uba-14-ss integration guide (5th edition)...uba -14-ss integration guide june 19, 2006 5th edition...

16
1 UBA-14-SS Integration Guide June 19, 2007 5th Edition Universal Bill Acceptor UBA-14-SS Integration Guide Component Names Acceptor Unit Transport Unit Release Lever USB for Software Download Dip Switch Faceplate Connector Diagnostic LEDs Frame Unit External Connector Cash Box

Upload: others

Post on 19-Mar-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

1

UBA-14-SS Integration GuideJune 19, 20075th Edition

Universal Bill AcceptorUBA-14-SS

Integration GuideComponent Names

Acceptor Unit

Transport UnitRelease Lever

USB for SoftwareDownload Dip Switch

Faceplate Connector

Diagnostic LEDs

Frame Unit

External Connector

Cash Box

komanns
Linien
Page 2: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

2

UBA -14-SS Integration GuideJune 19, 20065th Edition

1. Model Descriptions:The UBA model descriptions are structured to define the major components as shown below.

MODEL TYPE SOFTWARE

U B A - 1 4 – S S 5 0 0 – 0 0 – 0 0 0 F 0 U S A – 0 3 (1) (2) (3) (4)(5)(6) (7)(8) (9)(10)(11)(12)(13) (14) (15)

(1) Series Name(2) CPU board type 4: USB I/F Applicable(3) Stacking configuration SS: Security stacker(4) Box capacity 5: 500 notes(5) Box color 0: Black (plastic)(6) Box handle color 0: Blue (standard)

1: RedN: WBA BOX without HandleJ: WBA BOX with standard Handle

(7) Transport unit color 0: Standard Color (Black)

(8) Transport unit cover color 0: Blue (standard)(9) Faceplate 0: W/o faceplate

1: W/ UBA standard faceplate2: W/ Blue/Blue LEDA: W/ Blue/Blue LED (2-line)

(10) Intelligent cash box 0: W/o ICB board and ICB box1: W/ ICB board and ICB box2: W/ ICB board and w/o ICB box

2. Technical Specifications:1) Acceptance Rate: Refer to Software Specifications*1

2) Bills Accepted: Width: 62 – 85mm, Length: 120 – 165mm (up to 170mm with WBA steel cash box)3) Processing Speed: Approx. 2 sec. to send credit signal, 5 sec. to send vend signal.4) Escrow: 1 bill5) Anti-stringing Mech.: PB mechanism (anti-pullback system – JCM Patented)6) Cash Box Capacity: 500 notes or more7) Interface: ID-003/ID-024/ID-0288) Weight: Approx. 4.0kg

(*1) The following bills are excluded:- Bills with excessive or sparse magnetism, or unclear printing patterns.- Overlapped bills- Bill with stain, wear, wetness, tear or excessive wrinkles- Bill with folded corner or edge- Bill with incorrect cut dimensions or printing displacementWhen security measure against counterfeit is implemented, the software may not fulfill the specified level of acceptance rate.

3. Environment:1) Operation temperature: 5 to +50ºC2) Storage temperature: -20 to +60ºC3) Relative humidity: 30 to 85%RH (non-condensed)

4. Electrical Supply:1) Supply voltage: DC12V ± 5% (NOTE: Use power supply with 4.0A or more)

DC24V ± 5% (NOTE: Use power supply with 2.7A or more) - Only when used th Optional DC24V/DC13.5V Conversion Board -

2) Current consumption: DC12V: Standby 300mA, In operation 1.6ADC24V: Standby 150mA, In operation 1.0A

(11)Optional board 0: Standard (no external I/F board)1: With 24V/13.5V + RS232C I/F Conversion Board2: With RS-232C I/F Conversion Board

(12) Input/Output signals F: Photo-coupler IsolationR: RS-232C

(13) External Connection 0: Without Harness Harness 5: Standard Harness

6: OEM Harness7: DC24V/DC13.5V Conversion Harness (Photocoupler)8: DC24V/DC13.5V Conversion Harness (RS-232C)

(14) Country Code ISO3166 based 3-digit code(15) Interface 03: JCM ID-003 Serial Interface

24: OEM Interface28: OEM Interface (USB I/F)

komanns
Linien
Page 3: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

3

UBA-14-SS Integration GuideJune 19, 20075th Edition

87654321OFF

Pan Head Screw M4Less than 4mm deep

M4 Plate Head Screw orNo. 6-32 Plate Head Inch Screw

Side Mounting Back-to-back Mounting

5. Installation [Down Stacking Only]:1) Remove power from host machine.2) Set UBA DIP switches, if required. The initial setting is all OFF where all the denominations are enabled.3) Connect the proper interface harness from the host machine to UBA.4) Install the UBA into the host machine via the mounting screws (M4). There are 4 mounting holes on the frame

end and 3 each on both sides of the frame.5) Apply power to the machine, verify that the red chip LED next to the dip switch is ON, and both red and green

indicator LEDs are OFF.- If the red chip LED is OFF, check connections and make sure power is applied.- If any of the indicator LEDs are ON, check error codes to fix the problem.Check operation, insert banknotes of each denomination to verify that notes are accepted and credited properlyin the host machine.

* For details about Dip Switch Settings, refer to the software Information Sheet.

ON OFF Switch 1 Denomination 1 disabled Denomination 1 enabled Switch 2 Denomination 2 disabled Denomination 2 enabled Switch 3 Denomination 3 disabled Denomination 3 enabled Switch 4 Denomination 4 disabled Denomination 4 enabled Switch 5 Denomination 5 disabled Denomination 5 enabled Switch 6 Denomination 6 disabled Denomination 6 enabled Switch 7 Denomination 7 disabled Denomination 7 enabled Switch 8 TEST MODE NORMAL MODE

6. DIP Swich Configuration:Default setting (all OFF)

Front of UBA panel

komanns
Linien
Page 4: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

4

UBA -14-SS Integration GuideJune 19, 20065th Edition

Pin No.1234567891011121314151617181920

I/O

IN(OUT)

(IN)

Signal Name+12V PowerGND Power

M.RES(PC OUT)+12V I/F(PC IN)

(GND I/F)Vbus

-DATA+DATA(TTL1)

GND USB(GND I/F)

LED Power (TTL1) (TTL2)(TTL3)

LED - (TTL2)(TTL3)

NC

FunctionDC +12V powerDC 0V powerBill acceptor reset signal line(Signal output line from Acceptor to Controller)Interface Power: DC +12V(Signal output line from Controller to Acceptor)(Interface power: photo-coupler DC 0V)USB Communication Vbus signal line: DC +5VUSB Communication input/output signal lineUSB Communication input/output signal lineReserved (TTL1)USB Communication Ground: DC0V(Interface power: RS-232 DC0V)LED drive line - anodeReserved (TTL1)Reserved (TTL2)Reserved (TTL3)LED drive line - cathode (TTL2)Reserved (TTL3)Do not connect

External Connector

IN/OUTIN/OUT(OUT)

(IN)(IN)(IN)

(OUT)(OUT)

- I/O (input/output) is the term from bill acceptor's side.- Signal name, I/O, and function with parenthesis are for photo-couper isolation and RS-232C only.

14

20

Socket: DRA-20PC-FO (JAE)Contact: D02-22-26P-10000 (JAE)

Mating ConnectorSocket: DRA-20SC-FO (JAE)Contact: D02-22-26S-10000 (JAE)

1

7

7. Connectors and Pin Assignment:

8 5

4 1

12345678

I/OSignal NameNCNCNCNC

+12V PowerGND (Power)LED Power

LED -

Signal DescriptionsReservedReservedReservedReservedDC +12V PowerDC 0V PowerLED Drive Line (anode)LED Drive Line (cathode)

Pin No.

Front Bezel Connector (CN13)

Header: RF-H08(07)2SD-1110 (JST)Contact: RF-SC2210 (JST)Housing: RF-08 (JST)Recommended Wire: UL1007 AWG#24 to 26

- I/O (input/output) is the term from bill acceptor's side.

komanns
Linien
Page 5: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

5

UBA-14-SS Integration GuideJune 19, 20075th Edition

The Optional Conversion Board can be attached to the UBA unit. Two types of the optional conversion board are available.

Optional Conversion Board

M2.6x6 Bind P Tight Screws

Installing procedure for the Optional Conversion Board

1) Press down the front latch and slide the UBA’s acceptor unit forward.

2) Place the Optional Conversion Board and insert the M2.6×6 Bind P Tight screws into two (2) insertion slots. Use a screw driver to tighten each attachment screws and secure the board in place.

4033-3240-06-13A-01(EDP#:122467)

DC24V/DC13.5V and RS-232C Signal Level Conversion BoardThis board will allow you to convert DC24V to DC13.5V and communicatewith RS-232C Interface.

4033-3240-06-13A-02(EDP#: 123523)

RS-232C Signal Level Conversion BoardThis board will allow you to communicate with RS-232C Interface.

Acceptor Unit

Front Latch

8. Optional Conversion Board and Harness:

komanns
Linien
Page 6: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

6

UBA -14-SS Integration GuideJune 19, 20065th Edition

41

Pin No.1234

Signal NameMRESET

TXDRXD

GND (I/F)

Header: 53103-0430 (JAPAN MOLEX)Contact: 50083-8014 (JAPAN MOLEX)Houseing: 51030-0430 (JAPAN MOLEX) Recommended Wire: UL1007 AWG#24 to 26

There are three type conbination kit of the board and harness.

CN2 connector

31

Pin No.123

Signal Name24V12VGND

Photo-Coupler I/F Harnesswith M3X12 W Sems Screw and Clump

(Part#: 3240-05-18A)(EDP#: 122469)

DC24V/DC13.5V and RS-232C Signal Level Conversion Board(Part#: 4033-3240-06-13A-01)

(EDP#: 122467)RS-232C Signal Level

Conversion Board(Part#: 4033-3240-06-13A-02)

(EDP#: 123523)

External Interface Connection Structure for Optional Conversion Board

GamingMachine

24V/13VConversion

DC/DCConverter

*1

RS-232CConversion

IC

CN2 CN2

CN1 CN1

Relay Connector

USB Connector (A Type)

RS-232C Communication Line

External Reset Signal Line *2

24V, 12V

USB Cable

12V (13V) Output LineTTL Level Communication Line

External Reset Signal Line

InterfaceConnector

CPU Board

UBA

CN12 CN12

Optional Conversion Board

Harness

Board

*1 The 24V/13.5V Conversion DC/DC Converter is NOT mounted on 4033-3240-06-13A-02 board.

*2 For 3240-05-17 harness.

*3 For 3240-05-18 harness.

RemovableConnector

RS-232C I/F Harnesswith M3X12 W Sems Screw and Clump

(Part#: 3240-05-17A)(EDP#: 122468)

Relay connector

Header: 51029-0310 (JAPAN MOLEX)Header Contact: 50087-8014 (JAPAN MOLEX) or 70021-00041 (USA MOLEX)Housing: 51030-0330 (JAPAN MOLEX)Housing Contact: 51030-0430 (JAPAN MOLEX)Recommended Wire: UL1007 AWG#24 to 26

JCM’s Communication Harness Prepare the harness as nessesary

Photo-Coupler Communication Line *3

External Reset Signal Line *3

UBA 24V/RS-232C Board+

RS-232C Harness Kit(EDP#: 123200)

UBA 24V/RS-232C Board+

Photo-Coupler Harness Kit(EDP#: 123521)

UBA RS-232C Board+

RS-232C Harness Kit(EDP#: 123522 )

komanns
Linien
Page 7: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

7

UBA-14-SS Integration GuideJune 19, 20075th Edition

9. Maintenance:It is important to keep the bill path, rollers, and belts clean.The sensor lenses are transparent, and made of polymer material. Handle them with care.Use a soft lint-free cloth or cotton bud to wipe out dirt and stain on the surface of magnetic and optical sensors,rollers and belts. Repeat the cleaning process as needed until the transport path is free of contaminants.Do not use alcohol or thinner for cleaning.

Dirty rollerDirty lenses

After cleaningAfter cleaning

komanns
Linien
Page 8: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

8

UBA -14-SS Integration GuideJune 19, 20065th Edition

10. Operational Flowchart:

Bill validation OK ?

Disabled bill ?

Vend code output

Stack commandreceived ?

Validation retries done twice ?

Reverse bill transport

Bill rejection D

A

E

Yes

Yes

Yes

YesNo

No

No

*1

Power Up

Initialization

Idling

LED OFF

Bill centered

Bill transported

Collecting bill data

Transport stops

C

YesAcceptanceInhibited ?

LED ON

Bill Inserted ?

Bill taken

DYes

No

No

komanns
Linien
Page 9: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

9

UBA-14-SS Integration GuideJune 19, 20075th Edition

Bill Transport

Transported to stacker OK ?

Acceptance retried twice ?

Operation StopsAbnormal Signal Output

PB unit operation defect ?

PB unit rotation

Vend signal output

A

Yes

YesNo

No

No

Yes

*2

Operation StopsStackerfull Signal Output

Stacker Full Detected ?

Bill Stacking

C

Yes

No

*3

A

*1: When the bill validation is NG, bill is rejected and then automatically inserted again forsecond validation. Altogether the bill acceptor tries to revalidate the bill 3 times atmaximum.

*2: When abnormal signal is detected, remove the cause of failure and power up again, orsend reset command to bill acceptor.

*3: When stackerfull signal is detected, take out bills from cash box, and re-install the box inposition. The unit will initializes itself automatically.

komanns
Linien
Page 10: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

10

UBA -14-SS Integration GuideJune 19, 20065th Edition

11. Clearing Bill Jam:

When a bill is jammed near the acceptor's entrance, pullthe tab on top of the acceptor to open the cover of acceptorunit. Remove the jammed bill.

When a bill is jammed near the cash box entrance, pull thebox handle to take out the cash box from frame.

Remove the jammed bill.

12. Technical Support:

- Americas & Oceania -JCM American Corporation Phone: +1-702-651-0000 Fax: +1-702-644-5512925 Pilot Road, Las Vegas, NV 89119 e-mail: [email protected]. Website: www.jcmamerican.com

- Europe, Russia, Middle East, Africa -Japan Cash Machine Germany GmbH Phone: +49 211 530645 0 Fax: +49-211-530645 65Mündelheimer Weg 60 e-mail: [email protected] Website: www.jcm-germany.comD-40472 Düsseldorf Germany

- UK & Ireland -JCM United Kingdom Ltd. Phone: +44-(0)870-770-2863 Fax: +44 (0) 190-837-7834Unit B, Third Avenue, e-mail: [email protected] Website: www.jcm-uk.comDenbigh West Business ParkBletchley, Milton Keynes,Buckinghamshire MK1 1EJ, UK

- Asia -JCM Gold (HK) Ltd. Phone: +852-2429-7187 Fax: +852-2929-7003Unit 1-7, 3/F., Favor Industrial Centre e-mail: [email protected] Website: www.jcmgold.com.hk2-6 Kin Hong Street, Kwai Chung,N.T. Hong Kong

komanns
Linien
Page 11: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

11

UBA-14-SS Integration GuideJune 19, 20075th Edition

13. I

nput

/Out

put C

ircu

its:

6

1 3

4 5

1 234

6

1 3

4 5

D5V

D5V

D5V

D5V

D5V

D5V

1 2 3 4 5 6 7 8

1234567891011121314151617181920

12

D5V

D5V

D5V

98

1110

1312

14 7

12V

Vbus

5

Tron

6

GND

2

CS45

RD43

HWR

41

INT0

42

INT1

11

XOUT

13

XIN

14

TC1

10

D730

RES

46

D629

D528

D427

D326

D225

D124

D023

Dreq

19

Dack

18

TEST

7

D-3

D+4

VCC

1

IO V

CC12

Dreq

047

Dack

048

GND

15

VCC

16

IO V

CC35

GND

36

P031

P132

P233

P334

P437

P538

P639

A040

A117

A218

A319

A420

A521

A622

LWR

44

D5V

D3.3V

D3.3V

D5V

D5V

D5V

12 1311

14 7D5V

56

34

34

12

1312

14 711

10

98

56

123

4

D5V

D5V

D5V

D5V

D5V

GND

5A

6

B4

GND

2

NC3

NC1

D

G

S

NC

12V

(POW

ER)

GND

(POW

ER)

MRES

ETPC

OUT

GND

(PC)

Vbus

-DAT

A+D

ATA

O-TT

L1GN

D (U

SB)

GND

(TTL

)LE

D PO

WER

I-TTL

1I-T

TL2

I-TTL

3O-

TTL2

O-TT

L3

PC IN

12V

(PC)

NC

12V

(POW

ER)

GND

(POW

ER)

MRES

ETPC

OUT

GND

(PC)

Vbus

-DAT

A+D

ATA

O-TT

L1GN

D (U

SB)

GND

(TTL

)LE

D PO

WER

I-TTL

1I-T

TL2

I-TTL

3O-

TTL2

O-TT

L3

PC IN

12V

(PC)

NC NC TXD0 NC 12V

PW G

ND

LED

POW

ER

LED

HPZ1

6088

221A

0ohm

1/8W

220o

hm4.7

k

22k

22k

22k

22k

22k

0.1uf

0.1uf

0.1uf

0.1uf

27oh

m

27oh

m

22k

0ohm

15pF

15pF0.1

uf

74VH

C32

74VH

C14

0.1uf

N662

91GP

68oh

m

1N

CS10

24.0M

Hz

1.5K

74VH

C14

74VH

C14

0.1uF

PC40

0

PC40

0

PC35

7

0.1uF

D21S

S352

1/8W

2.2K 4.7

K 1SS3

52

1/8W

2.2K

1SS3

52

4.7K

41K

0.1uF

1/8W

220

ohm

74LS

07

0.1uF

24LS

0722

K

4.7K

100o

hm10

0pF

74VH

C14

74VH

C14

74LS

0774

VHC1

474

VHC1

4

74VH

C14

74VH

C14

100p

F

4.7K

100o

hm

100o

hm

0.1uF

22K

74LS

07

SN65

220

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

74LS

07

4.7K

Exte

rnal

Con

nect

or In

terfa

ce C

ircui

t

komanns
Linien
Page 12: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

12

UBA -14-SS Integration GuideJune 19, 20065th Edition

1 1 012 1 9

+ 1C1

+2C4

+V

241 731 8

- 1C3

- 2C5

-V

6

CCV

61

DN

G51

Opt

iona

l Con

vers

ion B

oard

Inte

rface

Circ

uit

NC

NC

NC

NC

12V

PW G

ND

LED

PO

WER

LED

NC

NC

NC

NC

12V

PW G

ND

LED

PO

WER

LED

12V

12V 0.1u

FD

5V

1/8W

220 Ω

74LS

07

1 2 3 4 5 6 7 8

Face

plat

e Si

de (R

efer

ence

)A

ccep

tor S

ide

Face

plat

e LED

Lig

htni

ng C

ontro

l Circ

uit

komanns
Linien
Page 13: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

13

UBA-14-SS Integration GuideJune 19, 20075th Edition

Malfunction ErrorsNo. of REDLED Flash

GREEN LEDStatus Failure Description

Boot ROM error

Incorrect contents of external ROM/Eempty programNo program in external ROM (Flash ROM)

Internal RAM error

External RAM error

External Boot ROM error

Download file error (Download did not complete successfully.)

Cash box full

Stacker pusher mechanism faultTransport jam (1)

Transport jam (2)

Stacker encoder signal faultJam in acceptor

Feed motor speed too fast or too slowNeeds sensor adjustment

Transport motor fault

Reserved

Reserved

PB Unit Fault

Cash box not seated or not present

Reserved

Cheated

Centering mechanism solenoid fault

Centering mechanism fault

Reserved

ICB Box Communication Error (Failure 02)

ICB Box Check Sum Error (Failure 07)

ICB Box installed in another machine (Failure 08)

ICB Box data retrieved without initialization (Failure 09)

ICB Failure Description

x 1

x 2

x 4

x 1

x 2

x 3

x 4

x 5

x 6

x 7

x 8

x 9

x 10

x 11

x 12

x 13

x 14

x 15

x 3

ICB Setting Error (Failure 03)

x 5

x 6

Reject Errors

x 1

x 2

x 3

x 4

x 5

x 6

x 7

x 8

x 9

x 10

x 11

x 12

x 13

x 14

x 15

Slant insertion

Magnetic sensor pattern error

Paper detected inside acceptor at standby

Optical sensor error 1

Bill feed error

Bill identification error

Optical sensor error 2

Optical sensor error 3

Inhibited Bill

Return Bill

Reserved

Bill feed error 2

Bill length error

Optical sensor error 4

Optical sensor error 5

Failure DescriptionRED LEDStatus

No. of GREENLED Flash

14. LED Diagnostic Codes

komanns
Linien
Page 14: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

14

UBA -14-SS Integration GuideJune 19, 20065th Edition

OPEN

CENT

ERIN

G GUI

DE

6.6

276.

66.

6

49.8

6.6

6.6

86

503.5

3.5

21

2782

114

99.5

3010

0

165

225

4.2

9.2

26721.5

298

30155

298

67

67

75.4

50.8101.6

8.4

2-M3

6-M4

4- 4

202

NO

TES:

!!A

ll di

men

sion

s sho

wn

are

for r

efer

ence

purp

ose

and

are

subj

ect t

o m

anuf

actu

ring

& a

ssem

bly

tole

ranc

es.

All

dim

ensi

ons s

how

n ar

e in

mm

unl

ess

othe

rwis

e in

dica

ted.

91

97

104.4

4.2

9.2

2.5

15.

Out

line

Dim

ensio

nsU

BA-1

4-SS

Com

plet

e Uni

t

komanns
Linien
Page 15: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

15

UBA-14-SS Integration GuideJune 19, 20075th Edition

UBA

-14-

SS C

ompl

ete U

nit w

ith U

BA S

tand

ard

Face

plat

e

OPEN

CENTER

ING GU

IDEJCM

114

99.5

3010

0

165

225

30155

298

67

67

75.4

50.8101.6

8.4

6-M4

4- 4

202

253

260.540

2.5

35

225

11.2

25.1

2.5

1.220.8

2774

R0.

587.4

93

106

R1 R1

NO

TES:

!!

& a

ssem

bly

tole

ranc

es.

purp

ose

and

are

subj

ect t

o m

anuf

actu

ring

All

dim

ensi

ons s

how

n ar

e fo

r ref

eren

ce

othe

rwis

e in

dica

ted.

All

dim

ensi

ons s

how

n ar

e in

mm

unl

ess

komanns
Linien
Page 16: UBA-14-SS Integration Guide (5th Edition)...UBA -14-SS Integration Guide June 19, 2006 5th Edition 1. Model Descriptions: The UBA model descriptions are structured to define the major

16

UBA -14-SS Integration GuideJune 19, 20065th Edition

161(25)8.4

100

186

11063

43

UBA CASHBOX(without ICB) Dimensions NOTES:

!

!

& assembly tolerances.purpose and are subject to manufacturingAll dimensions shown are for reference

otherwise indicated.All dimensions shown are in mm unless

1618.4

100

11063

43

(30)

182

3045

186

85

UBA CASHBOX(with ICB) Dimensions NOTES:

!

!

& assembly tolerances.purpose and are subject to manufacturingAll dimensions shown are for reference

otherwise indicated.All dimensions shown are in mm unless

Plastic Cash Box

komanns
Linien