Towards a New Energy ModelChallenges and solutions to enable large RES penetration in

the Canary Islands’ isolated power systems

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

Page 2: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018 2

AGENDA

REE at a Glance

The Canary Islands Electrical Systems

A Vision for Tomorrow

The TSO Challenges

What We Are Doing

Page 3: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

REE at a Glance

3

The Spanish TSO

• 4 control centres

• 43.801 km of transmission grid

• 4.360 busbars

• 85.144 MVA transformer capacity

Page 4: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018 4

95 km

1800 km

REE at a Glance

TSO in the Canary Islands

Page 5: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

The Canary Islands Electrical Systems

5

TODAY

• 6 isolated electrical systems on 7 islands

• Generation mainly based on fossil fuels

• Low meshed weak infrastructure

• High wind and solar potential

Page 6: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

Size matters…

0,042 TWh 3,4 TWh ( )x80 248 TWh ( x6.000)

El Hierro

Tenerife

Spanish mainland

ENTSO-E

( x 70 )

3.278 TWh ( x78.000)

( x 1.000 )

Page 7: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

The Canary Islands electrical system

7

TODAY

• La electricidad no es almacenable

• Es necesario un equilibrio instantáneo entre generación y demanda

7

91.4%

8.6%

91.9%

8.1%

95.6%

4.4%

89.0%

11.0%

99.3%

0.7%

53.5%

46.5%

Annual demand covered by RES (2017)

TenerifeGran Canaria

Lanzarote -

Fuerteventura

La Palma

La Gomera El Hierro

Page 8: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

A Vision for Tomorrow

8

• Reducing oil dependency

• Reducing CO2 emissions

43

155 168

11.30.4

11.8

92

340370

11.3 0.411.8

227

664714

39.2 4.6 12.1

260

546 549

43.5

11.5 8.00

100

200

300

400

500

600

700

800

Lz-Fv Gran Canaria Tenerife La Palma La Gomera El Hierro

Current and future RES installed capacity vs Peak demand (MW)

2017 2018 (Estim.) 2025 (EECan25) PEAK DEMAND

• Exploiting local primary energy sources

• Minimizing system costs

A BIG move towards renewable energy

Page 9: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

The TSO Challenge

9

Large amount of non-controlable generation in the energy mix

Page 10: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

What we are doing

10

Facing the challenge…

NETWORK DEVELOPMENT

ENERGY STORAGE

INTERCONNECTIONS

R&D

Page 11: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

NETWORK DEVELOPMENT

Page 12: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

What are we doing

12

NETWORK DEVELOPMENT

Page 13: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

What are we doing

13

NETWORK DEVELOPMENT

Page 14: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

INTERCONNECTIONS

Page 15: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

La Gomera – Tenerife

(planned)

Gran Canaria – Fuerteventura

(in study)

Lanzarote – Fuerteventura

(planned)

42 km2x 66kV

14 km1x 132 kV

What we are doing

15

INTERCONNECTORS

(current 1x66 kV)

Page 16: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

ENERGY STORAGE

Page 17: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

What we are doing

17

STORAGE: SORIA-CHIRA REVERSIBLE PUMPED STORAGE

588 65

Page 18: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

What we are doing

18

STORAGE: SORIA-CHIRA REVERSIBLE PUMPED STORAGE

A Project redesigned by the TSO to serve as a tool for:

Main design requisites• Units with smooth start and stop maneuvers• Maximum control over active power both generating/pumping• Fast transition between operating modes• Continuous operating range• Reactive power regulation capabilities (MVar) for voltage control• Black-start capabilities• Other: frequency-power regulation, inertial response, transient

overvoltage, etc.

System stability Security of supply RES Integration

Page 19: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

What we are doing

19

STORAGE: CENTRAL HIDROEÓLICA DE EL HIERRO (CHE)

Technical specs:

o Wind: 11.5 MW

o Pumps: 6.4 MW

o Turbines: 11.4 MW

o Upper reservoir: 380 dam3

o Lower reservoir: 149 dam3

o Roundtrip efficiency: 50%

El Hierro island:

o Peak demand: 7 - 8 MW

o Lowest demand: 3.5 - 4 MW

CHE:

o Owned by Gorona del Viento:

• Cabildo de El Hierro

• ENDESA

• Instituto Tecnológico de Canarias

o Dispatched by the TSO

Page 20: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018 20

Longest run being 100% renewable: January 25th to February 12th, 2018

(18 consecutive days)

What we are doing

STORAGE: CENTRAL HIDROEÓLICA DE EL HIERRO: 100% RENEWABLE

Page 21: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

43

57

RES integration in El Hierro island

98%

2%

80.6%

19.4%2014

2015

2016

40.6%59.4%

2216 hours 100% renewable

46.5%

53.5%

2017

Page 22: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

What we are doing

22

STORAGE: CENTRAL HIDROEÓLICA DE EL HIERRO

El Hierro system frequency

Page 23: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

R&D

Page 24: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

ALISIOS/OSMOSEHybrid storage projects to provide system services

24

STATCOM + ULTRACONDENSADOR

FLYWHEEL

BATERÍA

Multi-megawatt hybrid storage to provide system services in high RES penetration scenarios.• Managing RES variability• P-f Regulation• Inertia emulation• Voltage control• Congestion relief

Hybrid storage to keep security of supply and operating efficiency a low Meshed isolated power grid.• STATCOM: 25 Mvar• SUPERCAPACITOR: 10 MW – 55 MWs• FLYWHEEL: 1.6 MW – 18 MWs• BATTERY: 3 MW - 1 MWh

TENERIFE LANZAROTE - FUERTEVENTURA

Page 25: Towards a New Energy Model - integrationworkshops.org · Towards a New Energy Model Challenges and solutions to enable large RES penetration in the Canary Islands’ isolated power

3rd International Hybrid Power Systems WorkshopTenerife - May, 8-9 2018

Summary

25

The Canary Islands face a big challenge in its way to a cleaner power system

The TSO role is key to achieve the objectives

We are facing the challenge from different angles

NETWORK DEVELOPMENT

ENERGY STORAGE

INTERCONNECTIONS

R&D

We are achieving some promising resultsThere is still a lot of work to do…