trans@ctions - portal user’s - grtgaz

93
Contents 1 Presentation of TRANS@ctions 4 1.1 About the TRANS@ctions portal 4 1.2 Loging into the TRANS@ctions portal 4 1.3 Browsing 6 1.3.1 TRANS@ctions Home page 6 1.3.2 TRANS@ctions portal structure 6 1.3.3 Personal information modification 7 1.3.4 Access to functions 8 1.3.5 Publication search module 9 1.3.6 Global functionning 10 1.3.7 Alerts 11 1.3.8 Alerts subscription 13 1.3.9 Communication with GRTgaz 14 TRANS@ctions - Portal User’s Guide Shippers

Upload: others

Post on 28-Apr-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRANS@ctions - Portal User’s - GRTgaz

Contents 1 Presentation of TRANS@ctions 4

1.1 About the TRANS@ctions portal 4

1.2 Loging into the TRANS@ctions portal 4

1.3 Browsing 6

1.3.1 TRANS@ctions Home page 6

1.3.2 TRANS@ctions portal structure 6

1.3.3 Personal information modification 7

1.3.4 Access to functions 8

1.3.5 Publication search module 9

1.3.6 Global functionning 10

1.3.7 Alerts 11

1.3.8 Alerts subscription 13

1.3.9 Communication with GRTgaz 14

TRANS@ctions - Portal User’s

Guide

Shippers

Page 2: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

2

2 Contracts and Capacity 15

2.1 Access to your Contracts 15

2.2 Overview of the Capacity Management Process 15

2.3 Subscribing capacity on the Upstream Netwok 16

2.3.1 MT/LT capacity request 16

2.3.2 Requests for Short Term capacity : Daily and Auctions 23

2.3.3 Requests for “Auction” capacity 24

2.3.4 Capacity transfers 25

2.4 Subscribing capacity on the Downstream Network 27

2.4.1 Capacity request on a Consumer Delivery Point (LI) or a Regional Network Interconnection Point

(PIRR) 27

2.4.2 Manage your Right of Use Transfers (RoU) 30

2.4.3 Capacities on Distribution Points (PITD) 33

2.5 Service Subscription 36

2.5.1 Access to the PEGs 36

2.5.2 Optional Balancing Tolerance 37

2.5.3 Short-term daily capacity reservation 38

2.5.4 Test Phase Offer 39

2.6 Checking your Services and Capacities Portfolio (PSC) 40

2.6.1 Presentation of PSC 40

2.6.2 Checking PSC « live data » 43

2.6.3 Checking published PSC 43

3 Operationnal Capacities 45

3.1 Accessing Restriction Data 46

3.1.1 Case of a point without interruptibility conditions and with engineering work 46

3.1.2 Case of a point with interruptibility conditions and without engineering work 46

3.1.3 Case of a point with interruptibility conditions and with engineering work 47

3.1.4 Consolidated Maintenance Schedule - Publication 48

3.2 Accessing Operationnal Capacity 49

3.2.1 Checking the Summary of Operationnal Capacity 50

3.2.2 Notice, Statement and Schedule of Operationnal Capacity 51

4 Nominations and Scheduling 53

4.1 Cycle 53

4.1.1 Day Ahead 53

4.1.2 Intra Day 54

4.2 Elaboration of scheduled quantities 55

4.2.1 Transmission request 55

4.2.2 UIOLI optimisation 63

Page 3: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

3

4.3 Scheduling and Publications 65

4.3.1 Partial Confirmation Notice 65

4.3.2 Confirmation Notice 66

5 Allocations and Balancing 68

5.1 Process Presentation 68

5.1.1 Publication of intraday data 68

5.1.2 Publication of provisional data 69

5.1.3 Publication of definitive data 69

5.1.4 Publication of adjusted data 70

5.1.5 Publication Operationnal tolerances 71

5.2 Measurements 71

5.2.1 Checking Intraday measurements 72

5.2.2 Checking Measurement notice 73

5.2.3 Checking Measurement statement 75

5.2.4 Definitive measurements statement 77

5.2.5 Adjusted measurements statement 77

5.3 Calculating Tolerances 78

5.3.1 Checking Effective temperatures 78

5.3.2 Tolerances graph 79

5.3.3 Checking Maximum Imbalances Statement 79

5.4 Calculating Allocations and Balancing 80

5.4.1 Intraday allocations 81

5.4.2 Checking Allocation notice 82

5.4.3 Checking Quantity statement 84

5.4.4 Checking the CEA monitoring statement 87

5.5 Overruns 89

5.5.1 Capacity overruns on LI 89

5.5.2 Checking Capacity overruns statement 89

6 Invoices 92

Page 4: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

4

1 Presentation of TRANS@ctions

1.1 About the TRANS@ctions portal

The TRANS@ctions Portal (which replaces the ECT website) is a new secured tool that allows shippers to get access to contractual information and perform operations such as:

Creating and consulting capacity or service requests

Subscribing to alerts

Checking alerts

Checking Publications

Managing transmission requests

Consulting invoices

1.2 Loging into the TRANS@ctions portal

The login to the portal is personal, and is performed using an user and a password. You must have a valid user account to login into the TRANS@ctions portal, if this is not the case please contact your GRTgaz account manager to get them via email. Open your web browser and enter the following URL in the address bar : https://transactions-prd2.grtgaz.com/,

Page 5: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

5

Note : When login the first time, the system asks you to change your password. Forgotten Password In case you have forgotten your password, you can click on « Forgot your password ? » in the login screen. A new password will be emailed to you after answering the challenges chosen by you.

Page 6: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

6

1.3 Browsing

1.3.1 TRANS@ctions Home page

The homepage TRANS@ctions portal consists of a top bar, a central area containing five available interactive menus and a bottom bar.

1.3.2 TRANS@ctions portal structure

The top bar is always visible and allows a quick access to :

- user’s personal settings, - some functionalities of the main menu - the search for publication, - the management of alerts:

Page 7: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

7

The bottom bar on the home page gives you a quick access to the maintenance schedule, as well as to the effective temperatures of the three balancing zones :

1.3.3 Personal information modification

To change your personal information, click on « Your parameters » on the top bar :

Page 8: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

8

1.3.4 Access to functions

The access to different functionalities is possible either via the top bar :

Or by the homepage :

Page 9: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

9

The top bar and the home menu always give you access to the most recent publication: to consult the historical publications please use the search tool

1.3.5 Publication search module

The publication search module is a functionality giving you access to the different publications generated by TRANS@ctions and allowing you to download them. To get access to this module click on « Find » on the top bar :

TRANS@ctions displays all the publications meeting the search criteria selected and lists them from most recent to oldest. You can download any publication in XML and CSV formats.

Page 10: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

10

1.3.6 Global functionning

Search screen This screen consists of a form containing different search criterias according to the menu selected. Mandatory criteria are indicated by asterisks. Example of research Consolidated Maintenance Schedule screen :

If no criteria is entered, the system will display all data available

Result screen This area situated below the search form displays the results meeting the search criteria. Example of a capacity offer search:

To get access to the details of each capacity offer, click on the « + » icon displayed on the left of the results list.

Page 11: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

11

Request screen This type of screen allows the user to make a capacity request, a transmission request … Example of a capacity request screen:

1.3.7 Alerts

On some occasions, processes trigger an alert that is displayed on the portal and sent by e-mail and/or by fax. To get access to the alerts click on « Alerts » in the top bar :

Calendar

Free Entry Box

Page 12: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

12

Click on the column « Reference » to get access to the detail of an alert :

If you click on « Complete » the alert will not be visible, although it will remain available via the search tool. If you subscribe to receive alerts by email, these alerts will be sent to you as below :

Page 13: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

13

1.3.8 Alerts subscription

You can choose the alerts you want to receive. To subscribe to the different alerts, click on « Your parameters » in the top bar and tick the alerts you want:

You can select the email address entered in your personal information. You will receive the alert’s mail at this address.

Page 14: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

14

1.3.9 Communication with GRTgaz

The Portal will be your working tool for communicating with GRTgaz. Moreover :

EDIGAS is not affected by the introduction of TRANS@ctions

A new FTP platform is available for files not supported by EDIGAS

Page 15: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

15

2 Contracts and Capacity

2.1 Access to your Contracts

By clicking on “Consult your Contracts”, you’ll be redirected to the website etransmission.grtgaz.com,

where you can consult and manage your contracts, amendments and invoices, if you have opted for the

electronic signature of contractual documents.

2.2 Overview of the Capacity Management Process

The following flowchart describes the capacity management process on the Upstream network as well as

on the Downstream network.

This process is the same on both networks, with two differences:

On the Upstream network, you can check the level of available capacity before booking your capacity.

You can transfer all or part of your capacity on some points of the upstream network.

Page 16: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

16

2.3 Subscribing capacity on the Upstream Netwok The TRANS@ction portal allows you to subscribe capacity on the following points of the network :

o Network Interconnection Points o North/South Link o H-gas to L-gas and L-gas to H-gas Conversion Points o Transmission-Production Interface Point

NB : On Transmission-Storage Interface Points and Transmission-LNG Terminal Interface Points, GRTgaz applies an automatic capacity allocation. In the portal you can check the capacity that has been allocated. The TRANS@ction portal allows you also to track your capacity transfers :

o Full capacity transfers o Transfers of capacity right-of-use

2.3.1 MT/LT capacity request

A MT / LT capacity request could be multi-annual, seasonal, annual, seasonal or monthly . The process for booking MT / LT capacity in TRANS@ctions includes four steps :

1. Consulting commercialised and available capacity 2. Searching for the corresponding Capacity Offer 3. Creating, Saving and Confirming your capacity request 4. Tracking your request

Page 17: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

17

Step 1 : Consulting available capacity Click on « Capacities & Services> Manage your LT/MT Main Network Request> Consult the Marketed Capacities » on the top bar menu or the homepage menu :

NB : You can consult any file published by GRTgaz (at kWh 25°C or MWh 0°C) or download them in csv or xml formats (at kWh 25 °C). These files are updated by GRTgaz at least 3 times a month. Step 2 : Searching for the corresponding Capacity Offer Click on « Capacities & Services > Manage your LT/MT Main Network Request > Create a Capacity Request » on the top bar menu or the homepage menu :

Page 18: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

18

Offer Coding Principle : Contractual Point Code – Flow direction – Type of Capacity (firm/interruptible) – Type of Subscription (annual/seasonal/monthly) NB : If you enter the first letters of the Code or the PCR name, all offers associated with this PCR will be displayed (regardless of the type of capacity or type of subscription).

Step 3 : Creating, Saving and Confirming a MT/LT capacity request Life cycle of a MT/LT capacity request and related status:

Page 19: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

19

Creating the request : Drill down the capacity offer by clicking on the « + »

Shipper

Capacity

request creation

Request

registration

Initialised

Cancelled

Issued

Cancelled

Request

confirmation

Sent

Cancelled

Request processed

Requests

verified

Export

Converted Reservation

Accepted

Refused

Capacity Allocated

Accepted

Refused

Feasibility

Reservation

GRTgaz

Page 20: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

20

NB: The request can be a feasibility or a reservation

Saving and Confirming the request : Click on « Capacities & Services > Manage your LT/MT Main Network Request > Registrate your Capacity Requests » Then click on « Capacities & Services > Manage your LT/MT Main Network Request > Validate your Capacity Requests » on the top bar menu or the homepage menu :

Page 21: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

21

Remember to save and confirm the request, because requests will only be processed by GRTgaz if they have been confirmed (i.e. “Sent” status).

Step 4 : Tracking the request Click on « Capacities & Services > Manage your LT/MT Main Network Request > Create a Capacity Request » on the top bar menu or the homepage menu :

Page 22: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

22

Click on the reference of the request to display the details:

Page 23: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

23

2.3.2 Requests for Short Term capacity : Daily and Auctions

Life cycle of a Short Term capacity request in TRANS@ctions and related status :

The process for a ST capacity request in TRANS@ctions includes three steps :

1. Consulting available capacity 2. Creating, Confirming and Tracking your capacity request 3. Checking the auction results if any

Step 1 : Checking available capacity

Click on « Capacities & Services > Manage your Short Term Main Network Request > Consult The Short Term Available Capacities » on the top bar menu or the homepage menu :

Page 24: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

24

NB : Click on the « Daily capacity request » link to access directly to the capacity request screen.

Step 2 : Creating/Confirming/Tracking a ST capacity request Click on « Capacities & Services > Manage your Short Term Main Network Request » or Capacities & Services > Manage your Auctions Requests » on the top bar menu or the homepage menu to get access to the creation and confirmation submenus of your ST capacity request :

2.3.3 Requests for “Auction” capacity

Life cycle of a request for Auction capacity in TRANS@ctions

Step 3 : Checking results and the auction price Click on « Capacities & Services > Manage your Auctions Requests > Consult The auction results » on the top bar menu or the homepage menu :

The procedures are similar to those for MT/LT requests. The main difference is that the request does not need to be registered, as it can be approved directly after initialisation. In the case of an auctions capacity request, enter a level of capacity and an auction price in € / MWh 0°C (whatever the unit chosen for the input).

Page 25: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

25

NB: You can export the results of an auction in a csv file by clicking on the "Export .csv" button.

2.3.4 Capacity transfers

Full capacity transfers : In the case of a full transfer, all the rights and obligations relating to the transferred capacity are transferred from the transferor to the transferee. The full rights and obligations being transferred, the full transfer impacts the level of subscribed capacities of each shipper. The full capacity transfers can be made via Capsquare or joint notification (e-mail then letter) to GRTgaz. In both cases, the capacity acquired and transferred are updated and can be consulted via TRANS@ctions in the Capacities Portfolio (PSC) menu. Transfers of capacity right-of-use : In the case of a right-of-use transfer, the transferor shipper (first holder of the capacity) continues to be liable to GRTgaz for all the obligations relating to the capacity on which the right of use has been transferred. The shipper receiving the transfer, for their part, acquires the use of that capacity. The transfer therefore impacts on the operational capacity of both shippers concerned, and not on the capacity subscribed for by the transferor. The transfers of capacity right-of-use on the Upstream Network are made exclusively on Capsquare.

Page 26: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

26

The capacity acquired and transferred is updated and can be accessed via TRANS@ctions in the Services and Capacities Portfolio (PSC). Checking your acquired and/or transferred capacities in the Services and Capacities Portfolio (PSC).

Click « Capacities & Services > Consult your subscribed Capacities & Services > Consult your Services &

Capcity Portolio D or M » on the top bar menu or the homepage menu, then click on the icon to display the details of your subscribed capacities on the concerned point :

Page 27: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

27

2.4 Subscribing capacity on the Downstream Network

2.4.1 Capacity request on a Consumer Delivery Point (LI) or a Regional Network Interconnection

Point (PIRR)

Life-cycle of a capacity request in TRANS@ctions and related status :

The process for capacity request on LI/PIRR in TRANS@ctions includes three steps :

1. Searching for the corresponding Capacity Offer 2. Creating, Saving and Confirming your capacity request 3. Tracking your request

Step 1 : Searching for the capacity offer Click on « Capacities & Services > Manage your Regional Network Requests > Create a Capacity Request » on the top bar menu or the homepage menu :

Shipper GRTgaz

Request

Creation

Request

Registration

Initialised

Cancelled

Issued

Cancelled

Request

Confirmation

Processing

Cancelled

Request

processed

Requests

Consultation

Export

Conversion Reservation

Accepted

Refused

Capacity Allocated

Accepted

Refused

Feasibility

Reservation

Processed in region

Page 28: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

28

Offer Coding Principle : Contractual Point Code – Flow direction – Type of Capacity (firm/interruptible/empty) – Type of Subscription (annual/seasonal/monthly/daily) NB : If you don't fill the "Capacity type" field on the regional network, you will create a single request for firm and interruptible capacities

Step 2: Creating, Saving and Validating your request The procedure is the same as for Upstream Network Requests. The corresponding input screen is below :

Page 29: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

29

NB: By clicking on "Monthly Services and Capacities Portfolio", you can check the yearly and monthly capacities that you have already subscribed on this point. As on the Upstream Network, you can make a feasibility request or a Reservation.

From now on, you must enter the extra capacity you need, regardless the time step of your subscription. If you have already subscribed the capacity on this point and you want to change it to higher level of capacity, you must enter a positive request. Similarly, if you have already subscribed the capacity on this point and you want to change it to lower this level of subscription, you must enter a negative request.

Step 3 : Tracking your requests Click on « Capacities & Services > Manage your Regional Network Requests > Consult your Capacity Requests » on the top bar menu or the homepage menu :

Page 30: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

30

2.4.2 Manage your Right of Use Transfers (RoU)

During a Right of Use Transfer of downstream capacities on a delivery point, the transferor shipper is allowed to transfer the Operational downstream capacity, while keeping it in its contractual portfolio. The Right of Use Transfer covers at least a full month and must be entered in TRANS@ctions before the 15th of month M-1 to start the first of the month M. For the Right of Use Transfer on a Delivery Point, the whole capacity on the dedicated point will be transferred (annual, monthly, daily, firm or interruptible) and any new subscription during the transfer period will automatically be transferred to the transferee. Re-transferring a transferred capacity is not permitted. You can cancel a RoU (before starting) or interrupt (once started) by informing GRTgaz. Life-cycle of a RoU Request in TRANS@ctions and related status :

Page 31: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

31

Step 1 : The Transferor creates the RoU request Click « Capacities & Services > Manage your Regional Network Transfer of Right-of-Use > Create a TRU Request » on the top bar menu or the homepage menu :

Transferor GRTgaz

Request Creation of

RoUInitialised

Cancelled

Acceptance of

RoU requestReserved

RoU Consultation Export

Confirmed

Not confirmed

RoU

RoU processing

Transferee

RoU Consultation Export

Refused

Page 32: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

32

NB : The transfer involves the full capacity subscribed at a point, therefore you simply enter the delivery point concerned. Step 2 : The Transferee accepts the RoU request Click « Capacities & Services > Manage your Regional Network Transfer of Right-of-Use > Consult your TRU Request » on the top bar menu or the homepage menu :

Click on the request reference to view its details and accept it :

Page 33: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

33

NB : Once the request has been processed by GRTgaz, both Shippers are notified by a specific alert and both Shippers Portfolios are updated.

2.4.3 Capacities on Distribution Points (PITD)

Standardized Subscription principle All capacity subscribed on any PITD is allocated in a standardized way, whatever the subscription type (annual/monthly/daily), on the basis of the information sent by the Distribution System Operators.

DSO Sousnorms Files :Subscriptions/CAR & Profiles

Standardised

Capacity Processing

Capacity Allocated

Joint DeclarationsCAT/CAD/PITD

Page 34: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

34

You don't need to make any capacity request at these regional network's points, but send a joint declaration (ie declare a Transmission Contract and a Distribution Transmission Contract active in one or more Distribution Points), so GRTgaz will automatically allocate capacity on the basis of the DSOs data (see flowchart below) :

Creating a joint declaration Click on « Contract > Manage your PITD Counterparties > Create a Joint Declaration » on the top bar menu or the homepage menu :

Shipper GRTgaz

Joint Declaration

createdInitialised

Cancelled

Joint Declaration

InitialisedSent

Joint Declaration

processed

Joint Declaration

Consultation

Export

Validated

Rejected

Joint Declaration

Capacity on the PITDs

“Sousnorms”Files sent by the DSOs

Processed by GRTgaz

Standardized Allocation of

Capacity on the PITDs

Standardized Subscriptions

Modified

Amended

Page 35: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

35

Please notify GRTgaz for any new CAD (Distribution Contract)

Save your declaration once you have selected the PITD(s) and entered the starting and ending date :

Sending your joint declaration to GRTgaz

Page 36: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

36

Click on « Contract > Manage your PITD Counterparties > Send your Joint Declarations » on the top bar menu or the homepage menu :

You can print your joint declaration by clicking on : « Contract > Manage your PITD Counterparties > Print your Joint Declarations »

2.5 Service Subscription

Services provided by GRTgaz : o Access to the PEG o Subscription for Optional Contractual Tolerances o Short-Notice Reservation Offer o Test Phase Offer

The subscription to a service is automatic, provided that the fields are correctly completed and consistent

2.5.1 Access to the PEGs

Click on « Capacities & Services > Subscribe to a Service > Suscribe to Access to Title Transfer Point » on the top bar menu or the homepage menu :

Page 37: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

37

2.5.2 Optional Balancing Tolerance

This service allows you to increase your standard balancing tolerance up to 3% of your subscribed daily delivery capacity. Click on « Capacities & Services > Subscribe to a Service > Suscribe to Optional Balancing Tolerance » on the top bar menu or the homepage menu :

Page 38: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

38

2.5.3 Short-term daily capacity reservation

This service allows you to subscribe daily capacity on a consumer delivery point with a short notice period. Click on « Capacities & Services > Subscribe to a Service > Suscribe to reduced-notice offer » on the top bar menu or the homepage menu :

Page 39: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

39

2.5.4 Test Phase Offer

This service allows you to use up to 10 days of daily delivery capacity, depending on your needs over a month, with the possibility of changing the days of use retrospectively. Click on « Capacities & Services > Subscribe to a Service > Suscribe to Trial Offer » on the top bar menu or the homepage menu :

LIXXX1

LIXXX2

Name XXX1

Name XXX2

Page 40: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

40

Click on the « Subscribe » link at the chosen contractual point to enter the trial offer details :

2.6 Checking your Services and Capacities Portfolio (PSC)

2.6.1 Presentation of PSC

This portfolio summarises in a single document :

the capacities and services you have subscribed,

your possible capacity transfers or/and your Right-of-Use transfers,

your Operational subscribed capacity, in 3 sections (Upstream Network, Downstream Network, Services) The portfolio can be consulted in 2 different formats :

The Daily PSC : o Aggregates the datas gas day by gas day o Covers your capacities and services subscribed on Months M-1, M, M+1

The Monthly PSC : o Aggregates the datas on a monthly basis o Covers your capacities and services subscribed on Month M+2 to your last subscription o Also provides a valuation in €uros of the subscribed capacity (valuation at the tariff which is in

force when the PSC is generated) Section 1 : Upstream Network

LIXXX1 Name XXX1

Page 41: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

41

This section contains all your :

Capacity allocated through a TRANS@ctions request : Link / Conversion / PIR / PITP

Capacity automatically allocated by GRTgaz, on the basis of the adjacent operators data : PITS / PITTM

Example of Monthly PSC :

Example of Daily PSC :

Section 2 : Downstream Network This section contains all your :

Page 42: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

42

Capacity allocated through a TRANS@ctions request : LI / PIRR

Capacity automatically allocated by GRTgaz, on the basis of the DSOs data : PITD Example of Monthly PSC :

Example of Daily PSC :

In the Daily PSC you can consult the details of Standardized Capacity on the PITDs (Annual Standardized Consumption and profile of your profiles customers and/or subscriptions of your non-profiled customers).

Section 3 : Services This section contains all the capacities and services you have subscribed :

Page 43: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

43

2.6.2 Checking PSC « live data »

Click on « Capacities & Services > Consult your subscribed Capacites & Services > Consult your subscribed Services & Capacity Portfolio D or M » on the top bar menu or the homepage menu :

The PSC “live data” is available on the portal. These data are updated at each new capacities subscription.

2.6.3 Checking published PSC

Access to publications is possible by clicking on the « Find » link on the top bar or by clicking on the « Consult publications » button of the PSC live data view screens :

Page 44: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

44

The published PSC is updated : The day after the subscription of new capacity for the Monthly PSC The hour after the subscription of new capacity for the Daily PSC

You can therefore see a gap between the live data and the published data.

Page 45: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

45

3 Operationnal Capacities This part describes :

The publications related to your Operationnal capacities

The Consolidated Maintenance Schedule : indicate the restrictions that may impact your capacities.

The following flowchart describes the process of Operationnal capacity.

GRTgaz

ConsolidatedMaintenance Schedule

Alert D-1

Calculation of

Operational Capacity

Allocated

Operational CapacitySchedule

Operational CapacityNotice

Operational CapacityStatement

Operational

CapacitySubscribed

UIOLI Capacity

Acquired

Restriction Rate

Calculation

Calculation of Actual

Operational Capacity

Shippers

Restriction Data

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

Page 46: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

46

3.1 Accessing Restriction Data Definitions

3.1.1 Case of a point without interruptibility conditions and with engineering work

Example: Montoir

3.1.2 Case of a point with interruptibility conditions and without engineering work

Example: North/South Link

TRANS@ctions

name

ECT

nameDefinition Publication

CTNf CFT

Firm Nominal Technical Capacity. It corresponds

to the physical capacity associated with a

Contractual Point defining firm Saleable

-

CMNTt CMNTTechnical Minimum Capacity available in the

event of engineering works.

At last 60days before (1st)

Can decrease until D-5

Can increase until D-1

CMXTt CMXTTechnical Maximum Capacity available in the

event of engineering works.

At last 60days before (1st)

Can change until D-1

CMNTi -Minimum Technical Capacity including available

interruptible capacity (F+I).From D-3

CMXTi CRT (D-3 / D-2)Maximum Technical Capacity including available

interruptible capacity (F+I).From D-3

CTE CRT

It is the actual total technical capacity on a PCR

that GRTgaz can actually guarantee to all

Shippers per Gas Day. It can differ from CTN in

the event of restrictions.

On D-1

∑COSf / ∑COSi CFS / CISSubscribed Firm / Interruptible capacity by all

shippers for a day.-

CMXTt

CMNTt

CTE

COSf

Page 47: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

47

3.1.3 Case of a point with interruptibility conditions and with engineering work

Example: Dunkerque

If there is a variation in the restriction rates calculated for 3:30 pm on D+1, you will be sent an alert to notify you. Restriction Data can be accessed in the “Consolidated Maintenance Schedule” document (PTC). This publication gives the following data:

The daily Restriction Data: CMXTt, CMNTt, CMXTi, CMNTi and CTE.

The daily restriction rates: Max TRf, Min TRf, Max TRi, Min TRi, TRf and TRi.

Firm technical capacity: CTNf

Subscribed firm and interruptible capacity: ∑COSf and ∑COSi

Fact sheets specifying the nature of the engineering work The Consolidated Maintenance Schedule is updated 2 times par day: 3:30 pm.

CTE

CMXTt

CMNTt

CMNTi

CMXTi

D-3 D-1

COSf

Page 48: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

48

Download in csv format for a research (ex: on a point/day) Download in csv and xml formats for the all PTC

3.1.4 Consolidated Maintenance Schedule - Publication

Click « Operations > Consult the Maintenance » on the top bar menu or the homepage menu :

Click on the « Search » button to display results :

Page 49: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

49

To access past Restriction Data, click on the Gas Day. To access the details of a fact sheet, click on the publication notice reference To access the Operationnal Capacity Summary, click on the « Operationnal Capacity Summary » link at the bottom of the page.

3.2 Accessing Operationnal Capacity The summary of the Operationnal capacity is detailed in several publications:

Summary of Operationnal Capacity (SCO) containing live data and ongoing updates - consultable via the menu

Operationnal Capacity Notice : Snapshot of SCO at each cycle for a gasday – available in the Search module

Operationnal Capacity Statement: Snapshot of SCO from the 1st of the current month to the current gasday (daily publication at 5:50 am) – available in the Search module

Operationnal Capacity Schedule: Snapshot of the PTC for the next day (3 publications: 9:30 am/ 12:30 pm / 3:30 pm) – available in the Search module

It contains the following data :

The most recent transmission requests by the shipper

The Subscribed Operationnal Capacity

The restriction rates

When the page opens, you see only columns TRf, Tri and CTE. When you click on the « + » buttons attached to those columns, you see the min and max for the Restriction Rates and Restriction Data.

Page 50: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

50

The actual Operationnal Capacity

The Allocated Operationnal Capacity, guaranteed COA & planned COA

UIOLI D (“within rights”) and HD (“without rights”) capacity, which correspond to the parts assigned with and without rights (CU D & CU HD), where “CU” refers to “UIOLI Capacity”.

Available UIOLI capacity Except for the Operationnal Capacity Schedule which does not include :

Allocated Operationnal Capacity

Available and allocated UIOLI capacity

3.2.1 Checking the Summary of Operationnal Capacity

Click « Operations > Consult your Operationnal capacities > Consult your Operationnal capacities » on the top bar menu or the homepage menu :

In the search screen, two types of searches are possible :

Either a single gasday as search criteria

Or several criterias : a contractual point type and/or a contractual point and/or a direction and a period

Click on the « Search » button to display results :

Page 51: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

51

To access the Consolidated maintenance schedule, click on the « Consolidated maintenance schedule » link at the bottom of the page.

Click on the icon to access the curve that display your Transportation Requests and your capacities (subscribed and effective). This function works only if you select a single point/direction :

3.2.2 Notice, Statement and Schedule of Operationnal Capacity

Click on « Find » on the top bar and choose the type of publication :

Page 52: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

52

Page 53: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

53

4 Nominations and Scheduling

4.1 Cycle

4.1.1 Day Ahead

Two new processing cycles were added in day-ahead :

Nominations received between 4:00 pm and 6:00 pm in day-ahead will be processed at 6:00 pm. The related Confirmation Notice will be updated at 8:00 pm

Nominations received between 8:00 pm and 9:00 pm in day-ahead will be processed at 9:00 pm. The related Confirmation Notice will be updated at 11:00 pm

Page 54: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

54

4.1.2 Intra Day

In intraday updating of the Confirmation Notice takes two full hours. A Partial Confirmation Notice is published 15 minutes after the start of each processing cycle. It makes available the Confirmation data on PEGs :

Nomination

Renomination intra-day

2:00 pm 4:00 pm 6:00 pm 8:00 pm6:00 am 1:00 pm 6:00 am3:00 pm

Matching Notice

Renomination

CNN (2h full after)

Al locations for gas day D

D-1

D

D+1

Confirmation notice (CN)

10:00 pm

CN

Confirmation Notice updated every hour from

10 pm

Renomination CN

RenominationRenomination

CN

New processing cycles for transmission requests

between 6 pm and 10 pm

Cycle n+1

Partial Confirmation

Notice

Cycle n

15 mn

15 mn

Partial Confirmation

Notice

Confirmation Notice

Confirmation Notice

Page 55: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

55

4.2 Elaboration of scheduled quantities The following flowchart describes the actions performed on the transmission requests to elaborate the scheduled quantities :

Below the different steps of the process in the TRANS@ctions Portal.

4.2.1 Transmission request

A Transmission request includes : :

A Point

A Counterparty

A Direction

Energiy (kW 25°C) Each new transmission request replaces the previous one The setting of new counterparties is made directly via the portal

Check that nominations are in line with

Operational Capacities

Optimisation: Calculation of Use It Or

Lose It capacity

Matching at PEGs

Matching at adjacent operators’ Alert

Available

UIOLI

Alert

Confirmation & Publications

2

3

4

5

Alert

Recording of transmission requests

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

1

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

Verification of entry/exit balance

Transmission Request

Partial Mirror Notice (PGD = 1 )

Partial Confirmation Notice (PGD>1)

Confirmation Notice (PGD>1)

Mirror Notice (PGD = 1)

Quantity Statements (last PGD)

ShipperGRTgaz

Page 56: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

56

The Transmission request on the portal are signed :

Nomination Entry Network: positive

Nomination Exit Network: negative Forecasts :

No time constraints

Possibility of sending transmission requests up to 6 months in advance

If a daily transmission request is missing, forecasts are used as transmission requests

4.2.1.1 Creating un transmission request

Click « Operations > Manage your Transportation requests » on the top bar menu or the homepage. Then, you can make a manual input for each contractual point or Upload a batch file (.csv)

Uploading a file of transmission requests : Click «Operations > Manage your Transportation requests > Creation of a batch of transmission requests» on the top bar menu or the homepage:

Page 57: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

57

The file format must be CSV. Manual input of transmission requests : The manual input for each contractual point is made on the same screen as previously.

You can select the contractual point type and the gas days for which you want to make a request.

Page 58: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

58

Click on the « Search » button to access the list of contractual point related to the selected type and tick the points you want to nominate on. Entering a transmission request : The screen below displays the transmission requests by contractual point, counterparty and gas day. The upper part of the screen summarizes the imbalance due to the last transmission requests. The data are displayed by zone and gas day. At any time, you can recalculate these imbalances by clicking the « Refresh » button.

Page 59: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

59

The modified transmission requests are highlighted in green. Tick the rows that you want to take into account and confirm by clicking the « Confirm batch input » button. Add a new counterparty : To enter a transmission request, you have to modify the "quantity" column. Click the « Add a Counterparty/Direction pair to this Contractual Point » link to add a new counterparty :

Page 60: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

60

You can select a counterparty already used on a point. You can also enter a new counterparty and select a direction. Checking the direction : The quantities must be signed according to the principle below :

Transmission request in Reception (REC): Entering a positive transition request

Transmission request in Deliveru (DEL): Entering a negative transmission request If the sign is inconsistent with the direction of the transmission request, an error message is displayed and the request is reset to 0 in the input screen :

Page 61: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

61

You can then renew your entry. Only selected lines are included in the Confimation.

4.2.1.2 Creating a batch of transmission requests by copy

You can create a batch of transmission requests for a given period from the copy of a transmission request. In the input screen of transmission requests :

1. Select the request that you want to copy 2. Click the «Create a batch from selected requests » button 3. You can then select the desired period

4.2.1.3 Looking up transmission requests

Click on « Operations > Consult your Transportation Request Batches » on the top bar menu or the homepage:

Page 62: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

62

A search screen then allows you to access the batch of transmission requests according to several criterias:

The channel (Edig@s, File upload on the portal, Manual input on the portal)

The status (Accepted, Rejected)

The batch generation period

The gas day contained in the batch

Click the batch number to access :

The reason for rejection if the batch is rejected

The transmission requests of the batch if the batch is accepted

Page 63: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

63

4.2.2 UIOLI optimisation

4.2.2.1 Checking available UIOLI

Click « Operations > Consult the UIOLI Offer » on the top bar menu or the homepage :

Select the gas day and click the « Search » button. The UIOLI offer is displayed by contractual point :

Page 64: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

64

4.2.2.2 UIOLI capacity allocation

The UIOLI capacity allocated is available on the Operational Capacities statement :

The columns "CU D" and "CU HD" correspond respectively to the UIOLI capacity gained within the shipper’s rights and the UIOLI capacity gained above the shipper’s rights.

Page 65: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

65

4.3 Scheduling and Publications

4.3.1 Partial Confirmation Notice

4.3.1.1 Publication of Partial Confirmation Notice

Confirmation on the PEGs is done by the publication of a Partial Confirmation Notice in the first 15 minutes of each processing cycle. It makes available the programing data on the PEGs. Access to that publication is possible by clicking the « Find » link on the top bar :

4.3.1.2 Access to alerts

Potential mismatches due to the scheduling process at PEGs are reported via the alerts publication on the portal. These alerts are indicated to the user on the home page:

Following matching on the PEGs, the following alerts may be sent to shippers :

Matching at the Exchange Operator’s (alert displayed on the portal and/or sent by e-mail)

o Mismatch : Retention of the compensating party’s nomination o Exchange Operator not authorised for the contract (→ Confirmation at 0)

Matching at the PEGs (alert displayed on the portal and/or sent by e-mail)

o Mismatch : Counterparty not nominated (→ Confirmation at 0)

Page 66: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

66

o Mismatch : protection of last matched state/Lesser of Rule o PEG service not subscribed by the counterparty (→ Confirmation at 0)

4.3.2 Confirmation Notice

Click « Operations > Consult your Scheduling > Consult your Confirmation Notice D (or D+1) » on the top bar menu or the homepage :

Then you access to latest confirmation notice of the selected gas day (D or D+1) :

Page 67: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

67

At the header of the screen you can :

find details of the publication

download the notice in CSV and XML format Scheduled quantities by contractual point are grouped per balancing perimeter. For each perimeter, the imbalance of latest transmission requests and scheduled quantities are reported. In case of a mismatch the "Variation" box column are displayed in red. Historical scheduled quantity is published since the first cycle of the gas day. The shipper can access it by clicking on the contractual point :

By clicking on the scheduled quantity you can access the reason for capping if any :

Page 68: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

68

5 Allocations and Balancing

5.1 Process Presentation The following flowcharts indicate the making process for each publication type :

Publication of intraday data

Publication of provisional data

Publication of definitive data

Publication of adjusted data

Publication of operationnal tolerances

5.1.1 Publication of intraday data

Page 69: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

69

5.1.2 Publication of provisional data

5.1.3 Publication of definitive data

Intraday Measurement Notice

Intraday Allocations

Integration of

Intraday

measurements

Calculation of

Hourly Intraday

Allocations

GRTgaz Shippers

Measurement Notice

Allocation Notice

Provisional Measurements Statement

Provisional Quantities Statement

Integration of H/D

measurements

Calculation of Overrun

capacities

Alert

Aggregation of provisional

H/D measurements

Calculation of Provisional

Allocations

Integration of quantities

distributed to the PITD

Provisional CapacityOverrun Statement

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

GRTgaz Shippers

GRDs

Page 70: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

70

5.1.4 Publication of adjusted data

ADA tracking statement

Validation of allocations

and imbalances

Integration of H/D

measurements

Aggregation of definitive

H/D measurements

Calculation of definitive

allocations and definitive

imbalances

Definitive measurements

statement

Alert

Alert

Integration of quantities

distributed to the PITD

Validation of theoretical

ADA inventory

Definitive quantities

statement

Definitive capacity overrun

statement

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

GRTgaz Shippers

GRDs

GRTgaz Shippers

Validation of adjusted

Allocations

Integration of

adjustment data

Aggregation and

verification of adjusted

quantities

Calculation of adjusted

allocations and

adjustment data

Alert

Adjusted measurements

statement

Adjusted quantity statement

Adjusted capacity overrun

statement

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

FTP (échange de fichiers via la plateforme FTP)

Portail TRANS@ctions

Alertes (envoyées aux expéditeurs)

Fichier pivot

Timer

Etape de processus

Transition entre deux étapes de processus

Publication

Relation entre une étape et une publication

Mise à disposition d’une publication via un canal

Processus

Données entrantes

Données sortantes

Données lues en base accessibles sur le portail

Edigas (échange de fichiers via le canal Edigas)

Page 71: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

71

5.1.5 Publication Operationnal tolerances

5.2 Measurements Measurements are the quantities arising from metering or estimate on the PCE. They are published on the PLC and PLCd. Customer industrial measurements are viewable by his supplier if the customer has given him an official permission to view them. They are integrated into the TRANS@ctions system and can be checked on the portal through the following documents:

Intraday measurements

Measurement notices

Measurement statements (provisional/definitive/adjusted) Definitions :

Calculation of effective

temperatures

Calculation of

operational balancing

variables

Provisional Maximum Imbalances Statement

Definitive Maximum Imbalances Statement

GRTgaz Shippers

Effective Temperatures

Delivered

capacity

Document Definition Publication

Intraday

Measurements

Document giving the hourly intraday

measurements on the PCE (“Metering and

Estimation Point”) for each cycle.

Every day at 11 am, 3 pm, 7 pm, in

11 pm and 2 am.

Measurement

Notice

It contains the hourly and daily

measurements on the PCE for a gas day. At 11 am on D+1.

Provisional

Measurement

Statement

It contains the hourly and daily

measurements on the PCE for every day

from the 1st of the month until D.

At noon on D+1.

Definitive

Measurement

Statement

It contains the hourly and daily

measurements on the PCE for the period

from the first gas day in month M until

the last day of that month.

On the 3rd

working day in month

M+1 for month M.

Adjusted

Measurement

Statement

It is put together with the adjusted

measurements (for the gas days where an

adjustment is required) and definitive

measurements (for the gas days without

adjustment) for confirmed month M.

In M+n following validation of the

adjusted Allocations or in month

M+1 following validation of the

definitive Allocations calculated

using adjusted measurements.

Page 72: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

72

5.2.1 Checking Intraday measurements

Click « Metering & Allocations > Consult your Metering > Consult your Within-Day Metering Notice » on the top bar menu or the homepage menu :

Intraday MeasurementNotice

Measurement Notice

Provisional Measurements Statement

Definitive measurements

statement

Adjusted measurements

statement

Page 73: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

73

The latest publication is displayed :

The publication contains all of the metering points according to your authorizations. Click on the “Delivered quantity” of a metering point to access details of hourly measurements in the gas day:

Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).

5.2.2 Checking Measurement notice

Click on « Metering & Allocations > Consult your Metering > Consult your Metering Notice » on the top bar menu or the homepage menu :

Page 74: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

74

The latest publication is displayed :

The publication contains all the metering points according to your authorizations. Click on the “Delivered quantity” of a metering point to access the characteristics of the daily measurements :

Page 75: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

75

Click on the “Delivered energy quantities” to access the details of the hourly measurements in the gas day.

Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).

5.2.3 Checking Measurement statement

Click on « Metering & Allocations > Consult your Metering > Consult your Metering Statement » on the top bar menu or the homepage menu :

Page 76: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

76

The latest publication is displayed :

The publication contains all the metering points according to your authorizations. Click on the “Delivered quantities” to access the details of the measurements for a gas month :

Page 77: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

77

Click on the “Gas Day” to access the characteristics of the daily measurements :

Click on the “Delivered energy quantities” to access the details of the hourly measurements in the gas day.

Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right). Particulary at the begining of a month, two statements may be temporary. You will always find the current month's notice through the menu.

5.2.4 Definitive measurements statement

For access to this publication, click on « Find » on the top bar :

5.2.5 Adjusted measurements statement

For access to this publication, click on « Find » on the top bar :

Page 78: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

78

5.3 Calculating Tolerances Definitions :

Item Définition

Effective temperature for day D+1

Effective temperatures are published for the three balancing zones using the values from the Paris, Lyon and Lille weather stations.

Standard Contractual Tolerance (TCS)

Capacity allocated automatically based on capacity subscribed on the PLC/PLCd and PITD.

Optional Operationnal Tolerance (TOO)

It’s the real optional tolerance available taking into account Teff.

Total Contractual Tolerance (TCS)

TCS + TCO

Daily Imbalance (EBJ) An EBJ is calculated for each Gas Day and balancing zone. It is the difference between the total entries and the total exits.

Mid-Range This is based on a percentage of the tolerance, a percentage that varies from one gas day to another.

5.3.1 Checking Effective temperatures

Effective temperatures of the day are visible on the bottom bar of the homepage.

To consult the effective temperatures for a period, click on « Metering & Allocations > Consult your Operationnal Tolerances > Consult the Effective Temperatures » on the top bar menu or the homepage menu :

Page 79: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

79

5.3.2 Tolerances graph

5.3.3 Checking Maximum Imbalances Statement

The balancing variables can be checked in the maximum imbalances statement.

The provisional maximum imbalances statement is daily updated at 10:30 am.

Page 80: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

80

The definitive maximum imbalances statement is published before the 10th working day of the M+1 month.

Click on « Metering & Allocations > Consult your Operationnal Tolerances > Consult your Maximum Imbalances Statement » on the top bar menu or the homepage menu :

5.4 Calculating Allocations and Balancing Definitions

Document Definition Publication

Intraday Allocations Document giving the hourly intraday

allocation on the PLC/PLCd. Every day at 11 am, 3 pm, 7 pm, in

11 pm and 2 am.

Allocation Notice It contains the allocations arising from the

balancing mechanism for gas day D. Before 1pm on D+1

Provisional

Quantities

Statement

It contains the allocations arising from the

balancing mechanism for all days from the

1st

of the month until D. On D+1

Definitive

Quantities

Statement

It contains the allocations arising from the

balancing mechanism for the period from

the first gas day in month M until the last

day of that month.

Before the 10th working day of

month M+1

Adjusted

Quantities

Statement

It is made up of the adjusted allocations

(for gas days on which an adjustment has

taken place) and definitive adjustments

(for gas days without adjustment) for

validated month M.

Document published in M+n

following confirmation of the

adjusted allocations.

Page 81: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

81

5.4.1 Intraday allocations

Click on « Metering & Allocations > Consult your Allocations > Consult your Within-Day Allocation Notice » on the top bar menu or the homepage menu :

Intraday Allocations

Allocation Notice

Provisional Quantities Statement

Provisional CapacityOverrun Statement

ADA tracking statement

Definitive quantities

statement

Definitive capacity overrun

statementAdjusted quantity statement

Adjusted capacity overrun

statement

Page 82: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

82

The latest publication is displayed :

The publication contains all the PLC/PLCd according to your authorizations. Click on the “Delivered pool/point” to access the details of the hourly consumptions of the point :

Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).

5.4.2 Checking Allocation notice

Click on « Metering & Allocations > Consult your Allocations > Consult your Allocation Notice » on the top bar menu or the homepage menu :

Page 83: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

83

The latest publication is displayed :

The quantities are classified per perimeter (North-B zone, North-H zoen and South zone) then per category, PCR and direction.

You can hide perimeters by clicking on . If the allocation is different from the confirmation then it appears in red (this may be the case for a Delivered pool).

Page 84: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

84

Click on the Code of a Contractual Point to view the details of the Contractual Point by counterparty :

Click on the arrow to view the details of the contractual point under the delivery point

Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).

5.4.3 Checking Quantity statement

This is a new document merging the confirmation statement with the allocation statement (published at first at 6:00am with nominations and schedules then updated with the allocations at 1:00 pm).

Page 85: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

85

To consult the checking quantity statement, click on « Metering & Allocations > Consult your Allocations > Consult your Quantity Statement » on the top bar menu or the homepage menu :

Click on the « Find » link on the top bar to consult the other quantity statements : definitive, adjusted and provisional ( for the M-1 month, before validation).

Page 86: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

86

1/ The first array summarizes imbalances per perimeter:

You can access to details by date or by counterparty by clicking on a perimeter. 2/ Then, when clicking on the contractual point, you will have 2 access possibilities to the details by date or by counterparty :

3/ Details of the contractual point by counterparty :

Page 87: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

87

If you click on a counterparty, you can see the details of the contractual point by date for a given counterparty

Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right). Particulary at the begining of a month, two statements may be temporary. You will always find the current month's notice through the menu.

On the Adjusted Quantity Statement, The pictogram indicates that adjustments have been done on a point / balancing perimeter.

Click on to acccess the Adjustment Difference Account and the oldest adjustments.

5.4.4 Checking the CEA monitoring statement

To consult the CEA monitoring statement, click on « Metering & Allocations > Consult your Allocations > Consult your CEA Monitoring Statement » on the top bar menu or the homepage menu :

Page 88: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

88

The latest publication is displayed :

Conversion between "kWh 25°C" and "kWh 0°C" is possible in each publication. Oldest publications are available in the Search module (top right).

Page 89: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

89

5.5 Overruns Capacity overruns are available on the portal through the: “Capacity Overruns Statement” publication type.

Publication Definition

Provisional Capacity Overruns Statement

Published on D+1 at 1pm for the current month Contains for the 1st gas day of the month to D :

Provisional overruns

Provisional allocation

Operationnal Subscribed Capacities

Definitive Capacity Overruns Statement

Published :

Around the 4th working day of month M+1 for LI

Around the10th working day of month M+1 for PITD Contains for the gas month :

Definitive overruns

Definitive allocation

Operationnal Subscribed Capacities

Adjusted Capacity Overruns Statement

Published after validation of the adjusted allocations on M+n. Contains for the M month :

Adjusted and Definitive overruns

Adjusted and Definitive allocation

Operationnal Subscribed Capacities

5.5.1 Capacity overruns on LI

TRANS@ction calculates daily and hourly capacity overruns. Daily capacity overruns are calculated on :

exit from the Main Network

transmission on the Regional Network

delivery on the Regional Network Hourly capacity overruns calculated on :

transmission on the Regional Network

delivery The possible overruns are:

the difference between the allocation and the subscribed capacity if the allocation is greater than the subscribed capacity

0 else

5.5.2 Checking Capacity overruns statement

Click on « Metering & Allocations > Consult your Allocations > Consult your Capacity Overruns Statement » on the top bar menu or the homepage menu :

Page 90: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

90

The latest published Capacity overruns statement is displayed :

You can download the publication in XML and CSV format. You can also access it directly on the portal :

NB :

The pictogram indicates that the status of the capacity overruns is “adjusted”.

The daily and hourly overruns are indicated by a yellow pictogram if their status are provisional and by

a red pictogram if their status are definitive or adjusted. Click on the Contractual Point to access the daily capacity overruns :

R

Page 91: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

91

Click on the Gas Day Point to access the hourly capacity overruns :

R

R

Page 92: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

92

6 Invoices Note the simplification of the current invoices process by creating an amendment invoice:

The amendment invoice replaces the correction invoice and the adjustment invoice

It provides a delta amendment for a Transmission Invoice with both corrected capacity and adjusted quantities

It can apply to a period of 1 to n months The invoice for a M month includes :

Terms of capacity for M

Terms of quantities for M-1

UIOLI for M-1. To access latest published invoice, click on « Invoices » on the top bar menu or the homepage menu :

The latest publication is displayed :

Page 93: TRANS@ctions - Portal User’s - GRTgaz

TRANS@ctions - Portal User’s Guide (V0.1)

93

Points of attention Attached documents are :

- Your invoice - Your record of purchase - Possible explanatory notes for patches - The amendment invoice if a quantity or a capacity has been modified and the

related invoice statement

Shippers can export the invoices and the related documents in PDF, XML and CSV format. Here below an example of CSV format :

Oldest invoices are available in the Search module (top right).