
2.25
1.00
1.25
37440.00
20D
21
23:30
6A
20:00
9A
21
0.25
6A
6A
CT
7
10401300
02:00
33
6075
6400
28
4.5
4.5
1.3
1771
1020
d-023-G/094-G-02
1040
1.50 0.253.750.50
1040
4.25
DIRECTIONAL
0.25
01:45
00:15
1778m
05:15
02:15
07:00
06:00
127
174
173
175
5
14201750
0.60m
12.21m
0.32m
1020
7.00
24.00
12.00
5.00
50s/l
1.67m
10
9.18m
4.65m
9.25m
9.40m
0.78m
1310
14kdaN
49s/l
SHAKERS
710.06m
SHAKERS
5.23m
2kdaN
2
81kdaN
0
2.5
24:00
23:45
23:30
19:15
010
216
GOOD
1625
DRILL
9.49m
222
184
167
174
127
K507
1
1
11
1
-12.00
2.50
11
11
1771m
2
995.99m
CALMW
62m363m3
1
10
75
1771m
TORSION SHOCKSUB
6
sacks
1
HWDP(5.0 IN)
DC (6.75 IN)
JARS-HYD/MECH
PR
165
163
161
SINGLE
165
SINGLE
168
172
162167
170
213
168165
162
165
9346kPa
9400kPa
9400kPa
18:00
19:00
52s/l
DEVIATION SURVEY
BREAK IN BIT -DRILL 216MM HOLE FROM 1771M- 1778M
JK3723
35
1153054
SMITH
140
140
Lime - Hydrated
70
70
216
1
1
2
6.75
DRILL
Barite
2015/03/07 14895
14895
1778m 1789m
2
1
10
CHANGED 4 SHAKER SCREENS, 2 DECK FRAMES AND RUBBERS/ SWACO TECHS OUT
SKH1813D
HOLE FILL CAL 13.68M/3- ACT 14.35M/3- DIFF +.67M/3
CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES
10:45
10:30
X
13:00
11:45
07:15
07:00
10:00
06:00
13:157
0
ET
1.00
ETETET
ET
5
FLEX MONEL
PONY SLICKCOLLAR
X/OTURBINE MOTOR
BIT
7272
69
2
0
72
14kdaN
72
77kdaN
A207720
GAP SUB
25
FLEX MONEL
FLEX MONELX/O
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
19:15
JARS-HYD/MECH
126
23:45
5
0.25
19:00
HWDP(5.0 IN)
3
15-101-02 2015/02/27 16:45
2
2
72
2
69
72
72
7272
0
1806
1806
0.25
6.75
1740
0.50
1420
2
260
240
7
55
8.24m
1806m
x
x
x
3200.00
03
1
1
1
1
1
1
1
1
1
69
NEWALTA 1
2
10
74
35 70
NEWALTA 1
74
72
NEWALTA 270
69
NEWALTA
SHAKERS
GREG EVERSON
LLOYD BAUER
09:4507:30
LLOYD BAUER
SHAKERS
101
72
72
Progress HZ Julienne d-23-G/94-G-2
72
72
69
72
2
1803.78m
69
0
X/O
FLEX MONEL
0.00m
BIT
TURBINE MOTOR
X/O
DRILL 216MM HOLE FROM 1791M TO 1806M
80.00kdaN
PONY SLICKCOLLAR
DEVIATION SURVEY/CONNECTION
30261
FLEX MONEL
80.00kdaN
GAP SUB
80.00kdaN
FLEX MONEL
SAFETY MEETING /HAND OVER NOTES
DRILL 216MM HOLE FR 1806M-1835MRIG SERVICE- F/T UPPER PIPE RAMS 5 SECS C/O
1806.80m
1320
DEVIATION SURVEY
1
21300
127
21300
174
1050
2015/03/10
0.25
1835.26m
0.25
70
0.25
70
4.50
0.50
11.000.25
13101310
72
32240.00
21
23:3020:00
0.25
NTS
10
BC
5.23m
10501310
710.06m
03:00 06:30
36
PROGRESS ENERGY CANADA LTD.
1212
70
70
25
0.32m
12.21m
5
5
0.00m
710.06m
0.78m
5.23m
9.40m
9.18m
1.67m
9.25m4.65m
0.60m
0.25
10301050
d-023-G/094-G-02
sacks
11.00
6.75
9901030
5
0.00m
51050
7
21
2
4.50
64m362.50m3NEWALTA 1
0.25
NEWALTA 2
BLOWDOWN BOILER- REVIEW JSA N-05
CHANGING CATHEAD CABLES
2015
MIXING MUD PRODUCTS
07:00
06:45
1835m
1853m
127
8416
174
172510
0.50
5
77
12
RG
1440
22.25
1770
RG
6105
RG
75
6060
RGRG
0.60m
12.21m
0.32m
1030
7.00
24.00
12.00
5.00
50s/l
1.67m
9.18m
11
10
4.65m
25
9.25m
9.40m
0.78m
00:00
1310
19:00
50s/l
07:00
51s/l
1320
1771
1300
50s/l
3kdaN
710.06m
SHAKERS
5.23m
SHAKERS
3kdaN
1310
3kdaN
PARTLY CLOUDY
1
77kdaN
Ross Guynup
COMBIN-ED
COMBIN-ED
6.5
6.5
07:15
24:00
23:45
19:15
0168
19:00
RG
18:3018:15
RG
RG
Ed Tallon
216
74
1 of 4
62.5m3
70
61.7m3
GOOD
CANELSON DRILLING INC.
165
165
DRILL1835m
1771
18.97m
216
213
216
213
170
0.50
174
127
sacks
0.78m
0.25
1.67m
9.25m
9.40m
9.18m
168
165
162
K507
165
162
167
170
1
1
11
200/d-002-G/094-G-02/00
0.32m
12.21m
1
0.60m
4.65m
1
77kdaN
-13.00
1
11.00
1
2
11
JK3723
7
HORIZ
1800m 1806m
SHAKERSSHAKERS
2100.00Nm
2100.00Nm
1081.41m
2700.00Nm
216
12
1052.94m
216
CALMW
12
1024.48m
64.50m365m3
10.5
1
10
75
18.97m
1806m
sackssacks
m3
1771
sacks
JARS-HYD/MECH
sacks
6
1
6
1
HWDP(5.0 IN)
sackssacks
sackssacks
6.75
m3
COMBIN-ED
sacks
COMBIN-ED
sacks
165
162
GEN1: 9970HR (24HR RUNTIME ONLINE), GEN2: 10,723HR (OFF), GEN3: 10,615HR (24HR RUNTIME ONLINE)
COMBINED
167
101.8
PERKINS 1 : 10726HR (2 HR RUNTIME ONLINE), PERKINS 2: 10525HR (22 HR RUNTIME OFF)
COMBINED
162
F/T CROWN AN FLOOR SAVER/ BRAKE PAD / POP VALVE PINS
165
168
162167
170
213
168165
162
165
9436kPa
9400kPa
9346kPa
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
50s/l50s/l
1813m1809m
JK3723
37
1153054
38
82
24:00
SMITH
165
07:00
19:00
75
1
165
165
165
05:00
Barite
Base OilBarite
Gilsonite HTBentone 150
Lime - HydratedUltraseal XP
70
70
Cyber Seal
70
70
216
Bentone 150
2
Cyber Seal
24.50
1
2
1791m
29.00
Ultraseal XPGilsonite HT
DRILL
Base OilBarite
21800
13101030
2
4
2015/03/10 21215
2015/03/10
21215
4
1841m
RIG SERVICE/FUNCTION ANNULAR 15 SEC TO CLOSE
1852m
DRILL 216MM HOLE FROM 1835M- 1853M
1
SAFETY MEETING- CREW CHANGE OVER
UNKN101_20150311_1C
2
TURBINE MOTOR
BIT
GAP SUB
FLEX MONEL
2
PONY SLICKCOLLAR
1
X/O
FLEX MONEL
FLEX MONEL
X/O
1853.00m
K507
F/T CROWN AN FLOOR SAVER/ BRAKE PADS / POP VALVE PINS
K507
07:15
21800
07:00
18:30
18:15
06:00
64
SMITH
10.5
ET
DRILL
ETETET
ET
8190.00
6
2
FLEX MONEL
1.4
0.75
PONY SLICKCOLLAR
X/OTURBINE MOTOR
BIT
4.50
240
JARS-HYD/MECH
HWDP(5.0 IN)
1440
13.50
1760
72
1
72
1
69
1
2
1
Pason
0
72
1
77kdaN
72
1
1
1
JK3723
1
25
SMITH
00:00
06:45
GAP SUB
FLEX MONEL
25
FLEX MONELX/O
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
JARS-HYD/MECH
HWDP(5.0 IN)
0.25
2015/02/27 16:45
2
2
17301420
0.50
2
280
1.40m
1868m
3200.00
NEWALTA 1
2
10
74
70
7269
NWALTA 2
SHAKERS
GREG EVERSON
13:00
LLOYD BAUER
08:00
LLOYD BAUER
SHAKERS
72
72
72
Progress HZ Julienne d-23-G/94-G-2
72
69
72
1860.68m
2
69
0
X/O
FLEX MONEL
BIT
TURBINE MOTOR
X/OPONY SLICKCOLLARFLEX MONEL
30261
GAP SUB
FLEX MONEL
SAFETY MEETING/HAND OVER NOTES WITH CREW
DRILL 216mm HOLE FR 1868M -1893MRIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O
DEVIATION SURVEY
1
127
20900
174
20900
2.2
2015/03/10
0.25
4.75
NTSBC
5.23m
710.06m
38
PROGRESS ENERGY CANADA LTD.
0.32m
1863
12.21m
1863
4.29m
710.06m
5.23m
0.78m9.40m
9.18m
1.67m
9.25m4.65m
0.60m
0.25
sacks
11.00
10001040
5
0.00m
5
21
2
62.80m363m3NEWALTA 1NEWALTA 2
MIXING MUD PRODUCTS- REVIEW JSA G-09
MAKING CONNECTIONS
2015
MAKING CONNECTIONS
1903m
11
755
2040
0.25
77
RG
7
RG
22.25
RGRG
75
RGRG
2168
00:00
1310
52s/l
19:00
51s/l
07:00
1771
1310
2kdaN
PARTLY CLOUDY
1
Ross Guynup
COMBIN-ED
COMBIN-ED
07:15
RG
19:00
18:3018:15
RG
RG
Ed Tallon
74
1 of 4
62.2m3 60.7m3
70
CANELSON DRILLING INC.
165
165
1893m
216
213
0.50
0.78m
1.67m
9.25m
9.40m
9.18m
168
165
162
165
162
167
170
200/d-002-G/094-G-02/00
0.32m
1
12.21m
0.60m
80kdaN
4.65m
2
JK3723
7
HORIZ
SHAKERSSHAKERS
2200.00Nm
1900.00Nm
1138.25m
2200.00Nm1
216
2
11
216
1081.41m
11
10
18.95m
1771
6
1
sackssacks
bblsacks
6.50
sackssacks
COMBIN-ED
m3
COMBIN-ED
sacks
133.5
GEN1: 9995HR (24HR RUNTIME ONLINE), GEN2: 10,723HR (OFF), GEN3 : 10,640HR (24HR RUNTIME)
PERKINS 1: 10,750HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525 (OFF)
CHECKED FLOOR /CROWN SAVER/BRAKE PADS/POP VALVES PINS
F/T FLOOR & CROWN SAVERS/BRAKE PADS/ POP VALVE PINS
5339
5383
1882m1873m
40
132
24:00
165
07:00
19:00
75
165
1
Base Oil
Ultraseal XPBentone 150
Gilsonite HTCyber Seal
BariteLime - Hydrated
70
Opti-Thin
70
46.50
1853m
1310
20800
1040
4
4
2015/03/10
4
1
DRILL 216MM HOLE FROM 1893M- 1903M
UNKN101_20150312_1C
SAFETY MEETING- CREW CHANGE OVER
2
TURBINE MOTOR
BIT
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
X/O
FLEX MONEL
FLEX MONEL
X/O
1903.00m
K507
20800
SMITH
10:45
10.5
DRILL
6216.00
2
2.6
1.00
4.75
260
JARS-HYD/MECH
HWDP(5.0 IN)
14101760
35.50
1
1
1
1
Pason
1
1
1
1
1
25
SMITH
00:00
06:30
294
19:15
109
19:00
15-101-02
72
2
69
72
72
7272
0
0.50
6.50
260
106
x
x
x
03
1
1
1
1
1
1
1
1
1
69
97
74
NEWALTA 170NEWALTA 2
101
1879.6m
0.85m
82.00kdaN
DRILL 216mm HOLE FR 1853M - 1868M
DEVIATION SURVEY/CONNECTION
80.00kdaN
80.00kdaN
1868.00m
13001030
0.25
1893.00m
70
70
0.50
11.000.25
13101310
7
24700.00
2
21
23:3020:00
0.25
10
10501310
03:00 06:00
1212
70
25
70
4
4
1010
d-023-G/094-G-02
1030
6.50
1050
4.75
07:00
06:30
1893m
127
174
5
14301760
0.60m
12.21m
0.32m
1020
7.00
24.00
12.00
5.00
50s/l
1.67m
12
9.18m
4.65m
9.25m
9.40m
0.78m
13101300
3kdaN
51s/l
SHAKERS
710.06m
SHAKERS
5.23m
3kdaN
77kdaN
6.50
6.5
24:00
19:15
1260
216
GOOD
1771
DRILL
18.95m
216
213
170
174
127
0.50
135.5
K507
1
1
11
1
11.00
1
-16.00
1
11
1860m 1867m
1109.85m
CALMW
62m363m3
1
10
75
1868m
sackssacks
m3sacks
JARS-HYD/MECH
6
sacks
1
HWDP(5.0 IN)
165
162
167
COMBINED
162
COMBINED
165
168
162167
170
213
168165
162
165
9346kPa
9293kPa
9346kPa
52s/l50s/l
JK3723
39
1153054
SMITH
165
03:15
165
Barite
70
70
216
2
Bentone 150
51.25
Gilsonite HT
DRILL
Lime - HydratedBase OilBarite
2015/03/10 21938
21938
1895m 1902m
2
1
K507
GREG PUKAS-FIELD SUPP/ CANELSON DRILLING OUT FOR RIG INSPECTION
CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PIND
07:15
07:00
18:30
18:15
06:00
122
ET
ETETET
ET
6
FLEX MONEL
PONY SLICKCOLLAR
X/OTURBINE MOTOR
BIT
7272
69
2
0
72
72
80kdaN
JK3723
GAP SUB
25
FLEX MONEL
FLEX MONELX/O
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
21:45
22:45
19:15
210
JARS-HYD/MECH
10
0.25
19:00
3
HWDP(5.0 IN)
15-101-02 2015/02/27 16:45
2
2
72
2
69
72
72
72
0.25
72
0
1920
1920
0.25
6.50
1730
0.25
1390
2
250
240
5
55
0.00m
1922m
x
x
x
3200.00
03
1
1
1
1
1
1
1
1
1
69
10
2
7
151
74
70
NEWALTA 1
74
72
NEWALTA 270
69
GREG EVERSON
LLOYD BAUER
10:3007:45
LLOYD BAUER
101
72
72
Progress HZ Julienne d-23-G/94-G-2
72
72
69
72
2
1917.53m
69
0
X/O
FLEX MONEL
4.47m
BIT
TURBINE MOTOR
X/O
DRILL 216mm HOLE FR 1903M TO 1922M
80.00kdaN
PONY SLICKCOLLAR
RIG SERVICE/FUNCTION UPPER PIPES 5 SEC TO CLOSE
30261
FLEX MONEL
DEVIATION SURVEY/CONNECTIONS
GAP SUB
80.00kdaN
80.00kdaN
FLEX MONEL
SAFETY MEETING/HAND OVER NOTES
DRILL 216MM HOLE FROM 1922MRIG SERVICE-F/T LOWER PIPE RAMS 5 SECS C/O
1922.00m
1310
CONDITION MUD & CIRCULATEDEVIATION SURVEY
1
TRIP OUT OF HOLE- FLOW CHECK @ 1942M,PUMP PILL, FLOW CHECK @1816m
22588
127
22588
174
1050
2015/03/10
0.25
1944.00m
1.00
1.25
1.00
70
0.25
70
2.50
0.250.50
9.750.25
1.00
72
17680.00
21
6B
0.25
5
NTS
10
BC
5.23m
710.06m
03:00 06:00
40
PROGRESS ENERGY CANADA LTD.
1212
70
70
70
25
70
1920
0.28m
12.21m
0
0
1920
1.43m
710.06m
0.78m
5.23m
9.40m
9.18m
1.67m
9.25m4.65m
0.60m
0.251.00
1020
0.50
d-023-G/094-G-02
1050
9.75
6.50
990
0.25
1020
0.00m
6A
20
21
6B
65m360.50m3
3.75
NEWALTA 1NEWALTA 2
CLEANING SUB -REVIEW JSA K-05
MIXING BARITE
2015
TRIPPING PIPE
06:45
06:30
1944m
07:00
127
168
17
174
102020
0.50
0
7
4.75
7
0.50
2.5
RG
16.25
RG
5619
RG
5524
75
RGRG
0.60m
12.21m
0.32m
7.00
24.00
12.00
5.00
1.67m
9.18m
13
7
4.65m
7
9.25m
9.40m
0.78m
00:00
1320
19:00
53s/l
07:00
53s/l
1310
1944
1310
3kdaN
SHAKERS
710.06m
SHAKERS
5.23m
1320
3kdaN
OVERCAST
1
80kdaN
Ross Guynup
COMBIN-ED
COMBIN-ED
6.5
24:00
6.5
07:15
22:45
21:45
19:15
18:00
0
17:30
RG
17:1517:00
RG
RG
19:00
Ed Tallon
216
74
1 of 5
64.5m3
70
63.7m3
GOOD
CANELSON DRILLING INC.
165
165
1771
18.97m
216
213
216
213
170
0.50
174
127
1.00
sacks
0.78m
0.25
1.67m
9.25m
9.40m
9.18m
168
165
162
K507
165
162
167
170
1
1
11
200/d-002-G/094-G-02/00
0.32m
12.21m
1
0.60m
4.65m
1
80kdaN
1
9.75
-2.00
1
2
11
JK3723
7
HORIZ
1912m 1920m
SHAKERSSHAKERS
1900.00Nm
1900.00Nm
0.00m
2200.00Nm1
2
216
11
1166.70m
216
CALME
11
1138.25m
10
1
11
75
9.48m
1922m
sackssacks
sacks
1771
sacks
JARS-HYD/MECH
sacks
7R
1
6
1
HWDP(5.0 IN)
sackssacks
sackssacks
6.50
sacks
COMBIN-ED
m3
COMBIN-ED
sacksbbl
165
162
GEN1: 10,019HR (24HR RUNTIME ONLINE), GEN2: 10,723HR (OFFLINE), GEN 3: 10,664HR (24HR RUNTIME ONLINE)
COMBINED
167
135.8
PERKINS 1: 10,774HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525HR (OFFLINE)
COMBINED
162
CHECKED CROWN/FLOOR SAVER /BRAKE PADS /POP VALVES PINS
165
168
162167
170
213
168165
162
165
9346kPa
9346kPa
9346kPa
F/T FLOOR & CROWN SAVERS/BRAKE PADS/ POP VALVE PINS
FUNCTION BLIND RAMS WELL OUT OF HOLE
5619
54s/l54s/l
5524
1929m1924m
JH6335
41
1153054
0
SMITH
24:00
165
07:00
19:00
75
1
165
165
165
04:45
Barite
Bentone 150Opti-Thin
Gilsonite HTBase Oil
Ultraseal XPLime - Hydrated
70
70
Cyber Seal
70
70
216
Cyber Seal
2
Ultraseal XP
67.50
1
2
1903m
0.00
Gilsonite HTLime - Hydrated
DRILL
Bentone 150Barite
0
13201020
4
4
2015/03/10 20754
2015/03/13
20754
TRIP IN HOLE WITH NEW BIT TO 620M/FILL EVERY 500M
4
RECORD CAL-13.13 ACT-14.04 DIFF-.91
DIRECTIONAL WORK/CHANGE OUT MWD TOOL/CHANGE BIT
TRIP OUT OF HOLE FROM 1816m/FLOW CHECK @ 1360M ,762M,OUT OF HOLE /TRIP
1
SAFETY MEETING- CREW CHANGE OVER
UNKN101_20150313_1C
2
TURBINE MOTOR
BIT
GAP SUB
FLEX MONEL
2
PONY SLICKCOLLAR
1
X/O
FLEX MONEL
FLEX MONEL
X/O
763.31m
K507
F/T CRWON AND FLOOR SAVER / BRAKE PADS / POP VALVE PINS
18:00
17:30
K507
07:15
0
07:00
17:15
17:00
06:00
173
SMITH
10.5
ET
DRILL
ETETET
ET
5250.00
6
1
FLEX MONEL
1.5
0.50
PONY SLICKCOLLAR
X/OTURBINE MOTOR
BIT
240
JARS-HYD/MECH
HWDP(5.0 IN)
1420
57.75
1760
72
1
72
1
69
1
2
1
Pason
0
72
1
72
1
1
1
JK3723
1
SMITH
00:00
06:30
06:45
GAP SUB
FLEX MONEL
25
FLEX MONELX/O
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
JARS-HYD/MECH
HWDP(5.0 IN)
0.25
2015/02/27 16:45
2
2
17801420
0.50
1995
1995
2
260
0.17m
1953m
3200.00
NEWALTA 1
2
7
6A
3
74
70
7269
NEWALTA 2
SHAKERS
GREG EVERSON
10:30
LLOYD BAUER
08:00
LLOYD BAUER
SHAKERS
72
72
72
Progress HZ Julienne d-23-G/94-G-2
72
69
72
2
69
0
X/O
FLEX MONEL
BIT
TURBINE MOTOR
X/OPONY SLICKCOLLARFLEX MONEL
30261
GAP SUB
FLEX MONEL
SAFETY MEETING/HAND OVER NOTES
DRILL 216mm HOLE FR 1953M- 1994MRIG SERVICE- F/T ANNULAR 8 SECS C/O
DEVIATION SURVEY
1
127
22457
174
22457
1.6
0.90.8
1.4
2015/03/13
0.25
0.50
0.25
4.00
NTSBC
5.23m
710.06m
41
PROGRESS ENERGY CANADA LTD.
70
70
0.28m
12.21m
4.03m
710.06m
5.23m
0.78m9.40m
9.18m
1.67m
9.25m4.65m
0.60m
0.25
sacks
11.00
sackssacks
10001030
5
18.94m
5
7
10
21
2
68m357m3NEWALTA 1NWALTA 2
TUGGER USE- REVIEW JSA B-37
RUNNING IN THE HOLE
2015
MAKING CONNECTIONS
2006m
655
10
0.75
3
0.75
3
2.50
RG
3
RG
18.50
RG
5610
5560
75
RGRG
1510
00:00
1330
56s/l
19:00
53s/l
07:00
1944
1330
3kdaN
OVERCAST
1
Ross Guynup
COMBIN-ED
COMBIN-ED
07:15
RG
19:00
18:3018:15
RG
RG
Ed Tallon
74
1 of 4
67.7m3 67.6m3
70
CANELSON DRILLING INC.
165
165
1994m
216
213
0.50
0.78m
1.67m
9.25m
9.40m
9.18m
168
165
162
165
162
167
170
200/d-002-G/094-G-02/00
0.28m
1
12.21m
0.60m
80kdaN
4.65m
2
JH6335
2
HORIZ
SHAKERSSHAKERS
2300.00Nm
2250.00Nm
1223.58m
2200.00Nm
216
11
216
1166.70m
11
1
11
2
0.00m
1944
7R
1
sackssacks
sackssacks
3.50
sackssacks
COMBIN-ED
COMBIN-ED
GEN1: 10042HR (24HR RUNTIME ONLINE), GEN2:10723HR (OFF), GEN:310687HR(24HR RUNTIME)
PERKINS 1 : 10798HR (24HR RUNTIME), PERKINS 2 :10525HR (OFF)
CHECKE CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
1965m1957m
43
62
24:00
165
07:00
19:00
75
165
1
Bentone 150
Cyber SealUltraseal XP
Gilsonite HTLime - Hydrated
70
Cal Chloride Powder
70
14.50
1944m
1330
22700
1030
4
4
2015/03/13
4
RIG SERVICE/FUNCTION LOWER PIPES 5 SEC TO CLOSE
DEVIATION SURVEY/CONNECTION
1
DRILL 216MM HOLE FROM 1994M- 2006M
UNKN101_20150314_1B
SAFETY MEETING- CREW CHANGE OVER
2
TURBINE MOTOR
BIT
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
X/O
FLEX MONEL
FLEX MONEL
X/O
2006.00m
K507
22700
SMITH
12:4515:4518:15
07:00
10.5
DRILL
10920.00
0
1.00
4.00
240
JARS-HYD/MECH
HWDP(5.0 IN)
14501780
3.50
1
1
1
1
Pason
1
1
1
1
1
25
70
SMITH
70
00:00
02:30
03:15
06:45
23:30
126
19:15
23:15
10
19:00
15-101-02
72
2
69
72
72
7272
3.50
0
0.25
1958
1958
0.75
2.50
240
x
x
x
03
1
1
1
1
1
1
1
1
1
69
9
74
NEWALTA 170NEWALTA 2
101
1974.35m
1955.4m
1993.3m1983.83m
7.11m
82.00kdaN
TRIP IN HOLE FR 620M TO1928M/FILL EVERY 500M
REAMING FR 1928M TO 1944M
80.00kdaN
DRILL 216mm HOLE FR1944M TO 1953M
80.00kdaN
RIG SERVICE/FUNCTION LOWER HCR 3 SEC TO OPEN
0.50
1953.00m
13301060
0.25
1994.00m
70
70
0.50
11.000.25
13301330
7
45500.00
2
21
23:3021:00
0.25
10
10301330
03:45 06:00
1212
5662
5741
25
4
4
sackssacks
1030
d-023-G/094-G-02
1060
0.753.50 0.252.50
1030
4.00 0.25
03:15
02:30
1994m
07:00
06:45
127
174
5
14301760
0.60m
12.21m
0.28m
1000
7.00
24.00
12.00
5.00
55s/l
1.67m
14
9.18m
4.65m
9.25m
9.40m
0.78m
13301330
3kdaN
53s/l
SHAKERS
710.06m
SHAKERS
5.23m
3kdaN
80kdaN
4
4
24:00
23:30
23:15
19:15
102
216
GOOD
1944
5
DRILL
5
18.96m
55
216
213
170
174
127
134.9
153.3
130.4
K507
131.5
1
1
11
1
11.00
1
-2.00
1
11
1944m 1952m
1223.58m
CALME
65.50m366m3
1
10.5
75
1953m
sacks
JARS-HYD/MECH
7R
sacks
1
HWDP(5.0 IN)
165
162
167
COMBINED
162
COMBINED
165
168
162167
170
213
168165
162
165
9239kPa
9293kPa
9293kPa
56s/l56s/l
JH6335
43
1153054
SMITH
165
165
Lime - HydratedCal Chloride Powder
Cyber Seal
Gilsonite HTUltraseal XP
70
70
216
2
1
2
18.50
DRILL
Lime - HydratedBarite
2015/03/13 23151
23151
2000m 2005m
2
1
K507
CHECK FLOOR /CROWN SAVER/BRAKE PADS /POP VALVES PINS
07:15
07:00
18:30
18:15
06:00
50
ET
ETETET
ET
7R
FLEX MONEL
PONY SLICKCOLLAR
X/OTURBINE MOTOR
BIT
7272
69
2
0
72
72
80kdaN
JH6335
GAP SUB
25
FLEX MONEL
FLEX MONELX/O
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
19:15
1
JARS-HYD/MECH
22:45
2.25
HWDP(5.0 IN)
0.75
19:00
14 STDS DP
15-101-02 2015/02/27 16:45
2
2
72
2
69
72
72
7272
0
1.50
5.50
0.25
2024
2029
2
250
240
0.00m
2020m
x
x
x
3200.00
03
1
1
1
1
1
1
1
1
1
69
2
10
11.1
76
74
11.1
11.1
21:00
11.1
20:15
70
11.1
74
69
11.1
70
89
11.1
GREG EVERSON
LLOYD BAUER
08:00
LLOYD BAUER
101
72
72
Progress HZ Julienne d-23-G/94-G-2
72
72
69
72
2
2013.03m
69
2022.51m
0
X/O
2041.47m
FLEX MONEL
2031.98m
0.00m
BIT
TURBINE MOTOR
X/O
DRILL 216mm HOLE FR 2006M TO 2020M
PONY SLICKCOLLAR
82.00kdaN
DEVIATION SURVEY/CONNECTIONS/WORK SLIDE
30261
FLEX MONEL
GAP SUB
81.00kdaN
FLEX MONEL
81.00kdaN
SAFETY MEETING/HAND OVER NOTES
1.25
DRILL 216MM HOLE FROM 2020M- 2024MDEVIATION SURVEY
2020.00m
HANDLE DIRECTIONAL TOOLS- P/U NEW MOTOR, SET UP TO 1.83, SCRIBE
1330
RIG SERVICE- F/T BLIND RAMS 5 SECS C/O
TRIP OUT OF HOLE- FLOW CHECK @ 2022M, PUMP PILL, FLOW CHECK @1891M,988M,OOH
CONDITION MUD & CIRCULATE
HANDLE DIRECTIONAL TOOLS- LAY OUT MOTOR
1
SAFETY MEETING WITH PHOENIX & SCHLUMBERGER
22000
127
22000
174
5.8
2015/03/15
1030
0.25
2024.76m
1.25
70
0.25
70
3.50
0.503.25
1.000.25
0.25
1.25
0.25
1.00
102
37960.00
21
20D
21
0.25
6B
NTS
5
20D
7
BC
5.23m
710.06m
03:00 06:00
44
PROGRESS ENERGY CANADA LTD.
2029
4281
25
0.16m
8.70m
1
4
10.3
8.1
4.70m
710.06m
113.89m
5.23m
0.78m
9.18m
9.25m
1.67m9.40m
4.65m
0.257.00
1000
0.50
d-023-G/094-G-02
1030
1.00
5.50
0.00m
10
21
2
3.50
63.70m364m3NEWALTA 1NEWALTA 2
BOP DRILL/ TRIPPING
WORKING PIPE AFTER A SLIDE
2015
CHANGING HEADS AND LINERS
07:00
05:30
2024m
2067m
127
174
0.25
5
7
7.00
7
0.50
12
RGRG
10.00
RG
RG
75
RGRG
0.60m
12.21m
0.28m
7.00
24.00
12.00
5.00
1.67m
9.18m
15
42
4.65m
9.25m
9.40m
0.78m
00:00
1330
19:00
56s/l
07:00
2024
1330
710.06m
1330
11.111.1
3kdaN
398.50m
SHAKERS
5.23m
11.1 11.1
5kdaN
11.1
11.1 11.1
3kdaN
BLOWING SNOW
1
80kdaN
Ross Guynup
SINGLE
SINGLE
6.5
6.5
07:15
24:00
22:45
19:15
12:15
0
09:00
RG
08:3008:15
15:00
RG
13:45
13:30
RG
12:30
Ed Tallon
200
74
89
1 of 3
58.3m3
70
FAIR
CANELSON DRILLING INC.
165
165
2024m
1944
DRILL
0.00m
216
213
216
213
170
1.00
170
127
2.25
127
0.78m
1.50
1.67m
9.25m
9.40m
9.18m
168
165
162
180.6
U5135
165
162
167
170
1
1
11
200/d-002-G/094-G-02/00
0.28m
12.21m
1
0.60m
1
4.65m
80kdaN
1
-14.00
1
1
2
1
14267
7
HORIZ
2013m 2019m
SHAKERSSHAKERS
2300.00Nm
4500.00Nm
796.50m
2300.00Nm
200
6A
2
1251.99m
216
UP TO 19 KM/HW
2
1251.99m
1
11
2
1
10
75
1
9.46m
2020m
2024
JARS-HYD/MECH
8
sacks
1
8
1
HWDP(5.0 IN)
sacks
5.50
COMBIN-ED
COMBIN-ED
15:00
165
17:15
162
17:30
GEN 1:10,067HR (24HR RUNTIME ONLINE), GEN 2: 10,724HR (OFFLINE), GEN3:10,712HR (24HR RUNTIME)
COMBINED
167
173.1
PERKINS 1: 10,282HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525 HR OFF
COMBINED
162
CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS
165
168
165162
179.5
167
213
127168
165
162
9239kPa
9239kPa
9239kPa
17:15
19:00
178.9
17:30
F/T FLOOR & CROWN SAVERS/BRAKE PADS,POP VALVE PINS
57s/l55s/l
DRILLS/BOP, ETC. WHILE TRIPPING, WELL SECURE IN 2MIN 20SEC
TRIP IN HOLE- WASH 28M TO BOTTOM
TRIP IN HOLE TO 618M,FLOW CHECK ,FILL EVERY 500M/ F/C @ 1129M
2024m
14267
44
1153054
28
43
ULTERRA
24:00
165
07:00
19:00
75
1
165
165
165
02:45
70
70
Barite
93
93
216
0
0.00
2006m
3.50
DRILL
Cal Chloride Powder
17582
4
3
2015/03/13 21245
2015/03/15
21245
4
DEVIATION SURVEY/CONNECTIONS
DRILL 216MM HOLE FR 2024M TO 2067M
1
SAFETY MEETING- CREW CHANGE OVER
UNKN101_20150315_1B
2
TURBINE MOTOR
BIT
GAP SUB
FLEX MONEL
2
PONY SLICKCOLLAR
1
X/O
FLEX MONEL
FLEX MONEL
X/O
6A
21A
2067.97m
HOLE FILL CAL 13.43M/3- ACT 14.65M/3- DIFF +1.22M/3
K507
CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS
12:15
09:00
U5135
13:30
12:30
07:15
17582
07:00
08:30
08:15
06:00
13:45
ULTERRA
07:15
10.5
ETET
DRILL
ETETET
ET
10836.00
7R
1
0.25
1.50
2.25
GAP SUB
4.6
3.00
FLEX MONEL
PONY SLICKCOLLAR
MOTOR HS
BIT
3.50
240
JARS-HYD/MECH
HWDP(5.0 IN)
14601760
24.00
72
1
69
1
2
1
72
1
Pason
0
72
1
72
1
1
1
JH6335
1
25
SMITH
47
47
00:00
05:30
FLEX MONEL
FLEX MONEL
25
X/O4 STDS DP
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
JARS-HYD/MECH
HWDP(5.0 IN)
0.25
14 STDS DP
2015/02/27 16:45
2
2
1820
3.50
1460
2275
2
240
3.68m
2153m
3200.00
NEWALTA 1
10
2
7
89
74
70
6989
NEWALTA
SHAKERS
GREG EVERSON
LLOYD BAUER
10:0007:15
LLOYD BAUER
69
2126.81m
72
2117.34m
72
Progress HZ Julienne d-23-G/94-G-2
2107.87m
72
2098.37m
89
2088.89m
69
2079.4m
72
2069.92m
2
0
2354.32m
2335.36m
2344.84m
4 STDS DP
2316.39m
X/O
2325.85m
2306.92m
BIT
MOTOR HS
PONY SLICK COLLAR
FLEX MONEL
GAP SUB
30261
FLEX MONEL
FLEX MONEL
SAFETY MEETING/HAND OVER NOTES
DRILL 216MM HOLE FR 2153M-2305MRIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O
46.149.553.2
DEVIATION SURVEY- ACCUMULATED
1
127
14800
170
14800
35.9
38.5
127
40.8
43.3
2015/03/15
1.50
0.25
0.25
3.00
NTSBC
5.23m
398.50m
710.06m
31
PROGRESS ENERGY CANADA LTD.
47
38
2124
0.16m
8.70m
2143
0.00m
398.50m
5.23m
113.89m0.78m
710.06m
9.18m
9.25m
1.67m9.40m
4.65m
0.25
sacks
8.00
sacks
10201050
5
18.96m
5
10
21A
21
2
62m364.5m3NEWALTA 1NEWEALTA 2
SAMPLES- REVIEW JSA A-43
WASHING RIG
2015
MIXING BARITE
2375m
220
10294
655
0.50
33
RG
5
RG
15.00
RG
3049
75
RG
4940
1
RGRG
1025
00:00
1340
58s/l
19:00
58s/l
07:00
2024
11.111.1
11.1 11.1
11.1
11.1 11.1
1340
10kdaN
PARTLY CLOUDY
1
Ross Guynup
SINGLE
SINGLE
07:15
RG
19:00
15:3015:15
RG
RG
Ed Tallon
74
89
1 of 6
59.9m3 55.0m3
70
CANELSON DRILLING INC.
165
165
2305m
216
213
0.75
113.89m
9.25m
1.67m
0.78m
9.18m
127
168
165
162
165
162
167
200/d-002-G/094-G-02/00
0.16m
8.70m
1
4.65m
84kdaN
9.40m
2
14267
7
HORIZ
SHAKERSSHAKERS
4500.00Nm
6400.00Nm
1080.89m
5400.00Nm2
2
200
11
200
881.80m
0
2
10
9.50m
2024
8
1
sackssacks
sackssacks
bbl
4.00
sacks
192.5
sacks
193.8
SINGLE
m3
194.3
SINGLE
sacks
192.4
191.6189.7
187
GEN1: 10,091HR (24HR RUNTIME ONLINE), GEN2: 10,724HR (OFFLINE), GEN3 :10,736HR (24HR RUNTIME ONLINE)
PERKINS 1: 10,846HR (24HR RUNTIME ONLINE), PERKINS 2: 10,525HR (OFFLINE)
CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
189.5
190.2
190.9190.9
191191.1
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
4566
3049
2215m2162m
38
351
24:00
165
07:00
19:00
1
165
1
75
Base OilOpti-Thin
BariteBentone 150
Ultraseal XPCal Chloride Powder
Lime - HydratedCyber Seal
93
0
Gilsonite HT
15.50
2067m
1340
15000
1050
4
5
2015/03/15
DEVIATION SURVEY/CONNECTIONS/WORK PIPE
4
BOP DRILL WEL SHUT IN IN 90 SEC /CLOSED UPPER PIPES 5 SEC TO CLOSE/ OPEN
UPPER HCR 3 SEC TO OPEN
1
DRILL 216MM HOLE FROM 2305M TO 2375M
UNKN101_20150316_1B
SAFETY MEETING- CREW CHANGEC OVER
2
MOTOR HS
BIT
FLEX MONEL
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
FLEX MONEL
X/O
4 STDS DP
2375.00m
U5135
15000
11:1512:00
ULTERRA
08:1509:1509:45
10:45
07:45
10.5
DRILL
9156.00
1
HWDP(5.0 IN)
16.2
7.75
24.122.2
20.518.3
3.00
28.425.5
240
JARS-HYD/MECH
14 STDS DP
11.1
1460
11.1 11.1 11.1
11.1
1790
7.50
11.1 11.1
1
1
1
1
Pason
1
1
1
1
1
40
ULTERRA
47
00:00
04:00
04:15
22:30
11
19:15
22:15
155
19:00
15-101-02
69
72
2
69
72
7272
2.75
0
2143
2275
0.25
4.00
250
106
x
x
x
03
1
1
1
1
1
1
1
1
1
89
129
20:45
11.1
20:15
11.1
19:45
11.1
19:00
11.1
89
NEWALTA 1
11.1
70NEWALTA 2
11.1
22:15
74
21:30
11.1
101
2221.57m
2174.16m
2164.66m
2212.1m2202.6m2193.12m
2183.64m
0.00m
90.00kdaN
DRILL 216MM HOLE FR 2067M-
RIG SERVICE/FUNCTION ANNULAR 15 SEC TO CLOSE
82.00kdaN
DEVIATION SURVEY/CONNECTIONS /WORK PIPE
82.00kdaN
1.50
2153.27m
13401050
0.50
2304.97m
0
77
3.50
8.000.25
1330
7
32500.00
2
21
22:00
0.25
10
10301330
02:00 05:30
1212
47
4940
40
38
0
4
75.873.271.3
68.568.2
66.8
1020
d-023-G/094-G-02
1050
4.00 0.25
1030
3.00
04:15
04:00
2305m
07:00
127
127
170
5
14501780
4.65m
8.70m
0.16m
1000
7.00
24.00
12.00
5.00
9.25m
9.18m
16
9.40m
1.67m
0.78m
113.89m
1340
710.06m
1340
10kdaN
58s/l
SHAKERS
398.50m
SHAKERS
5.23m
7kdaN
6
0
24:00
22:30
22:15
19:15
1682
200
GOOD
10
2024
DRILL
0.00m
216
213
167
170
127
127
188.6188.2
188.5
2.75
188.6
187.9
187.8
U5135
188.8
1
1
11
1
8.00
1
-13.00
1
11
2102m 2143m
1024.00m
CALMW
62.40m3
1
10
75
1
2153m
sackssacks
sackssacks
JARS-HYD/MECH
8
m3
1
HWDP(5.0 IN)
14 STDS DP
162
165
162
SINGLE
165
SINGLE
168
127
165162
167
213
127168
165
162
9186kPa
9239kPa
9239kPa
60s/l60s/l
14267
36
1153054
ULTERRA
02:0001:30
03:1502:45
04:15
00:45
165
00:15
165
BariteGilsonite HT
77
0
216
0
Cal Chloride Powder
2
2
18.50
Gilsonite HT
DRILL
Lime - HydratedBentone 150Base Oil
2015/03/15 17047
17047
2340m
2
1
U5135
CHECKED CROWN/FLOOR SAVER/BRAKE PADS/POP VALVES PINS
07:15
07:00
15:30
15:15
06:00
281
ETETETETET
ET
8
GAP SUBFLEX MONEL
PONY SLICKCOLLAR
MOTOR HS
BIT
7269
2
72
0
72
72
14267
FLEX MONEL
FLEX MONEL
40
X/O4 STDS DP
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
JARS-HYD/MECH
HWDP(5.0 IN)
0.25
14 STDS DP
2015/02/27 16:45
4
7
1800
3.50
1440
2653
6
240
0.00m
2485m
3200.00
NEWALTA 1
7
2
10
89
74
70
6989
NEWALTA 2
SHAKERS
GREG EVERSON
LLOYD BAUER
09:4507:15
LLOYD BAUER
69
2439.67m
72
2430.21m
72
Progress HZ Julienne d-23-G/94-G-2
2420.74m
72
2411.27m
89
2401.77m
69
2392.27m
72
2382.8m
2
0
2714.58m
2733.55m
4 STDS DP
2686.11m
X/O
2695.58m
2676.65m
BIT
MOTOR HS
PONY SLICK COLLAR
FLEX MONEL
GAP SUB
30261
FLEX MONEL
FLEX MONEL
SAFETY MEETING/ CREW CHANGE HAND OVER NOTES
DRILL 200mm HOLE FR 2485M-2674MRIG SERVICE- F/TUPPER PIPE RAMS 5 SECS C/O
90.289.988.1
DEVIATION SURVEY
127
19800
170
19800
90
89.6
127
89.7
89.9
2015/03/15
1.75
0.25
3.00
NTSBC
5.23m
398.50m
710.06m
42
PROGRESS ENERGY CANADA LTD.
47
47
0.16m
8.70m
0.00m
398.50m
5.23m
113.89m0.78m
710.06m
9.18m
9.25m
1.67m9.40m
4.65m
0.25
sacks
8.00
10201050
5
18.94m
5
10
21
2
64m362m3NEWALTA 1NEWALTA 2
RE- FUELING CREW TRUCK- REVIEW JSA A-08
RIG SERVICE
2015
PICKING UP PIPE
2769m
5
102
1515
5
0.50
77
RG
3
15.00
RG
5130
75
RG
5195
1
RGRG
1685
00:00
1330
57s/l
19:00
57s/l
07:00
2375
11.111.1
11.1 11.1
11.1
11.1 11.1
1330
6.5kdaN
PARTLY CLOUDY
1
Ross Guynup
SINGLE
SINGLE
07:15
RG
19:00
15:3015:15
RG
RG
Ed Tallon
74
89
1 of 6
63.4m3 60.8m3
70
CANELSON DRILLING INC.
165
165
2674m
216
213
0.50
113.89m
9.25m
1.67m
0.78m
9.18m
127
168
165
162
165
162
167
200/d-002-G/094-G-02/00
0.16m
8.70m
1
4.65m
85kdaN
9.40m
2
14267
5
HORIZ
SHAKERSSHAKERS
11500.00Nm
11400.00Nm
1479.08m
8500.00Nm
200
11
200
1194.69m
0
2
10
9.47m
2375
8
1
sackssacks
sackssacks
4.00
bbl
188.1
sacks
188.5
SINGLE
sacks
187.9
SINGLE
m3
188.4
187.6188.4189.6
GEN1 : 10,114HR (24HR RUNTIME ONLINE) ,GEN 2: 10,727HR (3HR RUNTIME ONLINE), GEN 3: 10,756 (21HR RUNTIME OFF)
PERKINS 1: 10,852HR, PERKINS 2: 10,544HR (24HR RUNTIME ONLINE)
F/T CROWN AN FLOOR SAVER/ BRAKE PADS / POP VALVE PINS
149.6
145.4143
148.6146.9
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
2541m
52
394
24:00
165
07:00
19:00
1
165
1
75
Bentone 150
Opti-WetBase Oil
Lime - HydratedGilsonite HT
Cyber SealUltraseal XP
93
0
Barite
30.50
2375m
1330
20200
1050
12
12
2015/03/15
4
DEVIATION SURVEY/CONNECTIONS
1
DRILL 200 MM HOLE FROM 2674M TO 2769M
UNKN101_20150317_1A
SAFETY MEETING-CREW CHANGE OVER
2
MOTOR HS
BIT
FLEX MONEL
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
FLEX MONEL
X/O
4 STDS DP
2769.49m
U5135
20200
09:1510:00
ULTERRA
07:3008:0008:15
08:45
07:00
DRILL
8148.00
1
HWDP(5.0 IN)
80.3
8.00
85.184.3
82.781.6
3.00
86.586
240
JARS-HYD/MECH
14 STDS DP
11.1
1460
11.1 11.1 11.1
11.1
1780
22.50
11.1 11.1
1
1
1
1
Pason
1
1
1
1
1
40
ULTERRA
47
00:00
04:00
06:45
210
19:15
22:15
55
19:00
15-101-02
69
72
2
69
72
7272
0.25
0
2504
2653
2.75
4.00
55
x
x
x
03
1
1
1
1
1
1
1
1
1
89
110
21:00
11.1
20:00
11.1
19:30
11.1
19:00
11.1
89
NEWALTA 1
11.1
70NEWALTA 2
11.1
74
21:45
11.1
101
2544m
2496.57m
2487.09m
2534.54m
2525.04m
2515.56m
2506.07m
0.00m
95.00kdaN
DRILL 200MM HOLE FROM 2375 TO 2485M
DEVIATION SURVEY/CONNECTIONS/WORK PIPE
84.00kdaN
RIG SERVICE/FUNCTION LOWER PIPS 5 SEC TO CLOSE
84.00kdaN
1.75
2485.10m
13301030
0.25
2674.67m
0
93
3.50
8.000.25
1350
7
27040.00
2
21
22:00
0.25
10
10601350
03:00 06:00
1212
5195
40
0
4
88.589.3
89.990.4
90.2
1000
d-023-G/094-G-02
1030
4.00 0.25
1060
3.00
06:45
04:00
2674m
07:00
127
127
170
14801810
4.65m
8.70m
0.16m
1030
7.00
24.00
12.00
5.00
9.25m
9.18m
17
9.40m
1.67m
0.78m
113.89m
1330
710.06m
1330
6kdaN
60s/l
SHAKERS
398.50m
SHAKERS
5.23m
11kdaN
6.5
0
24:00
22:15
19:15
2102
200
GOOD
2375
DRILL
18.94m
216
213
167
170
127
127
182.1180.8
182.8
2.75
184
177.2
183.6
U5135
182.4
1
1
11
1
8.00
1
-8.00
1
11
2426m 2475m
1393.73m
CALMW
56m3
1
10
75
1
2485m
sackssacks
sackssacks
JARS-HYD/MECH
8
sacks
1
HWDP(5.0 IN)
14 STDS DP
162
165
162
SINGLE
165
SINGLE
168
127
165162
167
213
127168
165
162
9239kPa
9239kPa
9239kPa
57s/l58s/l
14267
49
1143092
ULTERRA
02:0001:15
03:3002:45
03:45
00:45
165
00:15
165
Barite
93
0
216
2
Ultraseal XP
2
2
33.50
Gilsonite HT
DRILL
Cyber SealLime - HydratedBarite
2015/03/15 18200
18200
2737m
2
1
U5135
CHANGED OUT 4 SHAKER SCREENS
FUNCTION TEST CROWN AN FLOOR SAVER / BRAKE PADS / POP VALVE PIN
07:15
07:00
15:30
15:15
06:00
299
ET
ETETET
ET
8
GAP SUBFLEX MONEL
PONY SLICKCOLLAR
MOTOR HS
BIT
7269
2
72
0
72
72
85kdaN
14267
FLEX MONEL
FLEX MONEL
40
X/O4 STDS DP
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
DP(5.0 IN)
DP(5.0 IN)
JARS-HYD/MECH
0.75
HWDP(5.0 IN)
2015/02/27 16:45
8
9
18001490
0.25
240
0.00m
2921m
3200.00
NEWALTA 1
10
2
7
89
74
70
6974
NEWALTA 2
GREG EVERSON
09:15
DARRYL GIBBONS
07:00
LLOYD BAUER
69
2885.29m
72
2866.29m
72
Progress HZ Julienne d-23-G/94-G-2
2847.37m
72
2828.44m
89
2809.45m
69
2790.45m
2771.47m
72
2
0
4 STDS DP
X/O
BIT
MOTOR HS
PONY SLICK COLLAR
FLEX MONEL
GAP SUB
30261
FLEX MONEL
FLEX MONEL
SAFETY MEETING/HAND OVER NOTES
DRILL 200mm HOLE FR 2921M-2940MCONDITION MUD & CIRCULATE/ WORK PIPE STEADY
P.O.O.H. FLOW CHECK @ 1513m
CREW CHANGE OVER MEETING
DEVIATION SURVEYDRILL 200MM HOLE FROM 2940M-2996M
1
TRIP OUT OF HOLE- FLOW CHECK @ 2995M,PUMP PILL, FLOW CHECK @2853M,
CONDITION MUD & CIRCULATE
127
21545
170
21545
91.2
90.9
127
90.8
2015/03/15
0.25
1.00
0.25
0.25
0.75
0.50
2.00
NTSBC
5.23m
398.50m
710.06m
58
PROGRESS ENERGY CANADA LTD.
0.18m
2769
8.47m
2883
0.00m
398.50m
5.23m
28.46m0.78m
710.06m
9.18m
9.25m
1.67m9.40m
4.65m
5.503.002.50
10201050
0
0.00m
11
0
21
11
7
21
20
6
58m361.50m3NEWALTA 1NEWALTA 2
COMMUNICATION
MIXING MUD
2015
LOG WELL
55
0.50
77
6.003.00
GG
4
GGGG
7.50
GG
75
1
GGGG
2945
00:00
1370
62s/l
19:00
62s/l
07:00
2996
12.7 12.7
12.7
12.7 12.7
1370
14kdaN
OVERCAST
1
GREG GODDU
SINGLE
SINGLE
07:15
11:30
GG
11:15
09:0007:30
GG
16:45
15:00
14:45
13:00
Ed Tallon
89
70
1 of 7
74
56.6m3 54.3m3
89
CANELSON DRILLING INC.
165
165
216
213
1.250.75
113.89m
9.25m
1.67m
0.78m
9.18m
127
168
165
162
165
162
167
200/d-002-G/094-G-02/00
0.16m
1
8.70m
4.65m
85kdaN
9.40m
2
14267
7
HORIZ
SHAKERSSHAKERS
14200.00Nm
540.32m
14200.00Nm2
200
2
6
200
1649.80m
0
10
18.95m
2024
8
1
sackssacks
sackssacks
5.00
141.8141.5
SINGLE
141.7
SINGLE
141.3
141.4
16:45
141.4
17:00
141.6
GEN1 : 10,115HR (OFF), GEN2 :10,752HR (24HR RUNTIME ONLINE), GEN3 : 10,781HR (24HR RUNTIME ONLINE)
PERKINS 1: 10,852HR (OFFLINE), PERKINS 2: 10,568HR (24HR RUNTIME ONLINE)
CHECKED FLOOR /CROWN SAVER /BRAKE PADS/POP VALVES PINS
D.W.A.D.G.
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
5180
5511
2945m2930m
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
19
24:00
165
07:00
19:00
1
165
1
75
Cyber Seal
Lime - HydratedUltraseal XP
93
Barite
0
40.75
2769m
1370
0
1050
1400
2015/03/18
LOG WELL WITH TOOL MAI-MSS-MPD-MDN-MGS-MTC-MCG/ TAGGED @ 2268M @ 2330 PM
SAFETY MEETING BEFORE RIGGING IN LOGGERS
RIG IN LOGGING TRUCK
RIG SERVICE FUNCTION BLIND RAMS (OUT OF HOLE) 4 SECS TO CLOSE(RS) & CLEAN
1400
FLOOR
SAFETY MEETING BEFORE LAYING DOWN DIRECTION TOOLS
LAY DOWN DIRECTIONAL TOOLS
1
DIFF-+0.06m3
UNKN101_20150318_1A
P.O.O.H FLOW CHECK OUT OF HOLE, HOLE FILL CAL-17.31m3, ACTUAL-17.37m3,
2
MOTOR HS
BIT
FLEX MONEL
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
FLEX MONEL
X/O
4 STDS DP
3006.87m
U5135
0
ULTERRA
10:0011:00
09:15
10.5
DRILL
7350.00
2
2.00
0.25
89.3
HWDP(5.0 IN)
3.002.00
91.189.7
90.590.4
9191.4
240
JARS-HYD/MECH
14 STDS DP
11.1
1480
11.1 11.1 11.1
11.1
1780
38.50
11.1 11.1
1
1
1
1
Pason
1
1
1
1
1
ULTERRA
00:00
05:00
05:15
20:45
19:45
20:30
168
19:30
2020
19:00
15-101-02
69
72
2
69
72
7272
1.75
0
0.25
5.00
270
55
1510
x
x
x
03
1
1
1
1
1
1
1
1
1
89
546
11.111.1
11.111.1
89
NEWALTA 1
11.1
70NEWALTA 2
11.1
74
11.1
22:00
21:00
101
2961.04m
2942.1m
2979.99m
0.00m
35.00kdaN
DRILL 200mm HOLE FR 2769M- 2921M
RIG SERVICE/FUNCTION UPPER HCR 3 SEC TO OPEN
85.00kdaN
DEVIATION SURVEY/CONNECTIONS
84.00kdaN
3.00
2921.27m
13801060
0.50
2996.99m
0.75
0
93
2.250.25
0.251.50
0.25
1.75
1.50
1.75
5
20280.00
2
21
6B
5
10
0.25
2
6
21
00
03:00 06:00
66
47
40
47
0
0
1030
d-023-G/094-G-02
1060
5.00 0.25
0
0.50 0.25
05:15
05:00
2996m
07:00
127
127
170
5
00
4.65m
8.70m
0.16m
0
7.00
24.00
12.00
5.00
9.25m
18
9.18m
9.40m
1.67m
0.78m
113.89m
681.60m
1380
1622.26m
1380
12kdaN
SHAKERS
5.23m
SHAKERS
85.42m
85kdaN
22:00
21:00
6
0
20:45
20:30
19:45
19:30
0
200
24:00
GOOD
2024
0.00m
127
216
213
167
127
170
127
sackssacks
141.7
1.75
141.4
KX516D
141.5
1
1
13
1
2.25
1
-11.00
1
11
2838m 2911m
21
1706.57m
CALMN
9
10
171
1
2921m
m3sacks
sackssacks
JARS-HYD/MECH
9
sacks
1
HWDP(5.0 IN)
14 STDS DP
162
165
162
SINGLE
165
SINGLE
168
127
165162
167
180
127168
165
162
9025kPa
8972kPa
8972kPa
17:00
19:00
60s/l60s/l
P.O.O.H. FLOW CHECK @ 697m
B.O.P. DRILL WHILE TRIPPING WELL SECURE IN 75 SECS
AX34572F
60
1153054
02:45
R.B.I.
01:45
04:1503:30
05:00
01:00
165
00:00
165
93
0
200
Cyber Seal
0
Ultraseal XPBentone 150
0.00
Base Oil
DRILL
Gilsonite HTLime - HydratedBarite
2015/03/15 20468
20468
72
2
1
6
U5135
HELD CREW MEETING WITH RIG MANAGER ABOUT CREW TRUCK/ ALCOHOL & DRUG POLICIES/ CAMP POLICIES
CHECKED CROWN/FLOOR SAVER/BRAKE PADS /POP VALVES PINS
11:30
11:15
14:45
13:00
07:15
07:00
09:00
07:30
06:00
15:00621
ETETETETET
ET
8
GAP SUBFLEX MONEL
PONY SLICKCOLLAR
MOTOR HS
BIT
7269
2
72
0
72
72
85kdaN
14267
FLEX MONEL
40
FLEX MONEL
X/OHWDP(5.0 IN)
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
23:00
19:15
DP(5.0 IN)
420
22:45
1.25
DP(5.0 IN)
0.50
19:00
JARS-HYD/MECH
1
HWDP(5.0 IN)
15-101-02 2015/02/27 16:45
5
69
72
2
69
72
7272
0
7.00
00
3006
4
260
270
0.29m
x
x
x
3200.00
03
1
1
1
1
1
1
1
1
3
74
NEWALTA 1
11
70
22:15
12.7
89
21:15
12.7
20:00
12.7
19:00
89
12.7
NEWALTA 1
70
69
12.7
NEWALTA 289
74
74
74
NEWALTA 2
23:15
89
SHAKERS
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
SHAKERS
101
69
72
Progress HZ Julienne d-23-G/94-G-2
72
72
74
69
72
2
0
3065.71m
3084.74m
HWDP(5.0 IN)
3027.82m
X/O
3046.75m
3008.86m
BIT
0.00m
MOTOR HS
PONY SLICK COLLAR
WIRELINE LOGS-CONTINUE TO RUN MAI,MSS,MPD,MDN,MGS,MTC,MCG LOGS/ FLOW CHECK
85.00kdaN
FLEX MONEL
EVERY 1/2 HR WHILE OUT OF HOLE- TAGGED @ 2268M @ 2330PM
30261
GAP SUB
FLEX MONEL
90.00kdaN
FLEX MONEL
CREW CHANGE OVER & SAFETY MEETING BEFORE PICKING UP DIRECTIONAL TOOLS
1.00
PICK UP DIRECTIONAL TOOLSR.I.H. TO CASING SHOE & FLOW CHECK
3006.87m
REAM & CLEAN F/2949m-2996m
R.I.H. TO 2949m
CUT OFF 23.50m OF DRILL LINE, FUNCTION TEST CROWN & FLOOR SAVERSSAFETY MEETING BEFORE SLIP & CUT
CIRCULATE BOTTOMS UP @ 1927m
1
R.I.H. TO 1927m, FILL PIPE EVERY 600m, FLOW CHECK @ 1500m
19200
170
19200
127
127
1272015/03/18
0.25
3006.87m
0.25
1.00
0
0.25
93
3.50
0.250.75
1.251.00
2.25
1390
2.00
1390
3.00
0.25
620
15860.00
21
5
21:30
6
19:15
0.25
9
NTS
21
3
6
BC
85.42m
10501390
681.60m
5.23m
1622.26m
19
PROGRESS ENERGY CANADA LTD.
00
5835
0.18m
8.47m
0
4
91.591.1
90.990.7
90.6
0.00m
5.23m
28.46m
85.42m
0.78m
681.60m
9.18m
1622.26m
9.25m
1.67m9.40m
4.65m
6.250.25
d-023-G/094-G-02
2.00
sacks
1.00
sackssacks
00
0.75
5
9.51m
51050
7
10
21
2
3.50
DIRECTIONALDIRECTIONALDIRECTIONALDIRECTIONAL
0.25
SLIP & CUT DRILL LINE
LOGGING - REVIEW JSA B-16
2015
CREW TRUCK OIL CHANGE- REVIEW JSA A-04
07:00
2996m
3006m
DIRECTIONAL
3102m
127
170
127
127
0.25 0.752.00
5
6.250.25
12
GG
1480
4.50
1820
GG
171
GG
1
GG
72
GG
4.65m
8.47m
0.18m
1020
7.00
24.00
12.00
5.00
65s/l
9.25m
9.18m
19
7
9.40m
9
1.67m
0.78m
28.46m
00:00
19:00
07:00
681.60m
2996
1622.26m
68s/l
5.23m
85.42m
12.7 12.7
10kdaN
12.7
12.7 12.7
6kdaN
2kdaN
OVERCAST
9
85kdaN
GREG GODDU
SINGLE
SINGLE
0
0
07:15
24:00
23:00
22:45
19:15
10:30
15
09:45
GG
09:3008:30
18:00
GG
16:00
13:45
13:30
Ed Tallon
200
89
70
1 of 3
74
89
GOOD
CANELSON DRILLING INC.
165
165
DRILL3006m
2996
55
0.00m
200
180
127
200
180
167
0.75
127
170
1.25
127
28.46m
7.00
9.25m
1.67m
0.78m
9.18m
127
168
165
KX516D
162
165
162
167
1
1
13
200/d-002-G/094-G-02/00
0.18m
8.47m
1
4.65m
9.40m
1
69kdaN
-11.00
1
1.00
1
2
11
AX34572F
7
HORIZ
6500.00Nm
9300.00Nm
625.65m
200
2
3.5
540.32m
200
CALMN
0
540.32m
62.5m359.8m3
2
10.5
2996m
9
10.5
171
1
0.00m
2949m
bbl
2996
DP(5.0 IN)
sacks
9
1
9
HWDP(5.0 IN)
1
DP(5.0 IN)
JARS-HYD/MECH
sacksm3
SINGLE
SINGLE
18:00
162
165
LP #1 10852 HRS ( 0 HRS RUN TODAY ) LP #2 10591 HRS ( RUN FOR 24 HRS )
162
165
GEN #1 10115 HRS ( 0 HRS RUN TODAY ) GEN #2 10775 HRS ( RUN FOR 24 HRS ) GEN #3 10804 HRS ( RUN FOR 24 HRS )
168
127
165
142.4
162
167
180
127168
165
162
8918kPa
8972kPa
9025kPa
19:00
140.7140.5
142.4141.6
F/T FLOOR & CROWN SAVERS/POP VALVE PINS/ BRAKE PADS
PATTERN BIT & DRILL 200mm HOLE F/2996m- 3006m
AX34572F
19
1153054
22
106
R.B.I.
24:00
165
07:00
19:00
1
9
165
165
165
171
72
Cyber SealUltraseal XP
Base Oil
Lime - Hydrated
0
0
Bentone 150
93
0
200
0
1.00
4.50
Opti-ThinBarite
21200
00
3
14
2015/03/18 0
2015/03/18
0
72
3025m
RIG SERVICE- F/T UPPER PIPE RAMS 5 SECS C/O
3050m
DEVIATION SURVEY
DRILL200MM HOLE FROM 3006M-3102M
1
SAFETY MEETING-CREW CHANGE OVER
UNKN101_20150319_1A
2
MOTOR HS
BIT
FLEX MONEL
GAP SUB
2
FLEX MONEL
1
PONY SLICKCOLLAR
FLEX MONEL
X/O
HWDP(5.0 IN)
3102.00m
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINESFUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
KX516D
D.W.A.D.G.
10:30
09:45
KX516D
13:45
13:30
07:15
21200
07:00
09:30
08:30
06:00
16:00
R.B.I.
10.5
ET
REAM
ET
DRILL
ETET
ET
6468.00
9
0
1.00
7.00
GAP SUB
DP(5.0 IN)
1.00
FLEX MONEL
HWDP(5.0 IN)
PONY SLICKCOLLAR
MOTOR HS
BIT
3.50
260
DP(5.0 IN)
JARS-HYD/MECH
12.7
12.7
12.7 12.7
0.00
12.7
72
1
69
1
2
1
72
1
Pason
0
72
1
69kdaN
72
1
1
1
AX34572F
3
40
R.B.I.
48
00:00
FLEX MONEL
40
FLEX MONEL
40
X/OHWDP(5.0 IN)
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
DP(5.0 IN)
DP(5.0 IN)
0.25
JARS-HYD/MECH
HWDP(5.0 IN)
2015/02/27 16:45
3
4
1810
4.00
1490
4
270
2.85m
3253m
3200.00
NEWALTA 1
10
2
7
70
89
89
6974
NEWALTA 2
74
SHAKERS
DARRYL GIBBONS
GREG EVERSON
11:0009:00
GREG EVERSON
SHAKERS
69
3217.55m
72
3198.56m
72
Progress HZ Julienne d-23-G/94-G-2
3179.61m
72
3160.64m
74
3141.57m
69
3122.61m
72
3103.63m
72
0
HWDP(5.0 IN)
3502.15m
X/O
3483.19m
BIT
MOTOR HS
PONY SLICK COLLAR
FLEX MONEL
GAP SUB
30261
FLEX MONEL
FLEX MONEL
CREW CHANGE OVER MEETING
DRILL 200mm HOLE F/3253m-3424mRIG SERVICE FUNCTION ANNULAR 8 SECS TO CLOSE(RS)
90.2TOTAL TIME FOR SURVEYS & CONNECTIONSDRILL 200mm HOLE F/3424m-3465m
1
170
22500
127
22500
90.4
127
90.7
127
90.4
90.2
2015/03/18
0.25
1.00
0.25
3.50
NTSBC
85.42m
681.60m
5.23m
1622.26m
27
PROGRESS ENERGY CANADA LTD.
46
46
3153
0.18m
8.47m
0.00m
5.23m
85.42m
28.46m
681.60m
0.78m
1622.26m
9.18m
9.25m
1.67m9.40m
4.65m
0.25
m3
7.50
sackssacks
10201050
5
0.00m
5
7
10
21
2
69.2m358.9m3NEWALTA 1NEWALTA 2
DRIFTING CASING
PREPARE & DRIFT CASING- REVIEW JSA B-03
2015
SNOW REMOVEAL- REVIEW JSA A-3.8
3522m
22
1151525
5
0.75
77
GG
12
15.50
GG
5575
171
GG
5750
1
GGGG
72
GG
7147
00:00
1380
60s/l
19:00
58s/l
07:00
2996
12.7 12.7
12.7
12.7 12.7
1400
10kdaN
LIGHT SNOW
9
GREG GODDU
SINGLE
SINGLE
07:15
19:00
GG
15:00
12:1512:00
GGEd Tallon
89
70
1 of 6
74
63m3 78m3
89
CANELSON DRILLING INC.
165
165
3465m
200
180
0.50
28.46m
9.25m
1.67m
0.78m
9.18m
127
168
165
162
165
162
167
200/d-002-G/094-G-02/00
0.18m
8.47m
1
4.65m
83kdaN
9.40m
2
AX34572F
7
HORIZ
SHAKERSSHAKERS
11000.00Nm
13500.00Nm
1052.60m
10900.00Nm2
200
11
200
768.00m
0
10.5
0.00m
2996
9
1
sackssacks
sacksm3
sacks
4.50
sacks
139.5
sacks
139.4
SINGLE
sacks
139.7
SINGLE
bbl
140.9
140.6140.5140.5
GEN#1- 10115 HRS ( 0 HRS RUN TODAY ), GEN #2- 10799 HRS ( RUN FOR 24 HRS ), GEN #3- 10828 HRS ( RUN FOR 24 HRS )
LP #1- 10852 HRS ( 0 HRS RUN TODAY ), PL #2- 10615 HRS ( RUN FOR 24 HRS TODAY )
F/T FLOOR & CROWN SAVERS/ BRAKE PADS/ POP VALVE PINS
137.1137.7
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
6075
3342m3292m
37
526
24:00
165
07:00
19:00
1
165
9
171
72
WalnutGraphite
Cyber SealOpti-Wet
Lime - HydratedUltraseal XP
Base OilBentone 150
93
0
Barite
16.50
3102m
1380
23100
1050
10
16
2015/03/18
14
RIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O
DEVIATION SURVEY
1
DRILL 200MM HOLE FROM 3465M-3522M
UNKN101_20150320_1A
SAFETY MEETINGCREW CHANGE OVER
2
MOTOR HS
BIT
FLEX MONEL
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
FLEX MONEL
X/O
HWDP(5.0 IN)
3522.00m
KX516D
23100
R.B.I.
07:4509:1510:15
11:00
07:00
10.5
DRILL
4830.00
0
DP(5.0 IN)
90.9
7.25
HWDP(5.0 IN)
90.290.8
90.690.4
3.50
89.989.9
260
DP(5.0 IN)
JARS-HYD/MECH
12.7
1490
12.7
12.7
1810
9.00
12.7 12.7
1
1
1
1
Pason
1
1
1
1
3
40
R.B.I.
00:00
04:30
04:45
23:00
1
19:15
22:45
102
19:00
15-101-02
69
72
72
69
72
7272
2.25
0
3271
3424
0.25
4.50
260
6136
x
x
x
03
1
1
1
1
1
1
1
1
3
74
257
12.7
22:00
12.7
20:15
12.7
70
NEWALTA 1
12.7
89NEWALTA 2
12.7
74
89
101
3274.41m
3255.46m
3331.39m
3312.44m
3293.43m
2.79m
95.00kdaN
DRILL 200MM HOLE FROM 3102M-3253M
RIG SERVICE- UPPER PIPE RAMS 5 SECS C/O
90.00kdaN
DEVIATION SURVEY
90.00kdaN
1.00
3253.54m
13801050
0.25
3465.00m
0
92
2.754.00
4.750.25
14201410
7
40560.00
2
21
22:4520:00
10
0.25
2
10501420
02:15 05:30
1212
47
40
0
4
91.3
90.2
sacks
sacksbbl
1020
d-023-G/094-G-02
1050
4.50 0.25
1050
3.50
DIRECTIONALDIRECTIONAL
0.25
04:45
04:30
3465m
07:00
127
170
127
127
5
14901810
4.65m
8.47m
0.18m
1020
7.00
24.00
12.00
5.00
62s/l
9.25m
9.18m
20
9.40m
1.67m
0.78m
28.46m
681.60m
1380
1622.26m
1380
10kdaN
62s/l
SHAKERS
5.23m
SHAKERS
85.42m
10kdaN
83kdaN
6
0
24:00
23:00
22:45
19:15
100
200
FAIR
2
168
2996
DRILL
34
18.99m
1
127
200
180
167
127
170
127
138.9
139.1
2.25
139
139.4
KX516D
139.2
1
1
13
1
7.50
1
-7.00
1
11
3149m 3215m
995.66m
CALMN
67.4m366.9m3
9
10.5
171
1
3253m
sackssacks
sacksm3
DP(5.0 IN)
9
sacks
1
HWDP(5.0 IN)
DP(5.0 IN)
JARS-HYD/MECH
162
165
162
SINGLE
165
SINGLE
168
127
165162
167
180
127168
165
162
8812kPa
8972kPa
8758kPa
60s/l60s/l
AX34572F
35
1153054
R.B.I.
02:4502:00
05:0003:45
05:30
01:15
165
00:30
165
Base OilBarite
Opti-ThinGraphite
Bentone 150Walnut
93
0
200
2
Barite
2
2
20.00
Bentone 150
DRILL
Base OilGraphiteWalnut
2015/03/18 22300
22300
72
3482m 3505m
2
1
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINESFUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
KX516D
D.W.A.D.G.
15:00
07:15
07:00
12:15
12:00
06:00
469
ET
ETETETETET
9
GAP SUBFLEX MONEL
PONY SLICKCOLLAR
MOTOR HS
BIT
7269
72
72
0
72
72
83kdaN
AX34572F
FLEX MONEL
FLEX MONEL
40
X/OHWDP(5.0 IN)
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
DP(5.0 IN)
DP(5.0 IN)
JARS-HYD/MECH
0.25
HWDP(5.0 IN)
2015/02/27 16:45
4
5
18101490
2.25
3802
5
275
3.25m
3633m
3200.00
NEWALTA 1
10
2
7
70
89
89
6974
NEWALTA 2
74
SHAKERS
DARRYL GIBBONS
14:00
GREG EVERSON
10:00
GREG EVERSON
SHAKERS
69
72
72
Progress HZ Julienne d-23-G/94-G-2
3616.07m
72
3597.12m
74
3578.13m
69
3559.12m
72
3540.15m
72
0
3805.75m
HWDP(5.0 IN)
X/O
3824.75m
3786.82m
BIT
MOTOR HS
PONY SLICK COLLAR
FLEX MONEL
GAP SUB
30261
FLEX MONEL
FLEX MONEL
CREW CHANGE OVER MEETING
DRILL 200mm HOLE F/3633m-3775mRIG SERVICE ISOLATE & FUNCTION H.C.R'S 1 SEC TO OPEN(RS)
91.190.8
TOTAL TIME FOR SURVEYS & CONNECTIONS
1
170
21500
127
21500
90.9
127
91.5
127
91.2
91.6
2015/03/18
0.25
1.00
0.25
3.50
NTSBC
85.42m
681.60m
5.23m
1622.26m
41
PROGRESS ENERGY CANADA LTD.
46
0.18m
3572
8.47m
0.00m
5.23m
85.42m
28.46m
681.60m
0.78m
1622.26m
9.18m
9.25m
1.67m9.40m
4.65m
0.259.25
10201050
5
9.50m
5
7
10
21
2
62.3m364.5m3NEWALTA 1NEWALTA 2
WORKING WITH INVERT
RIG SERVICE - REVIEW JSA - A-20
2015
BOILER BLOW DOWN- REVIEW JSA N-05
3845m
0.75
77
GG
12
GG
17.25
GG
5750
171
1
GGGG
72
00:00
1420
60s/l
19:00
56s/l
07:00
2996
12.7 12.7
12.7
12.7 12.7
1420
8kdaN
OVERCAST
9
GREG GODDU
SINGLE
SINGLE
07:15
GG
19:00
16:4516:30
GGEd Tallon
89
70
1 of 6
74
72m3 68m3
89
CANELSON DRILLING INC.
165
165
3775m
200
180
0.50
28.46m
9.25m
1.67m
0.78m
9.18m
127
168
165
162
165
162
167
200/d-002-G/094-G-02/00
0.18m
8.47m
1
4.65m
81kdaN
9.40m
2
AX34572F
7
HORIZ
SHAKERSSHAKERS
11000.00Nm
12800.00Nm
1365.70m
13400.00Nm2
200
11.5
200
1166.52m
0
2
10.5
0.00m
2996
9
1
4.50
SINGLE
141.4
SINGLE
140.2
140.3139.5139.2
GEN #1 10115 HRS (0HRS RUN TODAY), GEN #2 10823 HRS ( RUN FOR 24 HRS ), GEN #3 10852 HRS ( RUN FOR 24 HRS )
LP #1 10852 HRS ( 0 HRS RUN TODAY ) LP #2 10639 HRS ( RUN FOR 24 HRS TODAY )
F/T FLOOR & CROWN SAVERS/ BRAKE PADS/POP VALVE PINS
141.8141.5141.3
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
6225
3709m3670m
48
849
24:00
165
07:00
19:00
1
165
9
171
72
93
0
33.75
3522m
1420
23000
1050
12
20
2015/03/18
18
RIG SERVICE- F/T LOWER PIPE RAMS 5 SECS C/O
DEVIATION SURVEY
1
DRILL 200MM HOLE FROM 3775M-3845M
UNKN101_20150321_1A
SAFETY MEETING- CREW CHANGE OVER
2
MOTOR HS
BIT
FLEX MONEL
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
FLEX MONEL
X/O
HWDP(5.0 IN)
3845.00m
KX516D
23000
15:30
R.B.I.
08:3010:1511:30
13:45
07:15
10.5
DRILL
3234.00
0
DP(5.0 IN)
91.1
HWDP(5.0 IN)
5.50
90.791.8
92.191.6
3.50
260
DP(5.0 IN)
JARS-HYD/MECH
12.7
1490
12.7
12.7
1810
24.50
12.7 12.7
1
1
1
1
Pason
1
1
1
1
3
40
R.B.I.
47
00:00
04:30
04:45
23:00
1
19:15
22:45
5
19:00
15-101-02
69
72
72
69
72
7272
2.25
0
3689
0.25
4.50
250
x
x
x
03
1
1
1
1
1
1
1
1
3
74
637
22:30
12.7
21:15
12.7
19:30
12.7
70
NEWALTA 1
12.7
89NEWALTA 2
12.7
74
89
101
3654.03m
3635.09m
3729.86m3710.9m3691.93m
3672.99m
0.00m
90.00kdaN
DRILL 200MM HOLE FROM 3522M-3633M
RIG SERVICE- F/T ANNULAR 8 SECS C/O
90.00kdaN
DEVIATION SURVEY- ACCUMULATED
86.00kdaN
1.00
3633.07m
14201050
0.25
3775.34m
0
92
2.25
9.250.25
14201420
7
33280.00
2
21
23:3019:15
0.25
10
10501420
01:00 03:45
1212
6050
47
40
0
4
89.590.2
90.8
1020
d-023-G/094-G-02
1050
4.50 0.25
1050
3.50
DIRECTIONALDIRECTIONALDIRECTIONAL
0.25
04:45
04:30
3775m
07:00
127
170
127
127
5
14901810
4.65m
8.47m
0.18m
120
7.00
24.00
12.00
5.00
56s/l
9.25m
9.18m
21
9.40m
1.67m
0.78m
28.46m
681.60m
1420
1622.26m
1420
10kdaN
56s/l
SHAKERS
5.23m
SHAKERS
85.42m
10kdaN
81kdaN
6
0
24:00
23:00
22:45
19:15
1
200
FAIR
2996
DRILL
0.00m
127
200
180
167
127
170
127
142.3142
141.4
2.25
141.4
141.4
KX516D
141.4
1
1
13
1
9.25
1
-8.00
1
11
3540m 3581m
1308.79m
CALMN
63.7m359.3m3
9
10.5
171
1
3633m
sacks
DP(5.0 IN)
9
pails
1
HWDP(5.0 IN)
DP(5.0 IN)
JARS-HYD/MECH
162
165
162
SINGLE
165
SINGLE
168
127
165162
167
180
127168
165
162
8758kPa
8758kPa
8758kPa
61s/l62s/l
AX34572F
46
1153054
R.B.I.
04:3003:45
06:00
02:00
165
01:15
165
93
0
200
0
2
37.25
DRILL
WalnutNew Wash
2015/03/18 23000
23000
72
3784m 3840m
2
1
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
KX516D
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
D.W.A.D.G.
07:15
07:00
16:45
16:30
06:00
779
ET
ETETET
ET
9
GAP SUBFLEX MONEL
PONY SLICKCOLLAR
MOTOR HS
BIT
7269
72
72
0
72
72
81kdaN
AX34572F
FLEX MONEL
40
FLEX MONEL
X/OHWDP(5.0 IN)
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
DP(5.0 IN)
DP(5.0 IN)
JARS-HYD/MECH
0.50
HWDP(5.0 IN)
2015/02/27 16:45
5
5
18101490
0.25
275
4.45m
3974m
3200.00
10
2
7
70
89
89
6974
74
DARRYL GIBBONS
12:00
GREG EVERSON
09:00
GREG EVERSON
3976.59m
69 3957.62m
723938.67m
72
Progress HZ Julienne d-23-G/94-G-2
3919.75m
723900.78m
74
3881.75m
69
3862.75m
72
72
0
HWDP(5.0 IN)
X/O
BIT
MOTOR HS
PONY SLICK COLLAR
FLEX MONEL
GAP SUB
30261
FLEX MONEL
FLEX MONEL
CREW CHANGE OVER MEETING
DRILL 200mm HOLE F/3974m-4017mTOTAL TIME FOR SURVEYS & CONNECTIONS
SAFETY MEETING BEFORE LAYING DOWN DRILL PIPEWORK PIPE & CIRCULATE HOLE CLEAN
1
LAY DOWN DRILL PIPE FLOW CHECK @ 4010m, 3878m,
170
23000
127
23000
89.5
127
89.1
1272015/03/18
0.25
4.75
NTSBC
85.42m
681.60m
5.23m
1622.26m
53
PROGRESS ENERGY CANADA LTD.
46
0.18m
3936
8.47m
0.00m
5.23m
85.42m
28.46m
681.60m
0.78m
1622.26m
9.18m
9.25m
1.67m9.40m
4.65m
4.755.001.50
10201050
9.46m
21
6F
62.7m365.5m3NEWALTA 1NEWALTA 2
LAY DOWN DRILL PIPE
STEAM USE-REVIEW JSA A-20
2015
LAYING DOWN PIPE -REVIEW JSA 6-8
0.25
77
9.505.00
GG
12
GG
6.50
GG
5950
171
1
GGGG
72
60
00:00
1425
55s/l
19:00
54s/l
07:00
2996
12.7 12.7
12.7
12.7 12.7
1425
10kdaN
OVERCAST
9
GREG GODDU
07:15
14:15
GG
14:00
09:0008:45
GG
19:00
Ed Tallon
89
70
1 of 5
74
73m3 69m3
89
CANELSON DRILLING INC.
165
165
200
180
0.75
28.46m
9.25m
1.67m
0.78m
9.18m
127
168
165
162
165
162
167
200/d-002-G/094-G-02/00
0.18m
1
8.47m
4.65m
81kdaN
9.40m
2
AX34572F
5
HORIZ
SHAKERSSHAKERS
12500.00Nm
1536.54m
12700.00Nm2
200
7.5
200
1508.07m
0
10.5
9.46m
2996
9
1
sacks
5.00
138.8139.8
SINGLE
140
SINGLE
140.8
141.1140.9141.5
GEN #1 10115 HRS ( 0 HRS RUN TODAY ), GEN #2 10847 HRS ( RUN FOR 24 HRS ), GEN #3 10876 HRS (RUN FOR 24 HRS)
LP #1 10852 HRS ( 0 HRS RUN TODAY ), LP #2 10663 HRS ( RUN FOR 24 HRS TODAY )
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
F/T FLOOR & CROWN SAVERS/BRAKE PADS/POP VALVE PINS
5970
4017m4017m
54
24:00
165
07:00
19:00
1
165
9
171
72
93
Barite
0
44.00
3845m
1420
0
1050
20
2015/03/18
20
1
LAY DOWN DRILL PIPE FROM 2800M/ FLOW CECK @ 2800M,2036M,929M
UNKN101_20150322_1A
SAFETY MEETING- CREW CHANGE OVER
2
MOTOR HS
BIT
FLEX MONEL
GAP SUB
FLEX MONEL
PONY SLICKCOLLAR
FLEX MONEL
X/O
HWDP(5.0 IN)
4017.00m
KX516D
0
R.B.I.
07:4507:45
10.5
DRILL
3822.00
1
89.8
DP(5.0 IN)
HWDP(5.0 IN)
2.00
89.289.2
89.489.4
89.789.2
260
DP(5.0 IN)
JARS-HYD/MECH
12.7
1490
12.7
12.7
1810
42.50
12.7 12.7
1
1
1
1
Pason
1
1
1
1
3
R.B.I.
00:00
05:00
05:15
19:15
19:00
15-101-02
69
72
72
69
72
7272
1.75
0
4016
0.25
5.00
250
x
x
x
03
1
1
1
1
1
1
1
1
3
74
978
12.7
12.712.7
70
NEWALTA 1
12.7
89NEWALTA 2
12.7
74
89
101
4000m
3995.55m
4.45m
50.00kdaN
DRILL 200MM HOLE FROM 3845M-3974M
RIG SERVICE-F/T UPPER PIPE RAMS 5 SECS C/O
90.00kdaN
DEVIATION SURVEY
90.00kdaN
3974.62m
14201050
0.25
4017.00m
0
93
5.000.25
1.500.25
4.75
10
23920.00
2
21
6
21
0.25
5
00:15 03:00
1212
47
40
0
0
1020
d-023-G/094-G-02
1050
5.00 0.25
4.75
05:15
05:00
4017m
07:00
127
170
127
127
5
4.65m
8.47m
0.18m
7.00
24.00
12.00
5.00
9.25m
22
9.18m
9.40m
1.67m
0.78m
28.46m
681.60m
1420
1622.26m
1420
10kdaN
SHAKERS
5.23m
SHAKERS
85.42m
81kdaN
6
0
24:00
19:15
1
200
FAIR
2996
0.00m
127
200
180
167
127
170
127
1.75
138.6
KX516D
138
1
1
13
1
1.50
1
-10.00
1
11
3858m 3905m
1536.54m
CALMN
9
10.5
171
1
3974m
DP(5.0 IN)
9
1
HWDP(5.0 IN)
DP(5.0 IN)
JARS-HYD/MECH
162
165
162
SINGLE
165
SINGLE
168
127
165162
167
180
127168
165
162
8758kPa
8758kPa
8758kPa
54s/l55s/l
AX34572F
54
1153054
03:45
R.B.I.
02:45
05:1504:30
06:45
01:45
165
00:30
165
0
0
200
0
2
44.00
DRILL
2015/03/18 23100
23100
72
2
1
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINES
KX516D
FUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
D.W.A.D.G.
14:15
14:00
07:15
07:00
09:00
08:45
06:00
1021
ET
ETETET
ET
9
GAP SUBFLEX MONEL
PONY SLICKCOLLAR
MOTOR HS
BIT
7269
72
72
0
72
72
81kdaN
AX34572F
FLEX MONEL
40
FLEX MONEL
X/OHWDP(5.0 IN)
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
22:30
22:45
19:15
20:45
0.25
19:00
15-101-02 2015/02/27 16:45
23.20
2.25
0.50
0.25
0.25
0.50
0.25
0.75
0.25
2.00
00
260
275
11.75
x
x
x
3200.00
03
1
1
1
1
1
1
1
1
3
12A
21
7
25
21
20D
6F
21A
70
1021
89
89
NEWALTA 1NEWALTA 2
74
12B
SHAKERS
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
69
101
72
72
Progress HZ Julienne d-23-G/94-G-2
72
74
69
72
72
0
HWDP(5.0 IN)
X/O
BIT
MOTOR HS
PONY SLICK COLLAR
FLEX MONEL
80.00kdaN
LAY DOWN DRILL PIPE FROM 768M/ FLOW CHECK OOH
GAP SUB
30261
DRILLS/BOP, ETC. WELL SECURE IN 94 SECS
FLEX MONEL
30.00kdaN
SAFETY MEETING- PRIOR TO LAYING DOWN TOOLS/PHOENIX
FLEX MONEL
50.00kdaN
HANDLE DIRECTIONAL TOOLS- LAY OUT
CREW CHANGE OVER & SAFETY MEETING BEFORE RUNNING CASING
RUN CASING FLOW CHECK @ 1847m
4017.00m
2.75
1
OTHER- REMOVE WEAR BUSHING
RIG SERVICE- FT BLIND RAMS 5 SECS C/O- FLOW CHECK OOH
0
SAFETY MEETING WITH GIANT POWER TONGS
0
RIG UP/DOWN TO RUN CASING
RUN 132 joints 0f 114.3mm 20.09kgm, P-110 casing 1847.44m followed by 154
0.50
1.25
1.75
A
0.25
0
0.25
0
1.50
11.75
1410
18460.00
12
21
22:30
NTS
0.25
CT
BC
54
PROGRESS ENERGY CANADA LTD.
00
0
2
4.45m
5.23m
85.42m
681.60m
1622.26m
4017
d-023-G/094-G-02
0
0.25
0
2.00
12C
5
21
21
12B
1.75
RUN CASING
RUN CASING- REVIEW JSA 7-4,7-9
2015
RUN CASING/ CIRCULATING- REVIEW JSA 7-5
02:15
02:00
04:45
04:30
07:00
03:15
02:30
04:00
03:30
127
170
127
127
0.25
5
2.001.75
GG
12
GG
GG
171
1
GGGG
72
7.00
24.00
12.00
5.00
23
00:00
19:00
joints of 139.7mm, 34.23kgm, L-80 2167.74m set at 4015m
07:00
65s/l
0
PARTLY CLOUDY
9
81kdaN
0
GREG GODDU
SINGLE
SINGLE
0
0
24:00
22:45
07:15
22:30
20:45
19:15
GG
19:00
GGEd Tallon
1 of 3
GOOD
CANELSON DRILLING INC.
165
165
2996
9.46m
0.50
200
180
167
1.500.75
2.75
28.46m
9.25m
1.67m
0.78m
9.18m
200/d-002-G/094-G-02/00
0.18m
1
8.47m
4.65m
9.40m
-11.00
2
7
HORIZ
CT
0
200
CALMW
1536.54m
0
38.3m3
10.5
10.5
DP(5.0 IN)
1
HWDP(5.0 IN)
DP(5.0 IN)
1
JARS-HYD/MECH0.00
SINGLE
SINGLE
TD
162
165
162
GEN #1 10115 HRS ( 0 HRS RUN TODAY ), GEN #2 10871 HRS ( RUN FOR 24 HRS ), GEN #3 10900 HRS ( RUN FOR 24 HRS )
165
LP #1 10852 HRS (0 HRS RUN TODAY ), LP #2 10687 HRS ( RUN FOR 24 HRS )
HOLE FILL CAL 21.41M/3- ACT 22.19M/3- DIFF +.78M/3
168
127
8758kPa
8758kPa
1153054
24:00
165
07:00
19:00
165
165
165
0
0
55
0
1
2800
00
2015/03/18 0
0
CEMENTING- RIG UP CEMENTERS & CEMENT CASING
4017m
CONDITION MUD & CIRCULATE
SAFETY MEETING WITH SCHLUMBERGER
1
RUN CASING FROM 3704M/ P/U CASING JT TO TAG BOTTOM
UNKN101_20150323_1A
SAFETY MEETING- CREW CHANGE OVER
2
2
1
FUNCTION FLARE STACK IGNITTER & REMOTE CHOKE 32 SECS TO OPEN
VISUALLY INSPECTED BRAKE PADS, FLARE & DEGASSER LINESFUNCTION TEST CROWN & FLOOR SAVER, CHECK POP VALVE PINS(CH)
KX516D
D.W.A.D.G.
X
2800
07:15
07:00
06:00
0
10.5
0.75
ET
ETETET
ET
3108.00
9
0.500.75
17.25
260
12.7
12.7
12.7
44.00
12.7 12.7
Pason
AX34572F
R.B.I.
00:00
02:00
02:15
02:3003:15
03:30
04:00
04:30
04:45
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
0
0
07:15
19:15 24:00
0.75
19:1519:00
14:15
GG
14:0007:30
15-101-02
19:00
2015/02/27 16:45
Ed Tallon
1 of 2
4.75
2.75
1.00
GOOD
0.75
2.50
CANELSON DRILLING INC.
165
165
260
6.50
270
1.00 9.50
3.25 3.75
x
3200.00
03
200/d-002-G/094-G-02/00
1
-6.00
2
14B
14B
12C
12C
7
HORIZ
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
101
Progress HZ Julienne d-23-G/94-G-2
0
CALMW
0
CONTINUE TO CEMENT CASING/PLUG DOWN @ 2:30AM
30261
RIG OUT CEMENTERS AND FLUSH BOP,S
10.580.00kdaN
NIPPLE DOWN BOPS
SET CASING SLIPS AND CUT CASING
CREW CHANGE OVER MEETING
10.5
SAFETY MEETING BEFORE CHANGING ANNULAR ELEMENTCHANGE OUT ANNULAR ELEMENT, OPEN DOORS,CHANGE OUT RAM RUBBERS & WASH UP
SAFETY MEETING BEFORE RIGGING OUT TOP DRIVEB.O.P.
1
RIG OUT TOP DRIVE & CHANGE OIL IN GEAR BOX
1
0
1
0
pails
LP #1 10852 HRS ( 0 HRS RUN TODAY )- PL #2 10711 HRS ( RUN FOR 243 HRS TODAY )
0.25 4.75
GEN #1 10115 HRS ( 0 HRS RUN TODAY )- GEN #2 10895 HRS ( RUN FOR 24 HRS )- GEN #3 10924 HRS ( RUN FOR 24 HRS )
0
0.25
0
4.75
0.25
0.256.50
4.75
14
15600.00
21
21
22
NTS
21
0.25
BC
PROGRESS ENERGY CANADA LTD.
1153054
24:00
165
07:00
19:00
165
165
165
0
0
0
New Wash
0
0
0 0
d-023-G/094-G-02
0
0
EQUIPMENT, V -DOOR READY FOR SKID
1
TEAR DOWN- CLEAN MUD TANKS, BRIDAL BLOCKS, SUB TARPS, RIG OUT RENTAL
UNKN101_20150324_1A
SAFETY MEETING- CREW HAND OVER
2
21
22
2
1
CHANGE OUT ANNULAR ELEMENT
CEMENTING CASING- REVIEW JSA 7-7
2015
03:15
02:30
14:15
14:00
07:00
07:15
0
06:00
07:00
07:30
06:00
5
12
10.5
GG
GGGGET
ET
ET
7.00
1260.00
24.00
12.00
5.00
24
7
00:00
10.25
19:00
3.25
07:00
260
PARTLY CLOUDY
Pason
00:00
02:30
03:15
06:00
GREG GODDU
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
TOTALRigUp
Drill Actual Reaming Coring Cond Mud
& Circ Trips Rig Service
RepairRig
Cut Off Drilg Line
Dev Survey
Wireline Logs
Run Csg& Cement
Wait On Cement
Nipple Up BOP
TestBOP
Drillstem Test
PlugBack
Squeeze Cement Fishing Dir
WorkSafety
MeetingTear
DownWaiting
OnRig
Watch Other
HO
UR
S Tour 1Tour 2
Tour 3Total
DAILY CHECKS OP RM1) Daily Walk Around Inspection2) Detailed Inspection - Weekly (Using Check List)3) H2S Signs Posted if Required4) Well Licence & Stick Diagram Posted5) Flare Lines Staked6) BOP Drills Performed7) Visually Inspected BOPs - Flare Lines & Degasser Lines 1) Rig Site Health & Safety Meeting (one/crew/month)2) CAODC Rig Safety Inspection Checklist (one/rig/month)3) Mast Inspection before Raising or Lowering4) Crown Saver Checked5) Motor Kills Checked
Kelly Bushing Op Fuel
FUEL @ 08:00 HOURSRig Boiler
WE
AT
HE
R Time Temp
Current Conditions
Wind Direction Wind Strength
Road Condition
FRONT PAGE SUMMARYTour Sheet Serial Number Vendor Software Version Year Month Day
Well Type Re-Entry
Spud Date Time
Rig Release Date Time
License No Well Name Surface Location Prov Loc Type Unique Well Id
Contractor Rig No
Contractor’s Job No
Signature of Contractor’s Rig Manager
Operator
Operator’s AFE
Signature of Operator RepresentativePason
TOUR 1 SIGNATURE OF DRILLER START TIME END TIME
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
TOUR 3 SIGNATURE OF DRILLER START TIME END TIME
TOUR 2 SIGNATURE OF DRILLER START TIME END TIME
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
V. 1.3
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
Remarks:
TIME LOGFrom To Elapsed Code Details of Operations in Sequence & Remarks
SAFETYSafety Topic MEHL MACP
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
T0 ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
CUTTING STRUCTURETI Gage
TO ODC
MDC Reason Pulled
LOC Total Run (m/hr)BRG
DRILLING ASSEMBLYNo Component OD ID Length
Drill Pipe Stands
Drill Pipe Singles
Kelly DownTotal
Weight of DCWeight of String
BITSBit Number
Size
IADC Code
Manufacturer
Type
Serial No
Jets
Depth Out (m)
Depth In (m)
Total Drilled (m)
Hrs Run Today
Cumulative Hrs RunEntry Date
METRES DRILLEDFrom To D-R-C RPM WOB REDUCED PUMP SPEED
Pump No. Pressure Strokes/min Depth
@ @
@ @
@ @
MUD RECORDMud Type Water Oil
Other
TimeDensity
Funnel Viscosity
Fluid Loss
pH
Location of Sample
Depth
PVT
CIRCULATIONPump# Type Liner Size SPM Pressure Hours Run
Remarks:
HOLE CONDITIONHole Drag Up Down
Torque at Bottom
Fill on Bottom
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
MUD MATERIALS ADDEDProduct Amount Type
SOLIDS CONTROLEquipment
NameHours Run
Intake Density
Over Flow Density
Under Flow Density
DEVIATION SURVEYSTime Depth Deviation Direction Type
BoilerBoiler # Hours Run pH Stack Temp
0
21:00
0
24:0022:30
22:30
19:15
07:15
21:0020:30
20:30
0.75
19:1519:00
16:3012:30
12:00
15-101-02
19:00
2015/02/27 16:45
Ed Tallon
1 of 1
4.75
GOOD
7.00
CANELSON DRILLING INC.
165
165
260
2015/03/25 23:59
245
1.00 16.50
3200.00
03
200/d-002-G/094-G-02/00
1
-8.00
2
22
7
HORIZ
DARRYL GIBBONS
GREG EVERSON
GREG EVERSON
101
Progress HZ Julienne d-23-G/94-G-2
0
CALMW
0
RIG OUT TO SKID, CLEAN MUD TANKS,
30261
10.5
CREW CHANGE OVER MEETING
10
TEAR OUT TO SKID, CLEAN MUD TANKS. JACK RIG WITH ARDY'S RIG JACKING AND
LAYDOWN TEFLON FOR SKID
SKID RIG OVER NEW WELL, SPOT BULDINGSHOLD SAFETY MEETING WITH D&D TRUCKING PRIOR TO SKIDDING RIG
1
RIG UP, RUN POWER CORDS, FIRE UP GEN.
1
0
1
0
LP #1 -10852 HRS ( 0 HRS RUN TODAY ) - LP #2 - 10735 HRS ( RUN FOR 24 HRS TODAY )
0.25 4.75
GEN #1 - 10119 HRS ( RUN FOR 4 HRS TODAY )- GEN #2 - 10916 HRS ( RUN FOR 21 HRS ) - GEN #3 - 10927 HRS ( RUN FOR3 HRS TODAY )
1.50
0.50
1.50
0
0.25
0
1.25
0.504.00
4.75
2.50
22
13000.00
21
1
NTS
1A
0.25
21D
BC
PROGRESS ENERGY CANADA LTD.
1153054
24:00
165
07:00
19:00
165
165
165
0
0
0
0
0
0 0
d-023-G/094-G-02
0
6.50
0
HANG BLOCKS AND REMOVE WEIGHT INDICATORS AND DEADLINE PANCAKE FOR RE-CERT/
Rig Released @ 2359hrs on the 25th of March / 2015
VISUALLY INSPECT AND LOWER SUB @ 2100HRS
PREP TO LOWER DERRICK, VISUALLY INSPECT AND LOWER DERRICK @ 2230HRS
1
PREP TO LOWER SUB
UNKN101_20150325_1B
SAFETY MEETING- CREW CHANGE OVER
2
22
22
22
21
22
2
1
2015
07:00
16:30
12:30
07:15
0
07:00
12:00
06:00
5
12
6.50
10.5
7.00
840.00
24.00
12.00
5.00
25
7.00
00:00
19:00
07:00
260
PARTLY CLOUDY
Pason
00:00
GREG GODDU